ABIC-SW - SC-2008-Contract-Forms - Simple Work
ABIC-SW - SC-2008-Contract-Forms - Simple Work
No. Title
Standard Form
Con 1 Contractor’s Instruction (to Subcontractor)
Con 2 Request for Information
Con 3 Contractor's Written Decision
Con 4 Instruction for Variation Quotation
Con 5 Instruction to Proceed/Not to Proceed With Variation
Con 6 Notice of Substantial Completion
Con 7* Progress Payment Statement
Con 8* Final Payment Statement
Other Forms
Con 9 Instruction Subcontract Works Not At Substantial Completion
Con 10 Written Statement Subcontract Works Not At and Not Near Substantial
Completion
Con 11 Notice of Entitlement to Liquidated Damages
Con 12 Instruction to Correct Defects or Finalise Work
Con 13 Request to Submit Final Claim
Con 14 Assessment of Cost of Completing Subcontract Works
Con 15 Q9 Payment Statement as to Amount Payable
Con 16 Notice To Remedy Default
Con 17 Contractor's Notice to Subcontractor
Con 18 P2 Notice of Dispute
Con 19 Notice of Termination
* Two forms – simple version and complex version – for use where Security of Payment
legislation operates.
CONTRACTOR’S FORMS Con 1
Australian Building Industry Contract (ABIC) SW.SC 2008
CONTRACTOR'S INSTRUCTION
No:
Project:
Project no:
Date issued:
To Subcontractor:
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause number ..................... please provide information to resolve the following
matter [insert details here].
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause J1 you are instructed to provide the information detailed below with respect to
the following variation to the subcontract works:
• an estimate of the whole, or any part, of the cost or saving as a consequence of the variation;
• an estimate of the effect of the variation on the date for substantial completion;
• a quotation for the whole, or any part, of the cost of the variation;
• other information.
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause J3 you are instructed to proceed / not to proceed [delete where not
applicable] with the variation in respect of which you provided an estimation and quotation on
............................. [date details provided]
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause M4 you are notified that inspection of the subcontract works is complete and
substantial completion was reached on the ................................. [insert date of substantial completion]
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
The reason that the GST exclusive amount claimed and the GST exclusive amount certified are
different is as follows:
[insert reason here if applicable.]
…………………………................................................................(signature) for
Contractor
For use where Security of Payments Legislation is in Force. Check with your Legal Adviser
PROJECT:……………………………………………………………………………………………………………………
SUBCONTRACT: ……………………………………………………………
SUBCONTRACT NO: …………………………………………
SCHEDULE PREPARED BY:…………………………………………………………………………………. (Contractor)
OF: ……………………………………………………………………………………………… (ordinary place of business)
TELEPHONE NO: ………………………………………..... FAX NO: ……………………………………………………..
TO: …………………………………………………………………………………………………………….(Subcontractor)
THE AMOUNT OF THE PAYMENT THE CONTRACTOR
PROPOSES TO MAKE IS (see item 5 below) $......................................................
1. Assessed progress on the original Subcontract Work since the last payment $......................................................
2. Add for:
(a) Work completed on approved variations since the last payment $......................................................
(b) Extras adjustments to provisional allowances since the last payment $......................................................
(c) Other extras adjustment/s under the subcontract $......................................................
4. Less:
(a) Credit adjustments to provisional allowances since the last payment $......................................................
(b) Liquidated damages (if any) $......................................................
(c) Set offs etc due to the Contractor (see separate schedule) $......................................................
(d) Other deductions/credits under the subcontract $......................................................
THE REASONS FOR THE DIFFERENCE (IF ANY) BETWEEN THE CLAIMED AMOUNT AND THE
SCHEDULED AMOUNT AND THE REASONS FOR WITHHOLDING ANY PAYMENT (IF APPLICABLE) ARE
SET OUT IN THE ATTACHED SCHEDULES (IF ANY)
…………………………................................................................(signature) for
Contractor
Distribution: Original: Subcontractor □ Copies: File □ Other □
Note to Contractor.
You must issue a payment statement to the subcontractor within 20 business days of receiving a claim for a progress payment.
CONTRACTOR’S FORMS Con 8 Complex
Australian Building Industry Contract (ABIC) SW.SC 2008
For use where Security of Payments Legislation is in Force. Check with your Legal Adviser
PROJECT:………………………………………………………………………………………………………………………
SUBCONTRACT: ……………………………………………………………
SUBCONTRACT NO: …………………………………………
SCHEDULE PREPARED BY: ………………………………………………………………………………. (Contractor)
OF: ………………………………………………………………………………………………(ordinary place of business)
TELEPHONE NO: ………………………………………… FAX NO: …………………………………………………
TO: ………………………………………………………………………………………………………….....(Subcontractor)
5. Proposed amount to be paid in respect of the final claim (Item 3 – Item 4) $......................................................
