Window Delay Analysis - Final

The document outlines a delay analysis for infrastructure works due to plot amalgamation and master plan changes, detailing various windows of project timelines and associated delays. It specifies key dates, including engineer instructions and client approvals, along with the duration of delays for each window. The overall project duration is set from June 1, 2023, to May 31, 2025, with multiple delays impacting the schedule.

Uploaded by

eng.bheugenio45
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views3 pages

Window Delay Analysis - Final

The document outlines a delay analysis for infrastructure works due to plot amalgamation and master plan changes, detailing various windows of project timelines and associated delays. It specifies key dates, including engineer instructions and client approvals, along with the duration of delays for each window. The overall project duration is set from June 1, 2023, to May 31, 2025, with multiple delays impacting the schedule.

Uploaded by

eng.bheugenio45
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

WINDOW DELAY ANALYSIS-DELAY EVENT (EI No.

07- Undertake Changes for


Infrastructure Works Due to Plot Amalgamation and Master Plan Changes
Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25

01 JUN 2023
31 MAY 2025

PROJECT CONTRACT DURATION (BASELINE)

DD: 22 APR 2024

WINDOW 1 (Period: 01 JUN 2023 - 22 APR 2024)

31 MAY 2025

ENGINEER INSTRUCTION No. 07 (Undertake


23 APR 2024 Changes to the Infrastructure Works due to
Plot Amalgamation & Master Plan

WINDOW 1A (Period: 01 JUN 2023 - 22 APR 2024)

31 MAY 2025
Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25

ENGINEER INSTRUCTION No. 07 (Undertake


23 APR232024
A{ Changes to the Infrastructure Works due to
Plot Amalgamation & Master Plan

25 AUG 2024
Client Sent an Approved CMP
with Land Use Via Email

DD: 25 AUG 2024

WINDOW 2 (Period: 23 APR 2024 - 25 AUG 2024) 18 Calendar Days Delay

18 JUN 2025

DD: 25 SEP 2024

WINDOW 3 (Period: 26 AUG 2024 - 25 SEP 2024)


36 Calendar Days Delay
24 JUL 2025
Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24 Nov-24 Dec-24 Jan-25 Feb-25 Mar-25 Apr-25 May-25 Jun-25 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25

17 OCT 2024
Contractor submit Re- Design Report
for Phase 2 Under EI No.07

DD: 25 OCT 2024

WINDOW 4 (Period: 26 SEP 2024 - 25 OCT 2024) 33 Calendar Days Delay

26 AUG 2025

04 NOV 2024
Client Sent an Approval (Re- Design Report for
Phase 2 Under EI No. 07)

25 NOV 2024
Approved Shop Drawings- MV Network as per
New Design and New CMP

03 DEC 2024
Approved Shop Drawings- LV Network as per
New Design and New CMP

07 DEC 2024
Approved Shop Drawings- Storm Water
Network Plan & Profile CMP EI- 07

DD: 07 DEC 2024

WINDOW 5 (Period: 26 OCT 2024 - 07 DEC 2024)


29 Calendar Days Delay
24 SEP 2025