0% found this document useful (0 votes)
67 views16 pages

Anand Kumar

The document outlines the rules and structure for an examination consisting of 100 questions, each worth one mark, with penalties for incorrect answers. It includes specific instructions regarding question attempts, marking criteria, and various technical questions related to railway engineering and construction. Additionally, it provides details about the examination format, including parts of questions and the total number of pages in the question paper.

Uploaded by

tictic1099
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views16 pages

Anand Kumar

The document outlines the rules and structure for an examination consisting of 100 questions, each worth one mark, with penalties for incorrect answers. It includes specific instructions regarding question attempts, marking criteria, and various technical questions related to railway engineering and construction. Additionally, it provides details about the examination format, including parts of questions and the total number of pages in the question paper.

Uploaded by

tictic1099
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Time:-2:30/H44 i- 2:30 g Total Marks 100fqs 100 .

Nates :
negative
f There are total 100 question and each question carry one marks. There is
mark of each
marking and Every wrong answer will carry a penalty of 1/3 of-the

f r g q os 3j TÍ
2 Question not attempted will not fetch any marks./uuH T0

cutting/ overwriting is seen


3 Answer marking to be done after carefullanalysis. If any
I q4T H H4TON o}I fa
in answersheet, zero marks will be awarded/ SR

4 or B. Part Ais general question and Part B


Questionnos. 91 to 100 have tWO parts A
Ifboth parts are answered,
is 8ajbhasha question. Only one part is to be.answered. WA} Vi
Zero marks willbe awarded u . 91 100 HTÄyd B | 4T A TAT

A0 e 16. 3 I
5 There are atotal of 16 pages in the guestion paper fr
t fade /Choose the correct ánser
(1) "ÁT" in AT welding stands for /ya dofs À
(a)Auto- Thimble / 3TC)-ferdi
tb) Alumino - Thermit/ f--afte
(c) Auto - Thorium/ 1-eRyA
(d)Alternate -Temperature/ 3IGCTTE-}ar
(2) Which of the following is considered best /_À À HGH TEGR àH HI HI GIGI
(a) AT Weld Joint /qi tog vaise
(b) FP Joint/y vaise
(c) FB Weld Joint/ q idos alse"
(d) Joint with 60 cm FPs/ ge HÀ 60 5q gÌ 3Ì

(3) Portland Cement has madmum percenitage of which of the following/ AA WEeks
jalo) CAO/ CAO ýl44h i155
-(b) Sio,/ Sio, -11 0220-2S) GMe 60-6S.CqCo3s4T
(c) Al,o/ Al:0 - L2 (4-1)
äiZ(d) H,0/ H,0

(4) Portland Cerment has minimum percentage of which one out of following/ Fd
(a) CAO /CAO - iyy Tda hanfs
(B) SiO,/ SiO, -
Alymin
c) AL,03 / AL,O,
(d) All of the above / Ht

(5) Which of the following is responsible for initial heat generation during adding water to
(a) Czs/ C,S
(B) C;S/ GS
(c) CaAF/ C¡AF
(d) CsA/ C3A

(6) Which of the following is majorly responsible for strength in frst 8 days of
casting ot
(a) CzS/CS
(B) CS/ CGS
(C) CqAF/ CaAF
(D)CGA/CGA
(7) Which of the following is
majorly responsible for'strength in longer period of
(a) CzS/Gs
(B) C,S/ CGS
(C)CaAF /CaAF
(D)CGA/C¡A
(8) f.cant is inreased in an
(a) Cant excess existing cuve/ ggI d À Ge aaTÀ. 4R
(b) increasesoc fatH Gldt L
Cant deficiency decreases e f c
() Cantgradient edse
(d) Al:ofabove are orrect/
(9) tfcant is provided infield equl to
equilibrium cantreu
(a) Inside Rail will wear more -R t UIGT EY
(b) Outer Rail will wear more /AIg0 R T f
(c) Both Correct a t HI
(d) Both wrong/tt TeT
(10) It is not permitted to give more cant than this FA0 IG de tH À Hft
(a) 155mm/ 155 RA
(b) 160mm/i60 P
(c) 165mm/165 A
fd) 17omm/ 170 f
(11)WCR fals in which temperature Zone/ .AY à HIUR qR fT H AIGT
(a) Zone- /
(b) Zone l / ot+|
Page 2
PAAy - 40,BRIDU,-23.
WORKS - 2S
(c) Zone-ll / iH I|
(d) Zone-IV/ -V

