Coco API 650 Tank Data Sheet Template - SI Units

The document is an API Std 650 Storage Tank Data Sheet for the PNG COCO Project, detailing specifications and requirements for storage tanks. It includes sections on design, testing, materials, and various appurtenances, while emphasizing the confidentiality of the information. The document is intended for internal use and requires proper authorization for any dissemination.

Uploaded by

Raymond Ballad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views18 pages

Coco API 650 Tank Data Sheet Template - SI Units

The document is an API Std 650 Storage Tank Data Sheet for the PNG COCO Project, detailing specifications and requirements for storage tanks. It includes sections on design, testing, materials, and various appurtenances, while emphasizing the confidentiality of the information. The document is intended for internal use and requires proper authorization for any dissemination.

Uploaded by

Raymond Ballad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 18

00 Issued for Review

Rev. Date Description By Chk'd Apv'd

Document Title

API Std 650 Storage Tank Data Sheet


Project.
24023
PNG COCO PROJECT
Client Doc. No. AG&P Ref. No.
AGP-23050-XXX-XXX-XXX-XXXX

ILIJAN AG&P
28th Floor, Tower 2, Insular Life Corporate Centre, Insular Drive, Filinvest Corporate City, Alabang, Muntinlupa City 1781, Philippines
Phone: +63 (2) 663 2100 l Fax: +63 (2) 663 2199 l www.agpglobal.com

No. of Pages Attachments Rev.


This document is strictly confidential and the exclusive property of AG&P. It cannot be
copied, used, modified, adapted, disseminated, published or communicated, in whole or
in part, by any means, for any purpose, without express prior written authorization of
AG&P. Any violation of this clause may give rise to civil or criminal liability - © AG&P 10 X 00
AGP Ref. No. AGP-23050-XX-XXX-XXX-XXXX

Client Doc. No.

PNG COCO PROJECT Rev. 00


Date X-XXX-XX
API Std 650 Storage Tank Data Sheet
Page 2 of 10

REVISION SUMMARY

Issue
Revision No. Date of Issue Summary of Changes/Revision
Purpose

00 IFR -
AGP-23050-XX-XXX-XXX-XXXX

Status IFR
X-XXX-XX
Page 2 of 10

evision Page No.

X
API Std 650 Storage Tank
Data Sheet PAGE 3
* For boxes marked with *, if blank, Mfr. Shall determine and submit as per Appendix L. For all lines, see Appendix L for line-by-line instructions.
GENERAL Special Documentation Package Requirements:

Measurement Units to be used in API Std 650: SI X US Customary

1. Manufacturer* Contract No.*

Address*

Mfg. Serial No.* Year Built* Edition & Addendum to API 650*

2. Purchaser Contract No.

Address

Tank Designation

3. Owner/Operator Location

4. Size Limitations* Tank Diameter* m Shell Height*

Capacity: Maximum* M^3 Net Working* M^3 Criteria*

5. Products Stored:

Liquid Max. S.G.: at ° C

Blanketing Gas Vapor Pressure PSIA at Max. Operating Temp.

% Aromatic Suppl. Spec. H2S Service? Yes No Suppl. Spec.

Other Special Service Conditions? Yes No Suppl. Spec.

DESIGN AND TESTING Purchaser to Review Design Prior to Ordering Material? Yes No

6. Applicable API Standard 650 Appendices:* A B C F G H I J L M O P S U V

7. Max. Design. Temp. C ° Design Metal Temp.* ° C Design Liquid Level* M

Design Pressure KPA External Pressure KPA Maximum Fill Rate M3PH Maximum Emptying Rate

Floatation Considerations? Yes No Flot. Suppl. Spec:* Applied Supplemental Load Spec.

8. Seismic Design? Yes No Appendix E Alternate Seismic Criteria Seismic Use Group

MBE Site Class D Vertical Seismic Design? Yes No Vertical Ground Motion Accelerator AV: 0.0438

Basis of Lateral Acceleration (Select one): Mapped Seismic Parameters? Ss S1 S0 ; Site-Specific Procedures: MCE

Design Required? Yes No ; Other (Non-ASCE) Methods

Freeboard Required for SUG I Design Roof Tie Rods @ Outer Ring?* Yes No

9. Wind Velocity for non-U.S. sites, 50-yr. wind speed (3-sec. Gust)* KPH

Top Wind Girder Style* Dimensions* Use Top Wind Girder as Walkway? Yes

Intermediate Wind Girders?* Yes No Intermediate Wind Girder Style* Dimensions*

Check Buckling in Corroded Cond.? Yes No

10. Shell Design: 1-Ft Mthd?* Yes No ; Variable-Des-Pt Mthd?* Yes No Alternate ; Elastic Anal. Mthd?* Yes No

Plate Stacking Criteria* Centerline-Stacked? Yes No Flush-Stacked? Yes No Inside Outside

Plate Widths (Shell course heights) and Thicknesses * Numbers below Indicate Course Number.
1. 2. 3. 4. 5.
6. 7. 8. 9. 10.
11. 12. 13. 14. 15.

