Managing Web and Database Project

The document outlines a module titled 'Managing Web and Database Projects' developed by the Ministry of Labor and Skills, intended for training purposes with a nominal duration of 50 hours. It covers project initiation, execution, and closure, providing a comprehensive framework for managing web and database projects effectively. The module includes various units focusing on governance, needs analysis, feasibility studies, team management, and project closure, aimed at enhancing project management skills.

Uploaded by

misrak dagne
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views81 pages

Managing Web and Database Project

The document outlines a module titled 'Managing Web and Database Projects' developed by the Ministry of Labor and Skills, intended for training purposes with a nominal duration of 50 hours. It covers project initiation, execution, and closure, providing a comprehensive framework for managing web and database projects effectively. The module includes various units focusing on governance, needs analysis, feasibility studies, team management, and project closure, aimed at enhancing project management skills.

Uploaded by

misrak dagne
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 81

Logo Company Name: Form No.

የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029


MINISTRY OF LABOR AND SKILLS

Issue No: Page No:


Managing Web and Database Projects.
1 Page 1 of 81

Web Development and Database


Administration Level-V
Based on December 2024, Curriculum Version II

Module Title: Managing Web and Database Projects.


Module code: EIS WDDBA5 M06 1224
Nominal duration: 50 Hours

Prepared by: Ministry of Labor and Skill


November, 2023
Addis Ababa, Ethiopia
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 2 of 81
1

Table of Contents

Acknowledgment ........................................................................................................................... 4
Acronym ......................................................................................................................................... 5
Introduction to the Module .......................................................................................................... 6
Unit One: Project Initiation and Planning .................................................................................. 7
1.1 PROJECT GOVERNANCE AND ORGANIZATIONAL CONTEXT. ......................... 7
1.2 Needs Analysis and Defining Project Objectives ............................................................ 8
1.3 Feasibility Studies and Business Case Development .................................................... 10
1.4 Project Scope and Charter Development ....................................................................... 11
1.5 Project Planning ............................................................................................................. 13
1.6 Risk Management .......................................................................................................... 15
Self-Check 1 ................................................................................................................................. 16
Operation Sheet 1.1: Project Governance and Organizational Context. .............................. 19
Operation Sheet 1.2 Needs Analysis and Defining Project Objectives ................................... 21
Operation Sheet 1.3: Feasibility Studies and Business Case Development ............................ 23
Operation Sheet 1.4: Project Scope and Charter Development. ............................................. 27
Operation Sheet 1.5: Project Planning ...................................................................................... 31
Operation Sheet 1.6: Risk Management ................................................................................... 34
Lap Test: .............................................................................................................................. 38
Unit Two: Project Execution and Team Management ........................................................... 40
2.1 Team Formation and Development ............................................................................... 41
2.2. Communication and Collaboration Strategies .............................................................. 43
2.3. Quality Management and Control ................................................................................ 46
2.4. Change Management .................................................................................................... 48
2.5. Issue and Conflict Resolution. ...................................................................................... 51
2.6. Monitoring and Controlling Project Progress. .............................................................. 54
Self-Check-2 ................................................................................................................................. 57
Operation Sheet 2.1 : Project Execution and Team Management ......................................... 59
Unit Three: Project Closure and Review ................................................................................. 63

Ministry of Labor and Skills Managing Web and Version -1


Page 2 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 3 of 81
1

3.1 Project Handover and System Testing ........................................................................... 63


3.2. Project Documentation and Support Plans ................................................................... 65
3.3. Post-Project Review...................................................................................................... 66
3.4. Disaster Recovery Plan Updates ................................................................................... 68
3.5. Project Closure and Sign-off ........................................................................................ 69
Self- check .................................................................................................................................... 72
Operation sheet 3.1: Project Closure and Review .................................................................... 74
Developer’s Profile ...................................................................................................................... 81

Ministry of Labor and Skills Managing Web and Version -1


Page 3 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 4 of 81
1

Acknowledgment
Ministry of Labor and Skills wish to extend thanks and appreciation to the many representatives
of TVET instructors and respective industry experts who donated their time and expertise to the
development of this Teaching, Training and Learning Materials (TTLM).

Ministry of Labor and Skills Managing Web and Version -1


Page 4 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 5 of 81
1

Acronym
API -----------------------------------------------Application Programming Interface

WBS --------------------------------------------- Work Breakdown Structure

RTO ---------------------------------------------- Recovery Time Objective

RPO ---------------------------------------------- Recovery Point Objective

DR ----------------------------------------------- Disaster Recovery

FAQ ---------------------------------------------- Frequently Asked Questions

IT --------------------------------------------------Information Technology

PM ------------------------------------------------ Project Manager

KPI ----------------------------------------------- Key Performance Indicator

UAT ---------------------------------------------- User Acceptance Testing

SLA ----------------------------------------------- Service Level Agreement

QA ------------------------------------------------ Quality Assurance

Ministry of Labor and Skills Managing Web and Version -1


Page 5 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 6 of 81
1

Introduction to the Module


The module "Managing Web and Database Projects" provides a comprehensive framework for effectively
overseeing such projects from initiation to closure. It begins with Unit 1: Project Initiation and Planning,
focusing on project governance, needs analysis, feasibility studies, scope definition, planning, and risk
management to ensure a robust foundation. Unit 2: Project Execution and Team Management delves into
team formation, communication strategies, quality control, change management, conflict resolution, and
progress monitoring to deliver project objectives effectively. Lastly, Unit 3: Project Closure and Review
emphasizes system testing, project handover, documentation, disaster recovery updates, and post-project
reviews, ensuring smooth transitions and valuable lessons for future initiatives. Together, these units
provide a holistic approach to managing the lifecycle of web and database projects.

Module covers the following units:

 Project Initiation and Planning


 Project Execution and Team Management
 Project Closure and Review

Learning Objective of the Module:

At the end of this module, the trainee will be able to:


 Manage website and database project activities definition
 Undertake project planning
 Establish the Web and Database project team
 Manage project execution activities
 Coordinate project closure
Module Instruction

For effective use these modules trainees are expected to follow the following module instruction:
1. Read the information written in each unit
2. Accomplish the Self-checks at the end of each unit
3. Perform Operation Sheets which were provided at the end of units
4. Do the “LAP test” giver at the end of each unit and
5. Read the identified reference book for Examples and exercise

Ministry of Labor and Skills Managing Web and Version -1


Page 6 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 7 of 81
1
Unit One: Project Initiation and Planning

This unit is developed to provide you the necessary information regarding the following content
coverage and topics:
 Project Governance and Organizational Context
 Needs Analysis and Defining Project Objectives
 Feasibility Studies and Business Case Development
 Project Scope and Charter Development
 Project Planning
 Risk Management
This unit will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Develop Project Governance and Organizational Context
 Perform Needs Analysis and Defining Project Objectives
 Carry out Feasibility Studies and Business Case Development
 Develop Project Scope and Charter Development
 Prepare Project Planning
 Handle Risk Management

1.1 PROJECT GOVERNANCE AND ORGANIZATIONAL CONTEXT.

Ministry of Labor and Skills Managing Web and Version -1


Page 7 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 8 of 81
1

Project governance refers to the framework, functions, and processes that guide project
management activities to ensure they align with organizational goals. It includes setting roles,
responsibilities, and decision-making authority for project stakeholders.

Key Elements:

1. Organizational Structure: Understanding how the organization is structured (functional,


matrix, or projectized) and how this impacts resource allocation and authority.
2. Stakeholder Roles: Identifying key stakeholders (e.g., project sponsors, managers, and
team members) and their responsibilities.
3. Policies and Procedures: Ensuring adherence to organizational policies, industry
standards, and regulatory requirements.
4. Decision-Making Hierarchy: Establishing clear lines of authority and approval processes
for project decisions.

Examples:

1. Governance Framework Example:


 In a large IT company, a project governance board may oversee all web and
database projects. The board ensures that projects align with the company’s
strategic goals, such as enhancing user experience or improving data security.
2. Organizational Context Example:
 In a matrix organization, a web development team member might report to both a
functional manager (e.g., IT head) and a project manager. Effective governance
ensures there’s no conflict in resource assignments and priorities.
3. Policy Adherence Example:
 A government agency managing a database migration project must comply with
data protection regulations like GDPR. Governance ensures compliance by
integrating these requirements into the project plan.
4. Decision-Making Example:
 For a website redesign project, the project manager might need approval from the
marketing head for design changes. Governance frameworks define who has the
final say and how such decisions are documented.

Understanding project governance and organizational context helps project managers:

 Align projects with broader organizational objectives.


 Manage resources and authority effectively.
 Ensure compliance with relevant standards and regulations.
 Improve stakeholder communication and decision-making processes.

1.2 Needs Analysis and Defining Project Objectives

Ministry of Labor and Skills Managing Web and Version -1


Page 8 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 9 of 81
1

Needs analysis is a systematic process used to identify and evaluate the requirements and gaps
that a project must address. Defining project objectives involves setting clear, measurable goals
that the project seeks to achieve, ensuring alignment with the organization's strategic priorities.

Key Steps in Needs Analysis:

1. Stakeholder Identification and Engagement:


 Identify all stakeholders, including end-users, management, and external partners,
and gather their input on project requirements.
2. Data Collection and Research:
 Conduct surveys, interviews, and workshops to collect detailed information about
existing systems, processes, and desired outcomes.
3. Gap Analysis:
 Compare the current state with the desired state to identify gaps and prioritize
needs.
4. Requirement Documentation:
 Document functional and non-functional requirements, ensuring clarity and
traceability.

Steps in Defining Project Objectives:

1. SMART Criteria:
 Objectives should be Specific, Measurable, Achievable, Relevant, and Time-
bound.
2. Alignment with Organizational Goals:
 Ensure objectives support broader business goals such as increased efficiency,
customer satisfaction, or revenue growth.
3. Stakeholder Agreement:
 Validate objectives with stakeholders to ensure consensus and buy-in.
4. Objective Prioritization:
 Rank objectives based on their impact and feasibility.

Examples:

1. Needs Analysis Example:


 For a database upgrade project, interviews reveal that the current database has
performance issues during peak hours. Surveys identify a need for enhanced
scalability and better reporting features.
2. Defining Objectives Example:
 Objective: "Improve the database response time by 30% within six months while

maintaining data integrity."

Ministry of Labor and Skills Managing Web and Version -1


Page 9 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 10 of 81
1

Conducting a thorough needs analysis ensures that the project addresses actual gaps and
opportunities, while well-defined objectives provide a clear roadmap for success. These steps are
crucial for:

 Enhancing stakeholder satisfaction.


 Avoiding scope creep.
 Delivering measurable value to the organization.

1.3 Feasibility Studies and Business Case Development

Feasibility studies assess the practicality and viability of a proposed project, ensuring it is
achievable and beneficial. Business case development involves creating a detailed document that
justifies the project by outlining its benefits, costs, risks, and alignment with strategic goals.

Key Components of Feasibility Studies:

1. Technical Feasibility:
 Evaluates whether the technical resources and expertise are available to execute
the project.
 Example: Determining if the organization has sufficient server capacity and
technical expertise to deploy a new database system.
2. Economic Feasibility:
 Analyzes the cost-effectiveness of the project by comparing expected benefits with
estimated costs.
 Example: Calculating the ROI (Return on Investment) of automating a web
application’s testing process.
3. Operational Feasibility:
 Assesses whether the project fits into the existing operational workflow and is
practical to implement.
 Example: Ensuring that a new customer portal integrates smoothly with current
customer support processes.
4. Schedule Feasibility:
 Evaluates if the project timeline is realistic given the available resources and
constraints.
 Example: Checking if a website redesign can be completed before a key marketing
campaign launch.
5. Legal and Environmental Feasibility:
 Examines compliance with legal, ethical, and environmental standards.
 Example: Ensuring that a data storage solution adheres to GDPR requirements.

Steps in Business Case Development:

Ministry of Labor and Skills Managing Web and Version -1


Page 10 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 11 of 81
1

1. Executive Summary:
 Briefly outline the project, its goals, and its expected impact.
2. Problem Statement:
 Define the issue or opportunity the project aims to address.
 Example: "Current database performance lags during peak hours, causing
customer dissatisfaction."
3. Proposed Solution:
 Describe the recommended approach to addressing the problem.
 Example: Upgrading to a cloud-based database system for improved scalability
and speed.
4. Cost-Benefit Analysis:
 Detail the financial costs and anticipated benefits of the project.
 Example: "Initial implementation cost is $50,000, with an expected annual saving
of $20,000 from efficiency gains."
5. Risk Analysis:
 Identify potential risks and mitigation strategies.
 Example: "Risk: Delays in deployment. Mitigation: Allocate additional resources
and establish a buffer timeline."
6. Implementation Plan:
 Provide a high-level overview of how the project will be executed.
 Example: "Phase 1: Requirement gathering; Phase 2: Development; Phase 3:
Testing and rollout."

Examples:

1. Feasibility Study Example:


 A feasibility study for implementing a content management system (CMS) might
reveal that while technically viable, the high licensing costs outweigh the benefits,
prompting a search for open-source alternatives.
2. Business Case Example:
 A business case for transitioning to a cloud-based database might include a
detailed cost-benefit analysis showing reduced maintenance costs and improved
scalability as key advantages.

Conducting feasibility studies ensures that only viable projects proceed, reducing wasted
resources. A well-prepared business case helps gain stakeholder approval and secures necessary
funding by clearly articulating the project’s value proposition.

1.4 Project Scope and Charter Development

Project scope and charter development involve defining the boundaries, objectives, and
deliverables of a project, as well as formally authorizing the project to begin. This process

Ministry of Labor and Skills Managing Web and Version -1


Page 11 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 12 of 81
1

ensures clarity among stakeholders and provides a reference point for managing scope throughout
the project lifecycle.