THE FOLLOWING SECURITIES WILL ALSO BE RELEASED AS PART OF THE FINAL PAYMENT:
THE REASONS FOR THE DIFFERENCE (IF ANY) BETWEEN THE CLAIMED AMOUNT AND THE
SCHEDULED AMOUNT AND THE REASONS FOR WITHHOLDING ANY PAYMENT (IF APPLICABLE) ARE
SET OUT IN THE ATTACHED SCHEDULES (IF ANY)
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
The reason that the GST exclusive amount claimed and the GST exclusive amount certified are
different is as follows:
[insert reasons here if applicable.]
The Contractor hereby acknowledges their obligation to release the remaining security in the sum of
$.................... [if applicable.]
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause M5 you are instructed that the subcontract works are not at but near
substantial completion.
You are instructed to complete the following works promptly in order for substantial completion to be
reached.
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause M6 you are advised that for the following reasons the subcontract works are
not at and not near substantial completion [insert summary of reasons].
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause M10/ M11 [delete where not applicable] you are notified that, as the
subcontract works have not reached substantial completion by the due date, the contractor is entitled to
liquidated damages calculated in accordance with Item 19 of Schedule 1 / intends to enforce its right to
liquidated damages calculated in accordance with Item 19 of Schedule 1 [delete where not applicable] .
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause M12 you are instructed to correct the following defects / finalise the following
works [delete where not applicable] by ...................................[insert date as agreed or 5 working days]
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause N10 you are requested to submit a final claim for payment for the whole of
the works / a part of the works as defined below. [delete where not applicable]
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause Q8 the following is an assessment of the cost of completing the subcontract
works:
…………………………................................................................(signature) for
Contractor
$..................................
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause Q1 you are required to remedy the following default within 10 working days:
[insert details of default]
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Subcontractor:
…………………………................................................................(signature) for
Contractor
P2 NOTICE OF DISPUTE
Project:
Project no:
Claim notice no:
Date issued:
To Subcontractor
In accordance with clause P2.1 you are notified of a dispute in respect of.............................................
.............................................. [insert a description of the substance of the dispute]:
You are required to meet with us within 5 working days after delivery of this notice to make a bona fide
attempt to resolve the dispute.
FINAL ABIC SW.SC 2008 Contractor FormsFINAL ABIC SW.SC 2008 Contractor Forms
CONTRACTOR’S FORMS Con 19
Australian Building Industry Contract (ABIC) SW.SC 2008
NOTICE OF TERMINATION
No:
Project:
Project no:
Date issued:
To Subcontractor:
In accordance with clause Q1 / Q2 [delete where not applicable] you are notified that, as you have not
complied with [insert details of default or insolvency ]
…………………………................................................................(signature) for
Contractor
No. Title
Sub 1 Request For Information / Instruction / Notice
Sub 2 Notice Of Intention To Claim
Sub 3 Details Of Claim
Sub 4 Additional Information
Sub 5 Security By Unconditional Guarantee
Sub 6 Subcontract Works Program
Sub 7 Notice To Contractor – Subcontract Works Near Substantial Completion
Sub 8* Progress Claim – Summary Sheet
Sub 9 Final Claim – Summary Sheet
Sub 10 Notice Of Start Or End Of Delay
Sub 11 Notice To Contractor – Possession Of Subcontract Works Before Practical Completion
Sub 12 Notification Of Official Notice or Order
Sub 13 Notice Of Substantial Completion
Sub 14 Notice Of Dispute
Sub 15 Subcontractor's Notice To Contractor
Sub 16 P2 Notice of Dispute
Sub 17 Notice To Remedy Default
Sub 18 Notice of Suspension / Termination
* Two forms – simple version and complex version – for use where Security of Payment
legislation operates.
…………………………................................................................(signature) for
Contractor
No:
Project:
Project no:
Date issued:
To Contractor:
In accordance with clause number ……………, please provide an instruction / a notice / information
[delete where not applicable] to resolve the following matter [insert details here]:
…………………………................................................................(signature) for
Subcontractor
No:
Project:
Project no:
Date issued:
To Contractor:
You are notified of our intention to make a claim in accordance with clause number ............................,
[insert a brief description of the intended claim]:
…………………………................................................................(signature) for
Subcontractor
DETAILS OF CLAIM
No:
Project:
Project no:
Date issued:
To Contractor:
The details of our claim numbered.................................[ie. the same as its matching notice of claim no.]
and dated................................are as follows, [insert complete details of the claim]:
…………………………................................................................(signature) for
Subcontractor
ADDITIONAL INFORMATION
No:
Project:
Project no:
Date issued:
To Contractor:
In accordance with your request dated ..................................... for additional information regarding our
claim numbered
................................................................. the following details are provided, [insert details of the additional
information]:
…………………………................................................................(signature) for
Subcontractor
No:
Project:
Project no:
Date issued:
To Contractor:
In accordance with clause C3, security in the form of two equal unconditional guarantees is attached.
…………………………................................................................(signature) for
Subcontractor
No:
Project:
Project no:
Date issued:
To Contractor:
In accordance with clause G5, a program for the subcontract works is attached [insert details or
attach relevant documents].
OR
In accordance with clause G6, the updated program dated ................................ is attached
[insert details or attach relevant documents].
