0% found this document useful (0 votes)
42 views1 page

Consumer Pump Estimation E2E

Haritasa Enterprises has provided a quotation dated 20-01-2024 for the fabrication and installation of various storage tanks and related equipment, totaling INR 25,30,000. The quotation includes detailed descriptions, quantities, unit prices, and terms such as payment conditions and delivery timelines. The prices are valid for 30 days and do not include an additional 18% GST.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

Consumer Pump Estimation E2E

Haritasa Enterprises has provided a quotation dated 20-01-2024 for the fabrication and installation of various storage tanks and related equipment, totaling INR 25,30,000. The quotation includes detailed descriptions, quantities, unit prices, and terms such as payment conditions and delivery timelines. The prices are valid for 30 days and do not include an additional 18% GST.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HARITASA ENTERPRISES GSTN: 29AOQPR7828K3ZS

Date: 20-01-2024

QUOTATION
# DESCRIPTION QTY Unit Price Amount
1 Fabrication of 30KL MS Storage Tank as per drawings & 1 5,30,000 5,30,000
Specification with all the necessary accessories and duly
painted with two coats of Zinc Chromate red oxide primer
2 Fabrication of 25KL MS Storage Tank as per drawings & 1 4,85,000 4,85,000
Specification with all the necessary accessories and duly
painted with two coats of Zinc Chromate red oxide primer
3 ‘Dual Suction type Dispensing Unit’ HD-HD, LPM 2 3,10,000 6,20,000
@ 75; with 1” nozzles, 12 Digit Non-Reversible
Electronic Totalizer, with 2 Printers and PESO
Approved, Legal Metrology & ATEX Approval.
With Printers no’s, Automation Compatible
4 Pipeline Materials (80mm MS ERW Steel tubes, 80mm MS 1 2,20,000 2,20,000
NR Threaded Flanges, threaded elbow G.M angle check
valve, Sockets, Venthood, Ball valves, Hex nipples, gasket
rings, Nut & Bolts ½” X ½”
5 Panel Board (Proper fabricated panel board as per 1 85,000 85,000
specification to install electrical components, Power cut-
off switch. Auto change over switch to connect to
generator)
6 Electricals items (2.5sqmX 3core copper cable, 19mm DC 1 1,30,000 1,30,000
glands, PVC glands, coper plats, GI Pipes full set, 500VA
CVT, V guard VND stabilizer and other electrical items)
7 Civil Work (Island construction for dual Dispensers, Earthing 1 4,00,000 4,00,000
work for electrical cables from DU to Panel board room, PCC
work for Tank installation, Earth work for Pipeline installation.
Electrical room construction and other works as needed)
8 Installation and commissioning 1 60,000 60,000

Total Estimate for above work (INR) = 25,30,000/-


In-Words: Twenty-Five Lakh Thirty Thousand Rupees Only

Terms & Conditions


PRICE All the prices quoted above includes transportation charges to Client Site
PAYMENT 100% against with proforma invoice when the goods are ready to dispatch
GST 18% Extra
DELIVERY Within 30 days from the date of our order acceptance
VALIDITY The above prices are valid for 30 days only

Regd Office: A6- CADA Tel +91-9620212772 Email:


Colony, +91-9900639498 [email protected]
Munirabad Dam Area, Koppal,
Karnataka - 583233

You might also like