The document outlines a Level IV training module on estimating costs for web and database projects, prepared by the Ministry of Labor and Skills in Ethiopia. It covers essential topics such as project cost estimation, project scope definition, factors influencing costs, estimation methods, and tools for cost estimation, with a nominal duration of 60 hours. The module aims to equip trainees with the skills to effectively estimate costs and manage resources throughout the project lifecycle.

Uploaded by

misrak dagne
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views90 pages

TM10 Evaluating and Selecting

The document outlines a Level IV training module on estimating costs for web and database projects, prepared by the Ministry of Labor and Skills in Ethiopia. It covers essential topics such as project cost estimation, project scope definition, factors influencing costs, estimation methods, and tools for cost estimation, with a nominal duration of 60 hours. The module aims to equip trainees with the skills to effectively estimate costs and manage resources throughout the project lifecycle.

Uploaded by

misrak dagne
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 90

Web Development and Database

Administration Level IV
Based on November, 2023 Curriculum Version-II

Module Title: Estimating cost for Web and database


projects
Module code: EIS WDDBA4 10 0323
Nominal duration: 60 hours

Prepared by: Ministry of Labor and Skill

November, 2023

Addis Ababa, Ethiopia


Table of Contents
Acknowledgment..................................................................................................................................1

Acronym................................................................................................................................................2

Introduction to the module...................................................................................................................3

Unit One: Introduction to Project Cost Estimation................................................................................4

1.1. Overview of Project Cost Estimation.......................................................................................................5

1. 2 Understanding Project Requirements.....................................................................................................5

1.3. Key Components of Project Scope Definition:.........................................................................................7

Self –check 1.......................................................................................................................................16

Unit Two: Basics of Website and Database Projects...........................................................................18

2.1 Understanding Project Scope.................................................................................................................19

2.2 Types of Website and Database Projects...............................................................................................22

2.3 Differentiating Between Website and Database Components...............................................................24

2.4 Project Life Cycle Overview....................................................................................................................27

Self-check 2.........................................................................................................................................32

Unit Three: Factors Influencing Cost Estimation.................................................................................34

3.2. Functional Requirements......................................................................................................................40

3.3. Technology Stack..................................................................................................................................45

3.4. Resource Requirements (Human, Technological).................................................................................50

3.5. External Dependencies..........................................................................................................................57

3.6. Project Risks and Contingencies............................................................................................................61

Self-check 3.........................................................................................................................................65

Unit Four Cost Estimation Methods....................................................................................................67

4.1. Expert Judgment...................................................................................................................................68

4.2. Analogous Estimation............................................................................................................................72


Ministry of Labor and Estimate cost for Web Version-II
Page 2 of Skills and database
91 Author/Copyright projects November,
2023
4.3. Parametric Estimation...........................................................................................................................75

4.4. Three-Point Estimation.........................................................................................................................79

4.5. Bottom-Up Estimation...........................................................................................................................82

Self-check 4.........................................................................................................................................87

Operation sheet 4.1 Cost estimation..................................................................................................89

Unit Five Cost Components Breakdown..............................................................................................93

5.1. Development Costs................................................................................................................................94

5.2. Infrastructure Costs...............................................................................................................................96

5.3. Maintenance and Support Costs...........................................................................................................99

5.4. Contingency Costs...............................................................................................................................100

Self-Check 5.......................................................................................................................................103

Unit Six Cost Estimation Tools and Techniques.................................................................................105

6.1. Project Management Software...........................................................................................................106

6.2. Cost Estimation Tools..........................................................................................................................107

6.3. Version control system........................................................................................................................109

Self-check 6.......................................................................................................................................113

Operation sheet 6.1 Cost estimation using Microsoft project...........................................................115

Reference..........................................................................................................................................120

Developer’s Profile............................................................................................................................121

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of Skills and database
91 Author/Copyright projects November,
2023
Acknowledgment
Ministry of Labor and Skills wish to extend thanks and appreciation to the many representatives
of TVT instructors and respective industry experts who donated their time and expertise to the
development of this Teaching, Training and Learning Materials (TTLM).

Acronym
WBS …………………………………………………Work Breakdown Structure
EVM …………………………………………………Earned Value Management
SLOC …………………………………………………Source Lines of Code
SLA ……………………………………………………Service Level Agreement
SDLC ………………………………………………….Software Development Life Cycle

Ministry of Labor and Estimate cost for Web Version-II


Page 1 of 91 Skills and database projects
Author/Copyright November, 2023
DBMS …………………………………………………Database Management System
HTML …………………………………………………Hypertext transfer protocol
CMS ……………………………………………………Configuration Management System

Introduction to the module


This module explores the intricacies of cost estimation specifically tailored for website and
database projects. It will guide trainees through the process of understanding project
requirements, identifying influencing factors, and employing various estimation models. It
will also provide practical insights into resource and time estimation, different estimation
models, and strategies for monitoring and controlling costs throughout the project lifecycle.
This module covers the units:
 Introduction of Project Cost Estimation
 Basics of Website and Database Projects
 Factors Influencing Cost Estimation
 Cost Estimation Methods
 Cost Components Breakdown
 Cost Estimation Tools and Techniques
Learning outcome
 Understand Project Dynamics
 define Project Scope and Requirements
 Identify Cost Components and Factors:

Ministry of Labor and Estimate cost for Web Version-II


Page 2 of 91 Skills and database projects
Author/Copyright November, 2023
 Break Down Costs into Components:
 Evaluate Technology Stack Impact
 Apply Estimation Methods Effectively
 utilize Tools for Cost Estimation
 Develop Proficiency in Cost Estimation
 Enhance Decision-Making Skills
Module Instruction
For effective use this modules trainees are expected to follow the following module instruction:
1. Read the information written in each unit
2. Accomplish the Self-checks at the end of each unit
3. Perform Operation Sheets which were provided at the end of units

Ministry of Labor and Estimate cost for Web Version-II


Page 3 of 91 Skills and database projects
Author/Copyright November, 2023
Unit One: Introduction to Project Cost Estimation

This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Overview of Project Cost Estimation
 Understanding Project Requirements
 Key Components of Project Scope Definition:
 Importance of Accurate Cost Estimation
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Identify and comprehend the various components contributing to project costs
 Communicate effectively to collaborate with team members and stakeholders
 Identify project goals, deliverables, constraints, and success criteria.
 Determine the necessary personnel, technology, and other resources needed to meet project
objectives.
 Identify potential risks early in the planning phase.
 Align project deliverables with client expectations, ensuring that the final outcome meets or
exceeds quality standards.

1.1. Overview of Project Cost Estimation


Website project cost estimation involves the process of predicting and calculating the expenses
associated with the development, launch, and maintenance of a website. Accurate cost
estimation is crucial for project planning, budgeting, and ensuring that the project is

Ministry of Labor and Estimate cost for Web Version-II


Page 4 of 91 Skills and database projects
Author/Copyright November, 2023
completed successfully within financial constraints. The overview of website project cost
estimation encompasses various factors and considerations:
Certainly, understanding project requirements is a crucial initial step in the cost estimation
process. This phase involves gathering, analyzing, and documenting the needs and
expectations of stakeholders to form a clear project scope. Here's a detailed description of this
important aspect:

1. 2 Understanding Project Requirements


1.2.1 Gathering Client Requirements
Before any project begins, it's essential to engage in comprehensive discussions with the client or
stakeholders to elicit their expectations and objectives. This involves conducting interviews,
surveys, workshops, and other methods to gather both functional and non-functional
requirements. Functional requirements describe what the system should do, while non-
functional requirements specify how it should perform. Once the requirements are gathered,
the project scope must be defined. This involves outlining the boundaries of the project, what
will be included and excluded, and any constraints that may impact the project's execution. A
well-defined project scope serves as a roadmap for the entire project team, guiding their
efforts and minimizing scope creep.
1.2.2 Identifying Stakeholders
Understanding the various stakeholders involved in the project is crucial. Stakeholders can
include clients, end-users, project managers, developers, and other individuals or groups
affected by the project. Identifying stakeholders and understanding their perspectives helps in
managing expectations and ensures that all relevant voices are considered during the
requirement analysis phase.

1.2.3 Establishing Clear Objectives


Clear and measurable project objectives are essential for successful cost estimation. Objectives
should align with the overall goals of the organization and provide a basis for evaluating
project success. Establishing SMART (Specific, Measurable, Achievable, Relevant, Time-
bound) objectives helps in creating a shared understanding among team members and
stakeholders.
1.2.4 Documenting Requirements
Ministry of Labor and Estimate cost for Web Version-II
Page 5 of 91 Skills and database projects
Author/Copyright November, 2023
Thorough documentation of gathered requirements is a critical aspect of this phase. This
documentation becomes the basis for all subsequent project activities, including cost
estimation. Requirements documents typically include a detailed description of functionalities,
user stories, use cases, data models, and any other relevant information. This documentation
ensures that all team members have a common understanding of the project's goals.
1.2.5 Iterative Nature of Requirement Analysis
Requirements analysis is often an iterative process. As the project progresses, new insights may
emerge, and adjustments to the initial requirements may be necessary. Therefore, it's
important to recognize that the understanding of project requirements may evolve, and the
documentation should be flexible enough to accommodate changes while maintaining clarity
and alignment with project objectives.
Understanding project requirements lays the groundwork for accurate cost estimation by
providing a clear picture of what needs to be achieved. The subsequent chapters will build
upon this foundation, exploring how these requirements influence project complexity,
resource allocation, and ultimately, cost estimation.

1.3. Key Components of Project Scope Definition:


1.3.1 Project Objectives:
The project objective related to a website outlines the overarching goal or purpose of the website
development project. It serves as a guiding principle that directs the efforts of the project team
and aligns the project with the broader organizational or business objectives. Here's a detailed
explanation of the elements and considerations associated with defining project objectives for
a website:
 Clarity and Specificity:
 Importance: The project objective should be clear, specific, and easily understood by
all stakeholders.
 Example: "Develop an e-commerce website to facilitate online sales of our product
catalog."
 Alignment with Organizational Goals:
 Importance: Ensure that the website project aligns with the overall goals and strategic
objectives of the organization.

Ministry of Labor and Estimate cost for Web Version-II


Page 6 of 91 Skills and database projects
Author/Copyright November, 2023
 Example: "Increase online sales by providing a user-friendly platform that enhances
the customer shopping experience."
 Target Audience and User Experience:
 Importance: Identify the intended audience for the website and emphasize the
importance of a positive user experience.
 Example: "Create a website that caters to our target demographic, offering intuitive
navigation and a visually appealing interface."
 Measurable Outcomes:
 Importance: Define specific, measurable outcomes that will indicate the success of
the project.
 Example: "Achieve a 20% increase in online sales within the first year of the website
launch."
 Functionality and Features:
 Importance: Clearly outline the desired features and functionalities of the website.
 Example: "Implement a product catalog, user account management, secure payment
gateway, and real-time order tracking."
 Timeline and Deadline:
 Importance: Specify the timeframe for the project and the deadline for the website
launch.
 Example: "Complete website development within six months, with a launch
scheduled for [end date]."
 Scalability and Future Growth:
 Importance: Consider the scalability of the website to accommodate future growth
and additional features.
 Example: "Design the website architecture to easily integrate new products and
features as the business expands."
 Brand Image and Messaging:
 Importance: Address how the website contributes to the organization's brand image
and conveys key messaging.
 Example: "Ensure that the website reflects our brand identity, values, and
communicates our commitment to quality."
 Mobile Responsiveness:
Ministry of Labor and Estimate cost for Web Version-II
Page 7 of 91 Skills and database projects
Author/Copyright November, 2023
 Importance: Acknowledge the prevalence of mobile users and emphasize the
importance of a responsive design.
 Example: "Optimize the website for mobile devices to provide a seamless experience
across different screen sizes."
 Compliance and Security:
 Importance: Highlight the need for compliance with industry standards and the
implementation of robust security measures.
 Example: "Ensure that the website adheres to relevant data protection regulations and
incorporates SSL encryption for secure transactions."
 Analytics and Performance Metrics:
 Importance: Emphasize the importance of implementing analytics tools to track
website performance and user behavior.
 Example: "Integrate Google Analytics to monitor website traffic, user engagement,
and conversion rates."
 Collaboration and Communication:
 Importance: Stress the need for effective collaboration and communication among
team members and stakeholders.
 Example: "Establish regular communication channels and collaborative tools to
ensure transparency and timely feedback throughout the project."
Defining project objectives related to a website is a critical step in providing a clear direction for
the project team and aligning the website development effort with broader organizational
goals. These objectives guide decision-making throughout the project lifecycle and help
measure the success of the website upon completion.
 Deliverables:
 Enumerate the tangible outputs or results that the project will produce.
 Example: "Website with product catalog, user registration, shopping cart functionality,
and secure payment gateway."
Features and Functionality:
 Specify the features and functionalities the final product should have.
 Example: "User account management, product search, order tracking, and mobile
responsiveness."
 Project Exclusions:
Ministry of Labor and Estimate cost for Web Version-II
Page 8 of 91 Skills and database projects
Author/Copyright November, 2023
 Define what is explicitly not included in the project to manage expectations.
 Example: "Social media integration and third-party API connections are not within the
scope of this project."
 Constraints:
 Identify limitations or restrictions that may impact the project.
 Example: "Budget constraints limit the use of premium third-party plugins; the website
must be compatible with current browsers."
 Assumptions:
 Document assumptions made during project planning.
 Example: "It is assumed that the hosting provider will maintain 99.9% uptime for the
website."
 Acceptance Criteria:
 Clearly define the criteria that must be met for the project to be considered successful.
 Example: "Website performance must meet or exceed industry standards, and all
features should be bug-free."
 Stakeholder Identification:
 Identify and list all stakeholders involved in or affected by the project.
 Example: "Stakeholders include the project sponsor, end users, marketing team, and IT
support."
Project Timeline:
 Outline the project schedule, including key milestones and deadlines.
 Example: "The project is scheduled to start on [start date] and conclude with the
website launch on [end date]."
1.3.2 Importance of Project Scope Definition:
 Clarity and Understanding:
 Provides a clear and shared understanding of what the project aims to achieve.
 Scope Control:
 Helps prevent scope creep by defining what is and isn't part of the project.
 Risk Management:
 Facilitates the identification of potential risks and uncertainties early in the project.
 Resource Planning:
 Enables effective resource allocation and planning based on project requirements.
Ministry of Labor and Estimate cost for Web Version-II
Page 9 of 91 Skills and database projects
Author/Copyright November, 2023
 Communication:
 Serves as a communication tool to align all stakeholders on project expectations.
 Baseline for Measurement:
 Establishes a baseline for project success and criteria against which performance can
be measured.
Project scope definition is typically documented in a project scope statement, a formal document
that outlines the project's boundaries and parameters. It should be reviewed and agreed upon
by all relevant stakeholders to ensure a shared understanding and commitment to the project's
goals. Regular updates may be necessary as project requirements evolve during the course of
the project.
1.4 Importance of Accurate Cost Estimation
Accurate cost estimation is crucial for the success of website and database projects. It serves as a
foundational element in project planning, allowing organizations to allocate resources
effectively, manage budgets, and make informed decisions throughout the project lifecycle.
Here are several key reasons highlighting the importance of accurate cost estimation:
 Budget Planning and Allocation:
 Importance: Accurate cost estimation provides the basis for creating realistic project budgets.
 Impact: Enables organizations to allocate resources appropriately, preventing budget
overruns and ensuring financial stability throughout the project.
 Resource Management:
 Importance: Helps organizations allocate human resources, technology, and other assets
effectively.
 Impact: Ensures that the right skills and resources are available at each phase of the project,
optimizing productivity and minimizing bottlenecks.
 Risk Mitigation:
 Importance: Accurate cost estimation includes identifying and mitigating potential risks.
 Impact: Allows for proactive risk management, reducing the likelihood of unforeseen
expenses and project disruptions.
 Project Planning and Scheduling:
 Importance: Provides a foundation for developing realistic project schedules.
 Impact: Facilitates better planning, helping teams adhere to timelines and deliver the
project on schedule.
Ministry of Labor and Estimate cost for Web Version-II
Page 10 of 91 Skills and database projects
Author/Copyright November, 2023
 Stakeholder Communication:
 Importance: Accurate cost estimates aid in transparent communication with stakeholders.
 Impact: Builds trust by providing stakeholders with a clear understanding of the financial
aspects of the project, fostering collaboration and support.
 Decision-Making:
 Importance: Informs decision-making throughout the project lifecycle.
 Impact: Enables informed choices regarding project scope, features, and trade-offs,
ensuring that decisions align with budget constraints.