Joint Efficiency* % Shell-to-Bottom Weld Type* Shell-to-Bottom Weld Insp. Mthd*

Approvals: Revisions: Title:


By: GHI Ck'd:
Drawing No.: Sheet
OF 10

Maximum Emptying Rate M3PH

Seismic Use Group

0.0438

Site-Specific Procedures: MCE

No

Alternate

Date:
Sheet of
API Std 650 Storage Tank
Data Sheet PAGE 4
* If box is blank, Manufacturer shall determine and submit as per Appendix L.

11. Open-Top and Fixed Roofs: (See Sheet 6 for Floating Roofs) Open Top?* Yes No

Fixed Roof Type* Roof Support Columns*: Pipe Or Structural Shape

Cone Slope* Dome or Umbrella Radius* Weld Joints*


(Lap, Butt, Other)
Seal Weld Underside of: Lap Joints? Yes No ; Seal Weld Underside of Wind Girder Joints? Yes No

Gas-tight? Yes No Joint Efficiency* 70 %


Thickness* In. Snow Load* kpa App. Suppl. Load Spec.* Column Lateral Load

Normal Venting Devices* Emergency Venting Devices*

For Non-Frangible Roofs: Seal Weld Roof Plates to Top Angle on the Inside? Yes No ; Weld Rafters to Roof Plates?

Roof-to-Shell Detail* Radial Projection of Horizontal Component of Top Angle* Inward Outward

12. Bottom: Thickness* Style* Slope* Weld Joint Type*

Provide Drip Ring? Yes No Alternate Spec.

Annular Ring? Yes No Annular Ring: Minimum Radial Width* Thickness*

13. Foundation: Furnished by* Type*


Soil Allow: Bearing Pressure* Per Spec.* Anchors: Size* Qty.*
Foundation Design Loads: Base Shear Force: Wind* Seismic* Overturning Moment: Wind* Seismic*
Ring Forces: Weight of Shell + Roof New* Corroded* Roof Live Load* KPA Internal Pressure*
Partial Vacuum* Wind* Seismic*
Bottom Forces: Floor Wt. New* Corroded* Product Wt.* Water Wt.* Internal Pressure*
Partial Vacuum* Other Foundation Loads* Min. Projection of Fdn. Above Grade:

14. Responsibility for Heating Water, if Required: Purchaser Manufacturer

Hydro-Test Fill Height* Settlement Measurements Required? Yes No Extended Duration of Hydro-Test:

Predicted Settlement Profile is Attached

Responsibility for Setting Water Quality: Purchaser Manufacturer Supplemental Test Water Quality Spec.

Test Water Source & Disposal Tie-In Locations Hydro-Test Appendix J Tank? Yes

Post-Pressure-Test Activities Required of the Manufacturer: Broom Clean Potable Water Rinse Dry Interior

Other
15. Inspection by in Shop;
Supplemental NDE Responsibility Supplemental NDE Spec.
(Purch., Mfg., Other)
Positive Material Identification? Yes No PMI Requirements:

Max. Plate Thickness for Shearing

Must Welds not exceeding 6 mm (1/4 in.) Be Multi-Pass? Yes No Must Welds greater than 6 mm (1/4 in.) Be Multi-Pass? Yes

Leak Test Mthd: Roof* Shell* Shell Noz./Manhole Reinf. Plt*


Bottom* Floating Roof Components*

Modify or Waive API Dimensional Tolerances (see 7.5)? No Yes Specify:

Specify Additional Tolerances, if any, and Circumferential and Vertical Measurement Locations:
- Allowable Plumbness: Measure and Record at a Minimum of Locations or Every m (ft) around the Tank, at
the Following Shell Heights: (select one box): 1
/3 H, /3 H and H
2
Top of Each Shell Course Other:
- Allowable Roundness:** Measure Radius and Record at a Minimum of Locations or Every
around the Tank, at the Following Shell Heights (select one box):
Top of Tank, H 1
/3 H, 2/3 H and H Top of Each Shell Course Other:
**See Data Sheet Instructions for the Maximum Allowable Additional Radial Tolerance.
Approvals: Revisions: Title:
By: GHI Ck'd:
Drawing No.: Sheet
OF 10

Yes No

Yes No

in Field

No

m (ft) around the Tank, at

m (ft)

Date:
Sheet of
API Std 650 Storage Tank
Data Sheet PAGE 5

16. Coatings:
Internal Coatings by: Per Spec.*
(Not Req'd., Others, Tank Mfg.)
External Coating by: Per Spec.*
(Not Req'd., Others, Tank Mfg.)
Under-Bottom Coating by: Per Spec.*
(Not Req'd., Others, Tank Mfg.)

