List of Forms
T4 Description of the Approach, Methodology and Work Plan for performing the
Assignment.
T7 Staffing Schedule.
T8 Work Schedule.
F3 Summary of Fees.
F4 Summary of Reimbursables.
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 1 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: This Technical Proposal Submission Sheet should be on the letterhead of
the Bidder and should be signed by a person with the proper authority to sign documents that
are binding on the Bidder. It should be included by the Bidder in its technical proposal.
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 2 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Signed: [signature of person whose name and capacity are shown above]
Duly authorised to sign the proposal for and on behalf of: [insert complete name of Bidder]
Dated on ____________ day of __________________, _______ [insert date of signing]
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 3 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: The information requested is required in the format provided below and should be
included by the Bidder in its technical proposal.
Bidder’s Experience
[Using the format below, provide information on relevant assignments carried out in the last
five years which best illustrate your experience, where your firm/entity (and each associate
for the assignment) provided services similar to the ones requested under this assignment.]
Names of Senior Staff (Project Director/Coordinator, Team Leader) involved and functions
performed:
Bidder’s Name:
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 4 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: The information requested is required in the format provided below and should be
included by the Bidder in its technical proposal. If none, include form and state ”None”.
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 5 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: The information requested is required in the format provided below and should be
included by the Bidder in its technical proposal.
a) Technical Approach and Methodology. In this chapter you should explain your
understanding of the objectives of the assignment, approach to the services,
methodology for carrying out the activities and obtaining the expected output, and the
degree of detail of such output. You should highlight the problems being addressed and
their importance, and explain the technical approach you would adopt to address them.
You should also explain the methodologies you propose to adopt and highlight the
compatibility of those methodologies with the proposed approach.
b) Work Plan. In this chapter you should propose the main activities of the
assignment, their content and duration, phasing and interrelations, milestones
(including interim approvals by the Procuring Entity), and delivery dates of the
reports. The proposed work plan should be consistent with the technical approach and
methodology, showing understanding of the TOR and ability to translate them into a
feasible working plan. A list of the final documents, including reports, drawings, and
tables to be delivered as final output, should be included here. The work plan should be
consistent with the Work Schedule of Form T8.
c) Organisation and Staffing. In this chapter you should propose the structure and
composition of your team. You should list the main disciplines of the assignment, the
key expert responsible, and proposed technical and support staff.]
It is recommended that the approach, methodology and work plan, inclusive of charts
and diagrams, should be no more than 50 pages.]
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 6 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: The information requested is required in the format provided below and should be
included by the Bidder in its technical proposal. Bidders may reproduce this format in landscape
format, but are responsible for its accurate reproduction.
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 7 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: The information requested is required in the format provided below for each named
member of professional staff and should be included by the Bidder in its technical proposal.
3. Name of Staff:
4. Date of Birth: Nationality:
5. Education: [indicate college/university and other specialised education, giving names of institutions,
degrees obtained and dates of obtained]
8. Countries of Work Experience: [list countries of work experience in the last ten years]
9. Languages: [indicate proficiency in each language as good, fair or poor for speaking, reading and
writing]
10. Employment Record: [starting with present position, list every employment held since graduation,
stating dates of employment, employing organisation and positions held]
From: [year] _______ To: [year]
Employer:
Positions held:
11. Detailed Tasks Assigned: 12. Work Undertaken that Best Illustrates
Capability to Handle the Tasks Assigned:
[List all tasks to be performed [Indicate the following information for those assignments that best
under this assignment] illustrate the member of staff’s capability to handle the tasks listed
under point 11]
Name of assignment or project:
Year:
Location:
Client:
Main project features:
Positions held:
Activities performed:
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 8 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
13. Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly de-
scribes myself, my qualifications, and my experience. I understand that any wilful misstate-
ment described herein may lead to my disqualification or dismissal, if engaged.
___________________________________________ Date:
Signature of staff member or authorised representative of the staff Day/Month/Year
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 9 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: The information requested is required in the format provided below and should be
included by the Bidder in its technical proposal. Bidders may reproduce this form in landscape
format, but are responsible for its accurate reproduction.
Staff input should be counted from the start date of the assignment and indicated in weeks or months,
as appropriate. Professional staff should be indicated individually by name; support staff should be
indicated by category e.g. clerical staff. Input should be indicated separately for input at home and in
the field and for foreign and national staff, for the purpose of calculating travel, subsistence etc.