…………………………................................................................(signature) for
Subcontractor
No:
Project:
Project no:
Date issued:
To Contractor:
The subcontract works are near substantial completion. In accordance with clause M2 a detailed list of
defects and incomplete work and a timetable for their correction is attached.
…………………………................................................................(signature) for
Subcontractor
PROJECT: ……………………………………………………………………………………………………………
SUBCONTRACT: ……………………………………………………………
SUBCONTRACT NO: …………………………………………
MADE BY:………………………………………………………………………………………………(Subcontractor)
OF: …………………………………………………………………………………………… (ordinary place of business)
TELEPHONE NO: ………………………………………. FAX NO: ……………………………………………………..
TO: ………………………………………………………………………………………….……………...(Contractor)
TOTAL AMOUNT OF THIS PAYMENT CLAIM (see Item 12 below) $......................................................
THE WORK FOR WHICH THIS CLAIM IS MADE AND THE METHOD OF CALCULATION OF THE TOTAL AMOUNT OF THE
CLAIM ARE SET OUT BELOW (AND IN THE ATTACHED SCHEDULES)
2. Adjust for:
(a) Work completed on approved variations since the last claim2 $......................................................
(b) Adjustments to Prime Cost Items since the last claim3 $......................................................
(c) Adjustments to Provisional Sums since the last claim4 $......................................................
3. Total value of work done since the date of the last payment claim $......................................................
4. Add: Any monies due and payable to the Subcontractor (but unpaid) as of the $......................................................
date of this claim.
9. Less: Cash retention (if any) to be withheld from this payment $......................................................
Note to Subcontractor:
This summary sheet should form the first page of your claim. Comprehensive details should be
submitted with all progress claims.
SUB-8
CLAIM NO:
SUBCONTRACT NO: FOR the PERIOD …………………………. to …………………………
Note to Subcontractor:
This summary sheet should form the first page of your claim. Comprehensive details should be submitted with all
progress claims.
SUB-8
CLAIM NO:
SUBCONTRACT NO: FOR the PERIOD …………………………. to …………………………
Note to Subcontractor:
This summary sheet should form the first page of your claim. Comprehensive details should be submitted with all
progress claims.
SUBCONTRACTOR’S FORMS Sub 8 Simple
Australian Building Industry Contract (ABIC) SW.SC 2008
Project:
Project no:
Date issued:
To Contractor:
1. The contract value of building work completed to date in accordance with N3 is $............................................
2. The value of materials delivered to the site is $............................................
3. Less the amount of retention pursuant to clause C2 $............................................
4. The GST applicable to this net amount is $............................................
I declare that
• all wages and other entitlements including building industry superannuation and long service leave levies due
have been paid to or on behalf of all employees of the Subcontractor
• all monies due to sub-subcontractors have been paid
• all insurances required to be maintained by the Subcontractor are in force.
…………………………................................................................(signature) for
Subcontractor
Version 2004
Project:
Project no:
Date issued:
To Contractor:
3. GST is $............................................
…………………………................................................................(signature) for
Subcontractor
Project:
Project no:
Date issued:
To Contractor:
In accordance with clause L2 we advise that as of .........................................[insert date here] the subcontract works are
being delayed / the delay in the subcontract works has ended [delete where not applicable].
…………………………................................................................(signature) for
Subcontractor
Project:
Project no:
Date issued:
To Contractor:
As possession of the works was taken on ........................ [insert date] by the owner, which is prior to practical
completion, notification is hereby given under clause M9 that the works are deemed to have reached practical
completion.
…………………………................................................................(signature) for
Subcontractor
Project:
Project no:
Date issued:
To Contractor:
In accordance with clause J5 we notify that we have received an official document from
.............................................................in respect of ...............................................................
…………………………................................................................(signature) for
Subcontractor
Project:
Project no:
Date issued:
To Contractor:
You are notified that the subcontract works have reached substantial completion as at............................... [insert date
works reached substantial completion]
A detailed list of defects and incomplete work indicating correction or completion is attached.
…………………………................................................................(signature) for
Subcontractor
Project:
Project no:
Date issued:
To Contractor:
In accordance with clause A8 you are notified that we wish to dispute the payment statement / notice / written
decision / written assessment / failure to issue the following [delete where not applicable] as described below:
…………………………................................................................(signature) for
Subcontractor
Project:
Project no:
Claim notice no:
Date issued:
To Contractor:
P2 NOTICE OF DISPUTE
Project:
Project no:
Claim notice no:
Date issued:
To Contractor
You are required to meet with us within 5 working days after delivery of this notice to make a bona fide attempt to resolve
the dispute.
Project:
Project no:
Date issued:
To contractor:
In accordance with clause Q11 you are required to remedy the following default within 10 working days:
[insert details of default]
…………………………................................................................(signature) for
Subcontractor
Project:
Project no:
Date issued:
To contractor:
In accordance with clause Q12 / Q13 /Q14 [delete where not applicable] you are notified that as you have not complied
with [insert details of default] /as an insolvency event has occurred [delete where not applicable]
…………………………................................................................(signature) for
Subcontractor