Key Components of Project Scope:

1. Scope Statement:
 Describes what is included and excluded from the project.
 Example: For a web development project, the scope might include designing a
responsive website but exclude ongoing maintenance.
2. Deliverables:
 Identifies the tangible and intangible outputs of the project.
 Example: A new e-commerce platform with integrated payment processing and
user analytics.
3. Assumptions and Constraints:
 Assumptions: Factors assumed to be true for planning purposes.
 Example: The availability of skilled developers during the project timeline.
 Constraints: Limitations affecting project execution.
 Example: A fixed budget of $100,000.
4. Work Breakdown Structure (WBS):
 Breaks the project into manageable tasks and sub-tasks.
 Example: A WBS for a database migration project might include tasks like data
mapping, migration testing, and user training.

Key Components of Project Charter:

1. Project Authorization:
 Official approval to start the project.
 Example: A signed document from the CEO authorizing the redesign of the
company’s website.
2. Objectives:
 Clear and measurable goals.
 Example: "Launch a mobile-friendly website within three months to increase
traffic by 20%."
3. Stakeholders:
 A list of key stakeholders and their roles.
 Example: Project sponsor, project manager, and team leads.
4. Resources:
 An outline of the financial, human, and technical resources allocated to the
project.
 Example: A budget of $50,000 and a team of five developers.
5. Approval Criteria:
 Conditions that must be met for project success.
 Example: "The website must pass user acceptance testing with a 95% satisfaction
score."

Ministry of Labor and Skills Managing Web and Version -1


Page 12 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 13 of 81
1

Steps to Develop Project Scope and Charter:

1. Gather Requirements:
 Engage stakeholders to collect detailed project requirements.
 Example: Conduct workshops with end-users to identify essential website features.
2. Define Objectives and Deliverables:
 Use the SMART criteria to articulate project goals and expected outputs.
3. Create a Preliminary Project Plan:
 Develop an initial timeline and resource plan.
4. Document and Approve the Charter:
 Present the project charter to stakeholders for review and formal approval.

Examples:

1. Scope Example:
 For a database project, the scope includes migrating 500GB of data to a cloud-
based system, excluding historical data older than five years.
2. Charter Example:
 A project charter for an internal employee portal might include objectives like
"reduce HR support tickets by 40% within six months" and a resource plan
allocating two developers and a designer.

Developing a well-defined project scope and charter:

 Prevents scope creep by establishing clear boundaries.


 Aligns stakeholder expectations.
 Provides a foundation for planning and execution.
 Ensures accountability through formal project authorization.

1.5. Project Planning

Project planning involves creating a detailed roadmap to guide the execution and monitoring of a
project. It encompasses defining tasks, scheduling activities, allocating resources, and setting
milestones to ensure the project achieves its objectives efficiently.

Key Components of Project Planning:

1. Task Identification and Sequencing:


 Break the project into smaller tasks and determine their dependencies.
 Example: For a database migration, tasks might include data backup, schema
validation, and system testing.
2. Resource Allocation:
 Assign financial, human, and technical resources to tasks.

Ministry of Labor and Skills Managing Web and Version -1


Page 13 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 14 of 81
1

 Example: Allocating a senior database administrator to handle complex migration


tasks.
3. Timeline Development:
 Create a realistic schedule with milestones and deadlines.
 Example: Setting a milestone for completing user training two weeks before the
database launch.
4. Budget Planning:
 Estimate costs for all project activities and monitor expenditures.
 Example: Budgeting $10,000 for new server hardware.
5. Risk Management Planning:
 Identify potential risks and develop mitigation strategies.
 Example: Risk: Data corruption during migration. Mitigation: Perform
incremental backups and validate data integrity.
6. Communication Plan:
 Define how project updates and issues will be communicated among stakeholders.
 Example: Weekly progress reports shared via email and bi-weekly team meetings.

Steps to Create a Project Plan:

1. Define Objectives and Deliverables:


 Reiterate the project goals and outline the expected outcomes.
2. Develop the Work Breakdown Structure (WBS):
 Decompose the project into manageable components.
3. Estimate Time and Resources:
 Use historical data and expert judgment to estimate task durations and resource
needs.
4. Identify Risks:
 Conduct a risk assessment to foresee challenges.
5. Document and Share the Plan:
 Prepare a comprehensive document and distribute it to stakeholders for feedback
and approval.

Examples:

1. Project Plan for Website Redesign:


 Tasks: Conduct user research, create wireframes, develop prototypes, implement
designs, and perform testing.
 Timeline: 12 weeks, with user testing scheduled in week 10.
 Budget: $25,000 for tools, resources, and external consultants.
2. Project Plan for Database Upgrade:
 Tasks: Assess current database performance, select upgrade tools, migrate data,
test the system, and train users.
 Timeline: 8 weeks, with migration planned over a weekend to minimize
downtime.

Ministry of Labor and Skills Managing Web and Version -1


Page 14 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 15 of 81
1

 Risks: Potential data loss; mitigation includes conducting a full backup and testing
in a sandbox environment.

Effective project planning ensures:

 Clear guidance for the project team.


 Efficient resource utilization.
 Timely identification and resolution of potential issues.
 Achievement of project goals within scope, time, and budget constraints.

1.6. Risk Management

Risk management is the process of identifying, analyzing, and responding to potential risks that
could impact a project's success. It ensures proactive measures are taken to mitigate or eliminate
risks, enhancing the likelihood of achieving project objectives.

Key Components of Risk Management:

1. Risk Identification:
 Systematically identify potential risks that could affect the project.
 Example: Identifying risks such as delayed approvals, insufficient resources, or
cybersecurity threats during a web development project.
2. Risk Analysis:
 Assess the likelihood and impact of each identified risk.
 Example: Using a risk matrix to classify risks as high, medium, or low based on
their severity and probability.
3. Risk Response Planning:
 Develop strategies to address risks, such as avoiding, mitigating, transferring, or
accepting them.
 Example: Mitigation strategy for server downtime: Implement a failover system
and perform regular backups.
4. Risk Monitoring and Control:
 Continuously monitor risks and adjust response plans as needed.
 Example: Regularly updating the risk register to reflect new or evolving risks.

Steps to Implement Risk Management:

1. Create a Risk Management Plan:


 Define how risks will be identified, assessed, and managed throughout the project
lifecycle.
2. Conduct Risk Workshops:
 Engage team members and stakeholders to collaboratively identify and analyze
risks.

Ministry of Labor and Skills Managing Web and Version -1


Page 15 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 16 of 81
1

3. Develop a Risk Register:


 Document all identified risks, their analysis, and response strategies.
4. Implement Risk Responses:
 Take proactive actions to mitigate or eliminate risks as planned.
5. Monitor and Review Risks:
 Regularly review the risk management plan and update it to address new risks.

Examples:

1. Risk Management for Website Launch:


 Risks: Delayed content delivery, server overload on launch day, browser
compatibility issues.
 Responses: Assign dedicated resources for content review, implement load testing,
and conduct cross-browser testing.
2. Risk Management for Database Migration:
 Risks: Data loss, system downtime, user resistance.
 Responses: Perform incremental backups, schedule migration during low-traffic
hours, and conduct user training sessions.

Effective risk management ensures:

 Enhanced project stability and predictability.


 Minimized disruptions and delays.
 Increased stakeholder confidence in the project’s success.
 Proactive problem-solving rather than reactive responses.

Self-Check 1
Part-I: Read each statement and write 'True' if the statement is correct or 'False' if it is not.

Ministry of Labor and Skills Managing Web and Version -1


Page 16 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 17 of 81
1

1. A project governance structure ensures clear accountability and decision-making within a


project.
2. A needs analysis focuses only on technical requirements, ignoring business objectives.
3. A feasibility study evaluates the technical, financial, and operational aspects of a project.
4. Project objectives should align with organizational goals to ensure relevance and value.
5. The project charter is an optional document that only outlines high-level tasks.
6. Identifying stakeholders is not necessary during the project initiation phase.
7. Risk management planning should start after the project execution phase begins.

Part-II: Select the best answer from the provided options and circle the corresponding letter.

1. Which of the following is NOT a component of project governance?

A) Decision-making framework

B) Resource allocation policies

C) Stakeholder communication plan

D) Gantt chart development

2. What is the primary purpose of a needs analysis?

A) To assess potential risks

B) To identify and understand project requirements

C) To allocate resources

D) To create the project charter

3. Which document formally authorizes a project and outlines its objectives, scope, and
stakeholders?

A) Risk register

B) Feasibility study

C) Project charter

D) Communication plan

4. A feasibility study primarily helps in:

Ministry of Labor and Skills Managing Web and Version -1


Page 17 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 18 of 81
1

A) Evaluating if the project is viable

B) Defining project scope

C) Managing team collaboration

D) Creating a timeline

5. In project initiation, stakeholder analysis involves:

A) Assigning tasks to team members

B) Identifying and analyzing stakeholders' influence and interest

C) Ensuring all stakeholders approve the project objectives

D) Estimating project budgets

6. Which risk management activity involves prioritizing risks based on their likelihood and
impact?

A) Risk mitigation

B) Risk analysis

C) Risk identification

D) Risk monitoring

7. A project scope document is used to:

A) Assign team members to tasks

B) Outline the risks of the project

C) Define the boundaries and deliverables of the project

D) Develop a communication plan

Ministry of Labor and Skills Managing Web and Version -1


Page 18 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 19 of 81
1
Operation Sheet 1.1: Project Governance and Organizational
Context.
Equipments and Tools:

1. Office and Collaboration Tools(Laptops or desktops, Microsoft Office Suite


(Word, Excel, PowerPoint), Google Workspace (Docs, Sheets, Slides).)
2. Communication Tools(Outlook, Gmail, Zoom, Microsoft Teams)
3. Project Management Software:( Microsoft Project)
4.
5. Training and Simulation Tools(SimulTrain (project management simulator))

Scenario: XYZ Solutions, a medium-sized IT company, has secured a contract to redesign a


client’s outdated e-commerce website and migrate its database to a cloud-based system. The
client has requested minimal downtime during migration and expects the new website to enhance
user experience significantly.

Tasks:

1. Project Governance and Organizational Context:


o Define the governance structure for the project. Identify key stakeholders and their
roles. Develop a communication plan to ensure all stakeholders are kept informed.
o Example Question: How would you ensure the project aligns with the client’s
business objectives and internal processes?

Deliverables:

 A stakeholder analysis chart.

Step 1: Define Governance Structure

 Key Stakeholders:
o Client: CEO, IT Manager, Marketing Lead.
o Project Team: Project Manager, Web Developer, Database Administrator, UI/UX
Designer.
o Vendor: Cloud service provider representative.
 Roles:
o CEO: Approves final deliverables.
o IT Manager: Provides technical specifications and support.
o Marketing Lead: Ensures website aligns with branding.
o Project Team: Executes project tasks.
o Vendor: Assists with cloud migration.

Ministry of Labor and Skills Managing Web and Version -1


Page 19 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 20 of 81
1

Step 2: Develop a Communication Plan

 Weekly progress meetings via video conference.


 Daily project updates through email for internal teams.
 Milestone review meetings with the client after each phase.
 Example: After completing the feasibility study, a summary will be sent to all
stakeholders for feedback.

Deliverables:

 Governance structure chart.


 Communication plan document.

Quality Criteria:

Governance Structure Chart

Content:

1. Title: Governance Structure for XYZ Solutions’ E-Commerce Website Redesign and
Database Migration.
2. Diagram:
 Project Sponsor: CEO (Approves budget and major milestones).
 Key Stakeholders: IT Manager, Marketing Lead, End Users (Provide
requirements and approve deliverables).
 Project Team:
 Project Manager (Oversees execution).
 UI/UX Designer (Handles website design).
 Database Administrator (Manages migration).
 Developer (Implements the website features).
 Vendor Support: Cloud Platform Representative (Technical guidance during
migration).
3. Roles and Responsibilities:
 Project Sponsor: Makes strategic decisions and resolves conflicts.
 IT Manager: Provides infrastructure details and IT policies.
 Project Team: Executes tasks and delivers within scope, time, and budget.
 Vendor: Provides service support and post-migration guidance.

Communication Plan Document:

Content:

1. Title: Communication Plan for XYZ Solutions’ Project.

Ministry of Labor and Skills Managing Web and Version -1


Page 20 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 21 of 81
1

2. Communication Objectives:
 Ensure timely updates to stakeholders.
 Facilitate effective team collaboration.
 Minimize misunderstandings through clear channels.
3. Communication Methods:
 Weekly Progress Meetings: Team reviews and updates project status (Video/On-
site).
 Stakeholder Reports: Email bi-weekly project progress and risk status.
 Immediate Notifications: For critical issues via instant messaging apps (e.g.,
Teams/Slack).
4. Schedule:
 Weekly Team Meetings: Every Monday at 10 AM.
 Milestone Reviews: Upon completion of significant phases (e.g., Needs Analysis,
Testing).
 Daily Updates: Team members to email task progress at EOD.
5. Communication Matrix:

Audience Method Frequency Responsible Party


Project Sponsor Email/Meeting Monthly Project Manager
IT Manager Weekly Meetings Weekly Project Manager
Marketing Lead Bi-weekly Reports Bi-weekly Project Manager
Project Team Daily Updates Daily Team Leads
Vendor Support Team Issue Escalation As Needed Project Manager

6. Escalation Process:
 Low Priority: Email resolution within 48 hours.
 Medium Priority: Addressed in weekly team meetings.
 High Priority: Immediate escalation to the Project Sponsor.

