Farming Management System Info.
Farming Management System Info.
Mini Project
FARMING MANAGEMENT
SYSTEM
JIJAMATA COLLEGE OF SCIENCE AND ARTS,
Dnyaneshwar Nagar, Bhende
Tal-Newasa Dist.-Ahmednagar PIN-414605
-------------------------------------------------------------
Roll No- Exam Seat No-
CERTIFICATE
DEPARTMENT OF Computer
This is to certify that Ms.Ghodechor Prachi Navnath has satisfactorily
carried out the required Project work, prescribed by the Savitribai Phule
University of Pune for the SYBCS(Computer science) course in Computer
Project and this file represents her bonafide work in the year 2023-2024
IN Charge H.O.D
Prof. Sukalkar N. K. Sir Prof.Jawale.M.V.
CERTIFICATE
DEPARTMENT OF Computer
This is to certify that Ms.Gayake Pranjal Ankush has satisfactorily
carried out the required Project work, prescribed by the Savitribai Phule
University of Pune for the SYBCS(Computer science) course in Computer
Project and this file represents her bonafide work in the year 2023-2024
IN Charge H.O.D
Prof. Sukalkar N. K. Sir Prof.Jawale.M.V.
1. Structural Model
2. Beahavioral Model
Sequence Diagram
Collaboration Diagram
Activity Diagram
State Chart Diagram
3. Architectural Model
Component Diagram
Deployment Diagram
Package Diagram
Total
Total
INTRODUCTION:
1) Problem Definition:
Assignment Evaluation
0: Not Done 1: Incomplete 2:Late
Complete
3: Needs 4: Complete 5:Well
Improvement Done
Assignment 1.2 Requirement Specification:
Functional Requirements:
The system provides different types of users Admin and
User. The admin will acting as a controller.
Admin Requirements:
1) User Requirement:
Intuitive User Interface, Crop and Livestock
Management.
Field and Resource Management, Weather Data
Integration.
Financial Tracking, Mobile Accessibility.
Alerts and Notifications, Security and Data Privacy.
2) System Requirement:
A design aimed at the specific needs of the farmers.
A simple user-interface.
Automated and simple-to-use methods for data
processing.
A user controlled interface allowing access to processing
and analysis functions.
Assignment Evaluation
0: Not Done 1: 2:Late
Incomplete Complete
3: Needs 4: 5:Well
Improvement Complete Done