Introduction to Grid Code

The Malaysian Grid Code is a technical and regulatory document that outlines the rules and standards for the governance of the Malaysian Electricity Supply Industry. Its objectives include ensuring efficient and secure operation of the grid system, defining responsibilities of all parties involved, and providing guidelines for compliance. The code covers various aspects including planning, connection, operation, scheduling, data registration, and metering, with oversight from the Energy Commission.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Introduction to Grid Code

The Malaysian Grid Code is a technical and regulatory document that outlines the rules and standards for the governance of the Malaysian Electricity Supply Industry. Its objectives include ensuring efficient and secure operation of the grid system, defining responsibilities of all parties involved, and providing guidelines for compliance. The code covers various aspects including planning, connection, operation, scheduling, data registration, and metering, with oversight from the Energy Commission.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 27

THE MALAYSIAN

GRID CODE

PRE-
PRE-LAUNCH BRIEFING
21 December 2010
Cyberview Lodge Resort & Spa
The GRID CODE
• A technical document

• A regulatory instrument to ensure the rules, guidelines


and standards to be followed by various agencies and
participants in the system

• To describe the rights and responsibilities of all relevant


parties in the Grid System

• An inseparable, integral part of a set of legal and technical


documents defining the governance of the Malaysian
Electricity Supply Industry
THE GOAL
• To plan, develop, maintain and operate the grid system
in the most efficient, reliable, safe, and economic
manner.
GRID CODE OBJECTIVES
• To ensure that the power system will continue to be developed,
operated efficiently and securely in the related industry environment

• To define the base line technical rule

• To lay down governing principles, duties, mechanism, obligations,


requirements, procedures for compliance by all players

• To ensure safe, secure, efficient, and contractual least cost


operation of power system

• To provide a set of principles governing the status and the


development of the grid code
THE SCOPE
• The Energy Commission shall oversee the
implementation of the Grid Code

• Applicable to:
 The Grid Owner and GSO, in planning and operating the Grid
System
 From a technical point of view, for all users in relation to the
planning, operation and use of the Grid System
CONTENTS OF THE GRID CODE
• Preface
• Glossary and Definitions
• Introduction and Purpose
• General Conditions
• Planning Code
• Connection Code
• Operating Codes
• Scheduling and Dispatch Codes
• Data Registration Code
• Metering Code
• Appendices
COMPLIANCE TO THE GRID CODE

• Shall be complied by:


 GSO (Grid System Operator)
 Grid Owner
 All users of the Grid System
 Single Buyer
 Consumers
DEROGATIONS & EXEMPTIONS

• Derogation
 An order issued by the EC, after full consultation and
agreement with the GSO and the GCC, permanently or
temporarily for a strictly defined period

• Exemption
 An order issued by the EC, after full consultation and agreement
with the GSO

 Exempting a specific Generating Unit or Generating Plant or


Power Station or User from undertaking certain duties specified
in the Grid Code
PLANNING CODE

• DEFINITION
 Technical and design criteria and procedures in the planning and
development of the grid system
 Specifies procedures to be applied by the Grid Owner in
calculating the generation adequacy and capacity requirements
for next 10 years
OBJECTIVES of PLANNING CODE
SCOPE of PLANNING CODE
• Applies to:
 Grid Owner
 GSO
 Single Buyer
 And the following users:
Generators
Distributors
Network operators
Directly Connected Customers
Parties seeking connection to the Transmission
System or on to a User System
PLANNING PROCESS
CONNECTION CODE
• DEFINITION
 Specifies the minimum technical, design and operational criteria
 To be complied with by users connected/seeking
connection/seeking to modify their connection to the grid system

• OBJECTIVE
 To ensure that the design and operational criteria the basic rules
for connection to the transmission system are similar for all users
CONNECTION CODE SCOPE
• Applies to
Grid Owner
GSO
Single Buyer
And the following users:
 Generators
 Distributors
 Network operators
 Directly Connected Customers
 Parties seeking connection to the
Transmission System or on to a User System
OPERATION CODE
• DEFINITION
 Deals with all processes associated with operational planning and control
operation of the system in real time
 Obligations of the Users to provide and supply information to the Grid
Owner and GSO to enable those processes

• OBJECTIVES
 Matching generation & demand in operation
 Ensure the provision of data to the GSO by Users for operation purposes
 Provide for the factors to be taken into account by the GSO
SCOPE of OPERATION CODE
• Applies to
 GSO
 And the following users:
Generators
Distributors
Network Operators
Directly Connected Customers
Interconnected Parties
CONSTITUENTS of the OPERATION CODE

• OC 1: Demand Forecast

• OC 2: Outage & Other Related Planning

• OC 3: Operating Reserves & Response

• OC 4: Demand Control
CONSTITUENTS of the OPERATION CODE
(cont.)

• OC 5: Operational Liaison

• OC 6: Significant Incident Reporting

• OC 7: Emergency Operations

• OC 8: Safety Coordination
CONSTITUENTS of the OPERATION CODE
(cont.)

• OC 9: Numbering & Nomenclature

• OC 10: Testing & Monitoring

• OC 11: System Tests


SCHEDULING & DISPATCH CODE
• DEFINITION
Sets out the procedure for the preparation of an
indicative Least Cost Generation Schedule, scheduling &
dispatch instruction to generating units and the
procedures & requirements in relation to control of
system frequency & interconnector power transfers.

•OBJECTIVE
Ensures the security of supply
Enables optimization of the use of generating and
transmission capacities
Enables the preparation and issue of a Generation
Schedule
SCOPE of SCHEDULLING & DISPATCH
CODE
• Applies to
 Grid Owner
 GSO
 Single Buyer
 And the following users:
 Generators
 Distributors
 Network operators
 Directly Connected Customers
 Parties seeking connection to the Transmission
System or on to a User System
CONSTITUENTS of the SCHEDULLING &
DISPATCH CODE

• SDC 1: Generation Scheduling

• SDC 2: Control, Scheduling & Dispatch

• SDC 3: Frequency & Interconnector


Transfer Control
DATA REGISTRATION CODE
• DEFINITION
Sets out a unified listings of all data required by Grid
Owner and GSO from Users and by Users from the Grid
Owner and GSO
Identifies the section of the Grid Code under which
each item of data is required

•OBJECTIVE
List and collate all the data to be provided by each
category of User to GSO under the Grid Code
List all the data to be provided by GSO to each
category of User under the Grid Code
SCOPE of DATA REGISTRATION CODE
• Applies to
 Grid Owner
 GSO
 Single Buyer
 And the following users:
 Generators
 Distributors
 Network operators
 Directly Connected Customers
 Parties seeking connection to the Transmission
System or on to a User System
METERING CODE
• DEFINITION
Sets out the metering requirements relating to active power,
reactive power and active energy and reactive energy for all users
connected to/seeking connection to the transmission system

•OBJECTIVE
To ensure that all the technical requirements to comply with
statutory and license obligations
To define the accuracy requirements and the parameters to be
measured
To set out the provisions for the measurement of electrical power
and energy
To set out the provision of data for the commercial operation of the
Grid System
SCOPE of METERING CODE
• Applies to
Grid Owner
GSO
Single Buyer
And the following users:
 Generators
 Distributors
 Network operators
 Directly Connected Customers
 5) Parties seeking connection to the Transmission
System or on to a User System
 6) Externally Interconnected Parties
 7) TNB Transmission
TERIMA KASIH
THANK YOU

Farah Azrin Mohamed


Suruhanjaya Tenaga