Operation Sheet 1.2 Needs Analysis and Defining Project Objectives

Scenario: XYZ Solutions, a medium-sized IT company, has secured a contract to redesign a


client’s outdated e-commerce website and migrate its database to a cloud-based system. The
client has requested minimal downtime during migration and expects the new website to enhance
user experience significantly.

Tasks:

1. Needs Analysis and Defining Project Objectives:

Ministry of Labor and Skills Managing Web and Version -1


Page 21 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 22 of 81
1

o Conduct a needs analysis to understand the client’s requirements and expectations.


o Example Task: Draft a list of project objectives that balance user experience
improvements with technical feasibility.

Step 1: Conduct Needs Analysis

 Client Interviews: Discuss with the client the pain points of the current website, such as
slow loading speeds and a non-responsive design.
 User Feedback: Collect feedback from end-users on desired website features.
 Current Database Issues: Review database performance logs to identify bottlenecks.

Step 2: Define Project Objectives

 Objectives:
o Redesign the website for faster loading speeds (under 2 seconds).
o Ensure the site is mobile-responsive and adheres to accessibility standards.
o Migrate the database to a cloud platform with zero data loss.

Deliverables:

 Needs analysis report.


 Defined project objectives document.

Quality Criteria:

Needs Analysis Report implementation:

Title: Needs Analysis Report for XYZ Solutions’ E-Commerce Website Redesign and
Database Migration

1. Executive Summary

A summary of the key findings and recommendations based on the analysis of client needs for
improving the e-commerce website and migrating the database to a cloud platform.

2. Background Information

 Client Overview: XYZ Solutions, a medium-sized IT company.


 Current Challenges:
o Outdated website design with slow load times.
o Non-responsive website leading to poor mobile user experience.
o On-premise database causing scalability and maintenance issues.

3. Stakeholder Inputs

Ministry of Labor and Skills Managing Web and Version -1


Page 22 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 23 of 81
1

 Interviews Conducted:
o IT Manager: Highlighted the need for cloud-based scalability and security
improvements.
o Marketing Lead: Stressed on brand consistency and improved UI/UX.
o End Users: Provided feedback on navigation difficulties and search inefficiencies.
 Key Insights:
o 60% of website traffic comes from mobile users.
o Current database has experienced performance slowdowns during high traffic
periods.

4. Requirements Identified

 Website Requirements:
o Faster load times (under 2 seconds).
o Mobile-responsive design.
o Improved search functionality.
 Database Requirements:
o Cloud-based solution for scalability.
o Data backup and disaster recovery features.
o Minimal downtime during migration.

5. Recommendations

 Redesign the website using a modern framework like React or Angular.


 Migrate the database to a cloud platform such as AWS or Azure with zero downtime.
 Conduct user acceptance testing to ensure alignment with client needs.

Deliverable: A comprehensive report outlining the needs analysis findings and actionable
recommendations.

Operation Sheet 1.3: Feasibility Studies and Business Case


Development

Scenario: XYZ Solutions, a medium-sized IT company, has secured a contract to redesign a


client’s outdated e-commerce website and migrate its database to a cloud-based system. The
client has requested minimal downtime during migration and expects the new website to enhance
user experience significantly.

Tasks:

Ministry of Labor and Skills Managing Web and Version -1


Page 23 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 24 of 81
1

1. Feasibility Studies and Business Case Development:


 Assess the technical, financial, and operational feasibility of the project. Prepare a
business case to justify the redesign and migration.
 Example Question: What factors would you consider in evaluating the feasibility
of migrating the database to a cloud-based platform?

Step 1: Technical Feasibility

 Analyze compatibility of existing database schema with cloud platforms.


 Evaluate tools for seamless data migration.

Step 2: Financial Feasibility

 Estimate costs for website redesign and cloud migration.


o Example: $20,000 for design, $10,000 for cloud services.

Step 3: Operational Feasibility

 Assess the client’s technical staff readiness for managing the cloud platform post-
migration.

Step 4: Develop Business Case

 Justification: The redesign will improve user engagement and the migration will enhance
data security and scalability.

Deliverables:

 Feasibility study document.


 Business case report.

Quality Criteria:

Feasibility Study Document:

Title: Feasibility Study for XYZ Solutions’ E-Commerce Website Redesign and Database
Migration

1. Executive Summary

 Overview of the feasibility study findings, focusing on the technical, financial, and
operational viability of the project.
 Recommendation: Proceed with the redesign and migration based on feasibility analysis.

Ministry of Labor and Skills Managing Web and Version -1


Page 24 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 25 of 81
1

2. Objectives of the Feasibility Study

 Assess technical feasibility.


 Determine financial viability.
 Evaluate operational impact.

3. Technical Feasibility

 Current Technology Assessment:


 Outdated web technology (e.g., PHP-based system).
 On-premise database with limited scalability.
 Proposed Technology:
 Website redesign using React.js for improved performance and user experience.
 Database migration to AWS RDS for cloud scalability.
 Compatibility Analysis:
 Integration with existing payment systems and third-party APIs.
 Technical Risks and Mitigation:
 Risk: Downtime during migration.
 Mitigation: Schedule migration during off-peak hours and use incremental
backups.

4. Financial Feasibility

 Estimated Budget: $30,000.


 Website redesign: $15,000.
 Database migration: $10,000.
 Contingency: $5,000.
 Cost-Benefit Analysis:
 Increased website traffic expected to drive a 20% rise in sales.
 Reduced database maintenance costs by $5,000 annually.

5. Operational Feasibility

 Organizational Readiness:
 The IT team is skilled in web and database technologies but may need training on
cloud platforms.
 Impact on Business Operations:
 Minimal downtime anticipated due to phased migration.
 Improved website and database performance expected to enhance user satisfaction.

6. Recommendations:

Ministry of Labor and Skills Managing Web and Version -1


Page 25 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 26 of 81
1

Proceed with the project, as it is technically achievable, financially viable, and operationally
beneficial.

Business Case Report:

Title: Business Case for XYZ Solutions’ E-Commerce Website Redesign and Database Migration

1. Executive Summary

A concise summary of the justification for the project, highlighting the benefits and alignment
with business goals.

2. Problem Statement

 The current website is outdated, with slow load times and poor user experience, leading to
customer dissatisfaction.
 The on-premise database lacks scalability and incurs high maintenance costs.

3. Proposed Solution

 Redesign the e-commerce website using modern web technologies to improve


performance and usability.
 Migrate the database to a cloud platform for enhanced scalability, security, and cost
efficiency.

4. Strategic Alignment

 Aligns with the company’s goal of providing a seamless online shopping experience.
 Supports future growth by enabling scalable infrastructure.

5. Benefits

 Tangible Benefits:
 Increased sales due to improved website performance.
 Reduced IT maintenance costs.
 Intangible Benefits:
 Enhanced brand image through a modern, responsive website.
 Increased customer trust and satisfaction.

6. Cost Estimates

 Total Cost: $30,000.


 Redesign: $15,000.

Ministry of Labor and Skills Managing Web and Version -1


Page 26 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 27 of 81
1

 Migration: $10,000.
 Contingency: $5,000.

7. Risks and Mitigation Strategies

 Risk: Data loss during migration.


 Mitigation: Incremental backups and testing before deployment.
 Risk: Delayed project delivery.
 Mitigation: Use Agile project management practices and regular progress
tracking.

8. Success Criteria

 Website achieves a PageSpeed Score of 90+ on launch.


 Database migration completed with zero data loss.
 Positive user feedback during post-launch review.

9. Recommendations

Approve the project based on its clear alignment with business goals, significant benefits, and
manageable risks.

Operation Sheet 1.4: Project Scope and Charter Development.

Scenario: XYZ Solutions, a medium-sized IT company, has secured a contract to redesign a


client’s outdated e-commerce website and migrate its database to a cloud-based system. The
client has requested minimal downtime during migration and expects the new website to enhance
user experience significantly.

Tasks:

1. Project Scope and Charter Development:


 Develop a project charter that outlines the scope, objectives, deliverables, and
constraints.
 Example Task: Identify potential scope creep risks and propose strategies to
manage them.

Step 1: Develop Project Charter

Ministry of Labor and Skills Managing Web and Version -1


Page 27 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 28 of 81
1

 Scope:
 Redesign the e-commerce website, including homepage, product pages, and
checkout system.
 Migrate the database with minimal downtime.
 Deliverables:
 Fully responsive e-commerce website.
 Cloud-hosted database.
 Constraints:
 Timeline: 12 weeks.
 Budget: $30,000.

Step 2: Identify Potential Scope Creep

 Example: Clients requesting additional features like loyalty program integration mid-
project.
 Strategy: Implement a change request process for any new feature requests.

Deliverables:

 Project charter document.

Quality Criteria:

Project Charter Document

Title: Project Charter for XYZ Solutions’ E-Commerce Website Redesign and Database
Migration

1. Project Overview

Project Name:
E-Commerce Website Redesign and Database Migration

Project Sponsor:
XYZ Solutions

Prepared By:
[Project Manager’s Name]

Date:
[Insert Date]

Ministry of Labor and Skills Managing Web and Version -1


Page 28 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 29 of 81
1

Project Purpose:
The project aims to enhance user experience by redesigning the e-commerce website and improve
scalability, performance, and cost-efficiency by migrating the database to a cloud-based platform.

2. Project Objectives

1. Redesign the website to be mobile-responsive, user-friendly, and faster, achieving a page


load time of less than 2 seconds.
2. Migrate the on-premise database to AWS RDS for scalability, security, and reliability.
3. Ensure minimal downtime (less than 2 hours) during migration.
4. Enhance data security with disaster recovery and backup solutions.

3. Project Scope

In-Scope:

 Website redesign using modern frameworks (e.g., React.js or Angular).


 Migration of the existing database to AWS RDS.
 Implementation of disaster recovery and backup strategies.
 Training for internal staff on new system usage.

Out-of-Scope:

 Development of additional features beyond the current system’s functionality.


 Integration with third-party systems not currently in use.

4. Key Deliverables

1. Redesigned and fully functional e-commerce website.


2. Migrated cloud-based database with no data loss.
3. Comprehensive user and technical documentation.
4. Disaster recovery and backup system implemented.

5. Milestones

Milestone Expected Completion Date


Project Kickoff [Insert Date]
Completion of Website Design [Insert Date]
Database Migration Testing [Insert Date]
Final System Deployment [Insert Date]

Ministry of Labor and Skills Managing Web and Version -1


Page 29 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 30 of 81
1

6. Budget Estimate

 Website Redesign: $15,000


 Database Migration: $10,000
 Contingency: $5,000
 Total: $30,000

7. Project Risks and Mitigation Strategies

1. Risk: Data loss during migration.


Mitigation: Conduct incremental backups and verify data integrity during testing.
2. Risk: Delayed project delivery.
Mitigation: Use Agile project management practices and regular progress monitoring.
3. Risk: User resistance to new systems.
Mitigation: Provide thorough training and support to all stakeholders.

8. Roles and Responsibilities

Role Name Responsibilities


Project Sponsor [Name] Provide funding and strategic direction.
Project Manager [Name] Oversee project execution, schedule, and deliverables.
Web Developer [Name] Redesign and develop the e-commerce website.
Database Administrator [Name] Execute the database migration and ensure data security.
QA Specialist [Name] Test the website and database systems for performance.
9. Stakeholders

 Internal:
 IT Department, Marketing Team, Customer Support Team
 External:
 Project Client, End-Users

10. Approval Section

Approved By:

Name Role Signature Date


[Project Sponsor] Sponsor [Insert Date]
[Project Manager] Project Manager [Insert Date]

This project charter formalizes the project’s scope, objectives, and deliverables, serving as a
reference for all stakeholders.

Ministry of Labor and Skills Managing Web and Version -1


Page 30 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 31 of 81
1

Operation Sheet 1.5: Project Planning

Scenario: XYZ Solutions, a medium-sized IT company, has secured a contract to redesign a


client’s outdated e-commerce website and migrate its database to a cloud-based system. The
client has requested minimal downtime during migration and expects the new website to enhance
user experience significantly.

Tasks:

1. Project Planning:
 Create a preliminary project plan that includes a timeline, resource allocation, and
risk management strategies.
 Example Task: Develop a Gantt chart that outlines key milestones for the website
redesign and database migration.

Step 1: Develop Work Breakdown Structure (WBS)

 Example:
 Phase 1: Research and Requirements Gathering (Weeks 1-2).
 Phase 2: Website Design and Prototyping (Weeks 3-6).
 Phase 3: Database Migration Preparation (Weeks 4-6).
 Phase 4: Implementation (Weeks 7-10).
 Phase 5: Testing and Deployment (Weeks 11-12).

Step 2: Resource Allocation

 Assign tasks to team members:


 UI/UX Designer: Design prototypes.
 Database Administrator: Handle migration.
 Project Manager: Oversee tasks.

Step 3: Risk Management Plan

 Risk: Data loss during migration.


 Mitigation: Full backup before migration.

Step 4: Create a Gantt Chart

 Example Milestones:
 Week 2: Complete requirements gathering.
 Week 6: Finalize prototypes.
 Week 10: Complete migration.

Ministry of Labor and Skills Managing Web and Version -1


Page 31 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 32 of 81
1

Deliverables:

 WBS document.
 Resource allocation plan.
 Gantt chart.