(12) Who is responsible to stop enctoachment inside land boundary at mid section? /fre
(a) Station Master e HER
(b)SSE/PWAY/FWy/tà
(c) SEE/WKS qHs ac
(d) ALL /

(13) Recently Railways had made action plan of how many days / àt EG A faGt t
(a) 50 Days/ 50 fai
]100 Days/ 100 f&7
(c) 365 Days /365 fT
(d) 200 Days /200 f&

(14) 1f Back sight on benchmark(R.L. =100.00m) is 1.86m, R.L. of Station whose foresight is

(a)' 100.00m /100.00


(b) 98.14m /98.14 f1.
(c) 101.86m /101.86 1
(d) 103.72m/103.72 A.

(15) Whoisthe auther ot the book named "Exam Warriors" / "yarA aIfRAef" H5 qG
a)Narendra Modi/
(d)Umadash/sr<H
(c)Arvindra Subramaniam/srfd Hg4TH

(16) Steep gradients which need extra engine for hauling is known as ig GT y

a) Pusher gradient/gr tfSyE


b)Rulling Gradient /efci tfse
c) Reasonable gradient/î4 Dfsye
d) MomenturA gradient/9e4 tfse
(17)Tilting of rails is done at a slope of /4efio Oa foGt eH R fhI IT
a. 1 in 30 /30 1
b.1 in 25 /25 1
c. 1 in 20 /20 1
d. 1 in 15/15 1

(18)Clear perpendicular distance between inner faces of two rails isfa qefut à 3iafta
a. Gauge of track/roge

Page 3
gauge/3ifrA T
b.Inner d
base/T
c. Wheel
gauge/qfay o tI d taodH. e
d. Wheel /TT
in India is about
maximum cante and gauge G
(19)The ratio of
1/100
a)1/100/
b) 1/50 / 1/50
-c)1 /10 / 1/10
d) 1/25 / 1/25 /60 fuT 90 y
ye
kg 90 UTS rail?
assessed GMT service life of 60
(20) What is the
/65OsyA
a. 650 GMT
/600yHI
b. 600 GMT
sfrqHt
c. 800GMT/800 e
d. 500 GMT/500
rtwhat is the full formnot
MifionTonnes/ Ni T
a. Gross thickness/H APH4
b. Gross minimum thickness /uda `HY R o
C Gross
Maximçm
fsyg À 0
d. None of above 3HcHH TfA
Railway /TrT TOi À gI câi
in Indian
VWihat isthe Highest speedof train
(22)
/140Rifit
a. 140krnph /120Of/ict
b. 120knph 160fb-/M
we 160 kmph/
d. 130knph/
wORFr1Asa
(23)How many divisionsin
a. 5/5
b.4/4
c66
d. 3/3 HT
HqIg y a
What is the highest post in Railway /
(24)
Manager/ HgT9<YG
a. General t4T
Principal Chief Engineer / HG HGY
b. Board/4EH tHd aé
Chairnan Railway Manager/46aS
d Diisional Raway
d.None of aboveym 0à *
(26)What is the full form of OMS USed for tack recording fofT eY TT Hat
a. Outer most Surface fNRe
b. Oscillation Monitoring system/sirte eftyen.
c. Only measuring system /3Y- f t rZ
d. Official measurement system/3ftbT u ftZH
(27) Minimum radius of curve on Broadgauge /aíG R gHq T IGH HTOT EBr
a. 175 meter /175ter
b. 215 meter/ 215ter
C. 146 meter/ 1461er
d. 200 meter/ 200 Ác

(28) Maximum height above rail level of high passenger Platform/sa (er) UrA derí
. a. 860 mm /860 fA
b. 900 mm/900
we 840 mm/840 Pr
d. 875 mm/875

