0% found this document useful (0 votes)
8 views5 pages

2024 - 01 - CPR22A - Assign 1

This document outlines the assignment details for an Engineering Project Management course, including submission instructions, assessment criteria, and specific tasks related to project financial analysis and scope preparation. Students are required to work individually or in groups of up to three, and must submit a formal technical report by the deadline of 1 October 2024. The assignment includes calculations for financial models and the preparation of project documentation such as a Project Scope Statement and Work Breakdown Structure.

Uploaded by

radebep023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views5 pages

2024 - 01 - CPR22A - Assign 1

This document outlines the assignment details for an Engineering Project Management course, including submission instructions, assessment criteria, and specific tasks related to project financial analysis and scope preparation. Students are required to work individually or in groups of up to three, and must submit a formal technical report by the deadline of 1 October 2024. The assignment includes calculations for financial models and the preparation of project documentation such as a Project Scope Statement and Work Breakdown Structure.

Uploaded by

radebep023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Page 1 of 5

ASSIGNMENT 2024
DATE: 12 September 2024 TIME:
1 October 2024 (Submission) Before: 16:00
SUBJECT: ENGINEERING PROJECT MANAGEMENT CODE:CPR22A
PROGRAMME: B ENG. TECH
CODE: B_CVLE
ASSESSOR: Mr W Strydom MSc, BEng (Hons)
MODERATOR: Mr AL Badenhorst Pr Tech Eng
INSTRUCTIONS TO CANDIDATES:
1. This project assignment is group or individual work. Each group may consist of max
3 members.
2. A completed and signed ‘Assignment/Project submittal and identification sheet’ must
be included as the third page of your assignment/project.
3. The assignment/project should be submitted as a formal document/technical report,
inclusive of all the required sections, e.g., cover page, title page, submittal sheet, table
of contents, list of tables, list of figures, abbreviations, and reference list. All the
questions must be answered and presented in the correct order.
4. The assignment should be submitted as ONE PDF DOCUMENT with the following
document name:
a. Individual: “Student No_Student Surname_CPR22A_Assign1”.
b. Group: “Student No 1_Student No. 2_Student No. 3_CPR22A_Assign1”
A maximum of 3 attempts for submission via Safe Assign are allowed. You will be able
to view your Safe Assign originality report/plagiarism score, which must be limited to
<20%.
5. Assessment criteria (General): 15%
• Professionalism of project (template layout, format, typed, neatness, and
terminology): 60%.
• References (format, citations and reference list): 40%.
6. Assessment criteria (Knowledge area (KA) linked to GA 7/GAs): 25%
• Problem-identification: 10%.
• Completeness and correctness: 80%.
• Interpretation and discussion: 10%.
7. Assessment criteria (Graduate Attribute(s) 7 linked to KA): 60%
• As per detailed GA Development Rubric: 100%.

Assessor: ______________________ Moderator: ______________


Page 2 of 5

ASSIGNMENT/PROJECT SUBMITTAL AND IDENTIFICATION

Student number: __________________________________________________

Surname and initials: __________________________________________________

Subject name: ENGINEERING PROJECT MANAGEMENT

Subject code: CPR22A

DECLARATION OF OWN WORK:

By submitting my work on this platform, I declare that:


• I have completed this assignment/project in accordance with the CUT's Code of
Academic Integrity.
• All the work included in this assignment/project is my own work.
• I did not consult any person or means other than that allowed by the assessment
instructions.

Signed: ________________________________________________________

Date: ________________________________________________________

Assessor: ______________________ Moderator: ______________


Page 3 of 5

Question 1:
Making use of Numerical Models to select an appropriate Project, and preparation of a
Project Scope Baseline (50 Marks)

PROJECT BACKGROUND INFORMATION

You are the Project Manager for a company where the Client owns an existing office block.
The office block accommodates the Client’s personnel, as well as tenants for tree companies
who is renting the office space from the Client.

The Client needs your assistance to make a financial decision to either invest in renovating
the existing office block, or to sell the existing office block and build a larger office block that
can accommodate more tenants. Furthermore the Client requested that you prepare a Scope
Baseline for the best option.

YOUR ASSIGNMENT/TASKS:

Task 1: Provide a proposal to the Client motivating the best of the two Option by making use
of the following Numeric Selection Models, over a period of 5 years, (1) Payback period, (2)
Return on investment (ROI), (3) Net present value (NPV), and Internal rate of return (IRR).
The yearly interest rate is 5%.

Option 1: Renovating the existing office block (Client Investment = R 1,000,000)


Option 2: Sell the existing office block and build a larger office block
(Client Investment = R 3,500,000)

Cash Flow
Cash Flow
Years Option 1 Option 2
Year 1 R 400,000 R 600,000
Year 2 R 350,000 R 800,000
Year 3 R 200,000 R 750,000
Year 4 R 150,000 R 900,000
Year 5 R 100,000 R 600,000

a) Calculate the Payback Period for both Options, and motivate the most favourable
Option. [6]

Assessor: ______________________ Moderator: ______________


Page 4 of 5

b) Calculate the Return on Investment (ROI) for both Options, and motivate the most
favourable Option. [7]
c) Calculate the Net Present Value (NPV) for both Options, and motivate the most
favourable Option. [7]
d) Calculate the Internal Rate of Return (IRR) for both Options, and motivate the most
favourable Option.
(i) Prepare a table indicating the NPV and interest rate from 1% to 10% to establish
the IRR. [11]
(ii) Prepare a graph by plotting the NPV and interest rate for 1% to 10% to establish
the IRR. [7]
e) Indicate the best option and provide motivation based on the models used. [2]

Calculations and answers to be presented in a professional Spreadsheet format (no hand


written calculations and answers).
(Maximum 2 typed pages) [40]

Task 2: Prepare a Project Scope Statement for Option 1.


(Maximum 2 typed pages) [10]

Task 3: Prepare a Work Breakdown Structure (WBS) for Option 1 and prepare a WBS
Dictionary for one of the Work Packages.
(Maximum 1 typed page). [10]

Task 4: In your own words define a Project Charter, Project Scope Statement, Scope Baseline,
Schedule Baseline, and Cost Baseline.
(Maximum 1 typed page) [10]

PROFESSIONAL DOCUMENT REPRESENTATION [10]

Total: [80]

Assessor: ______________________ Moderator: ______________


Page 5 of 5

You are required to,


• Submit an individual assignment (No group work allowed).

• Formal hard copy submission to be handed in on 20 February 2017 at 17:15. (Submit a


complete Professional Document (i.e. cover page, table of content, task answers,
references, assignment submittal form, etc.) addressing all four (4) tasks.
• Calculated answers to be rounded to one decimal place.
• Submit no more than the requested amount of pages per task. Only the requested
amount of pages per task will be marked. (no hand written assignment will be accepted)
• CUT Formal Assignment Submittal Form to be submitted and signed with Assignment.
(10% can be deducted from the assignment if no / unsigned Assignment Submittal &
Identification Sheet is submitted with the assignment.)
• 10% per day or part of a day will be deducted from the assignment for late submissions.

END OF ASSIGNMENT PART 1