 Competitive Advantage:
 Importance: Accurate cost estimation allows organizations to competitively price their
services or products.
 Impact: Enhances competitiveness in the market by offering realistic and attractive
pricing without compromising profitability.
 Quality Assurance:
 Importance: A well-estimated budget supports the implementation of quality assurance
measures.
 Impact: Ensures that adequate resources are allocated for testing and quality control,
preventing issues that may lead to additional costs later in the project.
 Client and Stakeholder Satisfaction:
 Importance: Accurate cost estimates contribute to client and stakeholder satisfaction.
 Impact: Minimizes the risk of unexpected costs and scope changes, leading to a more
positive project experience for all involved parties.
 Project Success Metrics:
 Importance: The accuracy of cost estimation is a key metric for evaluating project
success.
 Impact: Provides a benchmark against which the project's financial performance can be
measured, helping organizations learn and improve for future projects.
 Funding and Investment Decisions:
 Importance: Accurate cost estimates support funding and investment decisions.
 Impact: Influences the decision-making of stakeholders, investors, and financial
institutions, facilitating project financing and investment.
Ministry of Labor and Estimate cost for Web Version-II
Page 11 of 91 Skills and database projects
Author/Copyright November, 2023
 Client Expectations Management:
 Importance: Accurate cost estimation helps manage client expectations.
 Impact: Allows organizations to set realistic expectations regarding project deliverables
and costs, minimizing the risk of dissatisfaction.
In summary, accurate cost estimation is fundamental to the success of website and database
projects. It ensures financial stability, effective resource allocation, and informed decision-
making, ultimately contributing to the achievement of project objectives and client
satisfaction.

Self –check 1
Part I: Write true if the statement is correct and false if it wrong
1. Accurate cost estimation is primarily essential for project planning, budgeting, and ensuring
successful project outcomes.
2. Project scope definition involves specifying tangible outputs, features, and functionalities, as well
as identifying project exclusions, constraints, and assumptions.
3. Iterative nature in requirement analysis acknowledges that project requirements may evolve as the
project progresses, necessitating flexible documentation.

Ministry of Labor and Estimate cost for Web Version-II


Page 12 of 91 Skills and database projects
Author/Copyright November, 2023
4. Stakeholder communication is one of the key impacts of accurate cost estimation, aiding in
building trust and fostering collaboration throughout the project.
5. The project scope statement is a formal document outlining the project's boundaries and
parameters, reviewed and agreed upon by relevant stakeholders to ensure a shared understanding
and commitment to project goals
.Part II: Choose the best answer
1. Which of the following is a key component of project scope definition?
a. Risk Mitigation c. Iterative Nature
b. Stakeholder Identification d.BudgetPlanning
2. What is the primary purpose of establishing clear project objectives?
a. Enhancing Stakeholder Communication c. Managing Resource Allocation
b. Aligning with Organizational Goals d. Facilitating Iterative Analysis
3. In the context of website and database projects, what does project scope definition help prevent?
a. Budget Overruns c. Iterative Nature
b. Stakeholder Communication d. Risk Mitigation
4. Why is the iterative nature of requirement analysis crucial in project development?
a. To prevent scope creep c. To align with organizational goals
b. To establish clear project objectives d. To facilitate budget planning
5. What role does accurate cost estimation play in project success metrics?
a. Facilitating Iterative Analysis c. Providing a Baseline for Measurement
b. Building Stakeholder Communication d. Enhancing Competitive Advantage

Ministry of Labor and Estimate cost for Web Version-II


Page 13 of 91 Skills and database projects
Author/Copyright November, 2023
Unit Two: Basics of Website and Database Projects

This unit is developed to provide you the necessary information regarding the following
content coverage and topics:
 Understanding Project Scope
 Types of Website and Database Projects
 Differentiating Between Website and Database Components
 Project Life Cycle Overview
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Understanding of the basic concepts and components of website and database projects.
 Distinguish between the elements specific to websites and databases, understanding
their roles and interactions in a project.
 Comprehend the various phases of a website and database project lifecycle
 Identify and categorize key cost components involved in website and database projects
 Understand how to efficiently allocate resources, including personnel, technology, and
infrastructure, to meet project requirements.

2.1Understanding Project Scope


The project scope plays a crucial role in the cost estimation process for both website and database
projects. It defines the boundaries of the project, outlining what is included and excluded, and
provides the necessary details for accurately estimating the costs associated with development,
implementation, and maintenance. Here's how project scope influences cost estimation in
website and database projects:
2.1.1 Role of Project Scope in Website Cost Estimation:
 Determining Features and Functionalities:
 Role: The project scope defines the features and functionalities that the website will
have.

Ministry of Labor and Estimate cost for Web Version-II


Page 14 of 91 Skills and database projects
Author/Copyright November, 2023
 Impact on Cost Estimation: The more complex and extensive the features, the higher
the development and testing cost. Each feature requires time and resources, impacting
the overall budget.
 Identifying Design Requirements:
 Role: The scope outlines design requirements, including the visual elements and user
interface.
 Impact on Cost Estimation: A highly customized and visually appealing design may
involve additional design and development efforts, affecting the overall cost.
 Technology Stack and Infrastructure:
 Role: The scope specifies the technology stack and infrastructure requirements.
 Impact on Cost Estimation: The choice of technologies and hosting options
influences costs. Some technologies or hosting services may have licensing fees or
higher operational costs.
 User Roles and Permissions:
 Role: The scope defines user roles and their permissions.
 Impact on Cost Estimation: Implementing role-based access control (RBAC) and
user authentication systems may require additional development efforts, impacting
costs.
 Mobile Responsiveness:
 Role: The scope determines whether the website needs to be mobile-responsive.
 Impact on Cost Estimation: Developing a responsive design requires additional
consideration and testing, affecting development costs.
 Integration with Third-Party Services:
 Role: The scope identifies any third-party services or integrations.
 Impact on Cost Estimation: Integration with third-party services may involve
additional development work and potential licensing costs, influencing the budget.
 Legal and Compliance Requirements:
 Role: The scope includes legal and compliance considerations.
 Impact on Cost Estimation: Ensuring legal compliance may involve legal
consultation and additional development efforts to implement privacy features,
affecting costs.
 Maintenance and Support:
Ministry of Labor and Estimate cost for Web Version-II
Page 15 of 91 Skills and database projects
Author/Copyright November, 2023
 Role: The scope may include post-launch maintenance requirements.
 Impact on Cost Estimation: Planning for ongoing maintenance and support is crucial
and affects the long-term costs of the website.
2.1.2 Role of Project Scope in Database Cost Estimation:
 Database Design and Complexity:
 Role: The project scope outlines the database design and complexity.
 Impact on Cost Estimation: A more complex database structure may require
additional development and optimization efforts, influencing costs.
 Data Modeling and Normalization:
 Role: The scope includes data modeling and normalization requirements.
 Impact on Cost Estimation: Applying normalization principles may increase
development time but can enhance data integrity, impacting costs.
 Query Language (SQL) Requirements:
 Role: The scope specifies the use of SQL for database interactions.
 Impact on Cost Estimation: Writing and optimizing SQL queries may require
additional development efforts, influencing costs.
 Indexing and Performance Optimization:
 Role: The scope may include requirements for indexing and performance
optimization.
 Impact on Cost Estimation: Implementing indexing and optimizing performance
may require additional development and testing efforts.
 Security Measures:
 Role: The scope outlines security measures for the database.
 Impact on Cost Estimation: Implementing robust security features, such as
encryption and access controls, may incur additional development costs.
 Integration with Applications:
 Role: The scope identifies integration requirements with other applications.
 Impact on Cost Estimation: Integrating the database with other systems may require
additional development efforts and influence costs.
 Scalability Considerations:
 Role: The scope outlines scalability requirements.

Ministry of Labor and Estimate cost for Web Version-II


Page 16 of 91 Skills and database projects
Author/Copyright November, 2023
 Impact on Cost Estimation: Planning for scalability may involve additional
development and architectural considerations, impacting costs.
 Compliance and Regulations:
 Role: The scope addresses compliance with industry-specific regulations.
 Impact on Cost Estimation: Ensuring compliance may involve additional
development efforts and potential legal consultation, affecting costs.
In both website and database projects, the project scope serves as a blueprint for cost estimation. The
more detailed and comprehensive the scope, the more accurate the cost estimation can be, leading to
better project planning and resource allocation. Regular reviews and updates to the project scope are
crucial to adapting to changes and ensuring that the cost estimation remains aligned with the evolving
project requirements.

2.2 Types of Website and Database Projects


2.2.1 Static Websites vs. Dynamic Websites
A. Static Websites
Static websites consist of fixed content that doesn't change unless manually updated. They are
suitable for simple online presence and are often built using HTML and CSS. Cost estimation
for static websites is generally lower, as they require less development effort and ongoing
maintenance.
B. Dynamic Websites
Dynamic websites, on the other hand, utilize server-side technologies like PHP, Python, or
Node.js to generate content dynamically. They often involve databases to store and retrieve
data, allowing for interactive and personalized user experiences. Dynamic websites are more
complex, requiring a higher level of development expertise and, consequently, a higher cost.
2.2.2 E-commerce Platforms
 Overview
E-commerce projects involve the development of online stores where businesses can sell products
or services. These platforms include features like product listings, shopping carts, and secure
payment gateways. The complexity and cost of an e-commerce project depend on factors such
as the number of products, payment integrations, and security requirements.
 Considerations

Ministry of Labor and Estimate cost for Web Version-II


Page 17 of 91 Skills and database projects
Author/Copyright November, 2023
Cost estimation for e-commerce projects should account for functionalities like inventory
management, order processing, and user account management. Security measures, such as
SSL certificates and compliance with payment card industry standards, also contribute to the
overall cost.
2.2.3 Content Management Systems (CMS)
 Overview
CMS projects involve the development of systems that enable users to create, manage, and
publish digital content on the web. Popular CMS platforms include WordPress, Drupal, and
Joomla. The cost of CMS projects depends on customization requirements, the complexity of
content structures, and integration with third-party plugins.
 Customization and Integration
Customizing the design and functionality of a CMS, as well as integrating it with other systems or
databases, can significantly impact the project's cost. Content-heavy websites with intricate
publishing workflows may also require more advanced CMS solutions.
2.2.4 Custom Database Applications
 Overview
Custom database applications involve the development of bespoke software solutions that rely on
databases to store, retrieve, and manipulate data. These projects are diverse and can include
customer relationship management (CRM) systems, inventory management systems, and
more. The cost estimation for custom database applications depends on the complexity of data
structures, user interfaces, and business logic.
 Database Considerations
The choice of the database system (e.g., MySQL, PostgreSQL, MongoDB) and the design of the
database schema influence the project's complexity and cost. Scalability requirements and
data security measures also play a significant role in determining the overall project budget.
Understanding the specific characteristics of each type of project is crucial for accurate cost
estimation. The subsequent chapters will explore the factors that influence the cost of these
projects, providing readers with insights into the nuances of estimating expenses for various
website and database development endeavors.

Ministry of Labor and Estimate cost for Web Version-II


Page 18 of 91 Skills and database projects
Author/Copyright November, 2023
2.3 Differentiating Between Website and Database Components
Websites and databases are integral components of modern information systems, and they serve
distinct but interconnected purposes. Let's differentiate between the components of websites
and databases. The differentiation between website and database components is crucial for
accurate cost estimation in a web development project. Each component has its own set of
considerations that impact the overall project budget. Here's a breakdown of how
differentiating between website and database components affects cost estimation:
2.3.1 Website Components and Cost Estimation:
 User Interface (UI) and Frontend Development:
 Cost Impact: Design complexity, interactive elements, and responsiveness influence
frontend development costs.
 Considerations: High-quality design and intricate frontend functionalities may
require more development time and resources.
 Backend Development:
 Cost Impact: The choice of backend technologies, complexity of business logic, and
integration with other systems affect costs.
 Considerations: More sophisticated features and functionalities on the server side
may require additional development effort.
 Web Server and Hosting:
 Cost Impact: Hosting services, server specifications, and scalability requirements
influence costs.
 Considerations: High-traffic websites or those with specific performance needs may
require more robust and potentially expensive hosting solutions.
 Content Management System (CMS):
 Cost Impact: The choice of a CMS (if used) may have licensing fees or customization
costs.
 Considerations: Customizing or extending a CMS to meet specific requirements can
impact development costs.
 Mobile Responsiveness:
 Cost Impact: Ensuring mobile responsiveness adds development and testing costs.

Ministry of Labor and Estimate cost for Web Version-II


Page 19 of 91 Skills and database projects
Author/Copyright November, 2023
 Considerations: The complexity of adapting the website to various screen sizes and
devices affects the budget.
 Integration with Third-Party Services:
 Cost Impact: Integrations with external services may have associated costs or require
additional development effort.
 Considerations: Access to certain APIs or third-party services may have associated
fees.
 Security Measures:
 Cost Impact: Implementing robust security features incurs additional development
and testing costs.
 Considerations: Security measures, such as encryption and secure authentication, are
crucial but may require extra resources.
 Legal and Compliance:
 Cost Impact: Ensuring legal compliance may involve legal consultation and
additional development efforts.
 Considerations: Compliance with data protection laws may influence the overall
project budget.

2.3.2 Database Components and Cost Estimation:


 Database Management System (DBMS):
 Cost Impact: Licensing fees, if applicable, and the choice of DBMS can impact costs.
 Considerations: Some advanced features of certain DBMS may have associated costs.
 Data Model and Database Design:
 Cost Impact: The complexity of the data model and the design process affect costs.
 Considerations: A well-designed, normalized database may require more upfront
effort but can enhance efficiency in the long run.
 Query Language and Indexing:
 Cost Impact: Writing and optimizing queries may require additional development
effort.
 Considerations: Efficient queries and proper indexing contribute to better
performance but may involve extra development work.
Ministry of Labor and Estimate cost for Web Version-II
Page 20 of 91 Skills and database projects
Author/Copyright November, 2023
 Security and Access Controls:
 Cost Impact: Implementing security measures involves development effort and
potential additional costs for specialized security features.
 Considerations: Access controls, encryption, and auditing may require additional
resources.
 Backup and Recovery:
 Cost Impact: Establishing backup and recovery mechanisms may have associated
costs.
 Considerations: Regular backup procedures and testing recovery processes may
involve additional efforts.
 Transactions and ACID Compliance:
 Cost Impact: Ensuring transactional integrity may require additional development
effort.
 Considerations: ACID compliance contributes to data consistency but may involve
more development resources.
 Scalability Considerations:
 Cost Impact: Planning for scalability involves architectural considerations and
potential additional costs.
 Considerations: Choosing scalable technologies and designing for future growth may
influence the budget.
 Compliance and Regulations:
 Cost Impact: Ensuring compliance with industry regulations may involve legal
consultation and additional development effort.
 Considerations: Compliance with specific standards may add complexity and cost to
the project.
In summary, understanding the specific components of websites and databases and their associated costs
is vital for accurate cost estimation. Factors such as technology choices, development complexity,
scalability needs, and legal considerations significantly impact the overall budget for a web
development project. Regularly reviewing and updating the cost estimates throughout the project
lifecycle ensures that any changes or additions to the scope are appropriately reflected in the budget.

