slides_class2-Process Analysis
slides_class2-Process Analysis
Class 2
Fundamentals of Process Analysis
Ali SHANTIA
1
Class Participation Guidelines
Let’s Get to Know Each Other
• Use Your Name Card
• Place your name card in front of you during each class
Punctuality matters
• Be on Time
• Arriving on time shows respect for everyone’s time and helps
us all get the most out of every session. Let’s make it a habit!
2
Part 1
Process view – Process types – Strategic fit
• What is a “process”?
A Construction Project
A Refinery Continues Flow
Taxonomy of
process types
• Different types of process
Single-Piece vs
Batch Production
Flow
• Illustrative Example
• Scan the QR code or go to
bit.ly/hbsp2pIlZPE
Taxonomy of
process types
• Different types of process
Taxonomy of process types
• Job Shop vs. Continuous Process
Machine
Product Equipment Labor Fixed Variable
Setup
Volume Specialization Skills Cost Cost
Frequency
Continuous
flow shop High High Low Low High Low
13
The Product Process Matrix: Matching Product Positioning and Process Choice
FI
T
RE
GI
ON
typically
Shouldice
rigid infeasible
(cash cow)
14
Process Choice: Matching products and processes
Low High Very high
Product volume; volume; volume;
One of a Very low
kind Many Standard Commodity
Process volume
products products products
Lost sales
Project
Opportunity costs
Job shop
Job shop
Batch
Assembly
Flow shop
line
15
Process choice
• Should a production process change as a product matures?
Annual Sales
•Stable volumes Product
•Stable product design
•Stable process technology Lifecycle
•No first-mover advantage
•Low volumes
•Rapid changes in product design
•Process technology evolution
•Speed to the market is critical •Decreasing volumes
•No new model variations
•Service parts/Repairs dominate
17
Part 2
Process Analysis
Process Analysis: 3 steps
2) Bottleneck analysis
• Determine the capacity of each stage/resource
• Determine the bottleneck stage/resource
• Determine the capacity of the process
3) Improvement decisions
• Recommend on how to improve the system
19
Process Analysis Step 1: The Process Flow Diagram
• How do we represent the major elements of a process?
Activity/Task
Material Flow
Inventory Buffer
Information Flow
Decision Point
Process Analysis Step 1: The Process Flow Diagram
• Single Stage:
Single Station
Parallel Stations Parallel Stations
Separate Lines Single Line
Process Analysis Step 1: The Process Flow Diagram
• Multiple Stages:
Serial Process
Mixed Process
Process Analysis: 3 steps
2) Bottleneck analysis
• Determine the capacity of each stage/resource
• Determine the bottleneck stage/resource
• Determine the capacity of the process
3) Improvement decisions
• Recommend on how to improve the system
24
Example: Shopping in
• Process
1. The customer lists items to purchase
2. The customer pays at the cashier’
3. Items are retrieved from Darty’s warehouse
4. Customer receives items
25
Example: Shopping in
1. The Process Flow Diagram:
• Determine the inputs and outputs:
Customer Completed
Order Order
Input Output
26
Example: Shopping in
1. The Process Flow Diagram:
• Determine the tasks and their sequence:
Customer Completed
Order Order
Input Output
Payment Retrieval Reception
27
Example: Shopping in
1. The Process Flow Diagram:
• Determine which resources are used for each task:
Customer Completed
Cashier Mover Receptionist
Order Order
Input Output
Payment Retrieval Reception
28
Example: Shopping in
1. The Process Flow Diagram:
• Determine where inventory is kept in the process:
Customer Completed
Cashier Mover Receptionist
Order Order
Input Output
Payment Retrieval Reception
29
Process Analysis: 3 steps
2) Bottleneck analysis
• Determine the capacity of each stage/resource
• Determine the bottleneck stage/resource
• Determine the capacity of the process
3) Improvement decisions
• Recommend on how to improve the system
30
Definitions
• Flow (or Throughput) Time: The length of time a unit spends at a given
stage/process
• Cycle Time: The average time between the completion of successive
units
• Flow (or Throughput) Rate: The rate at which units flow through the
stage/process
• Capacity: The maximum rate at which units flow through the
stage/process
• Inverse of cycle time (if the process works at capacity)
To-do
=
Can do
31
Example: Shopping in
2. Bottleneck Analysis:
• Determine the capacity of each stage/resource
• First determine the cycle time and then convert it to the capacity
for each stage:
10 min/ord
Customer Completed
Order Order
4 min/ord 0.5 min/ord
10 min/ord
10 min/ord
Customer Completed
Order Order
4 min/ord 0.5 min/ord
10 min/ord
• Retrieval: It takes 10 mins per order per mover; there are 2 movers
• Cycle Time = 5 min; Flow Time = 10 min Flow time does not
depend on the number
• Capacity = 2/10 orders/min = 1/5 order/min = 12 orders/hr of parallel resources
33
Example: Shopping in
2. Bottleneck Analysis:
• Determine the capacity of each stage/resource
• First determine the cycle time and then convert to the capacity for
each stage:
10 min/ord
Customer Completed
Order Order
4 min/ord 0.5 min/ord
10 min/ord
• Reception: It takes 0.5 mins per order per recept.; there is 1 recept.
