The project charter outlines the installation of a 33kVA wind turbine, AI-driven load distribution, and local manufacturing of solar energy with IoT power storage to address severe electricity shortages in the City of Jehovah. Objectives include increasing electricity availability, reducing reliance on the grid, and promoting renewable energy while ensuring compliance with regulations. The estimated budget for the project is $601,250, with a target completion date of March 1, 2025.

Uploaded by

mwenyalightson7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views9 pages

COM415 Systems Project Management PROJECT CHARTER

The project charter outlines the installation of a 33kVA wind turbine, AI-driven load distribution, and local manufacturing of solar energy with IoT power storage to address severe electricity shortages in the City of Jehovah. Objectives include increasing electricity availability, reducing reliance on the grid, and promoting renewable energy while ensuring compliance with regulations. The estimated budget for the project is $601,250, with a target completion date of March 1, 2025.

Uploaded by

mwenyalightson7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

PROJECT CHARTER

SUSTAINABLE ENEGRY SOLUTIONS


33kva Wind Turbine Installation, Ai-Driven Load Distribution and
Maintenance, And Local Manufacture of Solar Energy with IoT Power
Storage

CITY OF JEHOVAH
STREET ADDRESS
CITY, STATE ZIP CODE
DATE

COM415
CONTENTS
EXECUTIVE SUMMARY.............................................................................................................3
PROJECT PURPOSE/JUSTIFICATION.......................................................................................4
Business Need/Case....................................................................................................................................................4
Business Objectives....................................................................................................................................................4
PROJECT DESCRIPTION.............................................................................................................5
Project Objectives and Success Criteria.....................................................................................................................6
Requirements..............................................................................................................................................................8
Constraints..................................................................................................................................................................9
Assumptions.............................................................................................................................................................10
Preliminary Scope Statement....................................................................................................................................11
RISKS............................................................................................................................................11
PROJECT DELIVERABLES.......................................................................................................13
SUMMARY MILESTONE SCHEDULE.....................................................................................15
SUMMARY BUDGET.................................................................................................................16
PROJECT APPROVAL REQUIREMENTS................................................................................18
PROJECT MANAGER.................................................................................................................20
AUTHORIZATION......................................................................................................................21

COM415
EXECUTIVE SUMMARY
The nation is facing severe power challenges, with many areas receiving only three hours of
electricity per day. Thereby, negatively affecting businesses, homes, and the economy. To
address this crisis, we propose installing a 33KVA wind turbine to harness renewable
energy, reduce grid dependence, and provide a reliable power source for the community by
installing a 33KVA Wind Turbine, AI-driven based Load Distribution, Transmission Line
Maintenance, and Local Manufacturing of Solar Energy and IoT Power Storage.

PROJECT PURPOSE and JUSTIFICATION


Business Need/Case
The purpose of this project is to install a 33kVA wind turbine to generate renewable energy,
reduce dependency on unreliable grid power and on fossil fuels, and to contribute to
sustainability goals. This initiative will provide clean and cost effective energy, reduce
carbon emissions, and promote environmental stewardship.

Business Objectives
 To increase the availability of electricity
 To reduce reliance on inconsistent grid power.
 To stimulate local businesses by promoting and providing a more reliable energy supply,
potentially increasing productivity and job creation.
 To contribute to the reduction of carbon emissions and promote the use of renewable energy
sources.
 Support Regulatory Compliance regarding renewable energy and environmental standards
 To meet or exceed regulatory requirements and qualify for any available incentives,
subsidies, or tax benefits.

PROJECT DESCRIPTION
Project Objectives and Success Criteria
Objectives should be SMART to measure progress and success. The project objectives
Include the following;
1. To Design and install a 33KVA wind turbine
2. To utilize AI-Driven Load Distribution and Line Transmission
o To optimize energy distribution and maintenance using AI
o
3. To Promote Local Manufacturing of Solar Panels and IoT Power Storage with AI
o Research material availaibility and cost for solar panel manufacturing
o Research Power Storage solutions and AI for Power Storage Management
o Develop IoT solutions for real-time monitoring
4. Achievement of projected energy output within the first

