New Guide 2020 Test11

The document details the results of a Scrum Open assessment taken on February 3, 2021, where the participant scored 100% by correctly answering all 30 questions. It includes feedback on various Scrum concepts, emphasizing the importance of self-managing teams, the purpose of Sprints, and the roles of Scrum Team members. The document serves as both a record of the assessment and a learning tool for understanding Scrum practices.

Uploaded by

Vinayak Dudhal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views16 pages

New Guide 2020 Test11

The document details the results of a Scrum Open assessment taken on February 3, 2021, where the participant scored 100% by correctly answering all 30 questions. It includes feedback on various Scrum concepts, emphasizing the importance of self-managing teams, the purpose of Sprints, and the roles of Scrum Team members. The document serves as both a record of the assessment and a learning tool for understanding Scrum practices.

Uploaded by

Vinayak Dudhal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

2/3/2021 Finished.

Title: Scrum Open

Percentage: 100%

Duration: 00:04:15

Date started: Wed 3 Feb 2021 05:55

Date finished: Wed 3 Feb 2021 06:00

Feedback
Congratulations! Your score on the Open assessment demonstrates you know some Scrum basics.

Scrum on,
Ken Schwaber

Correctly answered Incorrectly answered Missed correct option

All Questions 30 Correct 0 Incorrect

Question 1 of 30

Which of the following are examples of a Scrum Team practicing Scrum poorly or not exhibiting
traits of a self-managing Scrum Team?

(choose the best three answers)

Correct answer: A) B) D)
You chose: A) B) D)
Note: This question displayed answers in random order during the test.

A) Stakeholders attend the Daily Scrum to check on the Scrum Team’s progress.
B) The Developers invite external stakeholders to the Sprint Planning to ask them how to turn a
Product Backlog item into an Increment via a complete and detailed Sprint Backlog.
C) The Developers have all the skills they need to create a valuable, useful Increment.
D) The Developers are working within the boundaries of their organizations functional
description and nicely handing off work from analyst to developer to tester to integration.
E) The Developers are collaboratively selecting their own work during the Sprint.

https://www.classmarker.com/online-test/results/ 1/16
2/3/2021 Finished.

F) The Developers create their own Sprint Backlog, reflecting all work that is required to meet
the Definition of Done.

Feedback
The Daily Scrum is for the Developers. It should not be used by external stakeholders to check
progress.
During Sprint Planning the Scrum Team should be crafting the Sprint Goal based on the set of
Product Backlog items selected for the Sprint. The Developers identify the necessary work to
meet the Sprint Goal.
Scrum Team members do not have titles, and no sub-teams; such as testing, architecture, or
operations are recognized. Accountability belongs with the Scrum Team as a whole, regardless
of whether team members have specialized skills.

Question 2 of 30

True or False: The purpose of a Sprint is to produce a valuable and useful Increment of working
product.

Correct answer: A)
You chose: A)

A) True

B) False

Feedback
The heart of Scrum is a Sprint, a timebox of one month or less during which a done, useful, and valuable
working product Increment is created.

Question 3 of 30

How much work must the Developers complete for each Product Backlog item they select for a
Sprint?

(choose the best answer)

Correct answer: B)
You chose: B)
Note: This question displayed answers in random order during the test.

A) All development work and at least some testing.

B) Enough so that each Product Backlog item they select meets the Definition of Done.

C) As much as it can fit into the Sprint.

D) Analysis, design, programming, testing and documentation.


https://www.classmarker.com/online-test/results/ 2/16
2/3/2021 Finished.

Feedback
The purpose of each Sprint is to deliver useful and valuable Increments that adhere to the Scrum Team's
current Definition of Done.

Question 4 of 30

When does a Developer become the sole owner of a Sprint Backlog item?

(choose the best answer)

Correct answer: A)
You chose: A)
Note: This question displayed answers in random order during the test.

A) Never. All Sprint Backlog items are "owned" by the Developers on the Scrum Team even
though each item may be implemented by an individual Developer.

B) At the Sprint Planning event.

C) Whenever a team member can accommodate more work.

D) During the Daily Scrum.

Feedback
Sprint Backlog and all of its items are collectively owned by the Developers. No individual Developer can
claim ownership over an item as this would block communication and collaboration.

Question 5 of 30

Which Scrum events are timeboxed?

(choose the best three answers)

Correct answer: C) E) F)
You chose: C) E) F)
Note: This question displayed answers in random order during the test.

A) Refinement.
B) Release Retrospective.
C) Sprint Review.
D) Release Testing.
E) Sprint Planning.
F) Sprint Retrospective.
https://www.classmarker.com/online-test/results/ 3/16
2/3/2021 Finished.

