The document outlines the implementation plan for an Attendance System using QR Codes, detailing the Work Breakdown Structure (WBS) which includes requirements, analysis and design, programming, testing, and implementation phases. It also presents a Gantt chart for project scheduling and a SWOT analysis highlighting opportunities and threats related to the project. The document emphasizes the importance of planning and collaboration among departments for successful system deployment.

Uploaded by

kalaiselvisjv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views4 pages

QR Appendix

The document outlines the implementation plan for an Attendance System using QR Codes, detailing the Work Breakdown Structure (WBS) which includes requirements, analysis and design, programming, testing, and implementation phases. It also presents a Gantt chart for project scheduling and a SWOT analysis highlighting opportunities and threats related to the project. The document emphasizes the importance of planning and collaboration among departments for successful system deployment.

Uploaded by

kalaiselvisjv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

1

Figure 1. Organizational Chart


Work Breakdown Structure (WBS)
Attendance System Using QR Codes Implementation
1. Requirement
1.1 Requirement plan
1.2 Study and observe the current situation
1.3 Retrieve document
2. Analysis and Design
2.1 Diagram of design system
2.2 Review design document
3. Programming
3.1 Development plan
3.2 Coding and unit task
3.3 Report progress of programming task
4. Testing
4.1 Test plan
4.2 Test case
4.3 System test
4.4 User acceptance testing
5. Implementation
5.1 Implement Plan
5.2 Implement System and deploy
5.3 Test System
Figure 2. Work Breakdown Structure
9
Gantt Chart

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6 Week 7 Week 8 Week 9


Requirements/Planning
Analysis and Design
Programming
Testing
Implementation
Collect issues found
Analysis Complete

Figure 3. Gantt Chart

SWOT Analysis

Opportunities Threats
• The budget for the • The population of
system is provided by enrollees is getting low
another department. • The department staff
• The system is being did not want to
used by another implement the system,
department. and there was lack of
funding.

Figure 4. SWOT Analysis

10
Flowchart of Existing System

Input

Input

No

Figure 5. Flowchart of Existing System