Ministry of Labor and Estimate cost for Web Version-II


Page 21 of 91 Skills and database projects
Author/Copyright November, 2023
2.4 Project Life Cycle Overview
The project life cycle provides a framework for managing and executing projects from initiation
to closure. Cost estimation is an integral part of each phase, helping stakeholders plan and
allocate resources effectively. Here's an overview of the project life cycle from the perspective
of website and database project cost estimation:
2.4.1 Initiation Phase:
 Overview:
 Define the project goals, scope, and objectives.
 Identify key stakeholders and establish project feasibility.
 Cost Estimation Considerations:
 High-level cost estimates based on initial project requirements.
 Preliminary identification of major cost drivers for both website and database
components.
2.4.2 Planning Phase:
 Overview:
 Develop a detailed project plan, including tasks, timelines, and resource requirements.
 Identify risks and develop a risk management plan.
 Define the project scope, deliverables, and acceptance criteria in detail.
 Cost Estimation Considerations:
 Refine cost estimates based on detailed project requirements.
 Break down costs for website and database components separately.
 Consider contingency planning for unforeseen expenses.
2.4.3 Execution (Development) Phase:
 Overview:
 Begin development based on the project plan.
 Regularly monitor and report progress.
 Implement features and functionalities outlined in the scope.
 Cost Estimation Considerations:
 Track actual costs against the planned budget.
 Address any deviations from the initial cost estimates.
 Assess resource usage and adjust estimates if needed.

Ministry of Labor and Estimate cost for Web Version-II


Page 22 of 91 Skills and database projects
Author/Copyright November, 2023
2.4.4 Monitoring and Controlling Phase:
 Overview:
 Monitor project performance, ensuring that it aligns with the project plan.
 Control changes and address issues promptly.
 Ensure quality control through testing and reviews.
 Cost Estimation Considerations:
 Continuously update and refine cost estimates based on ongoing developments.
 Monitor and manage changes to the scope that may impact costs.
 Evaluate and adjust cost projections based on real-time data.
2.4.5 Closing Phase:
 Overview:
 Finalize and deliver the project deliverables.
 Evaluate project success against objectives.
 Complete any remaining documentation and administrative tasks.
 Cost Estimation Considerations:
 Summarize actual costs and compare them against the final budget.
 Conduct a post-project review to identify lessons learned for future cost estimations.
 Ensure accurate accounting for all project-related expenses.
2.5Additional Considerations for Website Projects:
 User Acceptance Testing (UAT):
 Incorporate UAT costs for testing the website's functionality from the user's
perspective.
 Allocate resources for fixing issues identified during UAT.
 Content Management and Updates:
 Account for ongoing costs related to content updates and management, especially for
projects using a CMS.
 Marketing and Launch:
 Consider costs associated with marketing activities and the launch of the website, if
applicable.
2.6Additional Considerations for Database Projects:
 Data Migration:
 Include costs for migrating existing data to the new database system.
Ministry of Labor and Estimate cost for Web Version-II
Page 23 of 91 Skills and database projects
Author/Copyright November, 2023
 Plan for data validation and reconciliation during the migration process.
 Training and Documentation:
 Allocate resources for training end-users and creating documentation.
 Include costs for providing ongoing support and addressing user queries.
 Integration Testing:
 Budget for testing the integration between the database and other systems or
applications.
Continuous Improvement:
 Post-Implementation Review:
 Conduct a thorough review of the project after implementation to identify areas for
improvement.
 Use insights from the review to enhance future cost estimation processes.
By integrating cost estimation considerations into each phase of the project life cycle,
organizations can achieve more accurate budgeting, better resource allocation, and improved
overall project management for both website and database projects. Regular updates and
adjustments to cost estimates based on real-time data contribute to more effective decision-
making throughout the project.

Ministry of Labor and Estimate cost for Web Version-II


Page 24 of 91 Skills and database projects
Author/Copyright November, 2023
Self-check 2
Part I: Write true if the statement is correct and false if is wrong.
1. The complexity of features and functionalities in a website project has no impact on
development and testing costs.
2. Dynamic websites, utilizing server-side technologies and databases, generally have lower
development costs compared to static websites.
3. In a database project, applying normalization principles to the data model can reduce
development time but may compromise data integrity.
4. The choice of a Database Management System (DBMS) can impact costs, with some advanced
features in certain DBMS incurring additional expenses.
5. Regularly updating and refining cost estimates throughout the project life cycle is essential for
effective decision-making and resource allocation.
Part II: Choose the correct answer
1. Which factor influences the cost of developing a dynamic website utilizing server-side
technologies?
A) Number of static pages C) Use of HTML and CSS
B) Choice of programming languages D) Visual appeal of the design
2. What does the scope in a database project define?
A) User roles and permissions C) Features and functionalities
B) Hosting options D) Database design and complexity
3. Which consideration is relevant to both website and database projects?
A) Mobile responsiveness C) Data modeling and normalization
B) Integration with third-party services D) Compliance with industry regulations
4. In a website project, what does the Execution (Development) phase involve?
A) Finalizing project deliverables D) Implementing features outlined in the
B) Monitoring project performance scope
C) Writing and optimizing SQL queries
5.What is a crucial consideration for cost estimation in both static and dynamic websites?
A) Visual appeal of the design C) Choice of Database Management
B) Complexity of features and System (DBMS)
functionalities D) Integration with third-party services

Ministry of Labor and Estimate cost for Web Version-II


Page 25 of 91 Skills and database projects
Author/Copyright November, 2023
3.1. Project Size and Complexity:
Project size and complexity are key factors that significantly influence the cost estimation for both
website and database projects. Understanding the size and complexity of a project helps in
determining the amount of work, resources, and time required, thereby impacting the overall
cost. Let's explore these factors in detail for both types of projects:
3.1.1 Project Size and Complexity for a Website Project:
1. Small to Medium-Sized Website:
 Description:
 A small to medium-sized website typically includes a limited number of pages and
features.
 It might be a basic corporate website with information about the company, services,
and contact details.
 Influence on Cost:
 Development time is relatively shorter.
 The number of features and functionalities is limited, reducing complexity.
 Design and development efforts are less intensive.
Example:
Consider a small local business that needs a simple website to showcase its products and provide
basic contact information. The website may include a homepage, product pages, a contact
form, and a few additional informational pages.
2.Medium to Large-Sized E-commerce Website:
 Description:
 A medium to large-sized e-commerce website involves a significant number of product
pages, a shopping cart, and secure payment processing.
 Additional features may include user accounts, order tracking, and integration with a
product catalog or inventory management system.
 Influence on Cost:
 Development time increases due to the complexity of implementing e-commerce features.

Ministry of Labor and Estimate cost for Web Version-II


Page 26 of 91 Skills and database projects
Author/Copyright November, 2023
 Design and user experience considerations become more intricate.
 Integration with third-party services may be required.
Example:
Imagine a mid-sized retail company expanding its business online. The e-commerce website
needs a product catalog, a user-friendly shopping cart, secure payment processing, and
integration with a shipping service for order fulfillment.
3. Large-Scale Portal or Social Platform:
 Description:
 Large-scale websites such as portals or social platforms involve extensive user interactions,
dynamic content, and user-generated content.
 Features may include user profiles, messaging systems, content sharing, and complex search
functionalities.
 Influence on Cost:
 Development time significantly increases due to the complexity of implementing advanced
features.
 Scalability becomes a crucial consideration.
 Comprehensive testing and optimization efforts are required.
Example:
Consider the development of a social networking platform where users can create profiles,
connect with others, share multimedia content, and engage in real-time messaging. The
project's complexity increases with the need for robust user authentication, data privacy
features, and seamless interaction.
3.1.2 Project Size and Complexity for a Database Project:
1. Small to Medium-Sized Database System:
 Description:
 A small to medium-sized database project involves managing a moderate amount of data
with straightforward relationships.
 It may include basic CRUD (Create, Read, Update, Delete) operations and simple data
retrieval.
 Influence on Cost:
 Database design and implementation are relatively straightforward.

Query optimization may not require extensive efforts.
Ministry of Labor and Estimate cost for Web Version-II
Page 27 of 91 Skills and database projects
Author/Copyright November, 2023
 Testing and validation are manageable.

Example:
Consider a small business that needs a database to store and manage customer information,
purchase history, and inventory. The database design includes tables for customers, orders,
and products with straightforward relationships.
2. Medium to Large-Sized Database System:
 Description:
 A medium to large-sized database project involves handling a significant amount of data
with more complex relationships.
 It may include advanced features like data indexing, stored procedures, and triggers.
 Influence on Cost:
 Database design becomes more intricate, requiring careful consideration of
normalization and indexing.
 Query optimization efforts increase, impacting development time.
 Comprehensive testing and performance tuning are necessary.
Example:
Imagine a medium-sized e-commerce platform with a database that manages a large product
catalog, customer data, and order information. The database design involves multiple
interconnected tables, and the system requires advanced querying for reporting and analytics.
3.Enterprise-Level Database System:
 Description:
 An enterprise-level database project involves managing extensive datasets with complex
relationships, multiple users, and high transaction volumes.
 It may include features like data warehousing, replication, and distributed databases.
 Influence on Cost:
 Database design is highly sophisticated, considering scalability and redundancy.
 Advanced security measures, including encryption, are essential.
 Extensive testing, optimization, and ongoing maintenance efforts are required.

Example:
Ministry of Labor and Estimate cost for Web Version-II
Page 28 of 91 Skills and database projects
Author/Copyright November, 2023
Consider an enterprise-level database project for a multinational corporation with a need for a
comprehensive Customer Relationship Management (CRM) system. The database must
handle a vast amount of customer data, support multiple users globally, and ensure high
availability and performance.
Considerations for Cost Estimation:
1. Development Effort:
 The effort required for coding, testing, and debugging increases with project size and
complexity.
2. Resource Allocation:
 Larger and more complex projects may require a larger development team with
specialized skills, influencing labor costs.
3. Infrastructure and Technology:
 Advanced features and scalability requirements may necessitate specific infrastructure
and technologies, impacting costs.
4. Testing and Quality Assurance:
 Comprehensive testing efforts, including unit testing, integration testing, and user
acceptance testing, are essential for larger and more complex projects.
5. Project Management:
 The complexity of project management increases with project size, requiring more
sophisticated planning, monitoring, and coordination efforts.
Understanding the nuances of project size and complexity is crucial for accurate cost estimation.
Regularly revisiting and updating cost estimates throughout the project life cycle ensures that
the budget aligns with the evolving requirements and challenges of the project.

3.2. Functional Requirements


Functional requirements are specifications that outline the specific features, capabilities, and
behaviors that a system, such as a website or database, must exhibit to meet the needs of its
users. These requirements serve as a foundation for project planning, design, development,
and testing. Clear and well-defined functional requirements are essential for accurate cost
estimation. Let's explore functional requirements in detail with examples for both website and
database projects:
3.2.1 Functional Requirements for a Website Project:
Ministry of Labor and Estimate cost for Web Version-II
Page 29 of 91 Skills and database projects
Author/Copyright November, 2023
1. User Authentication:
 Description: Users should be able to create accounts, log in, and manage their profiles
securely.
 Example: Users can register on the website using a valid email address and password.
Once registered, they can log in and update their profile information.
2. Content Management System (CMS):
 Description: If applicable, the website may require a CMS for easy content updates and
management.
 Example: Admin users should be able to log in to the CMS, create, edit, or delete
content pages, and manage multimedia assets.
3. Search Functionality:
 Description: Users should be able to search for specific information or products within
the website.
 Example: A search bar on the website allows users to enter keywords, and the system
returns relevant search results.
4. E-commerce Functionality:
 Description: For e-commerce websites, users should be able to browse products, add
items to a shopping cart, and complete secure transactions.
 Example: Users can view a product catalog, add items to the cart, proceed to checkout,
and make payments securely.
5. Responsive Design:
 Description: The website should be accessible and usable on various devices, including
desktops, tablets, and mobile phones.
 Example: The website layout adjusts dynamically based on the screen size, providing an
optimal viewing experience.
6. User Feedback and Reviews:
 Description: Users should be able to leave feedback, ratings, and reviews for products or
services.
 Example: After making a purchase, users can rate the product and leave a review,
contributing to the overall user feedback.
7. Notification System:
 Description: Users may receive notifications for important events or updates.
Ministry of Labor and Estimate cost for Web Version-II
Page 30 of 91 Skills and database projects
Author/Copyright November, 2023
 Example: Users receive email notifications for order confirmations, shipping updates,
and other relevant information.
8. Integration with Third-Party Services:
 Description: The website may need to integrate with external services such as payment
gateways, social media, or analytics tools.
 Example: Social media sharing buttons on product pages allow users to share their
favorite products on their social accounts.
3.2.2 Functional Requirements for a Database Project:
1. Data Storage and Retrieval:
 Description: The database should efficiently store and retrieve data as needed by the
application.
 Example: A database table named "Products" stores information such as product ID,
name, description, price, and inventory.
2. User Authentication and Authorization:
 Description: The database should support user authentication and authorization
mechanisms.
 Example: User credentials are stored securely in the database, and access to certain
tables or data is restricted based on user roles.
3. Data Validation and Integrity:
 Description: The database should enforce data integrity rules and validate input to
maintain accurate and consistent data.
 Example: The database ensures that only valid data is stored, and constraints prevent the
entry of incorrect or incomplete information.
4. Indexing for Performance:
 Description: Indexes should be created to optimize data retrieval performance.
 Example: An index is created on the "Date" column of a table to speed up queries that
involve date-based filtering.
5. Transaction Management:
 Description: The database should support transactions to maintain the consistency of the
data.
 Example: When a user places an order, the database ensures that both the order details
and the inventory are updated atomically as part of a transaction.
Ministry of Labor and Estimate cost for Web Version-II
Page 31 of 91 Skills and database projects
Author/Copyright November, 2023
6. Backup and Recovery:
 Description: Regular backups of the database should be performed to prevent data loss
and facilitate recovery.
 Example: Daily automated backups are created, and a recovery plan is in place to restore
the database to a specific point in time if needed.
7. Scalability:
 Description: The database architecture should be designed to handle increased data
volume and user load.
 Example: The database is designed with shading or partitioning strategies to distribute
data across multiple servers for scalability.
8. Logging and Auditing:
 Description: The database should log relevant events and activities for auditing
purposes.
 Example: An audit log records every change made to sensitive data, including the user
who made the change and the timestamp.
9. Integration with Application Logic:
 Description: The database interacts seamlessly with the application's backend logic.
 Example: Stored procedures or triggers are used to enforce complex business rules
within the database.
Considerations for Cost Estimation:
1. Development Effort:
 The complexity of implementing each functional requirement affects development effort
and, subsequently, costs.
2. Technology Stack:
 Certain features may require specific technologies or tools, impacting technology-related
costs.

3. Testing and Quality Assurance:


 Each functional requirement necessitates testing efforts to ensure proper functionality,
adding to quality assurance costs.
4. Integration with External Services:

Ministry of Labor and Estimate cost for Web Version-II


Page 32 of 91 Skills and database projects
Author/Copyright November, 2023
 Integration with third-party services may involve additional development effort and
potential licensing costs.
5. Scalability Considerations:
 The need for scalability influences the choice of database architecture and may impact
infrastructure costs.
6. Data Security and Compliance:
 Features related to user authentication, data encryption, and audit logging contribute to
data security and compliance, impacting development and maintenance costs.
7. Documentation and Training:
 Comprehensive documentation and training efforts are required to support the
implementation and maintenance of functional requirements.
8. Ongoing Maintenance and Support:
 The complexity of features affects ongoing maintenance costs, including bug fixes,
updates, and support activities.
By thoroughly documenting and understanding the functional requirements for a website or
database project, project stakeholders can make more accurate assessments of the resources
and efforts required. Regularly revisiting and updating cost estimates based on any changes or
additions to functional requirements ensures that the budget remains aligned with project
goals.