G) Sprint Testing.

Feedback
The Scrum Guide states that the Sprint Planning, Sprint Retrospectives, and Sprint Reviews are timeboxed
events. Sprints are fixed length events of one month or less to create consistency, and the Daily Scrum is a
15-minute event.

Question 6 of 30

Which statement best describes the Sprint Review?

(choose the best answer)

Correct answer: B)
You chose: B)
Note: This question displayed answers in random order during the test.

A) It is a mechanism to control Developer activity during a Sprint.

B) It is when the Scrum Team and stakeholders inspect the outcome of a Sprint and figure out
what to do next.

C) It is a demo at the end of the Sprint for everyone in the organization to check on the work
done.

Feedback
Every event in Scrum, besides the Sprint, which is a container for the other events, is an opportunity to
Inspect and Adapt.

Question 7 of 30

Who is required to attend the Daily Scrum?

(choose the best answer)

Correct answer: D)
You chose: D)
Note: This question displayed answers in random order during the test.

A) The Scrum Team.

B) The Developers and Product Owner.

C) The Developers and Scrum Master.

D) The Developers.

https://www.classmarker.com/online-test/results/ 4/16
2/3/2021 Finished.

E) The Scrum Master and Product Owner.

Feedback
Only the people doing the work described on the Sprint Backlog need to inspect and adapt at the Daily
Scrum. If the Product Owner or Scrum Master are actively working on items in the Sprint Backlog, they
participate as Developers, they will need to be at the Daily Scrum.

Question 8 of 30

When should the Developers on a Scrum Team should be replaced?

(choose the best answer)

Correct answer: D)
You chose: D)
Note: This question displayed answers in random order during the test.

A) Every Sprint to promote shared learning.

B) As needed, with no special allowance for changes in productivity.

C) Never, it reduces productivity.

D) As needed, while taking into account a short-term reduction in productivity.

Feedback
Scrum Teams typically go through some steps before achieving a state of increased performance. Changing
membership typically reduces cohesion, affecting performance and productivity in the short term.

Question 9 of 30

An organization has decided to adopt Scrum, but management wants to change the terminology
to fit with terminology already used. What will likely happen if this is done?

(choose the best answer)

Correct answer: D)
You chose: D)

A) Without a new vocabulary as a reminder of the change, very little change may actually
happen.

B) The organization may not understand what has changed with Scrum and the benefits of
Scrum may be lost.

C) Management may feel less anxious.

https://www.classmarker.com/online-test/results/ 5/16
2/3/2021 Finished.

D) All of the above.

Question 10 of 30

The timebox for the Sprint Review is:

(choose the best answer)

Correct answer: E)
You chose: E)
Note: This question displayed answers in random order during the test.

A) 4 hours and longer as needed.

B) As long as needed.

C) 2 hours.

D) 1 day.

E) 4 hours for a monthly Sprint. For shorter Sprints it is usually shorter.

Feedback
Sprint Review is a maximum four-hour timeboxed event for one-month Sprints. For shorter Sprints, the event
is usually shorter.

Question 11 of 30

The timebox for the Sprint Planning event is?

(choose the best answer)

Correct answer: C)
You chose: C)
Note: This question displayed answers in random order during the test.

A) Monthly.

B) Whenever it is done.

C) 8 hours for a monthly Sprint. For shorter Sprints it is usually shorter.

D) 4 hours.

Feedback

https://www.classmarker.com/online-test/results/ 6/16
2/3/2021 Finished.

Sprint Planning is timeboxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints, the
event is usually shorter.

Question 12 of 30

Which statement best describes a Product Owner's responsibility?

(choose the best answer)

Correct answer: C)
You chose: C)
Note: This question displayed answers in random order during the test.

A) Managing the project and ensuring that the work meets the commitments to the
stakeholders.

B) Keep stakeholders from distracting the Developers.

C) Optimizing the value of the work the Scrum Team does.

D) Directing the Developers.

Feedback
The Product Owner is accountable for maximizing the value of the product and the work of the Scrum Team.

Question 13 of 30

Who is responsible for managing the progress of work during a Sprint?

(choose the best answer)

Correct answer: B)
You chose: B)
Note: This question displayed answers in random order during the test.

A) The Product Owner.

B) The Developers.

C) The Scrum Master.

D) The most junior member of the team.

Feedback
The Developers use the Daily Scrum to inspect progress toward the Sprint Goal and to inspect how
progress is trending toward completing the work in the Sprint Backlog.

https://www.classmarker.com/online-test/results/ 7/16
2/3/2021 Finished.