(29)What is the ful form of TGI / a q 4 q


a. Track Geometry index/ frg aH
b. Track general lIndex / RG $341
c. Track gravity Index /e Afad gta
d. None of above/sgat Â
(30)What do you mean by 60 kg rail /60 fbAT R IT4 RIT HHAT `
à. Weight of rail in 1 meter/ 1ter yet HR
b.Area of railof 1 meter/ 14e 1er T ta
c. Weight of rail in 1 feet/ 12c R | 4R
d. Volume of rail in 1 meter/ 1e te o 3414GT

(31)Points &Crossing is laid at a cant of /ui_e sir oifiT foH gOG R d iIt 1
a. 1 in 20 /20 * 1
b. 1-in 10 /10À 1
c. 1 in 15 /15 1
d. NILLAR
(32)Deep screening of entire track must be done at least/wuf ta er ât ETK¾TÍfT D4
(a) Once in a quarter/ 3 IZ Y qR
(b)Once in a year. fa¢ y qR
(c) Once in 5 years. /5 qt y# qr
(d) Once in 10 years/10 as yo ar

(33) What is speed restriction on deep screening site done by BCM and tamped by
machine followed with DGS/ g GRI Ô T, gHO AIG HeîT gRT TT

Page 5
(a) 20 /20
(b) 30 /30
(c) 40/40
(d) 10/10

(34) Diplorry can be worked/fS À MaTI G HOT


(a) In block /eits *
(B) without block ts faT
(c) With lookout caution HqYri HY
(d) None of theseTö E 0

(35)The maximum gradient in station yards should be....unlessspecial safely devices


are adopted and/or special rules enforced./ A TE fAT g SYGRU AJYIY
(a) 1 in 400/400 1
(B)1 in 500 /500 1
(c) 1 in 1000 /1000 1
(D)1 in 600 /600 1

(36) The recommended maximum gradient in the year for B.G is/f feR as iT

(a) 1 in 1000 /1000 1


(b) 1in 1200/12001
(c) 1 in 1500 /1500 1
(d) 1 in 1800 /1800 1
(37) The minimum horizontal distance from centre of track to face of passenger platform

far
(A) 1650 MM/1650 At
(B) 1670 MM/1670 fr
(C) 1676 MM /1676 At
(D) 1685 MM/1685Pr 16 B0 mn mai NuM) go meg
(38) Maximun cuvature permitted on B.G. is farsi qs H HC fodT
(a) 8 degree /8 fe
(b) 10 degree/10fst
(c) 12 degree /12
(d) 16 degree /16 fÁ

(39) The minimum track centres in new B.G. double line is


| ii sdi TST À TH
(a) 4500 mm /4500 faft
(b) 4750 mm /4750 fMr
(c) 5000 mm /5000 frf
(d) 5300mm/5300 fr

(40) O.D.C Stands for /ts 3RÍ


Page 6
(a) On direct current /si- StK
ut) Over dimensional consignment
(c) None of them /sÀà E
(d) Operating & gatefsi js t ottshore Developnet cente
(41) In case of 'A' Cass 0DCescort is. nsisî Hà ÀyRO
(a) Necessary /IaA6
(b) not necessary/ 3MGUG T0
(c) does not matter/ T
(d) ondirect current/srutae rT YR -

(42) The maximum height above rail level for B.G. goods platform is . . mm
.....

(a) 1000mm/ 1000 frf


(b) 1050mm /1050 fA
(c) 1065mm/1065 fA
(d) 1075mm/1075 f

(43) Xisa city which has roads generally parallel or perpendicular to each other. The
SUch a aty shoukd beXyo l AR HG¢
a. Dead End system ss ug fiFeH
b. Grid Iron system is RRT HCA
CRing system/fuRReH
d. Any of them
fD
(44) The strength of abridge is termed as MBG loading of 1987. MBG
refers to / yt ôi
a) Model Broad Gauge/sa AÍS
+b) Modified Budget Grant /ifstgS eT0e
c) Model Budget grant /Hsd qve Y0e
we) Modified Broad Gauge/ s G AS T

(45) In a temporary signaling arrangements for a


bridge work in BG section, caution
board shall be placed in advance of .....n from start of the
bridge/work spot./a tìl
a) 30 m /30 er
b) 1200 m /1200 er
c) 677 m/677 fR
d) 1000 m /1000 er