Quality Criteria:

WBS Document, Resource Allocation Plan, and Gantt Chart

1. Work Breakdown Structure (WBS) Document

Title: Work Breakdown Structure for E-Commerce Website Redesign and Database
Migration

1.0 Project: Website Redesign and Database Migration

WBS
Level Task Name Description
Code
1 1.0 Initiation Preliminary tasks to begin the project.
Stakeholder
2 1.1 Identify and document key stakeholders.
Identification
Project Charter
2 1.2 Create and approve the project charter.
Development
1 2.0 Planning Detailed planning of tasks, resources, and schedules.
2 2.1 Requirements Gathering Collect and document client and user requirements.
Risk Management
2 2.2 Identify risks and develop mitigation strategies.
Planning
1 3.0 Execution Redesign website and migrate database.
Develop mockups, wireframes, and implement the
2 3.1 Website Design
website design.
Backup, migrate, and test the database in the new
2 3.2 Database Migration
cloud environment.
1 4.0 Monitoring and Control Track progress and ensure quality deliverables.
Test website and database for functionality, speed, and
2 4.1 Performance Testing
user experience.
2 4.2 Stakeholder Review Conduct reviews and collect feedback for adjustments.
1 5.0 Closure Wrap up the project and document outcomes.
2 5.1 System Handover Transfer systems to the client and provide training.
2 5.2 Post-Project Review Evaluate project success and document lessons

Ministry of Labor and Skills Managing Web and Version -1


Page 32 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 33 of 81
1

WBS
Level Task Name Description
Code
learned.
2. Resource Allocation Plan

Title: Resource Allocation Plan for E-Commerce Website Redesign and Database
Migration

Allocation
Resource Name Role Assigned Tasks Availability
(%)
Oversight and Stakeholder Management,
Project Manager 50% Full-time
Coordination Project Monitoring
Develop Mockups,
Website Redesign
Web Developer Wireframes, and Front-End 70% Full-time
Specialist
Code
Database Data Migration Backup, Migrate, and Test
60% Full-time
Administrator Specialist Database
Quality Assurance Conduct Performance and
Tester 40% Part-time
Specialist Usability Testing
Setup and Troubleshoot On-demand as
IT Support Team Technical Support 30%
Cloud Infrastructure required
Feedback Provide Feedback During As scheduled for
Stakeholder Team 10%
Providers Reviews reviews
3. Gantt Chart

Title: Gantt Chart for E-Commerce Website Redesign and Database Migration

Duration
Task Name Start Date End Date Dependencies
(Days)
Stakeholder Identification 01/01/2024 02/01/2024 2 None
Project Charter
03/01/2024 05/01/2024 3 Stakeholder Identification
Development
Project Charter
Requirements Gathering 06/01/2024 10/01/2024 5
Development
Risk Management Planning 11/01/2024 14/01/2024 4 Requirements Gathering
Website Design 15/01/2024 30/01/2024 16 None
Database Migration 01/02/2024 15/02/2024 15 Website Design
Performance Testing 16/02/2024 20/02/2024 5 Database Migration
Stakeholder Review 21/02/2024 25/02/2024 5 Performance Testing

Ministry of Labor and Skills Managing Web and Version -1


Page 33 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 34 of 81
1

Duration
Task Name Start Date End Date Dependencies
(Days)
System Handover 26/02/2024 28/02/2024 3 Stakeholder Review
Post-Project Review 29/02/2024 01/03/2024 2 System Handover

These deliverables ensure clear planning, efficient resource utilization, and well-organized
timelines for the project.

Operation Sheet 1.6: Risk Management

Step 1: Identify Risks

 Example Risks:
 Delayed client approvals.
 Unexpected downtime during migration.
 Team resource unavailability.

Step 2: Analyze Risks

 Probability: High, Medium, Low.


 Impact: High, Medium, Low.

Step 3: Develop Risk Responses

 Delayed Approvals:
 Mitigation: Set deadlines for client feedback.
 Downtime:
 Mitigation: Schedule migration during non-peak hours and prepare a rollback
plan.
 Resource Unavailability:
 Mitigation: Assign backup personnel for critical roles.

Step 4: Monitor and Update Risks

 Schedule weekly risk review meetings.

Deliverables:

 Risk register document.


 Risk mitigation plan.

Ministry of Labor and Skills Managing Web and Version -1


Page 34 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 35 of 81
1

Quality Criteria:
Risk Register Document and Risk Mitigation Plan

1. Risk Register Document

Title: Risk Register for E-Commerce Website Redesign and Database Migration

Risk Risk Risk


Likelihood Impact Owner Mitigation Plan Status
ID Description Level

Perform full
backups, test
Data loss migrations in a
during Database sandbox
R1 High Critical High Active
database Administrator environment, and
migration validate data
integrity post-
migration.

Set clear deadlines,


Delayed
provide regular
content Project
R2 Medium Moderate Medium reminders, and Active
delivery from Manager
escalate delays to
client
decision-makers.

Conduct load
Server
testing, implement
overload on IT Support
R3 Low High Medium load balancers, and Planned
website launch Team
ensure scalable
day
infrastructure.

Schedule feedback
sessions in advance
Stakeholder and provide clear
Project
R4 feedback Medium High Medium guidelines to Active
Manager
delays stakeholders on
expectations and
deadlines.

Ministry of Labor and Skills Managing Web and Version -1


Page 35 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 36 of 81
1

Risk Risk Risk


Likelihood Impact Owner Mitigation Plan Status
ID Description Level

Conduct cross-
browser testing
using tools like
Browser Quality
BrowserStack;
R5 compatibility Low Low Low Assurance Planned
address
issues Team
compatibility issues
in development
phase.

Use encrypted
connections, restrict
access to authorized
Cybersecurity
IT Support personnel, and
R6 threats during High Critical High Active
Team monitor for
migration
unauthorized
activities during the
migration process.

Provide training
Team skill sessions and ensure
Project
R7 gaps for new Medium Moderate Medium availability of Planned
Manager
technologies external consultants
if required.

2. Risk Mitigation Plan

Title: Risk Mitigation Plan for E-Commerce Website Redesign and Database Migration

1. Introduction:

This document outlines strategies to minimize the impact of identified risks and ensure smooth
execution of the project.

2. Key Mitigation Strategies:

1. Data Loss During Database Migration (Risk ID: R1):


 Mitigation Steps:

Ministry of Labor and Skills Managing Web and Version -1


Page 36 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 37 of 81
1

 Perform incremental backups before each phase of migration.


 Test the migration process in a sandbox environment.
 Validate the accuracy and completeness of data post-migration.
 Responsible Party: Database Administrator.
 Monitoring: Regularly audit backup logs and test recovery processes.
2. Delayed Content Delivery (Risk ID: R2):
 Mitigation Steps:
 Develop a content delivery schedule with milestones.
 Use automated reminders for clients.
 Escalate delays to project sponsors promptly.
 Responsible Party: Project Manager.
 Monitoring: Weekly status checks on deliverables.
3. Server Overload on Launch Day (Risk ID: R3):
 Mitigation Steps:
 Conduct rigorous load testing in a staging environment.
 Implement load balancers and ensure scalability of servers.
 Monitor server performance in real time during launch.
 Responsible Party: IT Support Team.
 Monitoring: Real-time performance dashboards.
4. Stakeholder Feedback Delays (Risk ID: R4):
 Mitigation Steps:
 Schedule feedback sessions well in advance.
 Provide stakeholders with concise guidelines and response templates.
 Follow up promptly if responses are delayed.
 Responsible Party: Project Manager.
 Monitoring: Adherence to the feedback schedule.
5. Cybersecurity Threats (Risk ID: R6):
 Mitigation Steps:
 Use secure protocols (e.g., HTTPS) during migration.
 Limit access to authorized personnel only.
 Conduct penetration testing to identify vulnerabilities.
 Responsible Party: IT Support Team.
 Monitoring: Security logs and regular vulnerability assessments.

3. Contingency Planning:

For high-risk scenarios (e.g., data loss or cybersecurity threats), contingency plans include:

 Maintaining an offline copy of critical data.


 Deploying a backup system that can be activated within hours.

4. Plan Monitoring:

Ministry of Labor and Skills Managing Web and Version -1


Page 37 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 38 of 81
1

 Regular updates to the risk register.


 Weekly project review meetings to reassess risks and adjust plans.

5. Conclusion:

Proactive mitigation efforts combined with continuous monitoring will ensure the project remains
resilient against potential disruptions.
Lap Test:

Project Initiation and Planning

Case Study Scenario: You have been assigned as the project manager for a new web and
database development project for a fictional company, TechNova Solutions. The company intends
to launch an online platform that integrates customer management, e-commerce capabilities, and
a support ticketing system. The project will involve collaboration between the design,
development, and IT infrastructure teams.

LAP Test Objectives:

 Apply project initiation and planning principles.


 Develop key deliverables such as the governance structure, needs analysis report, and
project charter.
 Create a preliminary risk register and a high-level work breakdown structure (WBS).

Tasks:

1. Project Governance and Organizational Context:


 Identify the stakeholders for the project.
 Develop a governance structure chart detailing decision-making hierarchies.
2. Needs Analysis and Defining Objectives:
 Conduct a needs analysis based on the following inputs:
 The client wants a system that integrates product listing, customer
accounts, and live chat.
 Users need a seamless checkout process with secure payment options.
 Write a report summarizing the client’s requirements and constraints.
 Define SMART objectives for the project.
3. Feasibility Study and Business Case:
 Assess the feasibility of the project by analyzing budget estimates, resource
availability, and timelines.
 Prepare a one-page business case highlighting the benefits of the project for
TechNova Solutions.
4. Project Scope and Charter Development:

Ministry of Labor and Skills Managing Web and Version -1


Page 38 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 39 of 81
1

 Develop a detailed project scope statement, including inclusions, exclusions, and


key deliverables.
 Create a project charter document summarizing:
 Project purpose
 Objectives
 Key milestones
 Budget overview
5. Risk Management:
 Identify at least five potential risks to the project.
 Develop a basic risk register that includes risk descriptions, likelihood, impact,
and mitigation strategies.
6. Work Breakdown Structure (WBS):
 Create a high-level WBS for the project with at least three levels of hierarchy.

Deliverables:

 Governance structure chart.


 Needs analysis report and defined objectives document.
 Feasibility study and business case report.
 Project scope statement and charter document.
 Risk register.
 Work Breakdown Structure (WBS).

Expected Outcome: By completing this test, trainees will gain hands-on experience in initiating
and planning a web and database project. They will also enhance their ability to align project
deliverables with stakeholder expectations while proactively identifying and mitigating risks.

Ministry of Labor and Skills Managing Web and Version -1


Page 39 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 40 of 81
1

Unit Two: Project Execution and Team Management


This unit to provide you the necessary information regarding the following content coverage
and topics:
 Team Formation and Development
 Communication and Collaboration Strategies
 Quality Management and Control
 Change Management
 Issue and Conflict Resolution
 Monitoring and Controlling Project Progress
This guide will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Perform Team Formation and Development
 Develop Communication and Collaboration Strategies
 Carry out Quality Management and Control
 Handle Change Management
 Manage Issue and Conflict Resolution
 Monitor and Control Project Progress

Ministry of Labor and Skills Managing Web and Version -1


Page 40 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 41 of 81
1

2.1 Team Formation and Development

Team formation and development involve assembling a project team, defining roles and
responsibilities, fostering collaboration, and ensuring the team can effectively execute the project
plan. A well-formed and developed team is crucial for achieving project objectives within scope,
time, and budget.

Phases of Team Formation and Development:

1. Team Formation (Assembling the Team):


 Identify the required skills, expertise, and roles based on the project’s scope and
deliverables (e.g., as defined in the WBS from Unit 1).
 Select team members from internal resources or external hiring.
 Align team composition with the project's needs and organizational structure.

Example from Unit 1:


For the e-commerce website redesign and database migration project:

 Roles identified:
 Project Manager (to oversee execution).
 UI/UX Designer (to improve user experience).
 Database Administrator (to handle migration).
 QA Tester (to ensure functionality and reliability).
 Skills required: Technical expertise in web development, database management,
and testing tools.

2. Role
 Clearly define and document each team member's roles and responsibilities.
 Avoid overlaps and ensure alignment with the project’s governance structure
(defined in Unit 1).

Example:

 The Project Manager is responsible for communication and monitoring progress.


 The Database Administrator ensures the database is migrated with minimal
downtime.

3. Team Onboarding:
 Provide an orientation about the project scope, objectives, and timeline.
 Share key project documents (e.g., the project charter and communication plan
from Unit 1).

Ministry of Labor and Skills Managing Web and Version -1


Page 41 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 42 of 81
1

Example:
During onboarding, the team was introduced to the project goals of enhancing user
experience and migrating the database securely to the cloud.

4. Development and Collaboration:


 Foster teamwork using collaboration strategies and tools.
 Build team cohesion through shared goals and mutual understanding.
 Utilize project management tools (e.g., Trello, Microsoft Teams) to enhance
collaboration.

Example:
A weekly check-in meeting was established as per the communication plan to discuss
progress, address risks (tracked in the risk register), and resolve conflicts.

5. Skill Development and Training:


 Identify skill gaps and provide training or resources.
 Encourage continuous learning to address project challenges.

Example:

 A workshop on using the cloud database migration tool ensured the Database
Administrator and QA Tester were well-equipped for their tasks.

6. Performance Monitoring:
 Continuously evaluate team performance against project milestones (from the
Gantt chart).
 Provide feedback and address issues promptly.

Example:
When delays in wireframe development arose, the Project Manager facilitated additional
resources and clarified the designer's role to address bottlenecks.

Importance of Team Formation and Development:

1. Alignment with Project Objectives.


A well-formed team ensures the project deliverables (e.g., website redesign, database
migration) meet quality standards and timelines.
2. Enhanced Productivity:
Clear roles, responsibilities, and communication minimize misunderstandings and
optimize resource utilization.
3. Conflict Resolution:
A cohesive team fosters a culture of trust and collaboration, making it easier to resolve
conflicts.

