E2 - Connection:-: Loads:-Vertical Shear (Eor To Verify) (Connection Capacity)
E2 - Connection:-: Loads:-Vertical Shear (Eor To Verify) (Connection Capacity)
EMBED PLATE
(BY OTHERS)
10" X 1/2" min
L5X5X3/8 EMBED PLATE
(LONG LEG OSL)
2"
2"
1
HSS12X10X3/8
1"
12
5"
1/4
3"
1" 1/4
7"
14"X1/2" THK CLOSURE PLATE
3"
1"
12
1"
32 1"
12
2" MIN
TYP
1/4 2" MIN
TYP
Notes:-
All bolt holes are SSL hole in shear plate and STD hole in splice plate
All W steel are grade A992, HSS are A500 grade B & connection plates , angles are grade A36, studs are A108.
Incoming Beam: Incoming_Beam "HSS12X10X3/8"
Section Size:
2
db1 = 12 in bfb1 = 10 in t fb1 = 0.375 in t fb1des = 0.349 in Agb1 = 14.6 in
Factors:
Factors for tension yielding, bending & buckling f a = 0.6
Factors for bolts, welds, bolt bearing & web crippling f c = 0.5
Bolt properties :-
2
Area of bolt Abolt = 0.442 in
"STD" otherwise
( )
Ecc Holeconn , a , nr1 , nc1 , gb1 := e if a 3.5in nc1 = 1
a
2
(
if 2 nr1 5 Holeconn = "SSLT" Holeconn = "STD" )
a
if 6 nr1 12 Holeconn = "SSLT"
2
a if 6 nr1 12 Holeconn = "STD"
( nc1 - 1) gb1
e a + if nc1 > 1
2
return e
θ :=
Eccentricity (
e1 := Ecc Holeconn , a , nrb1 , ncb1 , gb1 ) e1 = 1.75 in
Coefficien C = 2.481
t
Fbg := C Scap Fbg = 29.6 kip
( )
Result kip Fbg , R vc = "Capacity (29.6 kip) > Load(15 kip)-----------> O.K"
Check for bearing/tearing capacity of shear / splice plate:- (Considering vertical shear)
D hsp
Bearing/tearing capacity
( ) ( )
Rs1v := min 2.4 f c dbolt t s1 Fup , 1.2 f c evb1 - t s1 Fup , Scap
2
at extreme bolt
( )
Result kip Rsv , R vc = "Capacity (29.6 kip) > Load(15 kip)-----------> O.K"
An := Ag - nrb1 Dhsp +
1 2
Net shear area in t An = 2.77 in
16 s1
Shear capacity ( ) ( )
Fcap := min 0.6 f g Ag Fyp , 0.6 f n An Fup Fcap = 48.1 kip
( )
Result kip Fcap , Rvc = "Capacity (48.12 kip) > Load(15 kip)-----------> O.K"
Shear capacity (
Fcaph := 0.6 f g Agh Fyb1 ) Fcaph = 132.45 kip
( )
Result kip Fcaph , Rvc = "Capacity (132.45 kip) > Load(15 kip)-----------> O.K"
Check for block shear capacity of shear / splice plate (considering vertical shear) :-
Gross shear area (
Agv := nrb1 - 1 Sb1 + evb1 t s1 ) Agv = 3.19 in
2
( )
Result kip Bscap , Rvc = "Capacity (44.96 kip) > Load(15 kip)-----------> O.K"
Check for combined flexural and shear stress of shear / splice plate ( Gross ) :-
2
Gross shear area Agv := Dp t s1 Agv = 3.75 in
( )
Shear capacity of plate ( )
Vgc := 0.6 f g Agv Fyp Vgc = 54 kip
2 2
Rvc Ms
Ratio of combined stress on plate Rx := + R x = 0.145
Vgc Mc
( )
Result ratio 1 , Rx = "(1) > (0.145)-----------> O.K"
Check for combined flexural and shear stress of shear / splice plate ( Net ) :-
3
Section modulus of plate Zmodn = 7.006 in
2 2
Rvc Ms1
Ratio of combined stress on plate Ry := + R y = 0.164
Vnc Mcap
( )
Result ratio 1 , Ry = "(1) > (0.164)-----------> O.K"
Fyp
Dp
1ksi
λ1 := λ1 = 0.305
2
Dp
10 t s1 475 + 280
e2
Q := 1 if λ1 0.7 Q=1
2
Dp t s1 3
Elastic section modulus Z1 := Z1 = 6.25 in
6
( fa) Fcr2 Z1