Question 14 of 30

True or False: The Scrum Team must choose at least one high priority process improvement
item, identified during the Sprint Retrospective, and place it in the Sprint Backlog.

Correct answer: B)
You chose: B)

A) True

B) False

Feedback
An earlier version of the Scrum Guide prescribed the practice of placing one improvement in the Sprint
Backlog. This was removed in the 2020 update to the Scrum Guide because it was felt to be too
prescriptive. However, if this practice provides value to you then you should adopt it. It is simply not
prescribed anymore, but can still be valuable.

Question 15 of 30

True or False: It is mandatory that the product Increment be released to production at the end of
each Sprint.

Correct answer: B)
You chose: B)

A) True

B) False

Feedback
The product Increment should be usable and releasable at the end of every Sprint, but it does not have to be
released.

Question 16 of 30

The Product Backlog is ordered by:

(choose the best answer)

Correct answer: E)
You chose: E)
Note: This question displayed answers in random order during the test.

https://www.classmarker.com/online-test/results/ 8/16
2/3/2021 Finished.

A) Size, where small items are at the top and large items are at the bottom.

B) Items are randomly arranged.

C) Risk, where safer items are at the top, and riskier items are at the bottom.

D) Least valuable items at the top to most valuable at the bottom.

E) Whatever is deemed most appropriate by the Product Owner.

Feedback
The Product Owner is accountable for effective Product Backlog management. The Product Backlog is an
emergent, ordered list of what is needed to improve the product. It is the single source of work undertaken
by the Scrum Team.

Question 17 of 30

What is the main reason for the Scrum Master to be at the Daily Scrum?

(choose the best answer)

Correct answer: A)
You chose: A)
Note: This question displayed answers in random order during the test.

A) He or she does not have to be there; he or she only has to ensure the Developers have a
Daily Scrum.

B) To gather status and progress information to report to management.

C) To write down any changes to the Sprint Backlog, including adding new items, and tracking
progress on the burn-down.

D) To make sure every team member answers the three questions.

Feedback
The Scrum Master only ensures that all Scrum events take place and are positive, productive, and kept
within the timebox.

Question 18 of 30

When is a Sprint over?

(choose the best answer)

Correct answer: B)
You chose: B)
https://www.classmarker.com/online-test/results/ 9/16
2/3/2021 Finished.

Note: This question displayed answers in random order during the test.

A) When all Product Backlog items meet their Definition of Done.

B) When the timebox expires.

C) When the Product Owner says it is done.

D) When all the tasks are completed.

Feedback
Sprints are fixed length events of one month or less to create consistency. A new Sprint starts immediately
after the conclusion of the previous Sprint.

Question 19 of 30

Why is the Daily Scrum held at the same time and same place?

(choose the best answer)

Correct answer: D)
You chose: D)
Note: This question displayed answers in random order during the test.

A) Rooms are hard to book and this lets it be booked in advance.

B) The place can be named.

C) The Product Owner demands it.

D) The consistency reduces complexity.

Feedback
The Daily Scrum is held at the same time and place each day to reduce complexity.

Question 20 of 30

During a Sprint, a Developer determines that the Scrum Team will not be able to complete the
items in their forecast. Who should be present to review and adjust the Product Backlog items
selected?

(choose the best answer)

Correct answer: D)
You chose: D)
Note: This question displayed answers in random order during the test.

https://www.classmarker.com/online-test/results/ 10/16
2/3/2021 Finished.

A) The Product Owner and all stakeholders.

B) The Scrum Master, the project manager, and the Developers

C) The Developers.

D) The Product Owner and the Developers.

Feedback
During the Sprint, scope may be clarified and re-negotiated between the Product Owner and the Developers
as more is learned. It is important to be transparent when challenges arise since ultimately the entire Scrum
Team is accountable for creating a valuable, useful Increment.

Question 21 of 30

What is the role of Management in Scrum?

(choose the best answer)

Correct answer: B)
You chose: B)
Note: This question displayed answers in random order during the test.

A) Identify and remove people that are not working hard enough.

B) Support the Product Owner with insights and information into high value product and system
capabilities. Support the Scrum Master to cause organizational change that fosters
empiricism, self-management, bottom-up intelligence, and intelligent release of software.

C) Monitor the progress of the Developers on the Scrum Team.

D) Continually monitor staffing levels of the Scrum Team.

Feedback
Management has no active role in the actual product development through Scrum. However, management
external to the Scrum Team is relevant in setting the vision and strategy to guide the overall direction of the
organization.

