P2
P2
P2
L
AL MA LEACHING DIGESTION
EW S ST LENGTH WIDTH
FIR HO ER WELL CHAMBER
/F BE
MA WC
DR
L OO
AL ST
ER LA
2.0 M
EW T& 0 V LL 3.50 M 1.50 M 0.75 M 2.00 M
F IR
B
BE
DR E WA 0
OO 5.9 FI R 4.6
FIR
EW
AL
L M
5
6
EW
AL
L
KS
BE
DR
OO
M
4
.00
10
PLUMBING LEGEND:
O FIR KI 3200
BEPEN
LO TO AR TCH RE
W L EA EN F 0 MWSL MAIN WATER SUPPLY LINE KS KITCHEN SINK
15 AL BE 3.4
DR
EW
.0
3.6 0 D OO 150 800 150 800 150 1300 150
F IR ARININ M
3
6 EA G WSL WATER SUPPLY LINE PVC POLYVINYLCHLORIDE
L NOBAR 2.0
0
AL
150
OK O
BE PEN
EW
TV
WA LO TO BE
2.3 FIR
LL W
HA
D RO WPL WASTE PIPE LINE SD SHOWER DRAIN
7 LLW OM 600
INE
AY 1
LL
LIV YL WC WATER CLOSET CB CATCH BASIN
WA
IN
G
BA
LC
ST
OR RT 2.0
3.0 E AR ON BE A GE PE 1
FIR O
1000
0 PO EA Y DR PR
OO LAV LAVATORY HBF
1000
RC HOSE BIBB FAUCET
600
H M
2 2.5
T& 3
B
SH CO CLEAN OUT LS
O/ WC
1.1 LAUNDRY SINK
F 5
LA
5 V
2.2 2.5 FD FLOOR DRAIN SS SOIL STACK
CA
7
150
5 R
1.7 PO VTR VENT THROUGH ROOF R
RT 1.7 RISER
HB 5
F
L INE VP
TY
VENT PIPE
0 ER
6.0 OP 5.0
PR 0
C
W V
GV M M
T
MA O W
IN A T
LIN ER
E
3200
150 800 150 800 150 1300 150
LAYOUT
300
2. THE PLUMBING LAYOUT IS ONLY DIAGRAMMATIC. PIPES
CLEANOUTS AND CHECK VALVES SHALL BE CONCEALED.
50
3. PIPES SHALL BE EMBEDDED IN STRUCTURAL MEMBERS UNLESS
50
50
OTHERWISE SPECIFIED.
4. RUN ALL HORIZONTAL PIPINGS IN DIRECT ALLIGNMENT AT ONE
UNIFORM GRADE OF NOT LESS THAN TWO PERCENT (2%).
1800
L
AL MA
5. ALL FLOOR DRAIN SHALL BE VENTED INDIVIDUALLY.
EW S
FIR SD TE
RB
ED
6. ALL CLEANOUTS SHALL BE FLUSHED MOUNTED TO WALL. DO
WC RO
L MA
OM NOT INSTALL FLOOR CLEANOUT EXCEPT AT LINES ON GRADE AND
AL ST
FD ER T& LA
2.0
EW L SERVICE AREAS NOT SUBJECTED TO TRAFFIC.
B V AL
0
FIR BE W
D E 0 7. ALL UNDERGROUND GALVANIZED IRON (G.I.) INDIRECT CONTACT
RO
OM 5.9 FIR 4.6
BE WITH SOIL SHALL BE PROVIDED WITH TWO(2) COATS OF TAR
L 6 5 DR
AL AL
L OO
EW COVERING IN WRAPPED WITH JUTE CLOTH.
0
M .0
FIR EW KS 4 10
O F IR KI 8. ALL PVC PIPE SHALL BE OF APPROVED QUALITY AND GALVANIZED
BE PEN
LO TO AR TCH RE
W L EA EN F 0 IRON PIPES FOR WATER DISTRIBUTION SHALL BE SCHEDULE 40
15 AL BE 3.4
DR
EW
.0
3.6 0 OO U.S. STANDARD WEIGHT.
6 FIR DI
AR NIN M
3
EA G
L NOBAR 0
2.0 9. PROVIDE VENT PIPE THROUGH ROOF OF PVC PIPE AS REQUIRED.
AL OK O
BEPEN
EW
TV
WA LO TO BE
FIR DR 10. PROVIDE GATE VALVE ON ALL WATER SUPPLY LINES TO
2.3 LL W
HA OO
LLW CB
7
AY M E FIXTURES.
1
3.0 EW
AL
L LIV
ING
AR
BA
LC
ON BE
ST
OR
A GE OP
ER
TY
LIN
1
2.0 DETAIL OF SEPTIC TANK
SCALE: NTS 11. ALL PLUMBING WORKS SHALL BE UNDER THE DIRECT SUPERVISION
0 FIR PO EA Y DR PR
RC OO
M
OF ALL DULY LICENSED SANITARY ENGINEER OR A MASTER
H 2 2.5
T& 3 12 MM DIA. 500 PLUMBER.
SD B
RETRACTABLE
FD WC
5
1.1 LIFTING BAR 12. ALL WORKS INCLUDED HEREIN SHALL BE EXECUTED
5 LA
V
IN CLOSE COORDINATION WITH THE BUILDING ADMINISTRATION.
2.2 S
TA EPTI 2.5
NK C 7 13. ALL SOIL PIPELINES AND VENT PIPELINES SHALL BE POLYVNYL
CA
100
5 R PO 6" DIA PVC CHLORIDE (PVC) BROWN COLORED, SUITABLE FOR DWV SERVICE.
1.7 RT 1.7 PIPE
5
14. ALL WATER PIPELINES SHALL BE SCH. 40 GALVIZED IRON WITH
E
Y LIN THE BUILDING WATER PIPELINES AND SHALL BE HYDROSTATICALLY
RT TESTED ALONG.
PE
0 T
6.0 DR O S O 5.0
AIN TRE PR 0
15. THE CONTRACTOR SHALL SUBMIT AS BUILT DRAWINGS PRIOR
AG ET 3" DIA PVC
VERIFY
500
WITH RED LEAD COATING
17. ALL PLUMBING FIXTURES SHALL BE IN ACCORDANCE WITH THE
INTERIOR DESIGN CONSULTANT'S REQUIREMENT.
ISOMETRIC
SCALE: 1:100 MTS.
LAYOUT SECTION
PLAN
DETAIL OF CATCH BASIN
SCALE: NTS
DESIGNER: CERTIFIED BY: REPUBLIC ACT 545 PROJECT TITLE OWNER SHEET CONTENT CADD BY: SHEET NO.
"ARCHITECTURE LAW OF THE PHILIPPINES", ARTICLE
2, SECTION 25: DESIGNED BY:
DRAWINGS & SPECIFICATIONS DULY SIGNED, STAMPED
& OR SEALED AS INSTRUMENTS OF SERVICE ARE THE