T7 Staffing Schedule
Totals
Part-time input
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 10 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: The information requested is required in the format provided below and should be
included by the Bidder in its technical proposal. Bidders may reproduce this form in landscape
format, but are responsible for its accurate reproduction.
Indicate all main activities of the assignment, including milestones such as submission of reports and
other deliverables. For phased assignments, indicate activities separately for each phase.
T8 Work Schedule
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 11 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Bid Security
[Input of Information to be completed by Bidder]
Date: [insert date (as day, month and year) of Proposal Submission].
Whereas [insert complete name of Bidder] (hereinafter “the Bidder”) has submitted its
proposal dated [insert date (as day, month and year) of proposal submission] for
Procurement reference Number [insert Procurement Reference Number] for the provision
of [insert brief description of the Services], hereinafter called “the Proposal.”
KNOW ALL PEOPLE by these presents that WE [insert complete name of institution
issuing the Bid Security], of [insert city of domicile and country of nationality] having
our registered office at [insert full address of the issuing institution] (hereinafter “the
Guarantor”), are bound unto [insert complete name of the Procuring Entity] (hereinafter
“the Procuring Entity”) in the sum of [specify in words the amount and currency of the
bid security] (specify the amount and currency in figures), for which payment well and
truly to be made to the aforementioned Procuring Entity, the Guarantor binds itself, its
successors or assignees by these presents. Sealed with the Common Seal of this Guarantor
this [insert day in numbers] day of [insert month], [insert year].
1. If the Bidder withdraws its bid during the period of proposal validity specified by the
Bidder in the Technical Proposal Submission Sheet; or
2. If the Bidder, having been notified of the acceptance of its proposal by the Procuring
Entity, during the period of proposal validity, fails or refuses to:
(b) Accept the correction of its proposal by the Procuring Entity in accordance
with ITB Sub-Clause 28.3.
We undertake to pay the Procuring Entity up to the above amount upon receipt of its first
written demand, without the Procuring Entity having to substantiate its demand, provided
that in its demand the Procuring Entity states that the amount claimed by it is due to it, owing
to the occurrence of one or more of the above conditions, specifying the occurred conditions.
This security shall remain in force up to and including twenty-eight (28) days after the period
of bid validity, and any demand in respect thereof should be received by the Guarantor no
later than the above date.
Name: [insert complete name of person signing the Bid] In the capacity of [insert
legal capacity of person signing the bid]
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 12 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Signed: [insert signature of person whose name and capacity are shown above]
Duly authorized to sign the bid for and on behalf of: [insert complete name of Bidder]
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 13 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: This Financial Proposal Submission Sheet should be on the letterhead of the
Bidder and should be signed by a person with the proper authority to sign documents that are
binding on the Bidder. It should be included by the Bidder in its financial proposal.
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 14 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: Bidders may reproduce this sheet in landscape format, but are responsible for its
accurate reproduction.
If BDS 14.3 requires the proposal price to be quoted separately for different Activities, complete this
form as a “Summary of Activity Price” for each activity and complete one overall Summary of
Proposal Price.
State the currencies under (currency 1), (currency 2) etc. Delete unused columns.
For lump sum contracts, this financial information will be used as a breakdown of contract price in
Appendix C of the contract. For unit price contracts, this financial information will be used as the
breakdown of cost estimates in Appendix C of the contract.
Fees
Reimbursables
Local taxes
Subtotals
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 15 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: Bidders may reproduce this form in landscape format, but are responsible for its
accurate reproduction. Complete this form for the total proposal or for each activity as indicated in
the ITB.
The Bidder should complete a separate form for each currency or add currency columns and show up
to three totals. Where required, enter separate rates for home and fieldwork.
F3 Summary of Fees
Total
Standard RFP for the Procurement of Consultancy Services issued by the PPA (Version 1, January 2006)
Document: Section 4. Section Page 16 of 17 File Ref: 854942936.doc
Part 1: Section 4 Bidding Forms
Note to Bidders: Bidders may reproduce this form in landscape format, but are responsible for its
accurate reproduction. The Bidder should complete a separate form for each currency or add
currency column and show up to three totals. Complete this form for the total proposal or for each
activity as appropriate.
F4 Summary of Reimbursable
Total
Notes Local transportation costs are not to be included if local transportation is being made
available by the Procuring Entity. Similarly, the project site, office
rent/accommodations/clerical assistance costs are not to be included if being made
available by the Procuring Entity.