Irr of PD 1096
Irr of PD 1096
IRR OF PD 1096
- For excavations more than 50 cu. site for the whole duration of
Meters and 2.00 + meters in construction
depth, the owner shall post a
cash bond of 50,000 for the first Section 305: Validity of Building Permits
50 cu. Meters and P300 for every - If the issuance of a permit is
excess until the BP is issued defective, the BO is allowed from
- In relation with the rule above, requiring the owner to effect the
the excavation shall not exceed necessarycorrections or from
100 cu.meters or 3 meters in stopping building operations
depth and shall not be left open - A permit shall expire if the
without work being done for building has not commenced
more than 120 days, otherwise within a period of 1 year after the
the cash bond shall be forfeited issuance of the permit or has
been suspended for 120 days
Terms and Conditions of Permits
- The architect who drew the plans Section 306: Non-issuance, Suspension
for the building is liable for or Revocation of Building Permits
damages for 15 years - Errors in plans and specifications
- The engineer/architect - Incorrect or inaccurate data
supervising the construction supplied
shall be solidarily liable with the - Non-compliance with any rules
contractor or regulations
- Should be accompanied by other
permits and plans, signed and Section 309: Certificate of Occupancy
sealed - Shall be submitted to the OBO
- The proposed project is in (together with Certificate of
conformity of the NBC completion, construction
• Survey would be done by a logbook, plans and specs with
Geodetic Engineer the Building Inspection Sheet)
• The person commencing the - Final inspection for the issuance
excavation will inform the of a Fire Safety
person of the adjoining - Inspection Certificate within 5
property not less than 10 days working days
before excavation - The OBO conducts the final
• Supervising inspection based on the
Architect/Engineer shall keep Certificate of Completion
a logbook of daily - Prior to the issuance of the
construction activities Certificate of Occupancy, the
• Upon completion of the OBO shall prepare the
logbook, it shall be submit to corresponding fees and order of
the Building Official payment
- No structure shall be used - A partial CO may be issued for
without a Certificate of the use of portions of the
Occupancy building as long as it doesn’t pose
- Work shall be done by a licensed any hazards to its occupants and
and registered contractor others
- Owner shall submit a Notice of
Construction to the OBO prior to
any construction activity
- Owner shall put a Building
Permit sign on the construction
PROFESSIONAL PRACTICE
IRR OF PD 1096
RULE 4:
TYPES OF CONSTRUCTION
Section 401: Types of Construction
❖ Type I – Wood construction
❖ Type II – Wood construction with
protective, fire-resistant
materials and 1 hour fire-resistive
throughout
❖ Type III – Masonry and wood
construction with 1-hr fire
resistance
❖ Type IV – Steel, iron, concrete or
masonry construction with 1
hour- resistive throughout
❖ Type V – Steel, iron, concrete or
masonry with 4-hr resistive
throughout