(46) Free Board is the level difference


between Formation Level and
a) Rail LevelR a
b) HFL/A q5 Yd
c) Bed Level/às dq
d) Danger Level /aur Ti

Page 7
(47) Minimum Free Board required in a bridge is/ua stfaT TGH S0 qS EI
va) 1 m/1ir
b) 1.20 m/1.20 er
c) 600 mm /600 ft
d) 300mm /300 fe

(48) Vertical Clearance (VC) in water way bridges is the level difference
between/icR
a) HFL and Formation level /ya y VË 5RIT Gdi
b)Bed level and bottom of
c) HFL and bottom of superstructureG dd d HtgTR I C4
superstructure/ya
d) Rail level and Formation
levelf ae
q5 yd qd yyKGR G HTA
GrTT GAd
(49) In a single span bridge, the clear
span is the distance between /TG H yT 1
a) Centres of
b) Inner facesAbutments
of
/ierrT
c) Outer faces ofAbutments/tyRT T 3R DH
Abutments fi4A AH H
d) Width of Abutment
/teAI tet
(50) Sub structure of a bridge does
not include y à HA -KGaR À
a) Abutment/eua
b)Girder/Slab/nfsr ta
c) Piers /qrT
d) Wing and Return walls/fT Ret
(51)Super structure of a
a) Girder/Slab/ d Ro bridge indudesfya
b) Abutment/ erRI
c) Piers fRA
d) Bed blodk s

(52)Bearings are provided in


bridges to transfer the load to
a) Super structure qR
b) Track / KR
c) Embankment /ag
d)Sub structure /4 TR
($3) Wing walls and returm
walls are provided to retain
a) earth on bridge
b) ballast fE approaches au RPa
c) track on
d) none approaches/a
i
6

Page 8
(54) In a temporary signaling aan eGsedíon, speed board
shall be placed in advance

a) C.L. of the bridge /ya I y



b) Termination Board/ zfftr e RA
c) Start of the bridge/work spot/ y
d)Caution Board/TaUr a
substructure is called A
(55) The medium to transfer loads from superstructure to

a) Abutment /ûrYAT
b) Bed block / lA
c) Bearing /fauf
d) Pier /yT
over the Railway span shall
(56)Temporary staging for casting PSC Box Girder for a ROB

a) after hardening of concrete/ o e HT B GIG


b)before hardening of conarete foe o HGi t se
c) during concreting
d) after stressing the cables.f RAs

(57)The guard rail is provided in bridges to.ci Ë Et GydT BI


a) prevent derailnent in bridges/yeRiei to 4
-13 b}prevent falling of vehices during derailmentnf f e o RIT AET ft qURI

c) have good riding /3rs) IfaT f


d) guide the wheels during running/e yfti HER foIs
(58)Steel channel sleepers are provided in bridges with superstructure of/.

a) PSC slab / g t Fta


b) PSC girder /ry f
c) Steel girder/ É
d) RCC Box /3TR qIH
(S9)Minimum.earth cushion required over RCC Box is/srr A ARI w ytfaa GH RÍ
a) 300 mm /300f
b) 600 mm/600f
c) Omm /0 fr
d) 1000 mm/ 1000ferf
(60) The height gauge need to be provided in /---

a) ROB HGF H4T qa


b) RUB/ HGG AI ya
c) FOB /tca yR yi
d) Fly Over /ne 3tar

Page 9
of /...
(61) The CRS sanction is required in the ROB project for construction

a) Approach spans a f H
b) Laying road /ugT qÀ4
c) Railway spans Rà
d) none /as
(04) The diameter of holefor 20 dia rivet shall be./20f H Ràe o TY *

a) 23 mmn /23 fr
b) 18 mm /18 fr
c) 21.5 mm/21.5 frr
d) 22 mm /22 f t

(63) IS code for Steel structures is /a gaR fY AIS yA Te


a) IS 236 H 236
b)S 226/A yH 226
c) IS 456 /41 H 456
d) Is 800/ 1 H800

(64)Pipe culvert is a/an /gs Hed yo


a) major bridge /y ya
b)minor bridge /oa y
c) unimportant bridge /r 8qquf ya
d) important bridge /gu yer
(65) One of the following works does not require CRS Sanction
go rf fR
a) Regirdering/ Rebuilding RAT FPrT
b) Erection ofnew FOB RA
Erection of platformshelterfaiaaAr
d) Pipe ine crossing AHT
(66) At FOBs in electrified section the
electrocution by live OHE wires is prevented by
...