17. Cathodic Protection System? Yes No Per Spec.*

18. Leak Detection System? Yes No Per Spec.*

19. Release Prevention Barrier? Yes No Per Spec.*

20. Tank Measurement System: Required? Yes No Remote Capability Required? Yes No

By:* Per Spec.*

21. Weight of Tank: Full of Water* Empty* Shipping* Brace/Lift Spec.*

22. References:* API Std 650, Appendix L

23. Remarks:*

Approvals: Revisions: Title:


By: GHI Ck'd:
Drawing No.: Sheet
OF 10

Date:
Sheet of
API Std 650 Storage Tank
Data Sheet PAGE 6 OF 10

* If box is blank, Manufacturer shall determine and submit as per Appendix L.


Table 1 MATERIALS OF CONSTRUCTION

Component Material*/Thickness* C.A. Component Material* C.A.


Shell, Course 1 to 1 Reinforcing Pads
Shell, Course 2 to 3 Manhole/Nozzle Necks
Shell, Course ___ to ___ Manhole/Nozzle Flanges
Shell, Course ___ to ___ Flange Covers
Shell, Course ___ to ___ Anchor Attachments
Roof Submerged Piping
Bottom Wetted Structurals
Annular Ring Non-wetted Structurals
+ Check here if C.A. is to apply to each exposed surface

Table 2 BOLTS and ANCHORS

Component Head Type* Bolt or Anchor Material* Nut Material* Thread Series* C.A.
Flange Bolting

Structural Bolting

Anchor Bolts

++ Total C.A., on the nominal diameter.

Table 3 NOZZLE and MANHOLE SCHEDULE* (for Fixed Roof, Shell, and Bottom)

Full Pen.
Neck Sch On Flange Gasket Bearing Proj. to FF or
Size, NPS, or Wall Reinf. Plate Open. Flange Class or Surf. Dimen. and Gasket Thick. Gasket Mat'l CL or from
Mark Service or Dia. (in.) Thick. Dimensions (Y/N) Type Thick. Finish and Dimen. and Descript. Datum Lines

SN01

SN03

SN02

SN04

SN02

SN04

SN02

SM01

RN02

RN03

RM01

Approvals: Revisions: Title:


By: Ckd: Date:
Drawing No.: Sheet of
API Std 650 Storage Tank
Data Sheet PAGE 7 OF

* If box is blank, Manufacturer shall determine and submit as per Appendix L.

OTHER TANK APPURTENANCES

24. Platform, Stairway, and Railing: Galvanizing Req'd?* Yes No Stairway Style* Walk Surf. Type*
(Straight or Helical)

Stair and Walkway Clear Width* National Safety Standards*

Architectural/Structural Specification*

Gauger's Platform Req'd? Yes No Qty. Req'd* Per Spec.*

25. Jacket Required?* Yes No Other Heaters/Coolers Required?* Yes No

Supplemental Jacket, Heater, or Cooler Specifications*

26. Mixer/Agitator: Quantity Size* Per Spec.*

27. Insulation: Required? Yes No Thickness* Material*

Per Specs* Responsibility for Insulation and Installation


(Purchaser, Manufacturer, Others)

28. Structural Attachments: Lift Lugs?* Yes No Desc.*

Shell Anchorage?* Yes No Type* Scaffold Cable Support? Yes

29. Various Other Items: Welded Flush-Type: Shell Connection Cleanout Fitting Waive Application of Appendix P? Yes

Miscellany #1 Miscellany #2

Miscellany #3 Miscellany #4

Miscellany #5 Miscellany #6

Table 4 OTHER TANK APPURTENANCES*

Service or
Mark Quantity Description Size Orientation Height from Datum Material Remark

Approvals: Revisions: Title:


By: Ck'd:
Drawing No.: Sheet
OF 10

(Purchaser, Manufacturer, Others)

Yes No

Yes No

OTHER TANK APPURTENANCES*

Remarks

Date:
Sheet of
API Std 650 Storage Tank
Data Sheet PAGE 8 OF

* If box is blank, Manufacturer shall determine and submit as per Appendix L.

