0% found this document useful (0 votes)
5 views

HDSepticSystemSteps

This document outlines the steps for obtaining approval for a septic system from the Dutchess County Department of Health (DCDOH) for residential lots. It details the necessary applications, inspections, and certifications required before and after construction. Additionally, it provides contact information for various DCDOH offices and resources for further assistance.

Uploaded by

Skeevie Steve
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

HDSepticSystemSteps

This document outlines the steps for obtaining approval for a septic system from the Dutchess County Department of Health (DCDOH) for residential lots. It details the necessary applications, inspections, and certifications required before and after construction. Additionally, it provides contact information for various DCDOH offices and resources for further assistance.

Uploaded by

Skeevie Steve
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

STEPS FOR BUILDING YOUR DUTCHESS COUNTY DEPARTMENT OF HEALTH

[DCDOH] APPROVED SEPTIC SYSTEM (Residential Lots Only)


IN ACCORDANCE WITH DCDOH POLICY AND PROCEDURE

BEFORE CONSTRUCTION BEGINS


1. YOU APPLY FOR A BUILDING PERMIT AT YOUR TOWN BUILDING
INSPECTOR’S OFFICE.
2. YOUR BUILDING INSPECTOR ISSUES A WORKFLOW SHEET
[SAN34] WHICH IS THEN FORWARDED TO DCDOH CENTRAL OFFICE,
REVIEWED, THEN SENT TO DCDOH DISTRICT OFFICE [D.O.] THAT
SERVES YOUR TOWN. [Allow several business days for this step.]
3. CALL THE DCDOH D.O. TO SETUP A PRE-CONSTRUCTION
INSPECTION OF YOUR LOT WITH THE AREAS OF THE SEPTIC SYSTEM
AND WELL STAKED-OUT PER THE APPROVED PLAN.
4. AFTER THE PRE-CONSTRUCTION INSPECTION, THE SAN34 IS
FORWARDED TO THE BUILDING INSPECTOR, GRANTING DCDOH
APPROVAL TO ISSUE A BUILDING PERMIT.

BEFORE SEPTIC SYSTEM IS COVERED


5. BEFORE DCDOH FINAL INSPECTION: THE FILL PAD (if required)
MUST BE CERTIFIED BY YOUR ENGINEER USING THE DCDOH
“CERTIFICATION OF FILL FOR SEWAGE DISPOSAL SYSTEM (HD-5)”
FORM AND RECEIVED BY DCDOH D.O.
6. PRIOR TO COVERING THE SEPTIC SYSTEM YOU MUST CALL THE
DCDOH D.O. FOR A FINAL INSPECTION.
7. BEFORE RECOMMENDATION OF CERTIFICATE OF OCCUPANCY,
ALL REQUIRED DOCUMENTATION MUST BE SUBMITTED FOR FINAL
REVIEW BY DCDOH: WELL COMPLETION REPORT TO DCDOH CENTRAL
OFFICE, PUMP OR DOSING CHAMBER CERTIFICATION (if required) TO
DCDOH D.O., SPECIAL P.E. CERTIFICATION TO DCDOH D.O.
8. AFTER YOUR FINAL INSPECTION AND ALL SUPPORTING
DOCUMENTATION IS RECEIVED AND REVIEWED, DCDOH D.O. THEN
FAXES THE COMPLETED SAN34 TO THE BUILDING INSPECTOR,
RECOMMENDING THE CERTIFICATE OF OCCUPANCY.
DCDOH – Environmental Health Services phone numbers
*NOTE: Please call the DCDOH District Office Monday-Friday, 9:30-11:00 AM and have the tax ID # or plan name and lot # ready
Central Office, Poughkeepsie ................. Voice (845) 486-3404 Fax (845) 486-3545
Beacon District Office ............................. Voice (845) 838-4801 Fax (845) 838-4824
{Beekman, East Fishkill, Fishkill, and Wappinger}
Millbrook District Office ........................... Voice (845) 677-4001 Fax (845) 677-4008
{Amenia, Clinton, Dover, Milan, North East, Pawling, Pine Plains, Pleasant Valley, Red Hook, Rhinebeck, Stanford, Union Vale, and Washington}
Poughkeepsie District Office................... Voice (845) 486-3480 Fax (845) 486-3545
{Hyde Park, LaGrange, and Poughkeepsie}
To Access This Form: http://www.co.dutchess.ny.us/CountyGov/Departments/Health/HDSepticSystemSteps.pdf;
e-mail: [email protected]

You might also like