7 Kambi

The document is an abstract estimate for the side protection of the 7 kambi-Churuli thodu in Ward 10 of Kanjikuzhy Panchayath, detailing the general civil work required. The total estimated cost for the project is Rs 1,500,000, which includes various construction activities and an 18% GST provision. The estimate is approved by Executive Engineer Levis Babu Cottur.

Uploaded by

Devanand R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views2 pages

7 Kambi

The document is an abstract estimate for the side protection of the 7 kambi-Churuli thodu in Ward 10 of Kanjikuzhy Panchayath, detailing the general civil work required. The total estimated cost for the project is Rs 1,500,000, which includes various construction activities and an 18% GST provision. The estimate is approved by Executive Engineer Levis Babu Cottur.

Uploaded by

Devanand R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

EST No.

:IRR/IA/EST/8027/2022_5_1_1 (Edit Id : 8)
(Dsor year : 2018,Cost Index (Place : Idukki,Value : 141.53),GST : 18%

ABSTRACT ESTIMATE
GENERAL-Side protection of 7 kambi- Churuli thodu in Ward 10 of Kanjikuzhy Panchayath-
Side protection of 7 kambi- Churuli thodu in Ward 10 of Kanjikuzhy Panchayath-General Civil
Work

Sl No Specification Quantity Rate Amount


1 DAR civil
1.001 2.6.1
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means
over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)
including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed
earth to be levelled and neatly dressed.All kinds of soil
Net Total 266.220cum @223.41/cum 59476.21
1.002 60.7.1
DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site
Net Total 315.495cum @3644.43/cum 1149799.44
1.003 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns
Net Total 25.650sqm @350.00/sqm 8977.50
1.004 4.1.5
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3
coarse sand : 6 graded stone aggregate 20 mm nominal size)
Net Total 6.413cum @7690.32/cum 49318.02
Heading Total(Rs) 1267571.17
Total Estimation PAC 1267571.17
3 Extra Charges
Provision for GST
2.001
1267571.17 18.00% 228162.81
Grand Total 1495733.98
Round off 4266.02
Rounded Total(Rs) 1500000.00
Rupees Fifteen Lakh

Approved By

Printed On 2025-01-24 15:27:51.051 1


EST No. :IRR/IA/EST/8027/2022_5_1_1 (Edit Id : 8)
(Dsor year : 2018,Cost Index (Place : Idukki,Value : 141.53),GST : 18%

Levis Babu Cottur


( PEN: 672996), Executive Engineer

Printed On 2025-01-24 15:27:51.051 2