Ministry of Labor and Skills Managing Web and Version -1


Page 42 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 43 of 81
1

4. Effective Risk Mitigation:


Skilled and informed team members can identify and address risks proactively.

Practical Implementation Example:

Scenario from Unit 1:


XYZ Solutions’ project to redesign the e-commerce website and migrate its database required
minimal downtime. The following steps were taken during team formation:

 Team Composition:
 A senior Database Administrator was assigned to handle the migration.
 A UI/UX Designer with e-commerce expertise worked on wireframes and
prototypes.
 Training:
 The team underwent a two-day workshop on the cloud-based database tool.
 Tools for Collaboration:
 Slack was used for daily communication.
 A shared Trello board tracked tasks and their dependencies.

Key Deliverables for Team Formation and Development:

1. Team Structure Chart:


 A diagram showing team members, their roles, and reporting lines.
2. Responsibility Matrix (RACI):
 Defines who is Responsible, Accountable, Consulted, and Informed for each task.
3. Team Development Plan:
 Outlines training and activities for skill enhancement.
4. Collaboration Strategy Document:
 Specifies tools, communication protocols, and meeting schedules.

Team formation and development bridge the project initiation phase (Unit 1) and execution (Unit
2) by ensuring the right people are in place to execute tasks effectively. This foundation directly
impacts the project's overall success.

2.2. Communication and Collaboration Strategies

Effective communication and collaboration are the backbone of successful project execution.
These strategies ensure that all stakeholders are informed, aligned, and working towards common
goals, minimizing misunderstandings and promoting teamwork.

Key Components of Communication and Collaboration Strategies

Ministry of Labor and Skills Managing Web and Version -1


Page 43 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 44 of 81
1

1. Communication Planning:
 Develop a structured plan that outlines how, when, and to whom information will
be communicated.
 Use the communication plan from Unit 1 as a foundation.

Example from Unit 1:


A weekly progress update is sent to stakeholders via email, as outlined in the
communication plan. For urgent issues, the Project Manager uses instant messaging tools
like Microsoft Teams.

2. Establishing Communication Channels:


 Use a mix of synchronous (real-time) and asynchronous (delayed) communication
tools.
 Ensure channels suit team preferences and project needs.

Examples:

 Synchronous: Video calls for team meetings.


 Asynchronous: Email for detailed updates and task-tracking tools like Trello or
Asana.

3. Defining Collaboration Tools and Platforms:


 Select tools that facilitate file sharing, task tracking, and discussion.
 Encourage consistent use of these tools to centralize communication.

Example:
During the e-commerce website redesign project:

 Trello was used to track progress on tasks such as wireframe design and database
migration.
 Google Drive stored shared documents like the WBS and project charter.

4. Stakeholder Engagement:
 Regularly communicate with stakeholders to manage expectations and gather
feedback.
 Tailor communication styles to stakeholder preferences.

Example from Unit 1:


The client received a bi-weekly report summarizing project milestones, risks, and
upcoming activities.

5. Conflict Management Through Communication:


 Address misunderstandings promptly using clear, respectful dialogue.
 Encourage an open-door policy for discussing concerns.

Ministry of Labor and Skills Managing Web and Version -1


Page 44 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 45 of 81
1

Example:
When team members disagreed about the website's homepage layout, the Project Manager
facilitated a meeting to gather input and reach a consensus.

6. Monitoring Communication Effectiveness:


 Periodically review whether the communication strategies are meeting project
needs.
 Adjust plans based on team feedback and project dynamics.

Example:
After noticing delays in responding to emails, the team shifted to Slack for quicker
updates on task status.

Practical Implementation Example:

Scenario:
During the database migration phase of the e-commerce project:

 Communication Plan:
The Project Manager scheduled daily 15-minute stand-up meetings to review progress and
address issues.
 Collaboration Tools:
The team used a shared Google Sheet to track data migration milestones and
dependencies.
 Conflict Resolution:
A miscommunication about testing deadlines was resolved through a one-on-one
discussion facilitated by the Project Manager.

Importance of Communication and Collaboration Strategies

1. Improved Team Alignment:


Clear communication ensures everyone understands the project’s objectives and their role
in achieving them.
2. Increased Efficiency:
Centralized collaboration tools reduce duplication of work and streamline task tracking.
3. Stakeholder Satisfaction:
Transparent updates and consistent engagement build trust and confidence in the project
team.
4. Enhanced Problem-Solving:
Open communication channels foster a collaborative environment for addressing
challenges quickly.

Key Deliverables for Communication and Collaboration Strategies

Ministry of Labor and Skills Managing Web and Version -1


Page 45 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 46 of 81
1

1. Communication Plan Document:


 Outlines meeting schedules, reporting formats, and escalation protocols.
2. Collaboration Tool Setup:
 Implementation of platforms like Trello, Slack, or Asana with clear user
guidelines.
3. Stakeholder Feedback Reports:
 Summarizes insights gathered from stakeholder interactions to refine strategies.
4. Conflict Resolution Logs:
 Records of resolved issues and actions taken to prevent recurrence.

Communication and collaboration strategies directly impact the smooth execution of tasks
defined in the WBS. They link the planning phase (Unit 1) with effective project management
during execution, ensuring project goals are met efficiently and stakeholders remain engaged.

2.3. Quality Management and Control

Quality management and control ensure that project deliverables meet predefined standards and
client expectations. It involves setting quality benchmarks, monitoring processes, and making
adjustments to address deviations.

Key Components of Quality Management and Control

1. Quality Planning:
 Define quality objectives and standards aligned with project requirements.
 Establish metrics to measure performance.

Example from Unit 1:

 For the e-commerce website redesign, a quality objective was ensuring that all
pages load within 3 seconds.

2. Quality Assurance (QA):


 Focus on preventing defects by standardizing processes.
 Conduct regular audits to ensure adherence to quality plans.

Example:
During database migration, QA included validating data consistency and running sample
queries to verify accuracy.

3. Quality Control (QC):


 Detect and correct issues in deliverables through testing and inspections.

Ministry of Labor and Skills Managing Web and Version -1


Page 46 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 47 of 81
1

 Use tools and techniques to verify that outputs meet quality standards.

Example:
The team performed cross-browser testing to ensure the website's compatibility with
Chrome, Safari, and Firefox.

4. Continuous Improvement:
 Collect feedback to refine processes and enhance future project performance.
 Use frameworks like Plan-Do-Check-Act (PDCA) to drive improvements.

Example:
Post-launch feedback highlighted issues with mobile responsiveness. The team adjusted
workflows to prioritize mobile testing in future projects.

Steps in Quality Management and Control:

1. Define Quality Standards:


 Collaborate with stakeholders to understand their expectations.
 Example: The client requested a 99.9% uptime guarantee for the database post-
migration.
2. Develop Quality Checklists:
 Create task-specific checklists to standardize evaluations.
 Example: A checklist for website design includes elements like responsive layout,
accessibility compliance, and error-free navigation.
3. Implement Testing Protocols:
 Use automated and manual testing to validate deliverables.
 Example: Load testing ensured the database could handle high traffic during
promotional events.
4. Review and Document Results:
 Record findings from quality checks and corrective actions.
 Example: Testing logs highlighted server performance under varying loads,
enabling optimizations.
5. Refine Processes:
 Analyze results and adjust workflows to address recurring issues.
 Example: Adjusting the testing schedule to include usability testing earlier in the
project timeline.

Practical Implementation Example:

Scenario:
During the development phase of the e-commerce project:

Ministry of Labor and Skills Managing Web and Version -1


Page 47 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 48 of 81
1

 Quality Standards:
The team committed to maintaining a 2-second page load time for all product pages.
 Testing Protocols:
Conducted user acceptance testing (UAT) with a pilot group of clients to validate the
design and functionality.
 Documentation:
Generated defect reports for bugs encountered during testing and tracked resolutions in
Jira.

Importance of Quality Management and Control:

1. Client Satisfaction:
Meeting or exceeding quality expectations ensures client trust and positive feedback.
2. Cost Efficiency:
Identifying defects early reduces the cost of rework and delays.
3. Enhanced Team Performance:
Clear quality benchmarks motivate teams to produce their best work.
4. Reputation Building:
Delivering high-quality outputs enhances the organization's credibility in the market.

Key Deliverables for Quality Management and Control:

1. Quality Plan Document:


 Defines standards, metrics, and processes for quality management.
2. Testing Reports:
 Logs of test results, issues detected, and resolutions.
3. Audit Logs:
 Records of QA activities, including process reviews and improvements.
4. Defect Reports:
 Detailed documentation of defects, including their severity and corrective actions
taken.
5. Lessons Learned Documentation:
 Insights gained during quality management to refine future practices.

Quality management connects directly to the risk management and planning activities in Unit 1.
By aligning with the defined objectives and metrics, it ensures the successful realization of
project goals during execution.

2.4. Change Management

Change management is the structured approach to planning, implementing, and monitoring


changes within a project to minimize disruptions and ensure alignment with project goals. It
focuses on handling scope, resources, or process modifications effectively.

Ministry of Labor and Skills Managing Web and Version -1


Page 48 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 49 of 81
1

Key Components of Change Management:

1. Change Identification:
 Recognize the need for changes, whether driven by internal factors (team
suggestions) or external factors (stakeholder requests).
 Example: During the e-commerce website redesign project, the client requested
adding a live chat feature mid-project.

2. Change Evaluation:
 Assess the impact of proposed changes on project scope, timeline, budget, and
resources.
 Example: Evaluating whether adding a live chat feature would delay the project
launch or exceed the budget.

3. Change Approval:
 Present changes to the appropriate stakeholders or governance committee for
review and approval.
 Example from Unit 1: The project steering committee, as part of the governance
structure, approved significant changes after reviewing feasibility studies.

4. Change Implementation:
 Incorporate approved changes into the project plan while minimizing disruptions.
 Example: Updating the task schedule in the Gantt chart to accommodate
development and testing of the live chat feature.

5. Change Communication:
 Inform all stakeholders about approved changes, their implications, and the
revised plan.
 Example: Sending a detailed update to stakeholders highlighting the new feature,
its benefits, and the adjusted timeline.

6. Change Monitoring and Control:


 Continuously track the progress of implemented changes and evaluate their
effectiveness.
 Example: Monitoring user feedback during testing to ensure the live chat feature
meets client expectations.

Steps in Change Management:

1. Request Changes:
 Document the need for change using a formal request form.
 Example: A change request form was submitted to add the live chat feature,
detailing its expected benefits.

Ministry of Labor and Skills Managing Web and Version -1


Page 49 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 50 of 81
1

2. Conduct Impact Analysis:


 Assess how the change affects existing tasks and resources.
 Example: Determining if extra developers were needed to implement the live chat
feature without delaying the launch.
3. Update the Project Plan:
 Revise timelines, budgets, and resource allocations as necessary.
 Example: Adjusting the Gantt chart to allocate an additional week for testing the
new feature.
4. Communicate Changes:
 Share the updated plan with the team and stakeholders.
 Example: Hosting a meeting with the development team to explain the updated
task priorities.
5. Monitor Implementation:
 Track progress on the change and resolve any issues promptly.
 Example: Assigning a Quality Assurance (QA) specialist to verify the
functionality of the live chat feature.

Practical Implementation Example:

Scenario:
During the database migration phase of the project, the client requested integration with a new
payment gateway.

 Change Request:
The client submitted a formal change request detailing the necessity of the new payment
system.
 Impact Analysis:
The team analyzed that adding the gateway would require an additional two weeks and
increase costs by $5,000.
 Approval and Plan Update:
The change was approved, and the project plan was updated with new tasks for
integration and testing.
 Implementation and Monitoring:
The team implemented the changes, conducting multiple rounds of testing to ensure
compatibility with the database.

Importance of Change Management:

1. Enhanced Flexibility:
Ensures the project can adapt to evolving requirements without derailing progress.
2. Minimized Disruptions:
Structured processes reduce chaos and confusion caused by unplanned changes.

Ministry of Labor and Skills Managing Web and Version -1


Page 50 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 51 of 81
1

3. Stakeholder Alignment:
Keeps stakeholders informed and ensures their needs are incorporated effectively.
4. Improved Project Outcomes:
Allows for enhancements that improve the final deliverables' quality and relevance.

Key Deliverables for Change Management:

1. Change Request Forms:


 Documented details of requested changes, including justification and expected
outcomes.
2. Impact Analysis Reports:
 Comprehensive evaluations of how changes affect scope, timeline, budget, and
resources.
3. Revised Project Plans:
 Updated Gantt charts, schedules, and resource allocations reflecting the approved
changes.
4. Change Logs:
 Records of all approved and implemented changes, including their status and
outcomes.
5. Stakeholder Communication Reports:
 Documentation of communication efforts detailing changes and their implications.

Change management ties directly to planning activities in Unit 1 and the team dynamics from
earlier topics in Unit 2. By establishing clear protocols for handling changes, projects can
maintain alignment with goals while incorporating necessary adjustments efficiently.

2.5. Issue and Conflict Resolution.

Issue and conflict resolution involves identifying, addressing, and resolving problems or disputes
that arise during a project's execution. It ensures the project remains on track while maintaining
team cohesion and stakeholder satisfaction.

Key Components of Issue and Conflict Resolution:

1. Issue Identification:
 Detect problems promptly and document them clearly.
 Example: A team member raises concerns about insufficient time allocated for
testing the database migration.

2. Conflict Recognition:
 Identify interpersonal or task-related conflicts affecting team performance.
 Example: A disagreement arises between the database administrator and the
developer regarding the migration timeline.