3.3. Technology Stack


The technology stack, often referred to as the tech stack, is a combination of software tools,
programming languages, frameworks, libraries, and other components that developers use to
build and operate a web application or a database system. The choice of a technology stack
significantly influences project development, scalability, and maintenance costs. Let's explore
the technology stack in detail for both website and database projects:
3.3.1 Technology Stack for a Website Project:
1. Frontend (Client-Side):
 HTML, CSS, JavaScript:
 Description: HTML for markup, CSS for styling, and JavaScript for dynamic client-
side interactions.
 Example: Building the structure, layout, and interactivity of web pages.
Ministry of Labor and Estimate cost for Web Version-II
Page 33 of 91 Skills and database projects
Author/Copyright November, 2023
 Frontend Frameworks:
 Example: React.js, Angular, Vue.js.
 Description: Frontend frameworks simplify development, enhance modularity, and
improve user interface interactions.
 Responsive Design:
 Example: Bootstrap, Foundation.
 Description: Frameworks that facilitate the creation of responsive and mobile-friendly
web pages.
2. Backend (Server-Side):
 Server-Side Scripting:
 Example: Node.js (JavaScript), Python (Django, Flask), Ruby (Ruby on Rails), PHP.
 Description: Executes on the server, handling business logic, database interactions,
and serving requests.
 Backend Frameworks:
 Example: Express.js (Node.js), Django (Python), Ruby on Rails (Ruby), Laravel
(PHP).
 Description: Frameworks expedite backend development, providing structure and
common functionalities.
3. Database:
 Relational Database Management System (RDBMS):
 Example: MySQL, PostgreSQL, Microsoft SQL Server.
 Description: Organizes data into tables with predefined relationships, suitable for
structured data.
 NoSQL Database:
 Example: MongoDB, Cassandra, Firebase.
 Description: Suitable for handling unstructured or semi-structured data and providing
flexibility in data storage.
4. Web Server:
 Web Server Software:
 Example: Apache, Nginx, Microsoft Internet Information Services (IIS).
 Description: Handles HTTP requests, forwards them to the application server, and
serves static files.
Ministry of Labor and Estimate cost for Web Version-II
Page 34 of 91 Skills and database projects
Author/Copyright November, 2023
5.Middleware:
 Authentication and Authorization:
 Example: Passport.js, OAuth.
 Description: Middleware for user authentication and authorization.
 API Middleware:
 Example: Express middleware, Django REST framework.
 Description: Handles API-related functionalities, request parsing, and response
formatting.
6.Content Management System (CMS):
 CMS Platforms:
 Example: WordPress, Joomla, Drupal.
 Description: For websites requiring content management by non-technical users.
7.Version Control:
 Version Control System:
 Example: Git.
 Description: Manages source code versions, facilitates collaboration, and aids in code
deployment.
8.Frontend Build Tools:
 Build Tools:
 Example: Webpack, Parcel.
 Description: Automates tasks like bundling, minification, and transpilation of
frontend code.

9.Testing Frameworks:
 Unit Testing:
 Example: Jest (JavaScript), Pytest (Python).
 Description: Ensures individual components function as intended.
 End-to-End Testing:
 Example: Cypress, Selenium.
 Description: Tests the entire application's workflow from end to end.
10.Deployment and Containerization:
 Containerization:
Ministry of Labor and Estimate cost for Web Version-II
Page 35 of 91 Skills and database projects
Author/Copyright November, 2023
 Example: Docker.
 Description: Packages applications and their dependencies into containers for
consistent deployment.
 Orchestration:
 Example: Kubernetes.
 Description: Manages containerized applications, automates deployment, and
scales applications.
By carefully considering the technology stack for a website or database project, project
stakeholders can make informed decisions that align with project goals, scalability
requirements, and budget constraints. Regularly revisiting and updating cost estimates based
on any changes to the technology stack ensures that the budget remains accurate and reflective
of the evolving project needs.

3.4. Resource Requirements (Human, Technological)


Resource requirements, including human and technological resources, play a crucial role in the
success of website and database projects. Accurate estimation of these resources is essential
for effective project planning and budgeting. Let's explore in detail the human and
technological resource requirements for both types of projects along with examples:
3.4.1 Human Resource Requirements:
1.Project Management:
 Project Manager:
 Responsibilities: Overall project coordination, communication with stakeholders, risk
management.
 Example: A certified project manager with experience in web development or
database projects.
 Scrum Master (Agile Projects):
 Responsibilities: Facilitates agile development processes, ensures team adherence to
agile principles.
 Example: A certified Scrum Master for managing agile development cycles.
2. Development Team:
 Developers:
Ministry of Labor and Estimate cost for Web Version-II
Page 36 of 91 Skills and database projects
Author/Copyright November, 2023
 Responsibilities: Write code, implement features, and ensure the functionality of the
project.
 Example: Frontend developers (HTML, CSS, JavaScript), Backend developers
(Node.js, Python, Ruby).
 Database Administrators (DBAs):
 Responsibilities: Design and manage the database, ensure data integrity and security.
 Example: A skilled DBA proficient in the chosen database management system (e.g.,
MySQL, PostgreSQL).
 Quality Assurance (QA) Engineers:
 Responsibilities: Test and validate the functionality of the website or database.
 Example: QA engineers using automated and manual testing methods.
 DevOps Engineers:
 Responsibilities: Manage deployment, monitor system performance, and implement
automation.
 Example: DevOps engineers skilled in tools like Docker, Kubernetes, and CI/CD
pipelines.
3.Design and User Experience (UX/UI):
 UX/UI Designers:
 Responsibilities: Design user interfaces, ensure a positive user experience.
 Example: Designers proficient in tools like Adobe XD, Figma, or Sketch.
4.Content Management:
 Content Writers:
 Responsibilities: Create and update website content, product descriptions, or database
documentation.
 Example: Content writers with domain knowledge for industry-specific projects.
5. Support and Maintenance:
 Technical Support:
 Responsibilities: Address user queries, troubleshoot issues, and provide technical
support.
 Example: Support specialists with knowledge of the website or database functionality.
 Maintenance Team:

Ministry of Labor and Estimate cost for Web Version-II


Page 37 of 91 Skills and database projects
Author/Copyright November, 2023
 Responsibilities: Implement updates, security patches, and ensure the system's
ongoing health.
 Example: Developers or DevOps engineers responsible for system maintenance.
6.Training:
 Trainers:
 Responsibilities: Train end-users, administrators, or support teams on using the
website or database.
 Example: Trainers with expertise in conducting training sessions.
3.4.2 Technological Resource Requirements:
1. Development Tools and Environments:
 Integrated Development Environment (IDE):
Example: Visual Studio Code, PyCharm, Eclipse.
 Description: Developers use IDEs to write, debug, and test code efficiently.
 Version Control System:
Example: Git.
 Description: Manages source code versions and facilitates collaborative development.
2.Programming Languages and Frameworks:
 Frontend Development:
Example: JavaScript, HTML, CSS.
 Description: The core languages for building the user interface, supplemented by
frameworks like React.js or Angular.
 Backend Development:
Example: Php,Node.js (JavaScript), Django (Python), Ruby on Rails (Ruby).
 Description: The backend is developed using languages and frameworks that handle server-
side logic.
3. Database Management System (DBMS):
 Relational Database:
Example: MySQL, PostgreSQL.
 Description: Selected based on project requirements for structured data.
 NoSQL Database:
Example: MongoDB, Cassandra.
 Description: Chosen for flexibility with unstructured or semi-structured data.
Ministry of Labor and Estimate cost for Web Version-II
Page 38 of 91 Skills and database projects
Author/Copyright November, 2023
4.Web Servers and Hosting:
 Web Server Software:
Example: Apache, Nginx.
 Description: Serves web pages and forwards requests to the application server.
 Cloud Hosting Services:
Example: AWS, Azure, Google Cloud.
 Description: Provides scalable infrastructure, storage, and hosting services.
5. Content Management System (CMS):
 CMS Platforms:
Example: WordPress, Drupal.
 Description: If applicable, a CMS simplifies content updates and management.
6. Testing and Quality Assurance:
 Testing Tools:
Example: Jest, Selenium.
 Description: Tools for unit testing, end-to-end testing, and performance testing.
7. Deployment and Containerization:
 Containerization:
Example: Docker.
 Description: Packages applications and dependencies into containers for consistent
deployment.
 Orchestration:
Example: Kubernetes.
 Description: Manages containerized applications, automates deployment, and scales
applications.
8. Monitoring and Analytics:
 Monitoring Tools:
Example: Prometheus, Grafana.
 Description: Monitors system performance and resource usage.
 Analytics Tools:
Example: Google Analytics.
 Description: Tracks user interactions and gathers insights into website usage.
Considerations for Cost Estimation:
Ministry of Labor and Estimate cost for Web Version-II
Page 39 of 91 Skills and database projects
Author/Copyright November, 2023
1. Licenses and Subscriptions:
 Costs associated with purchasing licenses for specific tools, frameworks, or services.
2. Training and Skill Development:
 Investment in training programs for team members to acquire new skills or certifications.

3. Hardware and Infrastructure:


 Costs associated with server infrastructure, cloud services, and networking components.
4. Software and Tooling:
 Expenses for acquiring and maintaining software licenses, development tools, and third-
party services.
5. Support and Maintenance Contracts:
 Costs associated with ongoing support contracts for tools, platforms, or services.
6. Consulting and Outsourcing:
 If applicable, costs for hiring external consultants or outsourcing specific tasks.
7. Continuous Improvement:
 Budget for implementing continuous improvement processes, including adopting new
technologies or tools.
8. Contingency and Risk Management:
 Allocation of budget for addressing unforeseen challenges or risks that may impact
resource requirements.
By thoroughly understanding the human and technological resource requirements for a website or
database project, project stakeholders can create more accurate cost estimates. Regularly
revisiting and updating these estimates based on project progress, changes in requirements, or
unexpected challenges ensures that the budget remains realistic and aligned with the evolving
needs of the project.

3.5. External Dependencies


External dependencies in the context of a project refer to the external factors, resources, or entities
that the project relies on but are beyond the direct control of the project team. These
dependencies can significantly impact the project's timeline, cost, and overall success.
Identifying and managing external dependencies is crucial for accurate cost estimation. Here

Ministry of Labor and Estimate cost for Web Version-II


Page 40 of 91 Skills and database projects
Author/Copyright November, 2023
are some common types of external dependencies and their implications for cost estimation in
website and database projects:
3.5.1 Types of External Dependencies:
1. Third-Party APIs and Services:
Example: Payment gateways, mapping services, authentication services.
 Cost Implications: Integration with third-party services may involve subscription fees,
transaction costs, or licensing fees.
2. External Libraries and Frameworks:
Example: Open-source libraries, frameworks, or plugins.
 Cost Implications: While many libraries are open source, dependencies on commercial or
licensed libraries can incur costs.
3. Regulatory Compliance:
Example: Compliance with data protection regulations (e.g., GDPR), industry standards.
 Cost Implications: Costs associated with legal consultations, audits, and implementing
compliance measures.
4. Infrastructure and Hosting:
Example: Reliance on cloud service providers (e.g., AWS, Azure).
 Cost Implications: Costs for infrastructure usage, storage, data transfer, and potential
overage charges.
5. External Teams or Contractors:
Example: Outsourced development teams, consultants, or specialized experts.
 Cost Implications: Contractual fees, hourly rates, and potential additional costs for changes
or extensions.
6. Government Approvals or Permits:
Example: Approvals from regulatory bodies or government agencies.
 Cost Implications: Delays in project timelines may result in increased labor costs and
potential fines.
7. Hardware Dependencies:
Example: Dependence on specific hardware components or devices.
 Cost Implications: Costs associated with purchasing or integrating specific hardware.
8. Data Migration:
Example: Migrating data from legacy systems or external databases.
Ministry of Labor and Estimate cost for Web Version-II
Page 41 of 91 Skills and database projects
Author/Copyright November, 2023
 Cost Implications: Costs associated with data extraction, transformation, and loading (ETL)
processes.
Cost Estimation Considerations:
1. Integration Costs:
 Integration with external dependencies may require additional development effort, testing,
and troubleshooting.
2. License and Subscription Fees:
 Some external dependencies, such as third-party APIs or libraries, may come with licensing
or subscription fees.
3. Development Timeframes:
 Delays in obtaining approvals, compliance certifications, or external services may lead to
increased development timelines, impacting labor costs.
4. Contingency Planning:
 Allocate budget for unforeseen issues related to external dependencies, such as delays or
unexpected costs.
5. Vendor Relationships:
 Building strong relationships with external vendors can help negotiate favorable terms and
potentially reduce costs.
6. Legal and Compliance Costs:
 Compliance with regulations may require legal consultations, audits, and the implementation
of specific measures, contributing to overall project costs.
7. Risk Management:
 Identify and assess potential risks associated with external dependencies to proactively
address challenges and avoid cost overruns.
8. Alternative Solutions:
 Consider the availability of alternative solutions or contingency plans in case external
dependencies pose unexpected challenges.

Mitigation Strategies:
1. Thorough Research and Due Diligence:
 Conduct extensive research on external dependencies to understand potential costs,
limitations, and risks.
Ministry of Labor and Estimate cost for Web Version-II
Page 42 of 91 Skills and database projects
Author/Copyright November, 2023
2. Clear Communication and Documentation:
 Maintain clear communication with external vendors, teams, or regulatory bodies. Document
agreements, expectations, and dependencies.
3. Regular Monitoring and Updates:
 Continuously monitor external dependencies throughout the project life cycle, updating cost
estimates as needed.
4. Flexibility in Planning:
 Build flexibility into project plans to accommodate potential delays or changes related to
external dependencies.
5. Collaborative Relationships:
 Foster collaborative relationships with external vendors and teams to facilitate smoother
communication and issue resolution.
6. Scenario Planning:
 Develop contingency plans and scenarios to account for different outcomes related to
external dependencies.
By understanding the nature of external dependencies and considering their potential impact on
the project, project managers can create more accurate and realistic cost estimates. Regularly
revisiting and updating these estimates as the project progresses and external factors evolve
ensures that the budget remains aligned with the project's needs and challenges.

3.6. Project Risks and Contingencies


Project risks are uncertainties or potential events that could impact the successful delivery of a
project, including its schedule, budget, and scope. Contingencies are planned responses to
manage or mitigate the impact of these risks. Identifying and addressing risks is crucial for
effective cost estimation in website and database projects. Here are some common project
risks and suggested contingencies:
3.6.1 Project Risks and Contingencies:
1. Technology Risks:
 Risk: Unforeseen challenges or limitations with chosen technologies, tools, or
frameworks.
 Contingency: Conduct thorough technology assessments before the project starts.
Include additional time and budget for learning curves or potential technology changes.
Ministry of Labor and Estimate cost for Web Version-II
Page 43 of 91 Skills and database projects
Author/Copyright November, 2023
2. Scope Creep:
 Risk: Uncontrolled expansion of project scope, leading to increased development effort
and costs.
 Contingency: Implement robust change control mechanisms. Clearly define and
document project scope. Regularly communicate with stakeholders to manage
expectations.
3. Requirements Volatility:
 Risk: Frequent changes in project requirements during development.
 Contingency: Conduct thorough requirements analysis before starting development.
Implement a change management process and allocate a contingency budget for
requirement changes.
4. Dependency on External Services:
 Risk: Delays or issues with third-party APIs, services, or external dependencies.
 Contingency: Identify alternative services, build in additional time for integration, and
communicate closely with third-party providers. Maintain a contingency fund for
potential delays.
5. Resource Constraints:
 Risk: Shortages or unavailability of key team members or expertise.
 Contingency: Cross-train team members, have backup plans for key roles, and maintain
a list of external resources or contractors who can be brought in if needed.
6. Security Concerns:
 Risk: Potential security breaches or vulnerabilities in the website or database.
 Contingency: Implement robust security measures, conduct regular security audits, and
allocate a budget for security enhancements or emergency response.
7. Data Migration Challenges:
 Risk: Complexities or difficulties in migrating data from legacy systems to the new
database.
 Contingency: Conduct thorough data analysis and testing before migration. Plan for a
phased approach to data migration, allowing for rollback in case of issues.
8. Regulatory Changes:
 Risk: Changes in regulations affecting the project during development.