FLOATING ROOF DATA

30. Floating Roof Selection

Design Basis: Appendix C Or Appendix H

Type of Roof: (External or Internal): Single Deck Pontoon* Double Deck*

(Internal Only): Tubular Pontoon* Metallic Sandwich Panel*

Other Supplemental Spec.:

31. Seals

Primary Seal: Shoe Envelope Wiper/Compression Plate Other Supplemental Spec.:

Shoe Mechanism: Mfg. Std. Other

Electrically Isolate Mechanism from Shoes? Yes No Wax Scrapers Required? Yes No

Minimum Shoe Thickness* Carbon Steel Shoes to be Galvanized? Yes No

Secondary Seal: Shoe Envelope Wiper None Other Supplemental Spec.:

32. Data for All Floating Roofs:

Overflow Openings in Shell Acceptable? Yes No Shell Extension? Yes No

Roof-Drain Check Valves Required? Yes No Roof-Drain Isolation Valves Required? Yes No

Freeze Protection for Roof Drains Required? No Yes Supplemental Requirements:

Roof-Drain Piping to External Nozzles: Mfg. Std. Armored Flexible Pipe Swivels in Rigid Pipe Other

Foam Dam? Yes No Supplemental Spec.:

Minimum Deck Thickness*

Bulkhead Top Edges to be Liquid-Tight? Yes No Seal-Weld Underside of Roof? Yes No

Electrical Bonding: Shunts: Yes No Cables: Yes No Supplemental Spec.:

Qty. of Non-Guide-Pole Gauge Wells Required Qty. of Sample Hatches Required

Guide Pole for Gauging? Yes No Slots in Guide Pole? Yes No Datum Plates? Yes No Striking Plates?

Guide Pole Emissions-Limiting Devices: Sliding Cover Pole Wiper Pole Sleeve Float Float Wiper

Qty. of Roof Manholes* Minimum High-Roof Clearance Above Bottom:

Removable Leg Storage Racks? Yes No ; Leg Sleeves or Fixed Low Legs

33. Additional Data for External Floating Roofs:

Weather Shield? Yes No Supplemental Spec.:

Rolling Ladder Required? Yes No Field Adjustable Legs? Yes No

Design Rainfall Intensity in./hr. (mm/hr) Based on a Minute Duration Associated with the Storm

Design Accumulated 24-Hour Rainfall in. Based on the Storm

Distortion and Stability Determinations Required? Yes No Supplemental Specification

Landed Live Load*

Approvals: Revisions: Title:


By: Ckd:
Drawing No.: Sheet
OF 10

Yes No

Pole Cap

Storm

Date:
Sheet of
API Std 650 Storage Tank
Data Sheet PAGE 9 OF

34. Additional Data for Internal Floating Roofs:

Two-Position Legs? Yes No Cable-Supported Roof? Yes No Fixed-Roof Inspection Hatches Required?

Internal Roof Drain Required? Yes No Omit Distribution Pads Supporting Uniform Live Loads? Yes No

Corrosion Gauge Required? Yes No Fixed Ladder Required? Yes No ; Type of Roof Vent:*

Modified Minimum Point Load? Yes No Supplemental Specification

Mfr. To Leak Test* % of Compartments in Assembly Yard in Erected Position Unknown; see separate contract term

Roof Erector's Flotation Test: w/ Tank Hydro at Completion of Roof at a Later Date Not Required

Flotation Test Media: Water Product (see H.6.6.1) Water Quality: Potable Other See Supplemental Spec.

Flotation Test: Duration Fill Height:

Flotation Test Items Provided by Purchaser (see H.6.7): None List Attached

Responsible Party for Inspecting Roof During Initial Fill: Purchaser Other

Table 5 FLOATING ROOF MATERIALS

Component Material*/Thickness* C.A./Coating* Component Material*/Thickness* C.A./Coat

Deck Plate Datum Plate

Inner Rim Plate Tubular Pontoon

Outer Rim Plate Pontoon Bulkhead

Foam Dam Submerged Pipe

Sandwich Panel Face Plate Guide Pole

Sandwich Panel Core Secondary Seal

Gauge Well Secondary Seal Fabric

Drain Sumps Wiper Tip

Opening Sleeves Wax Scraper

Floating Suction Lines Weather Seal

Primary Fabric Seal Envelope Fabric

Foam Log Core Shoe Mechanisms

Landing Legs Primary Seal Shoe

Landing Leg Bottom Pads Removable Covers

Manhole Necks Rolling Ladder

Vents Inlet Diffusers

Approvals: Revisions: Title:


By: Ck'd:
Drawing No.: Sheet
OF 10

Yes No

Unknown; see separate contract terms

Not Required

FLOATING ROOF MATERIALS

C.A./Coating*

Date:
Sheet of
API Std 650 Storage Tank
Data Sheet PAGE 10 OF

* If box is blank, Manufacturer shall determine and submit as per Appendix L.

Tank Plan and Sketches:

Notes:

Approvals: Revisions: Title:


By: Ck'd:
Drawing No.: Sheet
OF 10

Date:
Sheet of