Buckling capacity of shear/splice plate Pbuc := Pbuc = 38.49 kip
e2
( )
Result kip Pbuc , Rvc = "Capacity (38.49 kip) > Load(15 kip)-----------> O.K"
Moment strength of bolt group Mmax1 := 1.11 Fnv Abolt C1z Mmax1 = 15.16 kip ft
6Mmax1
Maximum thickness of shear tab Tpmax := if ncb1 > 1 Tpmax = 0.438 in
2
Fyp Dp
dbolt 1
+ in otherwise
2 16
(
min t sp , t sc ) otherwise
( )
Result in Tpmax , t sa = "t.avl (0.44 in) > t.req(0.37 in)-----------> O.K"
Rvc kip
Shear per inch on weld FL := FL = 0.750
2Lw in
5 FL
Size of fillet weld s := max t sp , 16 s = 3.75 in
8 0.707 0.6 f c F EXX ( )
Adopt 1/4 inch FW
FL
6.19
0.707 ( 0.6 f c) FEXX
Min shear plate thickness t min := 16 ksi t min = 0.086 in
Fup
( )
Result in t sp , t min = "t.avl (0.37 in) > t.req(0.09 in)-----------> O.K"
2
Gross shear area Ags := Lw t sp Ags = 3.75 in
Shear capacity (
Fscap := 0.6 f g Ags Fyp ) Fscap = 54 kip
( )
Result kip Fscap , Rvc = "Capacity (54 kip) > Load(15 kip)-----------> O.K"
M1
Couple force about weld C.G Cfs := C fs = 7.932 kip
db1 - Lwd
Rvc kip
Shear per inch on weld FL := FL = 0.600
2Lw1 in
Cfs kip
Tension force per inch on weld FT := FT = 4.961
Lwd in
2 2 kip
Resultant stress per inch on weld Rs := FT + FL R s = 4.997
in
FT
Resultant angle θs := atan θs = 83.103 deg
FL
1 Rs
Size of fillet weld s := max in , 16 s = 4.00 in
( )
4 0.707 0.6 f 1 + 0.5 sin θ 1.5 F
c s (
EXX ( ) )
Adopt 1/4 inch FW
Rs
3.09
t min := (
0.707 ( 0.6 f c) 1 + 0.5 sin ( θs)
1.5
)
FEXX 16 ksi t
Min closure plate
Fup
min = 0.192 in
thickness
( )
Result in t c , t min = "t.avl (0.5 in) > t.req(0.19 in)-----------> O.K"
Rs
6.19
t min := (
0.707 ( 0.6 f c) 1 + 0.5 sin ( θs)
1.5
)
FEXX
Min splice plate
Fup
16 ksi t min = 0.385 in
thickness
( )
Result in t sc , t min = "t.avl (0.5 in) > t.req(0.38 in)-----------> O.K"
2
Gross shear area Ags := Lw1 t sc Ags = 6.25 in
Shear capacity ( )
Fcapsc := 0.6 f g Ags Fyp Fcapsc = 90 kip
( )
Result kip Fcapsc , R vc = "Capacity (90 kip) > Load(15 kip)-----------> O.K"
( )
Result kip Acapsc , C fs = "Capacity (17.23 kip) > Load(7.93 kip)-----------> O.K"
Check for weld b/w closure plate and HSS beam wall :-(Longitudinal side)
Length of weld Lw2 := db1 - 2 2.25 t fb1 Lw2 = 10.312 in
Rvc kip
Shear per inch on weld FL := FL = 0.727
2Lw2 in
1 FL
Size of fillet weld s := max in , 16 s = 4.00 in
(
4 0.707 0.6 f c FEXX )
Adopt 1/4 inch FW
FL
3.09
Min HSS wall 0.707 ( 0.6 f c) FEXX
t min := 16 ksi
thickness Fub1 t min = 0.042 in
( )
Result in t fb1des , t min = "t.avl (0.35 in) > t.req(0.04 in)-----------> O.K"
FL
3.09
0.707 ( 0.6 f c) FEXX
Min plate thickness t min := 16 ksi t min = 0.042 in
Fup
( )
Result in t c , t min = "t.avl (0.5 in) > t.req(0.04 in)-----------> O.K"
2
Gross shear area Ags := Lw2 t c Ags = 5.156 in
Shear capacity ( )
Fscaptc := 2 0.6 f g Ags Fyp Fscaptc = 148.5 kip
( )
Result kip Fscaptc , R vc = "Capacity (148.5 kip) > Load(15 kip)-----------> O.K"
Check for weld b/w closure plate and HSS beam top wall :-(Transverse side)