Ministry of Labor and Estimate cost for Web Version-II


Page 44 of 91 Skills and database projects
Author/Copyright November, 2023
 Contingency: Stay informed about regulatory changes. Include buffers in the schedule
and budget to accommodate adjustments needed for compliance.
9. Quality Assurance Issues:
 Risk: Inadequate testing leading to the discovery of critical issues post-launch.
 Contingency: Implement a comprehensive testing strategy, including unit tests,
integration tests, and end-to-end testing. Allocate time and resources for thorough QA
processes.
10. Infrastructure and Hosting Challenges:
 Risk: Issues with cloud services, server outages, or unexpected infrastructure costs.
 Contingency: Diversify infrastructure providers if possible. Have a backup hosting plan
and budget for potential overage charges.
Cost Estimation Considerations:
1. Risk Impact Assessment:
 Assess the potential impact of each identified risk on project cost and schedule.
Prioritize risks based on their severity.
2. Risk Quantification:
 Quantify the potential financial impact of risks. This involves estimating the additional
costs that might be incurred if a risk event materializes.
3. Contingency Budgeting:
 Allocate a contingency budget as a percentage of the total project cost to cover
unforeseen expenses related to identified risks.
4. Communication and Documentation:
 Clearly communicate identified risks and contingencies to stakeholders. Maintain
documentation that outlines the risk management plan and contingency measures.
5. Regular Risk Reviews:
 Conduct regular risk reviews throughout the project life cycle. Update risk assessments
and contingencies as the project progresses and new information becomes available.
6. Learning from Past Projects:
 Draw on lessons learned from previous projects to identify potential risks and effective
contingency measures. Maintain a knowledge base for future reference.
7. Continuous Monitoring:

Ministry of Labor and Estimate cost for Web Version-II


Page 45 of 91 Skills and database projects
Author/Copyright November, 2023
 Continuously monitor project risks, especially those that evolve over time. Be proactive
in addressing emerging risks and adjusting contingencies as needed.
8. Risk Mitigation Strategies:
 Develop mitigation strategies for high-priority risks to reduce the likelihood or impact of
these events.
By incorporating risk identification, assessment, and contingency planning into the cost
estimation process, project managers can create more realistic budgets that account for
uncertainties. Regularly revisiting and updating the risk management plan as the project
evolves ensures that the budget remains aligned with the project's needs and challenges.

Self-check 3
Part I: Write true if the statement is correct and false if it is wrong.
1. Project Size and Complexity are Insignificant Factors in Cost Estimation.
2. A Content Management System (CMS) is Essential for All Website Projects.
3. Data Migration Tools are Exclusively Used in Database Projects.
4. The Choice of Frontend Frameworks Does Not Impact Website Development Costs.
5. Query Language SQL is Specific to NoSQL Databases.
Part II: Choose the correct answer
1. Which of the following is a key factor influencing cost estimation for both website and
database projects?
A) Weather conditions C) Marketing strategy
B) Project size and complexity D) Employee satisfaction
2. In a medium to large-sized e-commerce website project, what is a significant factor influencing costs?
A) Limited features and functionalities C) Short development time
B) Integration with third-party services D) Basic user authenticatio
3. What is the purpose of a technology stack in web development?
A) Creating project timelines C) Choosing software tools and
B) Managing financial resources components
D) Conducting user testing
4. Which functional requirement is crucial for an e-commerce website project?

Ministry of Labor and Estimate cost for Web Version-II


Page 46 of 91 Skills and database projects
Author/Copyright November, 2023
A) User feedback and reviews C) Search functionality
B) Content Management System (CMS) D) Responsive design
5. What is the primary role of a Database Management System (DBMS) in a database project?
A) Managing project timelines C) Organizing and manipulating data
B) Handling business logic D) Creating user interfaces

Ministry of Labor and Estimate cost for Web Version-II


Page 47 of 91 Skills and database projects
Author/Copyright November, 2023
Unit Four Cost Estimation Methods

This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Expert Judgment
 Analogous Estimation
 Parametric Estimation
 Three-Point Estimation
 Bottom-Up Estimation
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Gain knowledge about different cost estimation methods
 Identify the strengths, weaknesses, and best-use scenarios for each method.
 Comprehend the role of subject matter experts (SMEs) in providing insights for cost
estimation.
 Understand how analogous estimation relies on historical data from similar projects.
 Understand the identification of parameters, historical data analysis, and development of
mathematical models in parametric estimation.
 Develop critical thinking skills to assess the suitability of different cost estimation methods
based on project characteristics.

4.1. Expert Judgment


Expert judgment is a cost estimation method that relies on the knowledge, experience, and
insights of individuals or a group of experts to estimate various aspects of a project, including
costs, duration, and resource requirements. These experts, often individuals with significant
experience in the relevant domain or industry, use their judgment to provide informed
assessments based on their expertise. Expert judgment is particularly valuable in situations
where historical data may be limited or inadequate.

Ministry of Labor and Estimate cost for Web Version-II


Page 48 of 91 Skills and database projects
Author/Copyright November, 2023
Key Aspects of Expert Judgment in Cost Estimation:
1. Subject Matter Experts (SMEs):
 Description: SMEs are individuals who possess specialized knowledge and
experience relevant to the project at hand. They may come from various disciplines,
such as engineering, technology, finance, or project management.
 Role: SMEs contribute their expertise to assess project requirements, risks, and
potential costs.
2. Qualitative and Quantitative Inputs:
 Description: Expert judgment can involve both qualitative and quantitative inputs.
Qualitative inputs may include subjective assessments of project complexity, risks,
and uncertainties, while quantitative inputs involve numeric estimates.
 Role: Experts provide insights that go beyond mere numbers, offering nuanced
perspectives on the potential challenges and opportunities associated with the project.
3. Interviews and Workshops:
 Description: The expert judgment process often involves interviews, workshops, or
brainstorming sessions where experts collaborate to share their knowledge and
perspectives.
 Role: Interactions among experts can lead to a more comprehensive understanding of
the project, enabling a more accurate estimation.
4. Delphi Technique:
 Description: The Delphi Technique is a structured method for obtaining consensus
from a panel of experts. It involves multiple rounds of questionnaires or surveys, with
feedback provided anonymously between rounds to converge towards a consensus.
 Role: Delphi Technique helps mitigate biases and fosters collective intelligence
among experts.
5. Assumptions and Constraints:
 Description: Experts may need to make assumptions or work within certain
constraints when providing estimates. These assumptions and constraints should be
documented to ensure transparency and clarity.
 Role: Clearly defined assumptions and constraints help stakeholders understand the
context and limitations of the expert judgment.
6. Historical Knowledge:
Ministry of Labor and Estimate cost for Web Version-II
Page 49 of 91 Skills and database projects
Author/Copyright November, 2023
 Description: Experts often draw on their experience with similar projects or industry
standards to inform their judgment. Historical knowledge allows experts to consider
patterns, trends, and lessons learned from past endeavors.
 Role: Historical knowledge contributes to the accuracy and reliability of the expert
judgment process.
7. Continuous Feedback:
 Description: The estimation process may involve ongoing feedback loops, especially
when dealing with evolving projects. Continuous feedback allows experts to update
their estimates based on new information.
 Role: Adaptability and responsiveness to changing project conditions are crucial
components of expert judgment.
Advantages of Expert Judgment in Cost Estimation:
1. Domain Expertise:
 Experts bring deep domain knowledge and insights that may not be readily available
from other sources.
2. Qualitative Insights:
 Experts can provide qualitative insights into the project's complexities, risks, and
potential challenges, complementing quantitative estimates.
3. Adaptability:
 Expert judgment can adapt to unique project circumstances and conditions, making it
applicable in a wide range of scenarios.
4. Quick Decision-Making:
 In situations where historical data is limited or unavailable, expert judgment allows for
relatively quick decision-making based on expert insights.
5. Problem Solving:
 Experts can contribute to problem-solving by identifying potential issues and
proposing solutions based on their experience.
Challenges and Considerations:
1. Subjectivity:
 Expert judgment is inherently subjective and may be influenced by individual biases
or perspectives. It's essential to be aware of and manage these biases.
2. Limited Data:
Ministry of Labor and Estimate cost for Web Version-II
Page 50 of 91 Skills and database projects
Author/Copyright November, 2023
 In the absence of sufficient historical data, the reliance on expert judgment may be the
primary source of estimation, making it critical to choose experts wisely.
3. Diversity of Experts:
 It's crucial to involve a diverse group of experts to ensure a comprehensive
understanding of the project and avoid potential biases.
4. Documentation:
 Clear documentation of the assumptions, constraints, and reasoning behind expert
estimates is essential for transparency and accountability.
5. Continuous Learning:
 Organizations should encourage a culture of continuous learning, allowing experts to
stay updated on industry trends and advancements.
Expert judgment is a valuable and widely used method for cost estimation, particularly in projects
where unique or unprecedented elements require the insights of individuals with specialized
knowledge. Effective application of expert judgment involves selecting the right experts,
fostering collaboration, and integrating qualitative and quantitative inputs for a well-rounded
estimation process.

4.2. Analogous Estimation


Analogous estimation, also known as top-down estimation, is a project cost estimation method
that relies on historical data from similar projects as a basis for estimating the cost of the
current project. This method is particularly useful when detailed information about the current
project is limited or unavailable. Analogous estimation involves drawing parallels between the
current project and past projects to make cost predictions. Here's a more detailed explanation
of the process:
Key Aspects of Analogous Estimation:
1. Historical Data:
 Description: Analogous estimation uses historical information from previously
completed projects that share similarities with the current project.
 Role: Historical data serves as a reference point for understanding the resource
requirements, costs, and outcomes of comparable projects.
2. Similarity Assessment:
Ministry of Labor and Estimate cost for Web Version-II
Page 51 of 91 Skills and database projects
Author/Copyright November, 2023
 Description: The estimator identifies projects that are similar in nature, scope, size,
complexity, and other relevant factors to the current project.
 Role: The more closely the selected historical projects align with the current project,
the more accurate the analogous estimation is likely to be.
3. Adjustments for Differences:
 Description: Once a historical project is identified, adjustments are made to account
for any differences between the historical project and the current project.
 Role: Adjustments consider factors such as scale, technological advancements, project
complexity, and any unique attributes that differentiate the two projects.
4. Expert Judgment:
 Description: Analogous estimation often involves the input of experts who use their
judgment to assess the relevance and applicability of historical data to the current
project.
 Role: Experts contribute insights to ensure that adjustments are made appropriately
and that the estimation aligns with the specific characteristics of the current project.
5. Unit Cost or Parametric Models:
 Description: Analogous estimation may use unit cost or parametric models to
generalize cost estimates based on specific units of measurement (e.g., cost per square
foot, cost per function point).
 Role: These models provide a structured approach to adjusting historical data to fit the
current project's context.
6. Quick Assessment:
 Description: Analogous estimation is generally a quicker and less detailed estimation
method compared to some other methods, making it suitable for early project planning
stages.
 Role: Quick assessments can aid in initial project feasibility studies or when there is
limited time for a detailed estimation process.
Advantages of Analogous Estimation:
1. Speed and Simplicity:
 Analogous estimation is quick and relatively simple compared to other estimation
methods, making it suitable for projects with time constraints.
2. Limited Information Requirements:
Ministry of Labor and Estimate cost for Web Version-II
Page 52 of 91 Skills and database projects
Author/Copyright November, 2023
 It requires minimal detailed information about the current project, making it useful
when comprehensive data is not readily available.
3. Early Project Phases:
 Analogous estimation is often used in the early phases of a project when detailed
project information is scarce, helping stakeholders get a rough idea of potential costs.
4. Expert Judgment Integration:
 Expert judgment is integral to the process, allowing for qualitative considerations and
adjustments based on the collective experience of the estimation team.
Challenges and Considerations:
1. Limited Accuracy:
 The accuracy of analogous estimation is contingent on the similarity between the
historical and current projects. If the projects differ significantly, the estimation may
be less accurate.
2. Dependency on Historical Data:
 The method relies heavily on the availability and relevance of historical data. If
suitable historical data is not available, the accuracy of the estimation may be
compromised.
3. Subjectivity:
 Analogous estimation involves subjective judgments, and the adjustments made by
experts may introduce biases. It is crucial to manage and document these subjective
elements.
4. Scope Changes:
 If there are significant changes in the scope or requirements of the current project
compared to historical projects, the estimation may not accurately reflect the new
conditions.
5. Varying Project Complexity:
 Analogous estimation may struggle to account for variations in project complexity, as
it tends to provide a high-level overview rather than a detailed breakdown.
6. Need for Expertise:
 The method relies on the expertise of the estimation team to identify relevant historical
projects and make accurate adjustments. Inexperienced or uninformed estimators may
compromise the accuracy of the estimation.
Ministry of Labor and Estimate cost for Web Version-II
Page 53 of 91 Skills and database projects
Author/Copyright November, 2023
In summary, analogous estimation is a valuable method for providing quick and early project cost
estimates, especially when detailed information about the current project is limited. However,
its accuracy is contingent on the availability of relevant historical data and the expertise of the
estimation team in making appropriate adjustments for differences between projects.

4.3. Parametric Estimation


Parametric estimation is a project cost estimation method that involves using statistical
relationships between historical data and other project variables to calculate project costs. This
method relies on the identification of key parameters or variables that influence project costs
and the development of mathematical models to estimate costs based on these parameters.
Parametric estimation is particularly effective when there is a sufficient amount of historical
data and a clear understanding of the relationships between project characteristics and costs.
Key Aspects of Parametric Estimation:
1. Identification of Parameters:
 Description: The estimator identifies key parameters or variables that significantly
influence project costs. These parameters can include factors such as project size,
complexity, duration, or specific technical characteristics.
 Role: Identifying the right parameters is crucial for the accuracy of the estimation.
2. Historical Data Analysis:
 Description: Parametric estimation relies on historical data to establish relationships
between the identified parameters and project costs. The historical data serves as a
basis for developing the estimation model.
 Role: Analysis of historical data helps in understanding how changes in the identified
parameters impact project costs.
3. Mathematical Models:
 Description: Parametric estimation involves the development of mathematical models
that express the relationship between project parameters and costs. These models can
be simple linear equations or more complex statistical models.
 Role: Models are used to quantify the impact of changes in parameters on project
costs and provide a systematic approach to estimating costs.
4. Data Calibration:

Ministry of Labor and Estimate cost for Web Version-II


Page 54 of 91 Skills and database projects
Author/Copyright November, 2023
 Description: The estimation model is calibrated or fine-tuned using historical data.
This process involves adjusting coefficients or parameters in the model to align with
observed trends and patterns in the data.
 Role: Calibration ensures that the estimation model accurately reflects the
relationships present in the historical data.
5. Unit Cost Estimation:
 Description: Parametric estimation often involves calculating unit costs based on the
identified parameters. For example, the cost per square foot for construction projects
or the cost per function point for software development projects.
 Role: Unit costs provide a standardized measure that can be applied to different
projects based on their specific parameters.
6. Adjustments for Project Specifics:
 Description: While parametric estimation relies on general relationships, it allows for
adjustments to account for project-specific factors that may not be captured by the
parameters included in the model.
 Role: Adjustments enhance the accuracy of the estimation by accommodating unique
characteristics of the current project.
Advantages of Parametric Estimation:
1. Efficiency:
 Parametric estimation is often more efficient than some other methods, as it leverages
mathematical models to quickly calculate estimates based on known parameters.
2. Consistency:
 The use of standardized unit costs and mathematical models promotes consistency in
cost estimation across projects.