a) smoke gaurds ejs s


b) Roofing /of
c) Bottom lateral bracings iA dera aiT
d)protective screens/itefeq RÔTH
(67) One ofthe folowing is a
a) Pile foundationfqsT BSH shallow.foundation /PH a h
b) Raft foundationfgE G0JÈA
c) Under reamed pile foundation sisr fRrs YR bjse
d) Well foundation faa wisT

Page 10
(68) The pressure on soil worked the SBC of the sOt Ra R

a) more than GUTGI


b) equal to/* qIER
c) not equal to /¢ qRÊGR T0
d) less than/ HH

(69) has the least SBC of the soil. /............ o 1 4 H 0


a) Hard moorum /as RH
b) Stiff clay / 5 d
c) Black cotton soil oÌCT Ht
d) Soft rock /HIcvio
steel plates shalI be
(70) The minimum- edge distance for rivets of diameter d in

a) 2d72s
b) 3d/3
c) 1.5d/1.5 &
d) 2.5d/2.5 $
arrangement is/ ARA0T
(71) Speed restriction required for using CC cribs as temporary

a) 20 kmph /20 fo.. ufà jcT


b) 40 kmph /40 fo. ufë g
c) 35 kmph /35 ski i
)30 kmph/30 f . uft r
I HäT ST
(72) Bentonite is used in pile driving /qsi ^I_fa À -cgT
a) to facilitate pile driving /ao YgI SsfT HHIT yI I HÀ
ilfT f I GI HÝ
b) to enable proper pile concreting /anf sfaG ysGT
c) to stabilize the bore hole walls/af ar ld alH fR fb GI HÜ
d) None of the above/sywe si
Rf ferCH À
(73) In the eight digit code given in the rating system the first digit is called
a) URN / 3TR qT
b) ORN/ 3t 3T
c) CRN/ Ì3R 4
d) None of the above/ s R ST
(74) An important bridge is onë which has total waterway of equal to or more than

a) 1000 sq.metres/1000 qf fr
b) 800sq. metres /800 qf er
c) 500 sq. metres /500 qt er
d) 300 sq. metre /300 qt er

