0% found this document useful (0 votes)
8 views

software testing

The document discusses software testing, emphasizing its importance in identifying and fixing bugs early in the development process to ensure quality and minimize costs. It outlines various testing methodologies, including defect clustering and the significance of early testing, while also addressing the challenges of exhaustive testing. Additionally, it highlights the roles of verification and validation in ensuring that software meets user requirements and industry standards.

Uploaded by

ganeshnavale942
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
8 views

software testing

The document discusses software testing, emphasizing its importance in identifying and fixing bugs early in the development process to ensure quality and minimize costs. It outlines various testing methodologies, including defect clustering and the significance of early testing, while also addressing the challenges of exhaustive testing. Additionally, it highlights the roles of verification and validation in ensuring that software meets user requirements and industry standards.

Uploaded by

ganeshnavale942
Copyright
© © All Rights Reserved
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 14
Soft ware hosting. Gr © \uhal is Software hesAing g Tt Soltwore testing {ga gescess used te identify Ane Conrectnes ¢ iLemes and_quality of development software oY Software Leoting is the grocegs oP evaluatiag | _ and verifying, thot a Gwalltware applic De @ Goal of Solbware esting 2 - = petect and Pix bugs or defects early at r oftware walt ~ Minintize the tise ats Collures dn Qroduction = Bug Ai Cove = Customer SahiOCi cotton i -_ Reduce arke maintenace Coast = Tmpro! eC Soltware festing Pro le 53. |= Nalidode thal The Geflaare oeels ser and _bugine93 requrments. re ervey Js~ occures - A, Bon. Defedk- Bet yequemen} — sae —— | QI whol is aluve af errors As OyVOT 3- — fin error ig the miste ch made ; a x during design or Carling phase =Nn_errey is a migtake,mis Concep. Hoa ay _misunderstan, ling on the parr of Solbwane develoger a. Poult > Cae) - gO Ti thug 07 _dePect 7 = Thie code (6 mainkesiation of 2801 design and _dacumenbetton. ___ Defect + Costomer sequrement ts not Clearly listing. develope and misentergrit hak ‘ oetech. Aevetopey Bug i Nester eovesen| the Code For ~ the tester Shalt time by mistec& Coeahe ovrer. this is bugs. 3. failure + C guage) - A Sailure is occures When the Softer does pat Perform Pow gequrment = visit fo sister expected behav owr Ond Tequement do pot Same. [ = Pjow of Pailuves / Error ——— Fault ——% Failure Laperct | | paar | | | kdatt Colagl f | Sduvce, | 4 7 migstatele.| joefeet fim code duning Apsdlodmdnh dest olectasbelvel ak fhe Here of] | tre] ofa: | ca oleh sae arth Fac qenpte, | Mis{c bd i NOP! im wleinenty-| ito “Fe tegudfh y pigeysy use Exhaustive Wrals aie MR Presence — areoyy EO ee SS ae ia Principle of JesMag ® Testing chous the Present _o( errors > Testing, applicabion Con_on\y aliscolze one 7 more defogt exist ino but testing alone Conot grove Veal Hoe applicabton is error free. i. Fxehaustive ‘Testing ig imoessibie. =it js ot Possible to feat oN possible inpur , path etc. = eating Sholid Pocus most cribt cof high vis ovea. @ Carly Testing ~ 40 esting shtald short eorly 83 Possible in galtware dey elop men} tfecyde ~ Corly fesking te helo deted dotect £ rede cost Co) Defect Cluatering | - Tn Softeure Game, Specikte module, and fn +he ort For actly Pacact i a T oe oe | ~ Testing eftect fo highs mig 2; area 1 [FFLLI/ a Fallacy ~ haamsy alta Ay absence- sleeott Gmmae) s1@) pesticide Paradox anariwids Giang). Ss =Repetacl use of \ne Same test casea — wey time sit become. | effeckive in Vinding new defacts. @ “Testing “is Conbezd dependent Vary depending on the syee the | __agalicakion, envivamens pr demaip. ® fheence -of- erroy Paliacy: =Even if 9 Gottwore product ie defec/ Cree if Pay ot Meet user requixmen} 67 expectabion. y de\ect - sitor % oT dynamic - BK ) - a : AY __€ | dit} bef oveee? pari fication volidebioy Y Ver ication ‘on: vol Cor _ervoduct = focu - Corus fox process Oriented oriented. = Stoic fe Ling Cro - DYnamic_lesting Ci ovotves Code exicube) code oxecubion \ z asf ~ Prevent delect ~ petecs defed in the 7 Carly in Me Real product - | dovelapment Process - Povelvement : tenter + Jester