• Cycle Time = 0.5 min; Flow Time = 0.5 min
• Capacity = 1/0.5 orders/min = 2 orders/min = 120 orders/hr
34
Example: Shopping in
2. Bottleneck Analysis:
• Determine the bottleneck of the process
10 min/ord
Customer Completed
Order Order
4 min/ord 0.5 min/ord
10 min/ord
• Illustrative Example
• Scan the QR code or go to
https://qrco.de/bfMSIJ
Example: Shopping in
2. Bottleneck Analysis
• Why is the bottleneck so important?
• “An hour lost on a bottleneck is an hour lost for the entire plant”
• “An hour lost on a non-bottleneck is a mirage”
• “Manage the plant by the bottlenecks”
37
Process Analysis: 3 steps
2) Bottleneck analysis
• Determine the capacity of each stage/resource
• Determine the bottleneck stage/resource
• Determine the capacity of the process
3) Improvement decisions
• Recommend on how to improve the system
38
Process Analysis Step 3: Improvement Decisions
Identify the
system’s
bottlenecks
Subordinate
everything else to
the bottlenecks
Goal: Utilize Bottleneck @ 100%
Example: Shopping in
3. Improvement Decisions: Managing by the bottleneck
• Implications:
• Always keep bottleneck running
• Add capacity only at the bottleneck:
• At Darty:
• Add more movers
• Simplify the pick-up process so that each mover can complete an order faster
41
Supply- and Demand- Constrained Processes
Bottleneck
Demand
Input
Flow Rate
Supply-Constrained Demand-Constrained
Why is it important to actively manage the bottleneck?
• Increases productivity: Can serve more customers within the
same amount of time
• Example: Nintendo Wii
“Nearly two years after the Wii’s launch, US consumers still can’t walk into a retailer such
as Best Buy or Wal-Mart and pick one up off the shelf. Online retailers haven’t done
much better, though secondary market sites like eBay have Wii consoles in stock - for a
price jacked up from the $249.99 retail cost of the console”
Source: Thomas Wailgum, CIO, August 22 2008
• Speculative Explanations:
“Perhaps, packaging problems with the console could be one source of delay”
“It is not a simple or cheap process to create a new set of molds in order to increase the
number of shells produced, and the plant may not have the capacity to generate more
shells even if it received additional molds”
Source: Thomas Wailgum, CIO, August 22 2008
43
Let’s verify what we learned
Resources
Labor Machines
45
Process Improvement:
• Reduce process flow time:
• Be more responsive, i.e., produce/serve a unit within a shorter period
of time
60
A few interesting facts about
• Zara was described by Louis Vuitton fashion director Daniel Piette
as “possibly the most innovative and devastating retailer in the
world”.
• The company can design a new product and have finished goods
in its stores in four to five weeks; it can modify existing items in
as little as two weeks, compared to a six-month industry average.
61
Recap
• Flow time and cycle time are not necessarily the same:
• Flow time refers to a unit
• Cycle time refers to a task/stage in the process or the entire process
itself
62
Next Class
65