Length of weld (
Lw3 := min t sc + 5t c , bfb1 - 2 2.25 t fb1 ) Lw3 = 3 in
Moment induced (
Mvc := Rvc ecl + 2ehb1 + 0.5in + t c ) Mvc = 7.5 kip ft
Mvc
Couple force due to moment Cf := C f = 7.74 kip
db1 - t fb1
Cf kip
Tension per inch on FT := FT = 2.581
weld Lw3 in
1 FT
Size of fillet weld s := max in , 16 s = 4.00 in
( )
4 0.707 0.6 f c 1.5FEXX
Adopt 1/4 inch FW
FT
3.09
0.707 ( 0.6 f c) 1.5FEXX
t min :=
Min HSS wall
Fub1 16 ksi t min = 0.099 in
thickness
( )
Result in t fb1des , t min = "t.avl (0.35 in) > t.req(0.1 in)-----------> O.K"
FT
3.09
0.707 ( 0.6 f c) 1.5FEXX
Min closure plate thickness t min := 16 ksi t min = 0.099 in
Fup
( )
Result in t c , t min = "t.avl (0.5 in) > t.req(0.1 in)-----------> O.K"
Check for weld b/w closure plate and HSS beam bottom wall :-(Transverse side)
Cf kip
Tension per inch on FT := FT = 2.581
weld Lw3 in
FT
Size of weld s := s = 0.12 in
(
min f a Fyp , f c Fup )
Adopt CJP weld
( )
Result kip Acapb1 , C f = "Capacity (28.84 kip) > Load(7.74 kip)-----------> O.K"
1.5
2 6N t fb1des Es Fyb1 t c
Crippling strength Acri := 1.6 ( f c) t fb1des 1 + A = 158.27 kip
b t fb1des cri
fb1 t c
( )
Result kip Acri , 2 Cf = "Capacity (158.27 kip) > Load(15.48 kip)-----------> O.K"
( )
Result kip Ayie , 2 Cf = "Capacity (64.22 kip) > Load(15.48 kip)-----------> O.K"
kLw
k := k = 0.3889
Lw
2
kLw
xLw := xLw = 0.766 in
2kLw + Lw
Lai := 5in
aLw
a := a = 0.4705
Lw
C1 := 1 (E70xx electrode)
Size of fillet weld required per 16th of inch D := 4
kip
Rn := f c C weld C1 Lw D R n = 45.8 kip
in
C3 otherwise
( )
Result kip Fstr , R vc = "Capacity (45.85 kip) > Load(15 kip)-----------> O.K"
Factors for shear friction (Sec 11.7) f ci := 0.85 f u := 0.9 f cia := 0.65
No of stud:- n1 := 4
A := D stud
π 2 2
Area of stud A = 0.442 in
4
A Av
Result in , = "t.avl (0.44 in) > t.req(0.15 in)-----------> O.K"
1in in
Ahs := Dhstud
π 2 2
Area of stud head Ahs = 1.767 in
4
Area of the anchor head (Ah) (including the Ahs
area of the tensile stress component) is at F := F=4
least 2.5 times the area of the tensile stress A
component
( )
Result in Tstud , Th1 = "t.avl (0.6 in) > t.req(0.37 in)-----------> O.K"
Bearing area of head is approximately evenly distributed around the perimeter of the tensile stress component.
Determine required embedment length for the stud to prevent concrete cone failure
(B4.5.2,B.5.1.1)
The design pullout strength of the concrete, Pd, must exceed the minimum specified tensile
strength (Asfut) of the tensile stress component
D
2
D
2
Computation of Ld π LD + hstud - hstud Pd
2 2
Ftcap
(
LD LD + 1.5 )
Pd π 0.001
On solving equation ( )
LD LD + 1.5 51.311
LD 6.47
Provide embedment length 8 in
Check Embed plate thickness:
Select plate thickness such that ds /t < 2.7 , “Shear Strength of Thin Flange Composite Sections,” G. G. Goble, AISC
Engineering Journal,April, 1968.
D stud
t := t = 0.278 in
2.7
( )
Result in t ep , t = "t.avl (0.5 in) > t.req(0.28 in)-----------> O.K"