The document is a CAT Scan Certificate detailing the scanning of an excavation site on February 14, 2025, using a SONA SCAN device. It confirms that no live services were found and outlines safety procedures, including the requirement for edge protection and operator training. The certificate is signed by Eshwar Murkal, who declares compliance with EGA procedures and the communication of safety precautions prior to work commencement.

Uploaded by

Eshwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views2 pages

CAT San Report

The document is a CAT Scan Certificate detailing the scanning of an excavation site on February 14, 2025, using a SONA SCAN device. It confirms that no live services were found and outlines safety procedures, including the requirement for edge protection and operator training. The certificate is signed by Eshwar Murkal, who declares compliance with EGA procedures and the communication of safety precautions prior to work commencement.

Uploaded by

Eshwar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

EGA SAFETY PROCEDURES EGA.SAF.GEN.04.06.04.

F04

No. ABC -AT- 01-001

CAT SCAN CERTIFICATE - EGA.SAF.GEN.04.06.04.F04


Details:
Scanning Date: 14-02-2025 Time: 07:00 hrs.

Valid till Date: 20-02-2025 Time: 18:00 hrs.

CAT Scan Device used: SONA SCAN Other Specify: METAL DETECTOR

CAT Scan Device No: CAT4-10/C4EN31-24060 Last Calibration Date 28-01-2025

Type of Work Project Maintenance Other Specify:


Location: AT Laydown Area
Excavation and Backfilling for installation Access Gate concrete
Scope of Work:
foundation
Is an NOC required from third party? Specify: N/A
“As Built” Drawings checked? Drawing No: N/A
MSRA prepared, identifying methodology of excavation / breaking / drilling- YES
Location scanned by Cable Detection Device - YES
Are operatives conversant with safe digging / breaking / drilling practices - YES
Are edge protection barriers readily available for erecting as the excavation progresses - YES
Route of cable, pipe and service corridor marked to guide operators - YES
Is Access and Egress available as the excavation progresses -YES

Identified Buried / Concealed:

High Voltage Live Cable Low Voltage Cable Redundant Cables Communication Wires/Cables

Gas Pipe Line Distillate Fuel Pipe Line Steam Pipe Line Water Pipe Line

Civil Construction Earth Works Other Specify:

Buried/Concealed Service Details:


No Live Services Found At Site

Other requirements, conditions and precautions:

Issue of CAT Scan Certificate


I hereby declare that the CAT Scan was carried out by me and it complies with EGA Procedure. All other requirements,
conditions and precautions were communicated prior to receipt of CAT Scan Certificate.
I have received relevant training and I am certified to use the CAT Scan device.

Name: Eshwar Murkal

EGA Badge No.: T030509 Time: 0 8 0 0 Date: 1 4 2 5 Signature :

EGA Representative

File: EGASAFGEN040604F04.xls Revision: 1 (25-Jan-2021) Page 2 of 2


EGA SAFETY PROCEDURES EGA.SAF.GEN.04.06.04.F04

I hereby declare that I have witnessed scanning of the excavation or earthworks area using CAT Scan device mentioned in
the CAT Scan Certificate.

Name:

Emp. No.: Time: : Date: Signature :

Receipt of CAT Scan Certificate

I hereby declare that the CAT Scan Certificate requirements, conditions and precautions were communicated to me and all
control measures shall be in place before commencing the work. Toolbox Talk will be conducted by me on a daily basis
before starting the work.

Name: Eshwar Murkal

EGA Badge .No.: T030509 Time 0 8 0 0 Date 1 4 2 5 Signature :

File: EGASAFGEN040604F04.xls Revision: 1 (25-Jan-2021) Page 2 of 2