COM415
5. To achieve operational efficiency of at least 95% post-installation
6. Ensure compliance with all regulations and safety standards
7. Positive feedback from the community and stakeholders
Requirements
The project guidelines within which the project must conform as guided by the project
sponsor, customer, stakeholders and project team.
The proposed projects must meet the following list of requirements
Project 1:33KVA Wind Turbine Design and Installation
1. Technical Specifications: the project must meet industry specifications for integration to
the national grid
a. Turbine specifications
 Rated power output = 26.5KW
 Cut-in wind speed = 3m/s –
 Cut-out wind speed = around 25m/s
 Rated wind speed 10-12m/s
 Rotor diameter 12-15meter, Rotor type = 3 blades fiberglass
b. Tower height = 20-30 meters
c. Safety features = emergency shut-off mechanism
d. Certification = IEC 61400
2. Site Assessment
a. Average wind speeds
b. Terrain flat or gently sloppy, minimal obstructions
c. Access roads
d. Space sufficient for installation
e. Soil conditions- stable to support weight
f. Proximity to grid
3. Land use agreements
4. Grid compatibility
Project2: AI-Driven Load Distribution and Line Transmission
 Data collection and preprocessing
 AI model development
 Model Evaluation
 Integration

Project3: Local Manufacturing of Solar Panels and IoT Power Storage with AI
 Materials Needed for Solar Panels manufacturing
o Photovoltaic cells – silicon
o Glass-Low-iron
o Encapsulation materials-ethylene-vinyl acetate(EVA)

COM415
o Black sheets – polymer materials
o Frame
o Wiring connectors
o Mounting systems
o Inverters
 Power Storage systems
o Batteries
 AI and IoT Integration in Power Storage
o AI Applications-
o Predictive Analytics
o Demand Response management
o IoT Devices
 Smart Meters
 Remote Monitoring Systems
 Connected Sensors

Constraints
The restrictions or limitations that must be dealt with to ensure project success
 Budget limitations: The sum total for the 33KVA Wind Turbine, AI-Driven Load
Distribution and Local Manufacturing of Solar Panels must be within the allocated, as
aggregated from the individual project costs
 A fixed budget may restrict accommodating unexpected costs or upgrades
 Time Constraint. It must be noted that there may be expirations in approved grants due
to unforeseen circumstances, there are expected weather changes that may delay
implementations of the selected projects
 Regulatory requirements. The permits or licenses for land, council-local government,
ERB, for instance, may affect the sitting of the wind turbine installation, and solar
manufacturing plants.
 Site limitations such as space, terrain, accessibility may limit choice of turbine and
installation methods
 Grid connection issues such as grid capacity, connection costs, and interconnection
processes may impact project feasibility
 Resource availability such as materials, equipment, and skilled labour
 Technological: The existing information systems including Legacy systems and AI
integration may be affected due to compatibility issues

Assumptions

COM415
 Regulatory compliance: Permits and approval from local, and state obtainable without
delays
 Community support: the primary stakeholders and the entire community generally
support the project, reducing risk of opposition or delays
 Project timeline: the project will adhere to a realistic timeline, accounting for potential
delays due to weather, permits and construction challenges
 Funding Accessibility: Sufficient financing available to cover upfront costs and any
unforeseen expenses
 No natural disasters occurring during construction and installation
 Availability of materials: Raw material costs and supply remain unchanged
 Stakeholders do not change the project more than 10%
 Availability of skilled labour- there is sufficient pool of required manpower

Preliminary Scope Statement


The project goals are to alleviate the electricity supply challenges in terms of cost,
availability, reliability, and efficiency in the management of distribution, maintenances
etc., Therefore, the project will be including
1. The Design and installation of 33KVA Wind Turbine for the City of Jehovah
2. Integration of AI in load distribution and maintenance
3. Promotion of local manufacturing of solar panels and IoT- based power storage
with AI for the City of Jehovah.
The project funds will be managed by the project manager up to and including the
allocation amounts in this document. Any additional funding will require approval from
the project sponsor. The conclusion of this project should follow a submission of final
report (lessons learned, future recommendations) within 30 days after commissioning of
the wind turbine, AI solutions integrated, and solar manufacturing requirements are done
with all documentation submitted to the City of Jehovah president’s office.