(75) Foundation and substructure of the bridge should be inspected by

Page 11
(79) d)c)3 b)
b) a)(82)
ToTo
d) c) b) a)(81)
All All All d) c) b) a) (80)d)35to )3 b) a) 3.5
a)
3 2 (78) d) c) b) a) (77)
0.0.2to to to3to2 In to to to to In alDeep d)Gauge
Rebound All 8
0.3 0.4 In l HollowHoney c)/ib) a) (76) d) c) b) a)
form find bridgesminÍr major Flood
important to cement
to 10ke/sqcm.3A10 to 4kg/sqcm.f2t 6 Epoxy 7 10 6 4 the Repairing Thickness
All cross Once Once Once Once
0.9/0.8 0.3 0.4 kg/sqcm. kg./sqcm./3 cerment the Elcometer
the 0.5 kg./sqcm.kg./sqcm./2 above/yT
kg./sqcm. leached
rivet & level
bridges /0.2 /0.3 kg/sm.f350
/0.4 masonry, comb above level in a a a
hammer
strength /rfmajor pressure 3 year year
year
heads bridges/ertgauge #0.3 04 pressure pressure mortarconcrete by of / months
yei O.9 0.5 3à6 (3.5 /3 cement /qiet
paint/e is afterbefore any
bridges /et Dormant GAG used
/Ràe of is R to
grouting, time
concrete/oe used a¢ be grouting fL 4 10fo.u1.6 4
grouting, T
joints
monsoon
/3
f.A1. H monsoon/414F
tO
yet marked
48ayu 7foLf6 fo.UT./qrf
foT./
7 /e
pressure
TE
for L te measure
t
n R ft /qf crackst /s q
RargG ¢ faf Jt pressure qf / /H&# (
¢À RI yt in
watet Jaf aA
pressure
Ge aR
qt Á1. grouting the 4R
fes /arG t à t
Page12
R BI r cenent A. 0Ncir s fb
AHGT KR . . TG H
yei is is Yd
I
t kept kept can Tt q a
OI e aiSCH sÍròc s, H4
ratio be H
YGI T fafET as/ui as y#
aR
fbur adopted yã
FI is ....árÀz
EÀ aR
TGT kept
fey asf
forg ? in
R tR case
YIsfTT
TsfT
of/
À
R tr
(90) meters/400
d) c) b)400 a) (89) d) c) b) a) (88) d) c)-b) a)(87) d)10.7 c)
kg/10.7f>u.
d) ) b) a)(86) kg/30.5fau. 30.5 b)52 a)(85) 10cum/ d) c) ad) a)Broad
c)Broad
b)Sqm (84)
/ilcum/fer b) (83) d) c)
Traffic
S00 350 600
from
On-Brbád
Engineering
SignalEngineering
Traffic Traffic Total TrainTrackTreatment
Treatment
Weathering Damp What 50
Standard 10sqm/ None Broad BGML None To
For
Level TVU kg/ break
meters
meters/600
meters/350 vehicle kg/5o painting, gauge gauge
vehicle of gauge
levelGate/frrG loading the the LHS
Gate Crossingvariation vuinerable is proof 52f41. of
census is 10 10 abovefvyyT
/350
abbreviated over the DPC? feL bag qrfâR mainline mineral conarete
crossinggauge Gate/svfuft
and unit/ course3s
th unit/ foundation course of
4 the modifiedabovefsugT =
at cT e cReR Signal beyond unit/ unit the /Tri stands iited
a tratks te te ete cement unit
level roof /3Hs loading/asi loading structures
hëarGate/sffT Tho dth for/a:áiq /
ys
I of loading/ for
crossing the the / in rate
whiatl te eRAT /RAGI 0A
track outermost
ryT ye yt
bT o ...
is TÈI| /aoT
AsiE
as
shall indicator g l per IST Hegt
/.t yfe kg dI^T
Page13 TI YAE
oT /rtc- /fT E
be stop
4T ARG
done shall
rY tI GIAsG
^T sT
signals vifa fy clfsT GHI Subw
by/H9R H1G IST
be z1 afay Bar
provided
Hy is BTN ...tbY. ?
called R
R IA?
Tc
HHYR
at /aTUTH
uI ...gt a
di_tance BGI
eel3d
eÍy ?
qe
fafG of
e y)
as yR
x')
)4265mmd) bj a) (92) 30/Le
30
d) gc 6) When Permeability/
Capillarity/ffyfA
July14
c)14
18June/18 c)/ab) a) (93) d.10/10
d) Porosity c16/16 a20/20
Parliamentary
b30/30 20/20
d) 16/ 16
15 14 a) Moisture 5300 4725 1676 b)10/10
a)1,00,000/1,00,000
Parliamentary
00,000/5,00,000 d)
5, c) b) a)
/50,000
50,000 (91) d) c) b) a)
December/15 The Centre 3, A
September/14 is mm/5300 mmmm 00,000 CostA
multidisciplinary team A tA
A team eam
Hindi property level
content/ J4265/1675Art
/4725 to sharing of of of
Divas /3,00,000
Rabhasha Centre Rajbhasha crossing SSE/ SSE/ $SE/
of fr
fier AiaR
celebrated rfrn P P
Way Way PWay
3caI a basis
(effafaa) soil spacing qualifies team
due Committee ycl Committee with and and and
OR H1AI
i to of State ofTraffic
Signal
which for SSE/
SSE/
uz) formation
fH construction
Government Inspector/ Works
has has inspector/
P
Page14 water Way,
how
OR how OR /.
FRN percolates for Signal
many double many
of . it. A.
S/GTYY
KI when
Road gu/rotger
lnspector . t.
? members? zot/Roye
through members-of railway the
Over TeT
Train and
it line / Bridge/
Traffic Te t Te .
G
is HHTs Vehicle AIGUTG .
known for g/qe
Loksabha Under Inspector/
Broad ITTGI
as Unit AA
/fct
Gauge Bridge i
i4 AAR is âi ft H
r4
Ái more
H
is À on ..
81 c)kshet
wb) a)(95) None/s 1d) LKAb)Madhya
ra/ formation/
a Naturald) c) b) a) (94)
ZerFormat
o ion ion
Soundness/HISH
c) b)VÁ) (97) vaPremchand
d) c) b)Hie Which d)Bottom
vá)
facé/b)
c) (96) d) c) b) a)
d)
4MetamorphiSedicmentary
Under Plutonic lgneous GAKHA Format Formation
The fil s
CompressiveInitial RajMaithli
iv Lal ShorterLonger Top PaperPaper Head
The Rajbhasha kshetra/
kshetra/ Pradesh
Le Bahadur face/y Rule Rocks formation
award in in
aetting Chatelier Gandhi/Sharan side/ieR face
Frog signing
generating office
of
rocks/riH
3
rock
A falls embankmentcuttingprepared
is /R of Adihikari of rocks/AfsiEformed a
strength time apparatus Shastri given H aofficer
Rajbhasha rock
g
Gupt/ brick in uRI /afeT
H0^S DHH Employee/ Aektbe from by
/TR by T which
i /a /IGiIG /uAT9I
is
YEIT
A
G rTfbe depositing
/r# ercrrrU
EIg
Railway normally molten
Í kshetra GRANT fyaie rÀTT beuekRed
GHTA is 3eor Adhiniyam,
I
used YR 0s
uHHU
JT Board OR made ZKTAR lG
OR 3dtll lava
Soil
to - ) OI
are
?/4 OR
RANR
Page 15 30determine aHH| for
story
on ht
its qI
whois 21dala called
) yG
over
H) ali
/HIHT: Har foH the
STHA writing, 3fcor responsible /Hec
which ga existing20X|DX(9
oI
T T GIAI
of Upanyas yR
the
qT for IGIT buek ground
following issüing t
5TT
writing cc0 level
SHO0
papers
properties Rad is
ET 56DN0. knowm
T in
at HI
HISG both ?
for RI as
lNHO