Question 22 of 30

The length of a Sprint should be:

(choose the best answer)

Correct answer: D)
You chose: D)

https://www.classmarker.com/online-test/results/ 11/16
2/3/2021 Finished.

A) Short enough to keep the business risk acceptable to the Product Owner.

B) Short enough to be able to synchronize the development work with other business events.

C) One month or less.

D) All of the above.

Feedback
All of these choices are appropriate considerations in determining the length of a Sprint.

Question 23 of 30

When many Scrum Teams are working on a single product, what best describes the Definition of
Done?

(choose the best answer)

Correct answer: C)
You chose: C)
Note: This question displayed answers in random order during the test.

A) It depends.

B) Each Scrum Team uses its own, but must make their definition clear to all other teams so
the differences are known.

C) All Scrum Teams must have a Definition of Done that makes their combined Increment
valuable and useful.

Feedback
The Increment must be valuable and useful. This means that when many Scrum Teams are working on a
single product, they are expected to adhere to a single Definition of Done for the Increment.

Question 24 of 30

What does it mean to say that an event has a timebox?

(choose the best answer)

Correct answer: D)
You chose: D)
Note: This question displayed answers in random order during the test.

A) The event must happen by a given time.

https://www.classmarker.com/online-test/results/ 12/16
2/3/2021 Finished.

B) The event must happen at a set time.

C) The event must take at least a minimum amount of time.

D) The event can take no more than a maximum amount of time.

Feedback
Timeboxed events are events that have a maximum duration.

Question 25 of 30

Who creates the Definition of Done?

(choose the best answer)

Correct answer: D)
You chose: D)
Note: This question displayed answers in random order during the test.

A) The Scrum Master since they are responsible for the productivity of the Developers.

B) The Scrum Team, in a collaborative effort where the result is the common denominator of all
members' definitions.

C) The Product Owner since they are responsible for the product's success.

D) If it is not an organizational standard, the Scrum Team must create a Definition of Done
appropriate for the product.

Feedback
If the Definition of Done for an Increment is part of the standards of the organization, all Scrum Teams must
follow it as a minimum. If it is not an organizational standard, the Scrum Team must create a Definition of
Done appropriate for the product.

Question 26 of 30

What is the recommended size for a Scrum Team?

(choose the best answer)

Correct answer: C)
You chose: C)
Note: This question displayed answers in random order during the test.

A) Minimum of 7.

B) 9.
https://www.classmarker.com/online-test/results/ 13/16
2/3/2021 Finished.

C) Typically 10 or fewer people.

D) 7 plus or minus 2.

Feedback
Optimal Scrum Team size is small enough to remain nimble and large enough to complete significant work
within a Sprint. Too few members decreases interaction and delivers smaller productivity gains. Too many
Scrum Team members requires too much coordination.

Question 27 of 30

When does the next Sprint begin?

(choose the best answer)

Correct answer: B)
You chose: B)
Note: This question displayed answers in random order during the test.

A) Immediately following the next Sprint Planning.

B) Immediately after the conclusion of the previous Sprint.

C) When the Product Owner is ready.

D) Next Monday.

Feedback
A new Sprint starts immediately after the conclusion of the previous Sprint.

Question 28 of 30

Who is on the Scrum Team?

(choose the best three answers)

Correct answer: A) C) D)
You chose: A) C) D)
Note: This question displayed answers in random order during the test.

A) The Scrum Master.


B) Project Manager.
C) The Product Owner.
D) Developers.
https://www.classmarker.com/online-test/results/ 14/16
2/3/2021 Finished.

Feedback
The Scrum Team consists of the Scrum Master, the Product Owner and Developers. The Scrum Team is a
cohesive unit of professionals focused on one objective at a time, the Product Goal.

Question 29 of 30

True or False: Scrum has a role called "project manager."

Correct answer: B)
You chose: B)

A) True

B) False

Feedback
A Scrum Team has a Scrum Master, a Product Owner and Developers. As a whole they have all controls
needed.

Question 30 of 30

Who has the final say on the order of the Product Backlog?

(choose the best answer)

Correct answer: D)
You chose: D)
Note: This question displayed answers in random order during the test.

A) The CEO.

B) The Scrum Master.

C) The Stakeholders.

D) The Product Owner.

E) The Developers.

Feedback
The Product Owner is the sole person responsible for ordering the Product Backlog.

https://www.classmarker.com/online-test/results/ 15/16
2/3/2021 Finished.

https://www.classmarker.com/online-test/results/ 16/16