a leams and Aevelogers , de igney. end-user enuolve men} = Vor eokton melhod [= validebion. b ingpechions twhite boy festing 2- walkthroughs 2. black boy esting a+ Reviews = iV ts low level | it ¢ bial levet- ackivity ackiutty =Chgure the Seftwore]- ingure the Sepware ig_louith Correctly meet user peed Ane aS per Georiticobion Parsdtam: Functor correc ane) standards. —_ SS —_ —-: ® hspects—- eye 4 Gata O \ deCervent bebween Fun | TundeMehtal festiog _] durmentel ¢ Ron fandameht/| . ndamental esting peak af = funclaMebal esting means] basic esting done to = advance and adititiorel testing thal goen beyord check and tore Cunchion- ality and ellability bosic functionality it focus on Specific (oftware a system aspeut Uke sequrity performance Os dbilibs enGure the golt wore , AL ee EL EE iperck (well ia different Condition ov meets | specific requirement i— * Sienale Lesbing Proce $$ + Compley lesting process «Focuses on _veriyin Pocus on advanced or cone Functionality an pevific aspect of eability- ‘ tne SoPtw ore " include Smoke Leshing * UNcbde Perley man Les licol Janity testtag unt Sequrity , usability testing, finchiarad Le bing! and ComyPolibliby teohda 2 Perbor mea daring . Performed in the large jhe early Stages 6 “Stege of development development _t | Val neTabwwne S — GHAR STW relioblR~ Wekeieljpay~ NY vorious~ dardoigun Feet (e=aawe) | | Preventing Diejo} ge © _— ral aeed of Soflwore Jesting: | - Ensures th quetlity of \he oftwore. = Qeled and fix bugs early actin develop men} 7 deatiQying Nalnerabilities ~ improve perfoymance under Various Condi = Provide a better user experience. = Save }ime and cost by Preventing lole ghaye fosu = _ ssh Tintmized—Cost = Ensures Compliance with industey Standard! nd equation. Sof pwore - <=> — ~y TL 1. tuoterk. <4 * ¥ Requivemems. as Analysts ~—t “Tes} + Plannin t [test + + + \_pesign Fy t [Tess all ‘ ementotion | Tt I Test | ebugging iN + system teshing | | : NX Acceptance Testing [1 fa LESAN — Yoperalion le maingement { tremen} = > wre a7 gathered and decume ntsc. = Testing focus verte op): beness Clarity” ee i Test elanping _ - test pldn document Ghoutd be Prepard | ob}ey requirment of Prpject ave Confiyme — - Test Clanning include deketmining ScoPe, “ appyoach » TeSoUrGE ii] “Test _design , Tmelementobion = developers write. the Code based on system design ~ Module are developed: and _iniegrajed Sequafi iv) “Testing _ Sustem test Coses are excubed fo verify the system. ~ Guys are fixed before provid the nexh ches vy) mainienance ~ fixes, update and enhanament pared: on user _Peeslbark. indyde bugs fixes, Upgrads 4 Perfor imprevement. Testing Vile Cele Capt c) Requivement ] analysis L Fest lannin T 7 Test analysis | VV \\\\\ Jt Fress_pesisn-t em — unk [testes cycle] y 4 T Boal yeskreg ] chs Lest im plemer [bsnl ak fo T id Requirgment Analysis. > Understand the requirement Porm the Sefw Tequirment gpecification CSRS) clocumenh. = idenkify testable and nan~ testable requiem hi] Tes} Planning. . = Define the Gcope ,deProach , resources and ¢chedule Pov lesitng + Jit | ~ Cotimmate eCGor} and delrae role LL ~ Tes} flan document. fall “Test analysic. > After tes} planning Phase is qver. #tep4 analysis Phase Sturt. = We need fo lig dtepay info Profect. i) “Test d®sig'n [ = Vorious Blacte-box and hile bor jess | design techniques are used to designs | = peey review 0? pes) Cose . 1 v) volidetion, ~ we need to clo oll fest activities . - alt fest designed inser 4 are verifred Sf ge Gar O wil Testing ‘Cxcie - i - ~Test execution and buy Re ostia | Bag Management . vid Final festing ¢ Sinplerrer Tater. = Pinal esting is dene for Gohbwork: 3 [= Vinal best execulion reperis and all best deMiverables are prepared: wii] Pest implimentabion = < nyivoment i andl restored fo dePault Grake- -_ the process _peview meeking be dene. eS Qe" 0 _ — if] hel is Debugging ? r = idenhi€y amd removing evrer Prom a ms Program oy ofware 15 in = ideally Pos of jesiing process = Debugging 1S. aluops Mang ale = Debugaing ig. dene by ether Grogromey ov develope > = Phases of * Debugging. % L. i Chanichatl Z- Defect Confirmation 3: Defect -qgnalsis. 4. peted Resolution. L- Deled idensficobton A prebiem is identified in a syskem and o defect report te created, Z. Defect Conbiz mak tor analyzes this error reporh ond Find Solation to the Some quohons, | a

You might also like