Itanagar/erIR tb) LbHome


December/fir d) ) June/Rajbhasa
September/rqR a) york
NewAe) ((100)The
b) (a) a)Gangtok/iud6
d) c) b)Agartala/ract {d) (a)
(c) (99)What d) c) Rajbhasaa) (d) lc) (b) (a) (98)/ d) c) b) Which
Juty/ge b) Manila/ Original Letters
Lettes Letters Under Irnphai/grpi Difence
Finance Rail Sourav Rajiv strength/ftTensiled)
Geneva Jay Rahul
Kapil Maithli Lal
Rule Ministry shah/ WhoGandhi/ Bahadur
headquarters received Ministry "Gaurav
is Miristry Dev/ award
Paktwadaisonganised received
received tMinistry
he Ganguly Dravid/ recentty
rel/fotT writing
of
S
u fa Sharan
capital te Shastri is
IE wofa given
-ii d - to in inRajbhasha
in /fqd RT4aleT /
Award /tra tagA become
Gupt/
be
Hndi Hindi
gf done English of 4aT Al4 <AS qi /lT by
Arunachal alY igeî teru
the to toAdhiniyam schem TEIÇT Railway
United in be be to the
ORt in Hindi
answered
answered be is new
whidhmonth answered OR Pradesh
T-ZIAT Board
OR
Nations run
1976uHINH1976 OR president
Page16 by
VR in in t) for
is English/ in /3|di which technical
located Hindi/fea
fEt Hindi/ of
13s
BCCI/
Ministry
f YaI
at JIa writings/
/y ei
& TAAn
T uaa
3aRyId a
ra 4
t
IGEI vHI
euT
orce
RCC- IE
TRG
áriA
HI sa à
as
yror i
aTU NI
r
vI IOt
HEI E
aUA foH reT
e

You might also like