RISKS
 Financial Risks. This includes potential budget overruns, and/or grant expiration due to
unforeseen circumstances such as changes in price for materials or addressing
emergences
o Mitigation: Establish a contingency fund and monitor expenses closely
 Technological Risks i.e. compatibility of wind turbines and the existing energy systems,
variable wind conditions, energy storage and/or grid integration
o Mitigation: selecting reputable suppliers, standards in liaison with ERB, Zesco
and ZABS.
 Regulatory delays in obtaining permits and licenses
o Mitigation: Engage with local authorities early in the process
 Community Opposition:
o Mitigation: Engage stakeholders early to address concerns

COM415
 Environmental Risks. Weather changes can negatively impact the project affecting
schedule and budget
 Resource Availability: There is a noted risk in supply of materials and labour due to
instable demands but limited supply mostly

PROJECT DELIVERABLES
The following deliverables must be met upon the successful completion of the project.
Any other changes be approved by the project sponsor to avoid scope creeps, delays and
project objectives success.
1. Design and installation of 33KVA Wind Turbine
a. Technical design specification
b. Site Assessment Report
c. Construction Permit
d. Procurement plan
a. Installed, Tested, and Commissioned Wind Turbine
e. Training - Operation and Maintenance of Wind Turbine

2. Deploy AI- Predictive Analytics in Load Distribution and Line Maintenance


a. Develop and Test a Machine Learning Model for load and line maintenance
prediction
b. Integration of model with the national grid system
3. Local Manufacturing of solar energy and IoT Integration of Storage Devices with AI
a. Materials sourcing – suppliers for batteries, inverters, and panels
b. Design and Development process
c. Prototype Solar solutions
d. Research AI for power storage management
e. Develop IoT-AI Solutions for real-time monitoring
f. Setup manufacturing facility
g. Train – Operation and maintenance manuals of solar panels, and IoT Devices

4. Project Management Report


a. Project performance
b. Future considerations
c. Stakeholder engagement plan

SUMMARY MILESTINE SCHEDULE


The project summary milestone schedule is presented below. As requirements are more

COM415
clearly define, this schedule may be modified and communicated by the project manage
Project milestone Target Date
Project Start 1st November, 2024
Complete Design Specification-Wind
Turbine
Procurement of Wind Turbine Kit, and
Materials for Solar and IoT Devices
Procurement of Hardware and Software
for AI deployment
Fully Installation of Wind Turbine
Solar Panel Prototype
Develop and Integrate AI models - load
distribution and maintenance, and IoT
real-time monitoring
Project Closure 1st March, 2025

SUMMARY BUDGET
Project Component Estimated Cost
Design and procurement of Wind
Turbine kit, Solar Panel materials and $200, 000
IoT Devices-
Hardware & Software for AI $50, 000
Permits and licenses $1, 000
Construction and Installation (Wind
turbine, IoT devices, and solar panel $250, 000
prototypes
AI development and Integration $60, 000
Training costs-materials and facilitation $20, 000
Labor costs $230, 000
PROJECT COST $481, 000
Contingency Fund @25% $120, 250
TOTAL $601, 250
TOTAL ESTIMATED BUDGET:…………………………………$601, 250.00

STAKEHOLDERS
1. Project sponsor: City of Jehovah

COM415
2. Project Manager
3. Community Members
4. Suppliers/Contractors
5. Electricity Utility Company
6. Government and regulatory bodies
7. Environmental Organizations

PROJECT APPROVAL REQUIREMENTS


This project charter formally authorizes the initiation of the 33KVA-26.5KW Wind
Turbine Installation. AI-Driven Load Distribution and maintenance, and Local
Manufacturing of solar energy and IoT Power Storage Integration with AI
Success for the 33kVA Wind Turbine project will be achieved when a fully tested wind
energy solution is implemented, documentation including technical design, operational
manual, warranty, construction permits are completed. Success will be determined by the
project sponsor, Mr. Cephas Zulu, who will also authorize completion of the project.

PROJECT MANAGER
Lightson Mwenya is named Project Manager for the duration of the 33kVA-Wind Turbine
Project. The responsibilities include to manage all project tasks, scheduling, and
communication regarding the 33kVA Wind Turbine project. The project manager will
coordinate all resource requirements through the Finance Manager, Jane Smith. Lightson
is authorized to approve all budget expenditures up to, and including all allocated
amounts. Any additional funding must be requested through the Project Sponsor, Cephas
Zulu. Lightson will provide weekly updates to the Project Sponsor.

AUTHORIZATION
Project Manager: Lightson Mwenya
Signature: ………………………………
Date:…………………………………….

Project Sponsor: Cephas Zulu, President, City of Jehovah


Signature: ………………………….
Date:……………………………….

COM415

You might also like