Ministry of Labor and Skills Managing Web and Version -1


Page 51 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 52 of 81
1

3. Root Cause Analysis:


 Investigate the underlying causes of issues or conflicts.
 Example: Realizing that the disagreement is due to unclear task assignments in the
updated project plan.

4. Stakeholder Involvement:
 Engage relevant stakeholders in resolving conflicts or issues.
 Example: Involving the project manager to mediate and clarify task priorities.

5. Resolution Strategies:
 Implement suitable solutions to address the identified issues or conflicts.
 Example: Allocating additional resources to expedite database testing and ease
team concerns.

6. Monitoring and Follow-up:


 Track resolution efforts to ensure issues are fully addressed and conflicts do not
resurface.
 Example: Conducting a follow-up meeting to ensure team members agree on the
revised timeline and tasks.

Steps in Issue and Conflict Resolution

1. Log the Issue or Conflict:


 Use an issue log to document details, including the problem description, date, and
individuals involved.
 Example: Logging an issue where a key feature in the redesigned e-commerce
website is underperforming.
2. Analyze the Problem:
 Determine whether it’s a technical issue, process-related problem, or interpersonal
conflict.
 Example: Discovering that slow page load times are due to improperly optimized
database queries.
3. Engage Stakeholders:
 Discuss the problem with all relevant parties to gain insights and propose
solutions.
 Example: Organizing a brainstorming session with the database team to address
performance bottlenecks.
4. Develop a Resolution Plan:
 Identify and prioritize actions to resolve the problem efficiently.
 Example: Assigning a senior developer to optimize the database queries and
reduce load times.
5. Implement the Solution:
 Execute the agreed resolution plan promptly.

Ministry of Labor and Skills Managing Web and Version -1


Page 52 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 53 of 81
1

Example: Deploying and testing optimized queries in a staging environment


before going live.
6. Evaluate and Document Outcomes:
 Assess the effectiveness of the resolution and update project documentation to
reflect changes.
 Example: Updating the risk register to include slow page loads as a mitigated risk.

Practical Implementation Example:

Scenario:
During the project, the design and development teams had a conflict over website layout changes
requested by the client.

 Issue Identification:
The developers felt the changes were too late in the project and might disrupt other tasks.
 Root Cause Analysis:
Miscommunication about deadlines for client feedback caused the late request.
 Stakeholder Involvement:
The project manager facilitated a meeting to mediate the conflict and clarify priorities.
 Resolution Plan:
The design team created a scaled-back version of the layout changes that the developers
could implement within the given timeframe.
 Follow-up:
A post-resolution review confirmed that both teams were aligned on how to handle
similar issues in the future.

Common Resolution Strategies:

1. Collaborative Problem-Solving:
Engage all parties to jointly develop solutions, fostering teamwork and shared
accountability.
2. Mediation:
Involve a neutral third party, such as the project manager, to facilitate discussions and
propose compromises.
3. Escalation:
Escalate unresolved issues to higher authority, like the project steering committee, for
final decisions.
4. Proactive Communication:
Maintain open lines of communication to address concerns before they escalate.

Deliverables for Issue and Conflict Resolution:

1. Issue Logs:

Ministry of Labor and Skills Managing Web and Version -1


Page 53 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 54 of 81
1

Detailed records of identified issues, including their status and resolution steps.
2. Resolution Plans:
 Documented actions and strategies implemented to address issues or conflicts.
3. Meeting Minutes:
 Summaries of discussions held to resolve issues, including key decisions and
action items.
4. Updated Project Documentation:
 Adjusted project plans or risk registers reflecting resolved issues and lessons
learned.

Issue and conflict resolution builds on the risk management practices established in Unit 1 and
connects to change management by addressing challenges in adapting plans. Proactively
resolving issues ensures project stability and fosters a positive team environment, contributing to
overall project success.

2.6. Monitoring and Controlling Project Progress.

Monitoring and controlling project progress involves tracking performance against the project
plan, identifying variances, and implementing corrective actions to ensure the project stays
aligned with its objectives.
Key Components of Monitoring and Controlling

1. Performance Metrics:
 Use Key Performance Indicators (KPIs) to measure progress.
 Example: Tracking completed tasks against planned milestones in the Gantt chart.

2. Progress Reporting:
 Regularly communicate updates to stakeholders.
 Example: Weekly status reports highlighting tasks completed, tasks in progress,
and potential delays.

3. Variance Analysis:
 Identify differences between planned and actual performance.
 Example: Comparing the budgeted time for database optimization with actual time
spent.

4. Issue Tracking:
 Record and address obstacles or deviations from the project plan.
 Example: Logging a delay in acquiring server hardware and expediting
procurement processes.

5. Change Management:

Ministry of Labor and Skills Managing Web and Version -1


Page 54 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 55 of 81
1

 Evaluate and approve or reject change requests to the project scope, timeline, or
budget.
 Example: Approving a change request to include additional features in the e-
commerce website.

6. Quality Control:
 Ensure deliverables meet defined standards and requirements.
 Example: Verifying that the migrated database maintains data integrity through
rigorous testing.

Steps for Effective Monitoring and Controlling:

1. Define Monitoring Tools and Techniques:


 Use tools like project dashboards, time-tracking software, or task management
platforms.
 Example: Utilizing tools like Jira or Trello to track task completion.
2. Establish Reporting Cycles:
 Determine the frequency of updates to stakeholders (e.g., weekly, bi-weekly).
 Example: Setting up bi-weekly video calls with the client to discuss project
progress.
3. Track Actual Performance:
 Compare real-time performance with the project plan.
 Example: Monitoring whether the database testing phase is proceeding according
to schedule.
4. Conduct Variance Analysis:
 Assess the cause and impact of variances and determine corrective actions.
 Example: Adjusting the timeline when a key resource becomes unavailable due to
illness.
5. Implement Corrective Actions:
 Take measures to bring the project back on track.
 Example: Adding additional team members to meet a critical milestone.
6. Review and Approve Changes:
 Use a change control process to manage and document adjustments to the project.
 Example: Revising the project budget to accommodate an unforeseen licensing fee
for database migration tools.
7. Maintain Documentation:
 Update project documentation to reflect monitoring activities and outcomes.
 Example: Keeping a detailed log of variances and corrective measures.

Practical Implementation Example:

Scenario:
XYZ Solutions is executing a project to redesign a client’s e-commerce website and migrate their
database to a cloud-based platform. During the database migration phase:

Ministry of Labor and Skills Managing Web and Version -1


Page 55 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 56 of 81
1

 Performance Tracking:
Progress is monitored using a Gantt chart, and a delay is identified in data validation due
to resource constraints.
 Corrective Action:
An additional database analyst is brought in to expedite data validation.
 Reporting:
A progress report is shared with stakeholders, detailing the actions taken and the updated
timeline.
 Outcome:
The delay is mitigated, and the project remains on schedule.

Monitoring and Controlling Tools

1. Project Management Software:


o Tools like Microsoft Project, Asana, or Smartsheet to track tasks and timelines.
2. Dashboards and Reports:
o Visual representations of progress, budget usage, and risks.
3. Variance Analysis Techniques:
o Tools like Earned Value Management (EVM) to compare planned and actual
performance.
4. Quality Assurance Processes:
o Testing tools for database integrity and website functionality.

Deliverables for Monitoring and Controlling

1. Progress Reports:
o Comprehensive updates on task completion, milestones, and challenges.
2. Variance Reports:
o Analysis of deviations from the plan, including reasons and proposed solutions.
3. Issue and Risk Logs:
o Detailed records of ongoing issues, risks, and resolutions.
4. Change Request Forms:
o Documentation of approved or rejected changes to the project.
5. Quality Assurance Checklists:
o Documentation confirming that deliverables meet quality standards.

Monitoring and controlling project progress ensures alignment with the project plan and
objectives, prevents scope creep, and maintains stakeholder confidence. This sub-topic builds on
earlier sections, particularly project planning and risk management, by emphasizing real-time
tracking and adjustments during project execution.

Ministry of Labor and Skills Managing Web and Version -1


Page 56 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 57 of 81
1

Self-Check-2
Part-I: Read each statement and write 'True' if the statement is correct or 'False' if it is not.

1. Effective team communication strategies involve only formal meetings with stakeholders.

2. Team development focuses on enhancing individual and collective performance within


the project team.

3. Quality management in project execution ensures that deliverables meet the required
standards.

4. Issue resolution should always be escalated to higher management for resolution.

5. Change management includes processes to evaluate and approve modifications to the


project plan.

6. Monitoring project progress involves comparing actual performance against planned


milestones.

7. Conflict resolution in team management often results in delays and reduced efficiency.

Part-II: Select the best answer from the provided options and circle the corresponding letter.

1. Which of the following is NOT a step in team formation and development?


a. Assigning roles and responsibilities
b. Ignoring team conflicts
c. Conducting team-building activities
d. Providing necessary training

2. What is the primary purpose of a communication plan during project execution?


a. To eliminate stakeholder feedback
b. To track financial expenditure
c. To ensure timely information sharing
d. To manage risks

3. Which of the following strategies is most effective for quality control?


a. Ignoring minor defects
b. Regular testing and reviews
c. Delaying testing until the end of the project

Ministry of Labor and Skills Managing Web and Version -1


Page 57 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 58 of 81
1

d. Allowing users to report issues after deployment

4. A key element of change management is:


a. Avoiding scope adjustments
b. Maintaining rigid schedules
c. Evaluating and approving change requests
d. Ignoring team suggestions

5. What is the first step in resolving conflicts within a project team?


a. Escalating the conflict to stakeholders
b. Understanding the root cause of the conflict
c. Ignoring the conflict
d. Changing team members' roles

6. Which tool is commonly used to monitor project progress?


a. Gantt chart
b. Risk register
c. Business case document
d. Feasibility study

7. A project issue log is primarily used to:


a. Document and track project risks
b. Track and resolve project issues
c. Create a stakeholder communication plan
d. Plan future project budgets

Ministry of Labor and Skills Managing Web and Version -1


Page 58 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 59 of 81
1
Operation Sheet 2.1 : Project Execution and Team Management
Equipments and Tools

Refer to Unit 1.

Scenario:
Continuing from Unit 1, XYZ Solutions is in the execution phase of the project to redesign the e-
commerce website and migrate the database to a cloud-based platform. The project team has been
established, and the project charter has been approved. As part of the project execution and
management, the focus is now on forming a high-performing team, managing quality
deliverables, and addressing potential issues and changes during execution.

Tasks:

1. Team Formation and Development:


 Assemble a diverse team with clear roles and responsibilities based on their
expertise.
 Conduct a team-building session to foster collaboration and align team members
with the project objectives.
 Develop a training schedule for team members to learn new tools and techniques
required for the project.

Activity:


Create a team structure chart, specifying roles such as Project Manager, Database
Administrator, UX Designer, and QA Analyst.
 Design a training module for the database migration tool.
2. Communication and Collaboration Strategies:
 Develop a communication plan to facilitate effective information flow among
stakeholders.
 Schedule regular project status meetings to review progress, discuss challenges,
and share updates.
 Use collaborative tools to streamline communication and document sharing.

Activity:

Draft a meeting agenda template for weekly status updates.


Set up a shared folder structure for document management on a platform like
Google Drive or SharePoint.
3. Quality Management and Control:
 Define quality standards for deliverables, such as website performance
benchmarks and database integrity checks.
 Conduct regular testing and reviews to ensure the project meets quality
expectations.

Ministry of Labor and Skills Managing Web and Version -1


Page 59 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 60 of 81
1

Activity:

Develop a checklist for database testing, including validation of data accuracy,


migration completeness, and system performance.
 Document quality review findings and provide recommendations for
improvement.
4. Change Management:
 Establish a process for handling change requests, including evaluation, approval,
and implementation.
 Monitor scope changes to minimize their impact on the timeline and budget.

Activity:

 Prepare a change request form template, including sections for description,


justification, impact analysis, and decision.
 Document a hypothetical change request, such as adding a feature for real-time
inventory updates on the e-commerce site.
5. Issue and Conflict Resolution:
 Maintain an issue log to record and track project challenges.
 Implement a conflict resolution strategy to address disputes within the team or
with stakeholders.

Activity:

 Populate an issue log with examples like delayed resource availability or


stakeholder disagreements over design choices.
 Draft a conflict resolution plan, detailing steps such as identifying the root cause,
facilitating discussions, and implementing solutions.
6. Monitoring and Controlling Project Progress:
 Track the project’s performance against milestones and KPIs.
 Identify variances and implement corrective actions to realign with the project
plan.

Activity:

 Use a Gantt chart to track the status of website redesign and database migration
tasks.
 Prepare a variance report highlighting deviations in the project schedule and
suggesting corrective actions.

Deliverables:

 Team structure chart and training schedule.


 Communication plan document and meeting agenda template.

Ministry of Labor and Skills Managing Web and Version -1


Page 60 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 61 of 81
1

 Quality control checklist and review findings.


 Change request form and documented example.
 Issue log and conflict resolution plan.
 Gantt chart and variance report.

Expected Outcomes: By completing this exercise, trainees will:

 Develop skills in forming and managing a high-performing project team.


 Learn to create and implement effective communication and collaboration strategies.
 Understand quality control processes and how to manage changes effectively.
 Gain experience in resolving project issues and tracking progress.