3. Quantitative Approach:
 The method provides a quantitative and systematic approach to cost estimation, which
can enhance objectivity and reduce subjectivity in the estimation process.
4. Data-Driven Decision-Making:
 Parametric estimation relies on historical data and statistical analysis, facilitating data-
driven decision-making in cost estimation.
Challenges and Considerations:
Ministry of Labor and Estimate cost for Web Version-II
Page 55 of 91 Skills and database projects
Author/Copyright November, 2023
1. Data Availability:
 The accuracy of parametric estimation depends on the availability and quality of
historical data. Limited or unreliable data can compromise the effectiveness of the
method.
2. Complexity of Relationships:
 Some projects may involve complex relationships between parameters and costs that
are challenging to capture accurately in a parametric model.
3. Assumption of Linearity:
 Parametric models often assume linear relationships between parameters and costs. In
reality, relationships may be nonlinear, and the model's accuracy may decrease in such
cases.
4. Project Specifics:
 While adjustments can be made, parametric estimation may struggle to fully account
for project-specific factors that are not explicitly included in the model.
5. Maintenance of Models:
 Updating and maintaining parametric models over time requires ongoing efforts to
ensure they remain accurate and reflective of changing project characteristics.
6. Expertise Requirements:
 Developing and using parametric estimation models requires expertise in statistical
analysis and modeling. Organizations need skilled individuals to effectively
implement this method.
In summary, parametric estimation is a valuable method that leverages statistical relationships
between historical data and project parameters to estimate costs. It is efficient, consistent, and
provides a quantitative approach to cost estimation. However, its effectiveness is contingent
on the availability of reliable historical data and the ability to develop accurate parametric
models that capture the relationships between parameters and costs.

4.4. Three-Point Estimation


Three-Point Estimation, also known as the PERT (Program Evaluation and Review Technique)
estimation, is a project management and cost estimation technique that uses three estimates to
represent the range of potential outcomes for an activity or task. The three estimates are the

Ministry of Labor and Estimate cost for Web Version-II


Page 56 of 91 Skills and database projects
Author/Copyright November, 2023
optimistic (O), pessimistic (P), and most likely (M) values. The Three-Point Estimation
method is particularly useful for tasks where there is a level of uncertainty or variability.
Key Aspects of Three-Point Estimation:
1. Optimistic Estimate (O):
 Description: The optimistic estimate represents the best-case scenario for the
completion time or cost of an activity. It assumes that everything progresses smoothly
with no unexpected issues.
 Role: The optimistic estimate provides an optimistic view of how quickly or
inexpensively the activity could be completed.
2. Pessimistic Estimate (P):
 Description: The pessimistic estimate represents the worst-case scenario for the
completion time or cost of an activity. It considers potential obstacles, delays, and
challenges.
 Role: The pessimistic estimate helps account for risks and uncertainties that could
result in a longer duration or higher cost.
3. Most Likely Estimate (M):
 Description: The most likely estimate represents the best judgment of the person
making the estimate based on realistic assumptions and considerations.
 Role: The most likely estimate provides a balanced and grounded view of the expected
completion time or cost, considering both positive and negative factors.
4. PERT Formula:
 Description: The PERT formula is used to calculate the expected value (TE) based on
the optimistic (O), pessimistic (P), and most likely (M) estimates. The formula is TE =
(O + 4M + P) / 6.
 Role: The PERT formula provides a weighted average that gives more weight to the
most likely estimate, reflecting a probabilistic view of the activity's expected duration
or cost.
5. Probability Distribution:
 Description: Three-Point Estimation introduces a probability distribution that allows
for a more nuanced understanding of the likelihood of different outcomes.
 Role: The probability distribution helps project managers and stakeholders assess the
level of uncertainty associated with the activity.
Ministry of Labor and Estimate cost for Web Version-II
Page 57 of 91 Skills and database projects
Author/Copyright November, 2023
6. Standard Deviation:
 Description: The standard deviation is a measure of the variability or spread of the
estimates. It is calculated using the formula σ = (P - O) / 6.
 Role: The standard deviation provides information about the level of uncertainty or
risk associated with the activity.
Advantages of Three-Point Estimation:
1. Risk Consideration:
 Three-Point Estimation explicitly considers both optimistic and pessimistic scenarios,
making it a valuable tool for risk management.
2. Probabilistic View:
 The inclusion of a probability distribution and standard deviation provides a more
nuanced, probabilistic view of the expected outcome.
3. Balanced Estimation:
 By combining optimistic, pessimistic, and most likely estimates, Three-Point
Estimation provides a balanced and realistic assessment of the activity.
4. Sensitivity Analysis:
 The method allows for sensitivity analysis, enabling project managers to assess how
changes in the estimates impact the overall project.
Challenges and Considerations:
1. Subjectivity:
 The estimates provided by individuals can be subjective, and biases may influence the
selection of optimistic, pessimistic, and most likely values.
2. Assumption of Normal Distribution:
 The PERT formula assumes a normal distribution, which may not always reflect the
actual distribution of outcomes.
3. Complexity:
 While Three-Point Estimation provides a more sophisticated view of uncertainty, it
adds complexity to the estimation process.
4. Data Availability:
 The accuracy of Three-Point Estimation depends on the availability of reliable data for
the optimistic, pessimistic, and most likely estimates.
5. Limited Applicability:
Ministry of Labor and Estimate cost for Web Version-II
Page 58 of 91 Skills and database projects
Author/Copyright November, 2023
 The method may be more applicable to certain types of projects or activities with
inherent variability. In cases where tasks are well-defined and predictable, simpler
estimation methods may suffice.
In summary, Three-Point Estimation is a valuable technique for project managers seeking to
account for uncertainty and risk in their project planning. It provides a more comprehensive
view of potential outcomes and allows for a probabilistic assessment of project timelines or
costs. Despite its challenges, Three-Point Estimation can be a valuable tool for projects with a
degree of unpredictability.

4.5. Bottom-Up Estimation


Bottom-Up Estimation is a project cost estimation method that involves breaking down a project
into smaller, more manageable components and estimating the costs associated with each
individual component. These detailed estimates are then aggregated to calculate the total
project cost. This method is often considered more accurate than other estimation techniques
because it provides a granular view of the project's requirements and allows for a thorough
analysis of each element.
Key Aspects of Bottom-Up Estimation:
1. Work Breakdown Structure (WBS):
 Description: The project is decomposed into a hierarchical structure known as the
Work Breakdown Structure (WBS). The WBS represents the project's scope and is
organized into smaller, more manageable components or work packages.
 Role: The WBS serves as the foundation for bottom-up estimation, providing a
structured framework for breaking down the project into discrete tasks.
2. Detailed Estimation for Each Component:
 Description: For each work package or component identified in the WBS, detailed
estimates are prepared. These estimates take into account the resources, time, and costs
required to complete each specific task.
 Role: Detailed estimation ensures a comprehensive understanding of the requirements
and resources needed for each aspect of the project.
3. Resource Identification:
 Description: Bottom-Up Estimation involves identifying and quantifying the
resources required for each work package. This includes personnel, materials,
Ministry of Labor and Estimate cost for Web Version-II
Page 59 of 91 Skills and database projects
Author/Copyright November, 2023
equipment, and any other resources necessary for completion.
 Role: Resource identification allows for a more accurate assessment of project costs,
as it considers the specific needs of each component.
4. Expert Input:
 Description: Subject matter experts and team members contribute their expertise to
the estimation process for individual work packages. Their input is valuable in
ensuring that the estimates are realistic and reflect the project's nuances.
 Role: Expert input enhances the accuracy and reliability of the bottom-up estimates.
5. Risk Analysis:
 Description: The detailed nature of bottom-up estimation allows for a more thorough
analysis of potential risks associated with each work package. Risks can be identified
and addressed at the component level.
 Role: Risk analysis contributes to a more robust risk management strategy by
addressing uncertainties at a granular level.
6. Aggregation of Estimates:
 Description: Once estimates are prepared for each work package, they are aggregated
to calculate the total project cost. This summation provides a comprehensive view of
the overall budget.
 Role: Aggregating estimates allows project managers and stakeholders to understand
the financial requirements for the entire project.
Advantages of Bottom-Up Estimation:
1. Accuracy:
 Bottom-Up Estimation is often more accurate than other methods because it considers
the unique requirements of each work package, leaving less room for oversights.
2. Detailed Analysis:
 The method allows for a detailed analysis of project components, promoting a better
understanding of the project's intricacies and potential challenges.
3. Granular Control:
 Project managers have granular control over the budget, as they can identify and
address cost-related issues at the level of individual work packages.
4. Effective Resource Planning:

Ministry of Labor and Estimate cost for Web Version-II


Page 60 of 91 Skills and database projects
Author/Copyright November, 2023
 Resource requirements are identified for each component, facilitating more effective
resource planning and allocation.
5. Risk Identification:
 Risks are identified and analyzed at the component level, enabling a proactive
approach to risk management.
Challenges and Considerations:
1. Time-Consuming:
 Bottom-Up Estimation can be time-consuming, especially for large and complex
projects, as it requires detailed analysis for each work package.
2. Resource Intensive:
 The method may require a significant investment of resources, both in terms of time
and personnel, to conduct a thorough estimation for each component.
3. Limited Applicability for Early Stages:
 Bottom-Up Estimation may be less practical during the early stages of a project when
detailed project information is not yet available.
4. Dependencies Between Work Packages:
 Dependencies between work packages can complicate the estimation process. Changes
in one component may impact others, requiring careful coordination.
5. Subject to Expertise:
 The accuracy of bottom-up estimates is subject to the expertise and knowledge of the
individuals involved in the estimation process.
Bottom-Up Estimation is particularly valuable when precision and accuracy are crucial, and when
the project's scope is well-defined. While it may be more time-consuming, the method
provides a comprehensive view of project costs, helping project managers make informed
decisions and manage resources effectively.

Self-check4
Part I: Write true if the statement is correct and false if it is wrong.
1. Expert judgment in cost estimation relies on the knowledge, experience, and insights of individuals or a
group of experts.

Ministry of Labor and Estimate cost for Web Version-II


Page 61 of 91 Skills and database projects
Author/Copyright November, 2023
2. Analogous estimation, also known as top-down estimation, is particularly useful when detailed information
about the current project is readily available.
3. Parametric estimation involves the development of mathematical models that express the relationship
between project parameters and costs, and these models can be either linear or nonlinear.
4. In Three-Point Estimation, the PERT formula calculates the expected value based on the optimistic,
pessimistic, and most likely estimates, and it gives equal weight to each of these estimates.
5. Bottom-Up Estimation involves breaking down a project into smaller components, estimating the costs for
each component, and then aggregating these estimates to calculate the total project cost.
Part II: Choose the correct answer
1. Which key aspect is associated with Expert Judgment in cost estimation?
A. Historical Data Analysis B. Identification of Parameters
C. Work Breakdown Structure (WBS) D. Subject Matter Experts (SMEs)
2. What does Analogous Estimation primarily rely on for estimating the cost of the current project?
A. Detailed project information C. Historical data from similar projects
B. Mathematical models D. Expert judgment
3. What role do mathematical models play in Parametric Estimation?
A. Assessing project risks C. Providing a weighted average
B. Calculating unit costs D. Identifying project parameters
4. In Three-Point Estimation, what formula is used to calculate the expected value?
A. TE = (O + P + M) / 3 C. TE = (O + 4M + P) / 6
B. TE = (O + 2M + P) / 4 D. TE = (O + P) / 2
5. What is a key advantage of Bottom-Up Estimation?
A. Speed and Simplicity
B. Limited Information Requirements
C. Granular Control and Detailed Analysis
D. Consideration of Optimistic and
Pessimistic Scenarios

Ministry of Labor and Estimate cost for Web Version-II


Page 62 of 91 Skills and database projects
Author/Copyright November, 2023
Operation sheet 4.1 Cost estimation
Operation Title:Cost estimation
Purpose:Cost estimation using parametric approach
Equipment and Tools:MS Excel
Step 1: Define Project Scope
Clearly define the scope of your website and database project. This includes understanding the
functionalities, features, and requirements that need to be implemented.
Step 2: Identify Parameters
Identify the key parameters that will influence the project cost. For a website and database
project, parameters might include the number of web pages, database size, user roles, and any
other relevant factors.
Step 3: Gather Historical Data
Collect historical data from previous similar projects. This data should include information on
project size, effort, duration, and cost. If your organization doesn't have such data, you might
need to rely on industry benchmarks or publicly available data.
Step 4: Develop Parametric Models
Based on the identified parameters and historical data, develop parametric models. These models
express the statistical relationships between project parameters and costs. For example, you
might use a formula like:
Cost=a×(Parameter1)b×(Parameter2)c×…
Step 5: Assign Values to Parameters
For your specific project, assign values to the identified parameters. This may involve working
with the project team to estimate the number of web pages, database size, and other relevant
factors.

Ministry of Labor and Estimate cost for Web Version-II


Page 63 of 91 Skills and database projects
Author/Copyright November, 2023
Step 6: Calculate Cost
Plug the assigned values into the parametric models to calculate the estimated cost. Adjustments
may be necessary based on project-specific factors that are not captured by the parametric
model.
EstimatedCost=a×(EstimatedParameter1)b×(EstimatedParameter2)c×…
Step 7: Validate and Refine
Compare the calculated cost with industry benchmarks or other available sources to validate its
reasonableness. If there are significant differences, refine the parametric models or reassess
the assigned values for parameters.
Step 8: Document Assumptions and Risks
Clearly document the assumptions made during the estimation process and identify potential risks
that could impact the project cost. This helps in managing expectations and preparing for
uncertainties.
Step 9: Communicate and Review
Communicate the estimated cost to relevant stakeholders and conduct a review to ensure that all
aspects of the project have been considered. Make adjustments as needed based on feedback.
Step 10: Monitor and Update
Throughout the project, monitor actual costs and compare them with the estimated costs. If there
are significant deviations, update the estimation models and refine the process for future
projects.
Remember that parametric estimation is a statistical approach, and the accuracy of the estimate
depends on the quality of the data and the appropriateness of the parametric models. Regularly
updating the models based on actual project data improves the accuracy of future estimations.
Let's break down the parametric cost estimation formula with specific values for illustration:
Cost=a×(Parameter1)b×(Parameter2)c×…
Suppose you have a software development project, and you want to estimate the cost based on
two parameters: the number of features (Parameter1) and the complexity level (Parameter2).
Let's assume the parametric model is:
Cost=100×(Number of Features)0.8×(Complexity Level)1.2
Now, let's say for your specific project:
 Number of Features (Parameter1Parameter1) = 50
 Complexity Level (Parameter2Parameter2) = 3
Ministry of Labor and Estimate cost for Web Version-II
Page 64 of 91 Skills and database projects
Author/Copyright November, 2023
Substitute these values into the formula:
Cost=100×(50)0.8×(3)1.2Cost=100×(50)0.8×(3)1.2
Now, calculate each part of the formula:
1. (50)0.8(50)0.8: Raise 50 to the power of 0.8.
2. (3)1.2(3)1.2: Raise 3 to the power of 1.2.
After performing these calculations, substitute the results back into the formula:
Cost=100×(result of (50)0.8)×(result of (3)1.2)Cost=100×(result of (50)0.8)×(result of (3)1.2)
Finally, compute the overall cost:
Cost=100×(result of (50)0.8)×(result of (3)1.2)
Let's note that the actual numerical values might differ based on the specific model and project
context. The purpose of parametric estimation is to capture the relationships between project
parameters and cost based on historical data or industry standards. Adjust the model
coefficients (such as 100, 0.8, and 1.2 in this example) to best fit your organization's historical
data and experience

Ministry of Labor and Estimate cost for Web Version-II


Page 65 of 91 Skills and database projects
Author/Copyright November, 2023
Unit Five: Cost Components Breakdown

This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Development Costs
 Infrastructure Costs
 Maintenance and Support Costs
 Contingency Costs
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Develop a comprehensive understanding of the concept of cost components breakdown in the
context of project management.
 Recognize the significance of detailed analysis and categorization in understanding financial
resource allocation.
 Understand the specific elements of development costs in the context of a website and
database project.
 Comprehend the nature of infrastructure costs in the context of a website and database
project.
 Understand the ongoing expenses associated with maintaining and supporting a website and
its underlying database.
 Recognize the importance of contingency costs in project cost estimation.