Implementation:

1. Team Formation and Development:


 Created a team structure chart:
 Project Manager: Alex Johnson
 Database Administrator: Maria Chen
 UX Designer: Liam O'Connor
 QA Analyst: Priya Patel
 Designed a training module focusing on:
 Basics of the cloud migration tool.
 Best practices for e-commerce website optimization.
2. Communication and Collaboration Strategies:
 Developed a communication plan document that outlines:
 Weekly status meetings every Monday at 10 AM.
 Tools: Zoom for meetings, Slack for daily updates, and SharePoint for
document sharing.
 Created a meeting agenda template covering:
 Project updates, challenges, risk reviews, and action items.
3. Quality Management and Control:
 Developed a database testing checklist, including:
 Validation of migrated data integrity.
 Performance testing under high user load.
 Documented findings and provided improvement recommendations, such as
optimizing database queries for speed.
4. Change Management:
 Prepared a change request form with:
 Description: Add real-time inventory tracking.
 Justification: Enhance customer experience.
 Impact: Adjust timeline by 2 weeks.
 Documented this request and prepared a scope adjustment plan.
5. Issue and Conflict Resolution:
 Populated the issue log with examples:

Ministry of Labor and Skills Managing Web and Version -1


Page 61 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 62 of 81
1

Resource delays for database administrator training.


UX Designer conflicts on design preferences with stakeholders.
 Drafted a conflict resolution plan:
 Step 1: Host a mediation meeting.
 Step 2: Clarify expectations and align on objectives.
6. Monitoring and Controlling Project Progress:
 Created a Gantt chart to track:
 Website redesign milestones: Wireframes, prototyping, final design.
 Database migration tasks: Backup, migration, validation.
 Prepared a variance report showing:
 Delay of 3 days in initial migration testing due to resource availability.
 Recommended corrective action: Allocate additional testing resources.

Ministry of Labor and Skills Managing Web and Version -1


Page 62 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 63 of 81
1
Unit Three: Project Closure and Review

This learning guide is developed to provide you the necessary information regarding the
following content coverage and topics:
 Project Handover and System Testing
 Project Documentation and Support Plans
 Post-Project Review
 Disaster Recovery Plan Updates
 Project Closure and Sign-off
Demonstration of effective operations
This guide will also assist you to attain the learning outcomes stated in the cover page.
Specifically, upon completion of this learning guide, you will be able to:
 Conduct Project Handover and System Testing
 Prepare Project Documentation and Support Plans
 Conduct Post-Project Review
 Create Disaster Recovery Plan Updates
 Conduct Project Closure and Sign-off

3.1 Project Handover and System Testing


Project handover and system testing represent the final phase of the project execution process,
ensuring that the system is complete, validated, and transitioned to the client or operational team.

Ministry of Labor and Skills Managing Web and Version -1


Page 63 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 64 of 81
1

This phase solidifies the project's readiness for live operation and client use, aligning with the
objectives defined during initiation and planning.

Steps for Implementation:

1. Project Handover:
 Documentation Transfer:
 Consolidate all project-related documents, such as user manuals, training
materials, and technical specifications.
 For the web and database system, include a detailed API reference
document and database schema diagrams prepared during Unit 1.
 Knowledge Sharing:
 Conduct comprehensive handover meetings or workshops. For example,
schedule a session to guide stakeholders through the cloud-integrated
database features and e-commerce platform functionalities developed
during earlier phases.
 Provide training to ensure client teams are equipped to handle the system's
core operations, like managing customer orders and updating inventory.
 Sign-off Process:
 Secure formal acceptance from stakeholders, confirming that all
deliverables meet the defined requirements.
2. System Testing:
 Test Plan Development:
 Create detailed test cases for functional, performance, security, and
usability testing.
 For instance, validate the database's ability to handle complex queries or
the website's responsiveness under varying network conditions.
 Test Execution:
 Perform end-to-end testing:
 Simulate real-world scenarios, such as a customer completing a
purchase on the e-commerce site while database updates occur in
real time.
 Conduct stress testing to measure the system's performance under
peak loads, such as during promotional campaigns.
 Bug Tracking and Resolution:
 Use a tool like JIRA or a spreadsheet to record and manage bugs. For
example, log any issues discovered during testing, such as slow page load
times or database query failures, and assign them for resolution.

Activity:

 Prepare a checklist of essential items for handover, including documentation, credentials,


and training materials.

Ministry of Labor and Skills Managing Web and Version -1


Page 64 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 65 of 81
1

 Develop and execute a test plan focusing on critical functionalities, such as payment
processing and inventory updates.
 Create a bug-tracking sheet with fields for issue ID, description, severity, resolution
owner, and status.

Deliverables:

 Comprehensive handover documentation, including user manuals, API references, and


training materials.
 A completed test plan document with test scenarios, expected outcomes, and results.
 A bug-tracking log detailing identified and resolved issues.
 Signed project acceptance document from stakeholders.

Example: For the TechNova Solutions project:

 The documentation transfer included an API reference for integration with external tools
and a user manual for the support ticketing system.
 The test plan involved scenarios such as:
 Validating secure payment gateways.
 Stress testing to ensure the database supports 500 concurrent users.
 Simulating a customer query to verify real-time inventory updates.
 During system testing, a critical bug was identified where checkout failed under high
load. The development team resolved it by optimizing server configurations.
 Stakeholders signed off on the project after a walkthrough of the system and successful
resolution of all major issues.

Expected Outcomes:

 The system is fully operational and ready for live deployment.


 Clients and stakeholders are trained and confident in managing the system.
 All critical issues are resolved, and formal acceptance is secured.

3.2. Project Documentation and Support Plans

Project documentation and support plans are essential to ensure the sustainability of the delivered
project. They provide the necessary information and resources for future maintenance, upgrades,
and troubleshooting.

Steps for Implementation:

1. Documentation Creation:
 Compile all project-related documents, such as:
 Design specifications

Ministry of Labor and Skills Managing Web and Version -1


Page 65 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 66 of 81
1

Development logs
Testing reports
 Ensure documentation is clear, concise, and accessible to the relevant teams.
2. Support Plans:
 Develop a support plan outlining:
 Procedures for incident management and troubleshooting.
 Maintenance schedules and responsibilities.
 Contact details for escalation and support requests.
3. Training and Knowledge Transfer:
 Conduct training sessions for the support team to familiarize them with the
system.
 Provide step-by-step guides and FAQs for common issues.

Activity:

 Create a repository structure for storing project documentation.


 Draft a support plan template, detailing key procedures and contact points.
 Prepare a training session agenda for the support team, including hands-on system
walkthroughs.

Deliverables:

 Organized repository containing project documentation.


 Detailed support plan document.
 Training materials and session agendas.

Example: For XYZ Solutions’ e-commerce project:

 The documentation included detailed API references and deployment instructions.


 The support plan specified 24/7 availability for the first three months post-launch, with a
dedicated support team.
 Training materials covered system navigation, troubleshooting scenarios, and database
management.

Expected Outcomes:

 Comprehensive documentation ensures continuity and efficient knowledge transfer.


 Support plans minimize downtime and ensure system reliability.
 Trained support teams are well-equipped to handle operations independently.

3.3. Post-Project Review

Ministry of Labor and Skills Managing Web and Version -1


Page 66 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 67 of 81
1

The post-project review is a critical process for evaluating the success and challenges of the
project. It identifies lessons learned, recognizes accomplishments, and provides actionable
insights for improving future projects.

Steps for Implementation:

1. Review Preparation:
 Schedule a meeting with the project team and key stakeholders.
 Gather necessary project documents, including the project plan, test reports, and
final deliverables.
2. Performance Evaluation:
 Assess whether the project objectives, scope, and quality standards were met.
 Review the timeline and budget adherence, identifying deviations and their causes.
3. Stakeholder Feedback:
 Conduct surveys or interviews with stakeholders to collect feedback on the
project’s execution and outcomes.
 Discuss satisfaction with deliverables and the overall process.
4. Lessons Learned:
 Identify challenges encountered during the project and document their resolutions.
 Highlight best practices and successful strategies employed.
5. Documentation:
 Compile a comprehensive post-project review report summarizing findings,
conclusions, and recommendations for future projects.

Activity:

 Develop a feedback form to collect stakeholder insights on project performance.


 Create a template for the post-project review report.
 Facilitate a brainstorming session with the project team to document lessons learned.

Deliverables:

 Completed feedback forms from stakeholders.


 Post-project review report, including performance analysis and lessons learned.
 Recommendations document for process improvements in future projects.

Example: For XYZ Solutions’ e-commerce project:

 A stakeholder survey revealed high satisfaction with the website’s functionality but
highlighted the need for more detailed user training.
 The post-project review identified that early testing phases contributed to fewer critical
bugs in the final system.
 Recommendations included increasing training resources for client teams and
implementing automated testing tools for future projects.

Ministry of Labor and Skills Managing Web and Version -1


Page 67 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 68 of 81
1

Expected Outcomes:

 Clear understanding of project successes and areas for improvement.


 Valuable insights to enhance future project planning and execution.
 Strengthened relationships with stakeholders through constructive feedback.

3.4. Disaster Recovery Plan Updates

Disaster recovery (DR) planning ensures that an organization can quickly restore its critical
systems and operations in the event of a disaster, minimizing downtime and data loss. In the
context of the web and database project, DR plan updates are essential to account for newly
implemented systems and technologies.

Steps for Implementation:

1. Assess Current Disaster Recovery Framework:


 Review the existing DR plan to evaluate its relevance to the newly developed
systems.
 Identify gaps in the plan, such as new integrations, dependencies, or security
features implemented during the project.
 For example, the cloud database migration completed in Unit 1 may require
updates to include backup protocols for cloud-based data.
2. Develop Updated Recovery Strategies:
 Define Recovery Time Objectives (RTO) and Recovery Point Objectives (RPO)
for the new systems:
 RTO: Time required to restore services after a disaster.
 RPO: Maximum acceptable amount of data loss measured in time.
 Incorporate redundancy strategies, such as:
 Automatic database failover to secondary cloud regions.
 Load balancing for the e-commerce platform to maintain availability
during high traffic or server failures.
3. Test and Validate Recovery Processes:
 Conduct simulated disaster scenarios to ensure all components of the DR plan
function as intended.
 Examples of tests include:
 Simulating a server outage to validate database failover mechanisms.
 Testing the restoration of the website using the latest backup.
 Verifying the functionality of integrated APIs during recovery.
4. Update Documentation and Training:
 Document the updated DR procedures, ensuring clarity and accessibility for IT
and support teams.
 Conduct training sessions to familiarize staff with the new DR processes, such as
database recovery steps or failover management.

Ministry of Labor and Skills Managing Web and Version -1


Page 68 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 69 of 81
1

5. Integrate with Ongoing Monitoring:


 Set up monitoring tools to detect and alert teams of potential failures.
 Use tools like AWS CloudWatch or Azure Monitor to oversee the performance of
the cloud infrastructure implemented in the project.

Activity:

 Analyze the existing DR plan and identify areas requiring updates based on the project’s
deliverables.
 Create a recovery workflow diagram for the new system, including steps for database
restoration and web application recovery.
 Conduct a tabletop exercise simulating a disaster, such as a cyberattack, and document the
response process.

Deliverables:

 Updated Disaster Recovery Plan document, including revised RTOs and RPOs.
 Workflow diagrams outlining recovery processes.
 Test results and action items from simulated disaster scenarios.
 Training materials for IT and support teams.

Example: For the TechNova Solutions project:

 The DR plan was updated to include cloud-specific recovery protocols, such as initiating
failover to a secondary AWS region in case of a primary region failure.
 A simulated data breach was conducted to test recovery processes, leading to the
implementation of additional encryption layers for database backups.
 Workflow diagrams were created to visualize the sequence of recovery actions, such as
reconnecting APIs and restoring customer orders from the last backup.

Expected Outcomes:

 The organization is equipped with a robust and updated DR plan tailored to the new
systems.
 Teams are trained to execute recovery processes efficiently, minimizing downtime during
actual disasters.
 Simulated tests provide confidence in the system’s resilience and identify further
improvement areas.

3.5. Project Closure and Sign-off

Ministry of Labor and Skills Managing Web and Version -1


Page 69 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 70 of 81
1

Project Closure and Sign-off is the culmination of the project lifecycle, ensuring all project
deliverables have been met and formally accepted by stakeholders. This phase signifies the
official conclusion of the project and transitions responsibility to the client or operational teams.

Purpose of Project Closure and Sign-off.

1. Formal Acknowledgment:
Signifies that all agreed-upon deliverables and objectives have been completed and
accepted by the client or stakeholders.
2. Accountability Transfer:
Transfers ownership of project outcomes to the client or operations team, ensuring all
necessary resources and knowledge are handed over.
3. Documentation of Completion:
Provides a record of project achievements, approvals, and any outstanding issues to
inform future projects and audits.

Steps for Project Closure and Sign-off

1. Validation of Deliverables:
 Review Final Outputs:
Verify that all deliverables align with the initial scope and objectives outlined in
the project charter.
 Example: For the TechNova Solutions project, confirm that the e-
commerce platform, customer management system, and support ticketing
features are fully functional as per the specifications.
 Address Outstanding Issues:
Resolve any remaining bugs, pending tasks, or stakeholder concerns identified
during handover or testing phases.
2. Stakeholder Approval:
 Conduct Final Review Meetings:
Present the final deliverables, testing results, and system walkthrough to key
stakeholders.
 Example: Demonstrate secure payment processing and real-time inventory
updates to TechNova's management team.
 Obtain Formal Sign-off:
Secure written or digital approval, ensuring stakeholders formally accept the
project deliverables.
3. Project Documentation:
 Compile and Archive Documents:
Organize all project-related documentation, such as contracts, change logs, test
reports, and training materials, into a central repository.
 Example: Include TechNova's API references, database schemas, and
system manuals.

Ministry of Labor and Skills Managing Web and Version -1


Page 70 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 71 of 81
1

 Provide Final Reports:


Deliver summary reports detailing project performance, budget adherence, and
key achievements.
4. Transition to Operations:
 Confirm Operational Readiness:
Ensure operational teams are equipped to manage and maintain the system
independently.
 Example: Verify that TechNova’s support team can handle user queries
and perform routine maintenance.
 Handover Support Responsibilities:
Define the extent of ongoing support, such as bug fixes or system updates, and set
clear timelines.
5. Celebrate Achievements:
 Recognize the efforts of the project team and stakeholders, fostering a positive
culture for future collaborations.

Deliverables

1. Signed Acceptance Document:


Confirms stakeholder approval of deliverables and formal closure of the project.
2. Final Project Report:
Summarizes the project timeline, budget, deliverables, and lessons learned.
3. Complete Documentation Repository:
Includes all project-related materials, such as design specifications, training guides, and
operational manuals.
4. Transition Checklist:
Verifies that all handover tasks, such as credential transfers and training, are complete.
5. Operational Handover Confirmation:
Ensures that the operations team is prepared and has acknowledged receipt of necessary
resources.

Practical Example: TechNova Solutions

 Validation of Deliverables:
TechNova's project team verified that the website supports 500 concurrent users, secure
transactions, and efficient database queries.
 Stakeholder Approval:
Stakeholders reviewed the final deliverables and signed off after confirming all features
were functional and aligned with business goals.
 Documentation:
The project manager compiled a report summarizing key metrics:
 Budget utilization: 95% of planned budget.
 Timeline adherence: Completed two weeks ahead of schedule.
 Deliverables: All objectives met with no critical bugs.

Ministry of Labor and Skills Managing Web and Version -1


Page 71 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 72 of 81
1

 Transition:
TechNova's operations team underwent training on system maintenance and
troubleshooting. AWS monitoring tools were configured to alert the team about any
server issues.

Expected Outcomes

 Project Completion:
Formal closure ensures all responsibilities and deliverables are fulfilled.
 Stakeholder Satisfaction:
Sign-off signifies stakeholder approval and trust in the project's outcomes.
 Operational Readiness:
The client or operations team is equipped to manage the system seamlessly.

Self- check 3

Part-I: Read each statement and write 'True' if the statement is correct or 'False' if it is not.

Ministry of Labor and Skills Managing Web and Version -1


Page 72 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 73 of 81
1

1. A formal sign-off process is required to complete the project handover phase.

2. End-to-end testing should only include functional test cases and exclude performance and
security testing.

3. Training and knowledge transfer are optional steps during the project closure phase.

4. Disaster Recovery Plans must include both RTO (Recovery Time Objectives) and RPO
(Recovery Point Objectives).

5. Stakeholder feedback during the post-project review helps identify areas for improvement
in future projects.

6. Documentation such as user manuals and API references is not required for the project
handover phase.

7. A post-project review can identify best practices and lessons learned for future projects.

Part-II: Select the best answer from the provided options and circle the corresponding letter.

1. Which of the following is NOT a deliverable during the project handover phase?
a) User manuals
b) Bug-tracking log
c) Marketing strategy report
d) Training materials

2. What is the main purpose of system testing during project closure?


a) To finalize project costs
b) To validate the system’s readiness for live operations
c) To analyze competitor performance
d) To create a new project scope

3. Which activity is part of disaster recovery plan updates?


a) Writing new code for the system
b) Conducting simulated disaster scenarios
c) Developing e-commerce platform designs
d) Creating marketing materials

Ministry of Labor and Skills Managing Web and Version -1


Page 73 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 74 of 81
1

4. What is included in the post-project review process?


a) Identifying unresolved system bugs
b) Conducting a needs analysis report
c) Documenting lessons learned
d) Designing system architecture diagrams

5. Which of the following is a critical component of transitioning the project to operations?


a) Performing market analysis
b) Transferring access credentials
c) Designing a new project proposal
d) Creating a WBS (Work Breakdown Structure)

6. What is the key focus during stakeholder feedback collection in the post-project review?
a) Identifying coding errors
b) Measuring satisfaction with deliverables and processes
c) Calculating final project costs
d) Developing system performance benchmarks

7. What tool is commonly used to monitor system performance after transitioning to


operations?
a) Google Analytics
b) AWS CloudWatch
c) Microsoft Excel
d) Jira

Operation sheet 3.1: Project Closure and Review

Ministry of Labor and Skills Managing Web and Version -1


Page 74 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 75 of 81
1

Equipments and Tools:

Refer to previous units.

Scenario:
XYZ Solutions, a medium-sized IT company, recently completed redesigning a client’s outdated
e-commerce website and migrating its database to a cloud-based system. The client requested
minimal downtime during migration and emphasized the need to enhance the user experience.

As the project manager, you are now responsible for completing the project closure phase. This
includes validating the website's functionality, updating the Disaster Recovery Plan with details
from the cloud-based migration, and conducting a post-project review to document feedback and
lessons learned.

Exercise Objectives:

1. Execute project closure tasks, including system handover, final testing, and stakeholder
sign-off.
2. Revise and finalize the Disaster Recovery Plan based on the project's outcomes.
3. Conduct a post-project review to gather feedback, summarize lessons learned, and outline
actionable recommendations.

Tasks:

Task 1: Final System Testing and Handover

1. System Testing:
 Create a test plan to validate key website functionalities, including:
 Product browsing and filtering.
 Cart and checkout workflows.
 User account management.
 Test the responsiveness and performance of the website across different devices
and browsers.
 Record issues encountered during testing, categorize them (critical, major, minor),
and document resolutions.
2. Handover Activities:
 Prepare and deliver user documentation, including:
 An admin guide for product management.
 Steps for monitoring website performance using cloud tools.
 Troubleshooting common website and database issues.
 Organize a handover meeting to present documentation and provide an overview
of the website's features and maintenance requirements.

Ministry of Labor and Skills Managing Web and Version -1


Page 75 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 76 of 81
1

Task 2: Disaster Recovery Plan Updates

1. Assess Current DR Plan:


 Review the initial Disaster Recovery Plan and identify gaps related to the newly
implemented cloud-based database and website.
 Include:
 Database backup configurations.
 Steps to restore the e-commerce platform in the event of a failure.
2. Simulated Recovery Exercise:
 Perform a simulated disaster recovery scenario, such as a database failure or server
outage.
 Document recovery times and assess if they meet the defined RTO and RPO goals.
3. Finalize the DR Plan:
 Incorporate updated workflows, recovery steps, and test results into the Disaster
Recovery Plan.
 Share the updated plan with stakeholders for review and approval.

Task 3: Post-Project Review

1. Gather Feedback:
 Distribute feedback forms to stakeholders to evaluate the project's execution and
the website’s performance.
 Collect insights on what worked well and areas needing improvement.
2. Conduct Lessons Learned Workshop:
 Organize a team meeting to reflect on:
 Challenges encountered during migration and redesign.
 Innovations or best practices adopted.
3. Post-Project Report:
 Prepare a detailed report including:
 Stakeholder feedback analysis.
 Lessons learned summary.
 Recommendations for future projects involving cloud migrations and user-
centric redesigns.

Task 4: Knowledge Transfer and Operational Transition

1. Training Sessions:
 Deliver training sessions to the client’s IT and operational teams covering:
 How to manage the new e-commerce platform.
 Database monitoring and maintenance using cloud tools.
 Techniques for troubleshooting common website issues.
2. Transition Plan:
 Create a transition checklist, ensuring all project deliverables (credentials, access
logs, maintenance guides) are transferred to the client.

Ministry of Labor and Skills Managing Web and Version -1


Page 76 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 77 of 81
1

 Obtain sign-off from the client confirming successful knowledge transfer and
readiness for independent operation.

Deliverables:

1. Test plan, executed test cases, and resolved issue logs.


2. Finalized Disaster Recovery Plan, including recovery test results.
3. User and troubleshooting documentation for the e-commerce website.
4. Post-project review report summarizing feedback, lessons learned, and recommendations.
5. Training session agenda, materials, and attendance records.
6. Signed-off transition checklist confirming project closure.

Implementing the case study would involve creating detailed outputs for each task. Below is the
implementation of the operation sheet based on the tasks outlined:

Task 1: Final System Testing and Handover

1. System Testing Plan and Results:

Test Case Description Status Remarks


Product Browsing & Verify category filters and search ✅
Functioning as expected.
Filtering functionality. Passed
Cart and Checkout Add items to cart, apply discounts, ✅ Payment gateway
Workflow and complete payment. Passed integrated successfully.
User Account Create, update, and delete user ✅
All CRUD operations work.
Management accounts. Passed
Multi-Device ✅ Responsive design
Test on mobile, tablet, and desktop.
Compatibility Passed confirmed.
Browser Test on Chrome, Safari, Firefox, and ✅ No issues across tested
Compatibility Edge. Passed browsers.

2. Handover Deliverables:

 Admin Guide: Covers product management, inventory updates, and order tracking.
 Monitoring Guide: Explains using cloud tools for database monitoring and performance
tracking.
 Troubleshooting Guide: Lists steps for resolving common issues like site downtime or
login problems.
 Handover Meeting Summary: Conducted with the client, presented documentation, and
provided training on navigating the new platform.

Task 2: Disaster Recovery Plan Updates

Ministry of Labor and Skills Managing Web and Version -1


Page 77 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 78 of 81
1

1. Revised DR Plan:

Recovery Step Details


Cloud Backup Scheduled hourly backups of the database to AWS S3 with 14-day
Configuration retention.
Documented steps to restore site availability in case of cloud outages
Platform Restoration
or database corruption.
Recovery Point Objective
Ensure a maximum of 1-hour data loss.
(RPO)
Recovery Time Objective
Full recovery within 4 hours.
(RTO)

2. Simulated Recovery Exercise Results:

Scenario Time to Recover Observations


Database Corruption 3 hours Met RTO. No data loss observed.
Cloud Outage 2 hours 30 minutes Failover system functioned well.

Task 3: Post-Project Review

1. Stakeholder Feedback Summary:

Aspect Feedback
Website Performance "Much faster and more responsive than before."
User Experience "Simpler navigation and better design."
Migration Process "Appreciate the minimal downtime during the migration."
Documentation "Clear and easy to follow."

2. Lessons Learned Workshop Key Points:

Area Lessons Learned


Planning Early engagement with stakeholders ensured smooth execution.
Cloud Migration Testing in a sandbox environment reduced live errors.
Communication Regular updates kept the client informed and satisfied.

3. Post-Project Review Report:

 Strengths: Timely delivery, minimal downtime, excellent client communication.


 Challenges: Managing dependencies during migration.

Ministry of Labor and Skills Managing Web and Version -1


Page 78 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 79 of 81
1

 Recommendations: Develop more automated testing tools for future projects.

Task 4: Knowledge Transfer and Operational Transition

1. Training Sessions:

 Agenda:
o Overview of e-commerce platform features.
o Steps for daily maintenance and updates.
o Tips for database health monitoring.
 Attendance Record:
o Client IT Lead: Present
o Operations Manager: Present
o Marketing Specialist: Present

2. Transition Checklist:

Item Status
Credentials and Access Logs ✅ Delivered
Documentation Handovers ✅ Completed
Training Sessions ✅ Conducted
Client Sign-Off ✅ Received
Conclusion:

XYZ Solutions successfully completed the project with:

 A seamless transition to the cloud-based system.


 Enhanced user experience with a faster, responsive website.
 A well-documented Disaster Recovery Plan.
 Valuable insights from the post-project review.

The client expressed satisfaction, and the project closure marked a significant achievement in
meeting and exceeding expectations.

References:

1. Project Management Body of Knowledge (PMBOK® Guide)


Author: Project Management Institute (PMI), Publication Year: 2017 (6th Edition)
2. Agile Project Management: Creating Innovative Products

Ministry of Labor and Skills Managing Web and Version -1


Page 79 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 80 of 81
1

Author: Jim Highsmith, Publication Year: 2009 (2nd Edition)


3. Database Systems: Design, Implementation, and Management
Authors: Carlos Coronel, Steven Morris, Publication Year: 2018 (13th Edition)
4. Web Development and Design Foundations with HTML5
Author: Terry Felke-Morris, Publication Year: 2019 (9th Edition)
5. Quality Management Demystified
Author: Sid Kemp, Publication Year: 2005
6. Risk Management in Projects
Author: David Hillson, Publication Year: 2009
7. IT Disaster Recovery Planning For Dummies
Author: Peter H. Gregory, Publication Year: 2011
8. The Art of Project Management
Author: Scott Berkun, Publication Year: 2005
9. The Lean Startup: How Today's Entrepreneurs Use Continuous Innovation to Create
Radically Successful Businesses
Author: Eric Ries, Publication Year: 2011
10. The Phoenix Project: A Novel About IT, DevOps, and Helping Your Business Win
Authors: Gene Kim, Kevin Behr, and George Spafford, Publication Year: 2013

Ministry of Labor and Skills Managing Web and Version -1


Page 80 of 81 Author/Copyright Database Projects December, 2024
Logo Company Name: Form No.:
የሥራና ክህሎት ሚኒስቴር OF/MoLS/TVT/029
MINISTRY OF LABOR AND SKILLS

Managing Web and Database Projects. Issue Page No:


No: Page 81 of 81
1

Developer’s Profile

No Name Qualification Field of Study Oganization/ Institution Mobile number E-mail


(Level)

1 Gari Lencha MSc ICT Management Gimbi PTC +251 917819599 [email protected]

2 Endalew Kassa MSc ICT Management Debremarkos PTC +251 913305454 [email protected]

3 Tewodros Girma MSc Information system Sheno PTC +251 912068479 girmatewodiros @gmail.com

Ministry of Labor and


Page 81 of 81 Skills Writing content for webpage Version -1
Author/Copyright