Ministry of Labor and Estimate cost for Web Version-II


Page 66 of 91 Skills and database projects
Author/Copyright November, 2023
5.1. Development Costs
Development costs in the context of cost estimation for a website and database project pertain to
the expenses associated with planning, designing, building, and implementing both the
website and its underlying database. These costs are crucial for estimating the financial
resources required for the successful execution of the project.
In the context of a website and database project, development costs specifically include budgeting
for:
 Personnel Costs:
Description: Personnel costs cover the salaries and benefits of individuals directly involved in the
development process, such as web developers, database administrators, project managers, and
UI/UX designers.
Examples: Web developer salaries, database administrator salaries, project manager salaries.
 Technology and Tools:
Description: Technology and tools costs encompass expenses related to acquiring or licensing the
necessary software, frameworks, and tools for web development and database management.
Examples: Web development frameworks (e.g., React, Angular), Database management system
licenses (e.g., MySQL, MongoDB), Integrated Development Environments (IDEs).
 Training and Skill Development:
Description: Training and skill development costs cover activities aimed at enhancing the skills
and knowledge of the development team, ensuring they stay updated on the latest technologies
and best practices.
Examples: Training programs for new technologies, Workshops on web development trends,
Certifications in database management.
 Consulting and Outsourcing:
Description: Consulting and outsourcing costs include payments made to external entities or
individuals providing specialized expertise, design services, or additional development
resources.
Examples: Hiring a UI/UX design consultant, outsourcing specific development tasks, Engaging a
security consultant.
 Prototyping and Testing:

Ministry of Labor and Estimate cost for Web Version-II


Page 67 of 91 Skills and database projects
Author/Copyright November, 2023
Description: Prototyping and testing costs cover expenses related to creating prototypes of the
website, conducting usability testing, and ensuring the quality and functionality of the site.
Examples: Prototyping tools, User testing services, Quality assurance tools.
 Materials and Resources:
Description: Materials and resources costs involve the procurement of physical items or resources
necessary for the development process, such as server hardware, networking equipment, and
storage solutions.
Examples: Web server hardware, Storage solutions for the database, Networking equipment.
 Facilities and Infrastructure:
Description: Facilities and infrastructure costs include expenses related to office space, utilities,
and other physical infrastructure required for development activities.
Examples: Rent for office space, Electricity and internet costs, Office furniture and equipment.
 Intellectual Property (IP) Costs:
Description: Intellectual property costs involve expenses associated with securing and protecting
the intellectual property rights of the website, such as trademarks or copyrights.
Examples: Trademark registration fees, Copyright filing costs, Licensing fees for third-party
components.
 Marketing and Launch:
Description: Marketing and launch costs include expenditures related to promoting and
introducing the website to the target audience. This is essential for attracting users and
stakeholders.
Examples: Digital marketing campaigns, Launch events or promotions, Advertising expenses.
 Documentation and Compliance:
Description: Documentation and compliance costs cover activities related to creating user
documentation, ensuring compliance with data protection regulations, and meeting industry
standards.
Examples: Privacy policy and terms of use documentation, Compliance testing services, Legal
consultation on data protection.
 Database Costs:
escription: Database costs include specific expenses related to the database, such as licensing fees
for the database management system, storage costs, and any specialized tools for database
optimization.
Ministry of Labor and Estimate cost for Web Version-II
Page 68 of 91 Skills and database projects
Author/Copyright November, 2023
In summary, development costs focus on the human and technological aspects of creating a
website and its associated database, excluding infrastructure expenses. These costs are integral
to effective project planning, resource allocation, and successful execution.

5.2. Infrastructure Costs


Infrastructure costs in the context of cost estimation for a website and database project refer to the
expenses associated with the physical and virtual components that support the development,
deployment, and ongoing operation of the project. These costs are crucial for ensuring that the
necessary resources and environments are in place to run both the website and its associated
database.
In the context of a website and database project, infrastructure costs include budgeting for:
1. Web Hosting: Allocating funds for hosting services that provide the infrastructure for the
website to be accessible on the internet, covering server space, bandwidth, domain registration
costs, and additional services provided by the hosting provider.
2. Database Hosting: Budgeting for infrastructure expenses related to hosting the database
separately from the website, covering database server costs, cloud database service fees, and
storage costs for database data.
3. Cloud Services: Allocating funds for using cloud platforms that provide infrastructure as a
service (IaaS), platform as a service (PaaS), or software as a service (SaaS) solutions,
including costs for cloud computing resources, cloud-based database services, and cloud
storage.
4. Networking Equipment: Budgeting for expenses related to the infrastructure needed for
communication between servers, databases, and other components, covering the purchase or
lease of networking hardware, configuration and maintenance costs, and internet service
provider fees.
5. Server Hardware: Allocating funds for expenses related to the physical servers that host the
website and database, including the purchase, maintenance, and upgrade of server equipment.
6. Data Center Costs: Budgeting for expenses related to the physical facilities that house the
servers and networking equipment, including rent, utilities, and security measures.
7. Backup and Recovery Infrastructure: Allocating funds for implementing and maintaining
robust backup and recovery solutions for both the website and the database, covering backup
server and storage costs, backup software licenses, and disaster recovery planning.
Ministry of Labor and Estimate cost for Web Version-II
Page 69 of 91 Skills and database projects
Author/Copyright November, 2023
8. Monitoring and Logging Tools: Budgeting for expenses related to software and services that
monitor the performance, security, and availability of the website and database, including
monitoring software licenses, cloud-based monitoring services, and security information and
event management (SIEM) tools.
9. Load Balancers: Allocating funds for hardware or software solutions that distribute incoming
web traffic across multiple servers to ensure optimal performance and reliability, covering
load balancer hardware costs, load balancing software licenses, and configuration and
maintenance costs.
10. Security Infrastructure: Budgeting for expenses related to implementing security measures
to protect the website and database from potential threats and attacks, including firewalls,
intrusion detection systems, SSL certificate costs, and security consulting services.
11. Scalability Planning: Allocating funds for planning for future growth in terms of users, data,
or functionality, ensuring that the infrastructure can scale as needed. This includes costs for
scalable cloud services, infrastructure upgrades, and capacity planning and optimization.
In summary, infrastructure costs involve anticipating and budgeting for the foundational
components that support the website and database throughout their lifecycle, from
development and deployment to ongoing operation and scalability.

5.3. Maintenance and Support Costs


Maintenance and support costs in the context of a website and database project refer to the
ongoing expenses associated with keeping both the website and its underlying database
operational, secure, and up-to-date. These costs are crucial for ensuring that the project
continues to meet its objectives, remains secure, and adapts to changing requirements over
time.
From a cost estimation perspective, maintenance and support costs involve budgeting for
activities such as:
1. Software Updates and Patches: Allocating funds for regularly updating and patching
software components to address security vulnerabilities, bugs, and introduce new features.
2. Security Measures: Budgeting for ongoing security measures to protect the website and
database from potential threats, including expenses for security software licenses, regular
audits, and incident response planning.
Ministry of Labor and Estimate cost for Web Version-II
Page 70 of 91 Skills and database projects
Author/Copyright November, 2023
3. Database Maintenance: Setting aside funds for routine database maintenance tasks, such as
optimizing queries, cleaning up unnecessary data, and ensuring data integrity.
4. Backup and Recovery: Allocating resources for regular backups of both the website and
database, as well as the implementation of recovery strategies to ensure data integrity and
business continuity.
5. Server and Hosting Renewals: Planning for costs associated with renewing server hosting
services, domain registrations, and other infrastructure components to ensure uninterrupted
access to the website.
6. Technical Support: Budgeting for accessing technical support services, which may include
support from software vendors, hosting providers, or third-party service providers.
7. User Support and Training: Allocating funds for providing ongoing support to end-users,
addressing user queries, and conducting training sessions for users as needed.
8. Monitoring and Performance Optimization: Setting aside resources for monitoring the
performance of the website and database, identifying bottlenecks, and optimizing system
performance.
9. Regulatory Compliance: Budgeting for expenses related to maintaining compliance with
relevant regulations and standards, especially in industries with specific data protection and
security requirements.
10. Content Updates: Allocating funds for updating and managing content on the website,
including text, images, and multimedia elements.
11. Mobile Responsiveness Updates: Budgeting for expenses related to ensuring that the website
remains mobile-responsive, accommodating various devices and screen sizes.
12. Accessibility Updates: Setting aside resources for maintaining and improving accessibility
features to ensure that the website complies with accessibility standards to accommodate users
with disabilities.
In summary, maintenance and support costs play a vital role in the long-term success and
sustainability of a website and database project. Effective cost estimation involves carefully
considering these ongoing expenses to ensure that the project remains secure, up-to-date, and
aligned with evolving business needs.

Ministry of Labor and Estimate cost for Web Version-II


Page 71 of 91 Skills and database projects
Author/Copyright November, 2023
5.4. Contingency Costs
Contingency costs in the context of a website and database project involve setting aside a reserve of
funds to address unforeseen circumstances, risks, or changes that may arise during the project
lifecycle. These funds act as a safety net to cover unexpected expenses and uncertainties, ensuring
that the project can adapt to challenges without compromising its success.
In the context of cost estimation for website and database projects, contingency costs include budgeting
for:
Risk Mitigation:Allocating funds to mitigate identified risks and uncertainties that may impact the
project, addressing issues related to technology, requirements, and external factors.
Scope Changes: Setting aside funds to accommodate changes to the project scope, whether initiated by
stakeholders or due to evolving requirements.
Technology Challenges: Budgeting for challenges related to technology, such as unexpected
compatibility issues, changes in technology trends, or the need to adopt new tools or frameworks.
Vendor or Service Provider Issues: Allocating contingency funds to address issues that may arise with
external vendors or service providers, such as delays, unexpected costs, or changes in service terms.
Regulatory Changes: Setting aside funds to address the financial impact of changes in regulations or
compliance requirements that may necessitate adjustments to the website and database.
Market Dynamics: Budgeting for adjustments needed to address changes in market conditions or user
preferences, ensuring the website remains competitive.
Security Incidents: Allocating funds to respond to security incidents, such as data breaches or
cyberattacks, including costs for forensic analysis, security patches, and legal or public relations
expenses.
Force Majeure Events: Setting aside contingency funds to address unforeseen events beyond the project
team's control, such as natural disasters, political instability, or other force majeure events.
In summary, contingency costs in cost estimation for website and database projects involve anticipating
and preparing for unexpected challenges, changes, or risks that may impact the project's budget. This
proactive approach ensures financial resilience and the ability to navigate uncertainties throughout the
project lifecycle.

Ministry of Labor and Estimate cost for Web Version-II


Page 72 of 91 Skills and database projects
Author/Copyright November, 2023
Self-Check 5
Part I: Write true if the statement is true and false if it is false.
1. Development costs in the context of a website and database project include expenses related to the
physical facilities that house servers and networking equipment.
2. Infrastructure costs for a website and database project encompass budgeting for activities such as
software updates, user support, and accessibility updates.
3. Maintenance and support costs in a website and database project involve planning for future growth in
terms of users, data, or functionality.
4. Contingency costs in cost estimation for website and database projects may include funds allocated to
address changes in market conditions or user preferences.
5. The breakdown of cost components primarily contributes to transparency and clarity in project control
but has minimal impact on financial planning and resource management.
Part II: Choose the correct answer and encircle it.
1. Which of the following is considered a development cost in the context of a website and database project?
A. Web hosting fees C. Database maintenance costs
B. Server hardware expenses D. Legal consultation fees
2. What do infrastructure costs for a website and database project include?
A. Training and skill development C. Marketing and launch expenditures
B. Backup and recovery infrastructure D. User support and training
3. What is a key aspect of maintenance and support costs in a website and database project?

Ministry of Labor and Estimate cost for Web Version-II


Page 73 of 91 Skills and database projects
Author/Copyright November, 2023
A. Allocating funds for web hosting services C. Planning for future growth in terms of users
B. Setting aside resources for monitoring system D. Mitigating identified risks and uncertainties
performance
4. Which of the following is a component of contingency costs in cost estimation for website and database projects?
A. Database licensing fees C. Addressing issues related to technology challenges
B. Allocating funds for software updates D. Budgeting for networking equipment
5. What is the primary purpose of a cost components breakdown in project management?
A. Minimizing project transparency
B. Ignoring financial planning considerations
C. Categorizing costs for clarity and understanding
D. Excluding development costs from resource management

Ministry of Labor and Estimate cost for Web Version-II


Page 74 of 91 Skills and database projects
Author/Copyright November, 2023
Unit Six Cost Estimation Tools and Techniques
This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Project Management Software
 Cost Estimation Tools
 Version Control Systems
 Collaboration and Communication Tools
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Develop a comprehensive understanding of collaboration and communication tools and their
role in enhancing team efficiency.
 Understand how collaboration and communication tools contribute to cost estimation in a
business context.
 Identify the specific advantages these tools offer in terms of improving operational efficiency
and reducing associated costs.
 Understand how these features contribute to time savings and improved accuracy, leading to
cost efficiency.
 Understand how improved team efficiency contributes to faster project completion and
potential cost savings.

6.1. Project Management Software


Project Management Software is a tool designed to help plan, organize, and track the progress of
projects. From a cost estimation perspective, these tools offer several advantages that
contribute to effective budgeting and resource management:

Ministry of Labor and Estimate cost for Web Version-II


Page 75 of 91 Skills and database projects
Author/Copyright November, 2023
1. Task and Resource Allocation: Project Management Software enables detailed task planning
and resource allocation. This ensures that team members are assigned tasks based on their
skills and availability, optimizing resource utilization and potentially reducing labor costs.
2. Time Tracking and Productivity Analysis: Many project management tools include features
for tracking the time spent on tasks. This data allows for a better understanding of resource
efficiency and can help identify areas for improvement, potentially leading to cost savings
through increased productivity.
3. Budget Management: Project management software often includes budget tracking features.
This allows project managers to monitor expenses, compare them against the allocated budget,
and make informed decisions to prevent cost overruns.
4. Risk Management: These tools provide a platform for identifying and managing project
risks. By addressing potential issues early on, project managers can mitigate the impact of
risks on timelines and budgets, reducing the likelihood of unexpected costs.
5. Collaboration and Communication: Project management tools facilitate communication and
collaboration among team members. Efficient communication can prevent misunderstandings,
reduce errors, and ultimately contribute to cost savings by avoiding rework and delays.
6. Real-Time Reporting: The ability to generate real-time reports on project progress,
milestones, and budget status is a key feature of project management software. This
transparency helps in proactive decision-making, preventing potential cost overruns and
ensuring projects stay on track.
7. Resource Optimization: By visualizing resource availability and workloads, project
managers can optimize the allocation of resources. This can prevent burnout, enhance team
efficiency, and contribute to cost savings by ensuring that resources are used effectively.
8. Task Dependencies and Critical Path Analysis: Project management tools often allow the
modeling of task dependencies and critical paths. Understanding these relationships helps in
identifying potential bottlenecks and optimizing project schedules, which can lead to time and
cost savings.
9. Workflow Automation: Automation features in project management software can streamline
routine tasks, reducing manual effort and minimizing the risk of errors. This efficiency can
result in cost savings by optimizing labor resources.

Ministry of Labor and Estimate cost for Web Version-II


Page 76 of 91 Skills and database projects
Author/Copyright November, 2023
10. Client Collaboration: For client-facing projects, project management tools that facilitate
client collaboration can improve communication, reduce misunderstandings, and enhance
client satisfaction, potentially leading to repeat business and positive financial outcomes.
In summary, project management software contributes to cost estimation by providing tools for
efficient resource allocation, budget management, risk mitigation, and real-time reporting.
These features collectively enhance project control and contribute to successful project
outcomes within budgetary constraints.

6.2. Cost Estimation Tools


Cost Estimation Tools for website and database projects play a crucial role in predicting and
managing financial resources. Here are key aspects from a cost estimation perspective:
1. Scope Identification: Cost estimation tools help in defining and quantifying the scope of the
website and database project. This involves specifying features, functionalities, and database
requirements, laying the foundation for accurate cost predictions.
2. Resource Planning: These tools assist in identifying the human, technological, and
infrastructure resources needed for website and database development. This includes estimating
the effort required for designing, coding, testing, and maintaining the project components.
3. Technology and Platform Considerations: Cost estimation tools account for the technologies
and platforms chosen for website and database development. Different technologies may have
varying licensing costs, and the scalability of database solutions can impact infrastructure
expenses.
4. Development Methodology: The chosen development methodology (e.g., Agile, Waterfall)
influences cost estimates. Tools consider factors like iterative development cycles, client
feedback loops, and testing iterations when estimating costs for website and database projects.
5. Database Design Complexity: The complexity of the database architecture, such as the number
of tables, relationships, and data volume, is a critical factor. Cost estimation tools evaluate the
intricacies of database design to determine resource requirements.
6. Integration Points: If the website and database need to integrate with other systems or third-
party services, cost estimation tools account for the development effort, API integrations, and
potential licensing costs associated with these integrations.
7. Security Requirements: Security considerations, such as implementing secure coding practices,
encryption, and compliance with data protection regulations, are factored into cost estimates.
Enhanced security measures may require additional development effort and resources.
Ministry of Labor and Estimate cost for Web Version-II
Page 77 of 91 Skills and database projects
Author/Copyright November, 2023
8. Testing and Quality Assurance: Cost estimation tools include provisions for testing activities,
ensuring that the website and database undergo thorough testing phases. This involves estimating
the effort for unit testing, integration testing, and quality assurance processes.
9. Scalability and Performance: Tools consider the scalability requirements of the website and
database to accommodate potential growth in users or data. Scalability features, such as load
balancing or sharding for databases, impact cost estimates.
10. Documentation and Training: Costs related to documenting the codebase and providing
training for stakeholders are taken into account. Clear documentation and training can reduce
future maintenance costs and enhance the project's overall efficiency.
In summary, cost estimation tools for website and database projects address the intricacies of web
development, database design, technology choices, and other project-specific factors. By
systematically evaluating these elements, these tools contribute to accurate budgeting,
resource planning, and successful financial management throughout the project lifecycle.

6.3. Version control system


A version control system (VCS) is a tool that helps manage changes to source code or any set of
files over time. From a cost estimation perspective, a VCS offers several benefits that
contribute to overall efficiency and savings in software development:
Collaboration Efficiency: VCS enables multiple developers to work on the same project
simultaneously. This parallel development reduces project timelines and labor costs.
Error Reduction: VCS tracks changes made by each developer, allowing for the easy
identification and correction of errors. This can significantly reduce the time and resources
spent on debugging.
Rollback and Recovery: In case of errors or unwanted changes, VCS allows for easy rollback to
a previous stable version. This feature minimizes the impact of mistakes, reducing the
potential costs associated with fixing errors.
Branching and Merging: VCS supports branching, allowing developers to work on separate
features or bug fixes independently. When ready, these changes can be seamlessly merged
into the main codebase. This reduces the likelihood of conflicts and the associated costs of
resolving them.
Auditing and Accountability: VCS logs every change made to the codebase, providing a
detailed history of who made what changes and when. This accountability can help in

Ministry of Labor and Estimate cost for Web Version-II


Page 78 of 91 Skills and database projects
Author/Copyright November, 2023
assessing the impact of changes and can be crucial in identifying the source of issues,
potentially saving costs related to investigating and resolving problems.
Continuous Integration (CI) and Continuous Deployment (CD): VCS integrates with CI/CD
pipelines, automating the testing and deployment processes. This automation ensures a more
reliable and streamlined development workflow, reducing manual effort and associated costs.
Code Reviews: VCS facilitates code reviews by providing a clear view of changes made. Code
reviews help catch issues early in the development process, reducing the likelihood of costly
errors in later stages.
Documentation and Collaboration: VCS often includes features for documentation and
collaboration, fostering better communication among team members. Improved
communication can lead to faster issue resolution and more efficient use of resources.
In summary, a version control system contributes to cost savings by improving collaboration,
reducing errors, enabling efficient recovery from mistakes, supporting parallel development,
and streamlining processes in software development projects.
Collaboration and communication tools play a crucial role in enhancing team efficiency and
reducing costs in a business environment. From a cost estimation perspective, these tools offer
several advantages:
Remote Collaboration: Collaboration tools enable teams to work together seamlessly, regardless
of geographical locations. This can result in cost savings by reducing the need for travel
expenses and maintaining physical office spaces.
Real-Time Communication: Instant messaging, video conferencing, and collaboration platforms
facilitate real-time communication. This immediacy can lead to quicker decision-making,
issue resolution, and project progress, ultimately saving time and associated costs.
Document Sharing and Version Control: Tools that allow for easy sharing and collaboration on
documents reduce the risk of errors and streamline workflows. This can result in time savings
and improved accuracy, contributing to overall cost efficiency.
Project Management Integration: Collaboration tools often integrate with project management
systems, providing a centralized platform for task assignment, progress tracking, and resource
management. This integration can optimize project timelines and resource allocation, leading
to cost savings.
Knowledge Sharing and Training: Platforms that facilitate knowledge sharing and training
contribute to employee skill development and faster onboarding. This can reduce training
costs and enhance the overall competency of the workforce.

Ministry of Labor and Estimate cost for Web Version-II


Page 79 of 91 Skills and database projects
Author/Copyright November, 2023
Workflow Automation: Many collaboration tools offer workflow automation features that
streamline routine tasks. Automating repetitive processes can save time and reduce the
likelihood of errors, ultimately lowering operational costs.
Centralized Communication History: Having a centralized record of communication and
collaboration activities can aid in decision-making, dispute resolution, and project audits. This
historical data can contribute to cost savings by providing insights into project timelines and
resource utilization.
Reduced Email Overhead: Collaboration tools often provide alternatives to traditional email
communication. By reducing reliance on email, which can be time-consuming and lead to
information overload, teams can operate more efficiently, potentially saving on productivity
costs.
Improved Team Productivity: Enhanced collaboration and communication contribute to
improved overall team productivity. When teams can work more efficiently and effectively,
projects are completed faster, leading to potential cost savings.
In summary, collaboration and communication tools can lead to cost savings by streamlining
workflows, reducing the need for physical presence, improving communication efficiency,
and optimizing project management processes. These tools contribute to a more agile and
responsive work environment, potentially translating into financial benefits for organizations.

Self-check 6
Part I: Write true if the statement is correct and false if it is wrong.
1. Project management software can assist in tracking labor costs associated with each task by
breaking down the project into activities.
2. Time tracking functionality in project management software is essential for monitoring project
timelines but does not contribute to accurate labor cost estimation.
3. Git is an example of a centralized version control system widely used for tracking changes in
source code during software development.
4. True/False: Collaboration and communication tools, such as Slack and Microsoft Teams, are
essential for effective teamwork and streamlining communication in website and database projects.
5. Cost estimation platforms like CostOS and Candy offer specialized features for project
management, including task and activity management, making them versatile tools for overall
project coordination.
Part II:Choose the correct answer
1. Which functionality in project management software is crucial for estimating personnel costs?
A) Time Tracking B) Resource Allocation
Ministry of Labor and Estimate cost for Web Version-II
Page 80 of 91 Skills and database projects
Author/Copyright November, 2023
C) Cost Tracking and Budgeting D) Collaboration and Communication
2. Which version control system is known for its speed, flexibility, and branching capabilities,
making it highly popular in web development projects?
A) Subversion (SVN) B) Mercurial C) Git D) Bitbucket
3. What is the primary purpose of using collaboration tools like Slack and Microsoft Teams in a
project?
A) Version control C) Effective teamwork and communication
B) Code debugging D) Infrastructure setup
4. Which tool is commonly used for estimating costs related to cloud services in website and
database projects?
A) GitLab B) AWS Pricing Calculator C) Jira D) Trello
5. In version control systems, what is the purpose of branching, allowing the isolation of features
or bug fixes?
A) Managing project budgets C) Facilitating collaboration
B) Conflict resolution D) Isolating changes in development lines

Operation sheet 6.1 Cost estimation using Microsoft project


Operation Title: Cost estimation using Microsoft project
Purpose: To enable trainees to acquire skill to use Microsoft project
Equipment and Tools: Microsoft project
Step 1: Define Project Scope
1. Open your project management software and create a new project.
2. Clearly define the scope of your website and database project. This includes identifying key
features, functionalities, and deliverables.
Step 2: Break Down Work Structure
1. Create a Work Breakdown Structure (WBS) in your project management software. This
breaks down the project into smaller, manageable tasks.
2. Identify tasks related to website development, database design, testing, and other relevant
activities.
Step 3: Estimate Task Durations
1. Assign durations to each task in the WBS. This could be in days or hours, depending on your
project management software.
2. Use historical data or expert judgment to estimate how long each task will take.
Ministry of Labor and Estimate cost for Web Version-II
Page 81 of 91 Skills and database projects
Author/Copyright November, 2023
Step 4: Identify Resources
1. List the resources (human and material) needed for each task. This might include developers,
database administrators, software licenses, etc.
2. Enter resource information into your project management software.
Step 5: Assign Costs to Resources
1. Attach costs to each resource in your project management tool. This could be hourly rates for
labor or fixed costs for materials and software licenses.
2. Ensure that these rates are accurate and up-to-date.
Step 6: Set Dependencies
1. Define task dependencies. For example, website development might depend on the
completion of the database design.
2. Input these dependencies in your project management software.

Step 7: Run Cost Estimates


1. Use the built-in features of your project management software to run cost estimates. Many
tools have cost estimation features that calculate costs based on resource rates, task durations,
and dependencies.
2. Review the calculated costs and ensure they align with your expectations.
Step 8: Add Contingency
1. Factor in contingency costs for unforeseen issues or changes in requirements. This is often a
percentage of the total estimated cost.
2. Update your project plan in the software to reflect the contingency.
Step 9: Review and Adjust
1. Review the overall cost estimate and ensure it aligns with the project budget.
2. Make adjustments as needed, considering any constraints or feedback from stakeholders.
Step 10: Monitor and Update
1. Regularly update the project plan as the project progresses.
2. Monitor actual costs and compare them with the estimated costs.
3. Use the software to track any changes in scope, resources, or timelines, and adjust the cost
estimates accordingly.
Remember that the specific steps and features can vary between project management tools, so
refer to the documentation of the software you're using for detailed instructions. Additionally,
effective communication with the project team and stakeholders is crucial throughout the
estimation and project management process.
Here's a step-by-step guide using Microsoft Project to estimate costs for a website and database
project:
Step 1: Open Microsoft Project and Create a New Project
1. Launch Microsoft Project.
2. Create a new project by selecting "File" -> "New" -> "Blank Project."
Step 2: Define Project Scope and Tasks
Ministry of Labor and Estimate cost for Web Version-II
Page 82 of 91 Skills and database projects
Author/Copyright November, 2023
1. Go to the "Task" tab and start creating tasks for your project. Include tasks related to website
development, database design, testing, etc.
2. Organize tasks hierarchically using the "Indent" and "Outdent" buttons to create a Work
Breakdown Structure (WBS).
Step 3: Estimate Task Durations
1. Click on the "View" tab and select the "Gantt Chart" view.
2. Double-click on each task and enter estimated durations in the "Duration" field.
Step 4: Identify Resources
1. Navigate to the "Resource" tab.
2. Enter the resources needed for each task. For example, developers, database administrators,
software licenses, etc.
Step 5: Assign Costs to Resources
1. In the "Resource Sheet" view, enter the cost information for each resource. This could be an
hourly rate for labor or a fixed cost for materials and software licenses.
2. Ensure that the rates are accurate and up-to-date.
Step 6: Assign Resources to Tasks
1. Go back to the "Gantt Chart" view.
2. Assign resources to each task by entering the resource names in the "Resource Names"
column.
Step 7: Set Dependencies
1. Identify task dependencies by linking tasks. Select the "Predecessors" column and enter the
task IDs that need to be completed before the current task can start.
Step 8: Run Cost Estimates
1. Go to the "Project" tab.
2. Click on "Project Information" and set the start date for your project.
3. Click on "Project" again, then select "Project Information" -> "Advanced Properties" to set the
project's currency.
4. Go to the "Resource" tab and click "Resource Usage" to view resource costs.
5. Use the "Cost" column in the "Gantt Chart" view to see task costs.
Step 9: Add Contingency
1. Create a contingency task or buffer time in your project plan.
2. Assign resources and costs to the contingency task.
Step 10: Review and Adjust
1. Review the overall cost estimate and ensure it aligns with the project budget.
2. Make adjustments as needed based on feedback or constraints.
Step 11: Monitor and Update
1. Regularly update the project plan as the project progresses.
2. Monitor actual costs and compare them with the estimated costs.
3. Use Microsoft Project's tracking features to track changes in scope, resources, or timelines,
and adjust the cost estimates accordingly.

Ministry of Labor and Estimate cost for Web Version-II


Page 83 of 91 Skills and database projects
Author/Copyright November, 2023
Remember, Microsoft Project has various features and views that can aid in project cost
estimation, so feel free to explore additional functionalities based on your project's needs.
Always communicate the estimates with stakeholders and regularly update the project plan as
the project evolves.

Reference

Books:
1. "Software Estimation: Demystifying the Black Art" by Steve McConnell:
2. "The Art of Project Management" by Scott Berkun:
3. "Estimating Software Costs: Bringing Realism to Estimating" by Capers Jones:
Online Resources:
1. SEER by Galorath:
 SEER is a suite of software estimation tools. Their website also features insightful
articles and resources on cost estimation.
2. ProjectManagement.com:
 ProjectManagement.com offers a wealth of articles, webinars, and templates related to
project management and estimation.
3. IEEE Software Engineering Body of Knowledge (SWEBOK):

Ministry of Labor and Estimate cost for Web Version-II


Page 84 of 91 Skills and database projects
Author/Copyright November, 2023
 SWEBOK provides a comprehensive overview of software engineering knowledge areas,
including software cost estimation.
4. Project Management Institute (PMI):
 PMI is a global leader in project management resources. Explore their publications,
webinars, and standards for project cost management.

Ministry of Labor and Estimate cost for Web Version-II


Page 85 of 91 Skills and database projects
Author/Copyright November, 2023
Developer’s Profile
Qualifi
N ca Organization/ Mobile
Name Field of Study E-mail
tio Institution number
n
1 Frew Atkilt M- Network & Bishoftu 0911787374 [email protected]
Te Information Polytechnic
ch Security College
2 Gari Lencha MSc ICT Managment Gimbi 0917819599 [email protected]
Polytechnic
3 Kalkidan BSc Computer Science Entoto 0978336988 [email protected]
Daniel Polytechnic
4 Solomon M- Computer M/G 0918578631 [email protected]
Melese Te Engineering /M/Polytech m
ch nic College

5 Tewodros MSc Information Sheno 0912068479 girmatewodiros @gmail.com


Girma system Polytechnic

Ministry of Labor and Estimate cost for Web Version-I


Page 86 of Skills and database
91 Author/Copyright projects November,
2023
College
6 Yohannes BSc Computer Science Entoto 0923221273 yohannesgebeyehu73@gmai
Gebeye Polytechnic l.com
hu College

Ministry of Labor and Estimate cost for Web Version-II


Page 87 of 91 Skills and database projects
Author/Copyright November, 2023