TP WTP 095
TP WTP 095
P&ID
Test Method : HYDRO 1 RIAU-WV01-M10-PI-0
Prepare Date : 22-Nov-20 2 RIAU-WV01-M10-PI-0
TP No. : TP-WTP-095 3 RIAU-WV01-M10-PI-0
System : WATER TREATMENT SYSTEM 4
Test Pressure : 4.5 5
Test Medium : WATER 6
Test Duration : 15 min 7
DESIGN PRESSURE : 3 8
DESIGN TEMPERATUR : 50 9
Test Pressure : 4.5 10
Area : WATER TREATMENT AREA 11
Pressure Gauge 1 : 12
Range : 100 bar(g) 13
Calibrated : 14
15
Pressure Gauge 2 : 16
Range : 17
Calibrated : 18
PID No. : RIAU-WV01-M10-PI-001 19
Drawing No. : RIAU-WV01-P10-PA-0002 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
P&ID Dwg Number Iso No.
RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6
RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7
RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7
Sheet No. Rev. No. NDE REQ Remark
2 OF 2 0 N/A
1 OF 2 0 N/A
2 OF 2 0 N/A
MATERIAL Insulation Weld WELD NDE
No.
Sub.
System Dwg. No. Line. No. Service DN Sheet Rev. No. BASE SCH. AG or UG
Site Painting Joint Spool
DN
Con. (P/F/N/W) No No.
Location Method
PMC Class SIDE A Heat No. Sch. SIDE B Heat No. Type Thickness Type Actual Date Welder 1 Welder 2 Report No.
(S/F) (RT/U/PT/VT)
Percent (%)
1 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV NPT.FLG CL150 PIPE S-80 AG 1 TH F 2.00 - - 0% 0%
2 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV PIPE S-80 EL.90 S-80 AG 2 TH F 2.00 - - 0% 0%
3 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV EL.90 CL3000 PIPE S-80 AG 3 TH F 2.00 - - 0% 0%
4 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV PIPE S-80 NPT.FLG S-80 AG 4 TH F 2.00 - - 0% 0%
5 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV NPT.FLG CL150 PIPE S-80 AG 5 TH F 2.00 - - 0% 0%
6 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV PIPE S-80 CON.RED S-80 AG 6 TH F 2.00 - - 0% 0%
7 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV CON.RED CL3000 PIPE S-80 AG 7 TH F 1.00 - - 0% 0%
8 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV PIPE S-80 BALL.VLV S-80 AG 8 TH F 1.00 - - 0% 0%
9 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV BALL.VLV CL800 PIPE S-80 AG 9 TH F 1.00 - - 0% 0%
10 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV PIPE S-80 EL.90 S-80 AG 10 TH F 1.00 - - 0% 0%
11 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV EL.90 CL3000 PIPE S-80 AG 11 TH F 1.00 - - 0% 0%
12 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV PIPE S-80 NPT.FLG S-80 AG 12 TH F 1.00 - - 0% 0%
13 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV PIPE S-80 COUPLING S-80 AG 13 TH F 1.00 - -
14 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV COUPLING S-80 PIPE S-80 AG 14 TH F 1.00 - -
15 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 4.00 1 OF 2 0 HB7 CS S-80 AG 1 SW F 4.00 - - 0% 0%
16 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 4.00 1 OF 2 0 HB7 CS S-80 AG 2 BW F 4.00 - - 0% 0%
17 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 3 BW F 1.50 - - 0% 0%
18 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 4 SW F 1.50 - - 0% 0%
19 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 5 SW F 1.50 - - 0% 0%
20 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 6 SW F 1.50 - - 0% 0%
21 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 7 SW F 1.50 - - 0% 0%
22 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 8 SW F 1.50 - - 0% 0%
23 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 2 OF 2 0 HB7 CS S-80 AG 1 SW F 1.50 - - 0% 0%
24 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 2 OF 2 0 HB7 CS S-80 AG 2 SW F 1.50 - - 0% 0%
25 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 2 OF 2 0 HB7 CS S-80 AG 3 SW F 1.50 - - 0% 0%
26 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 2 OF 2 0 HB7 CS S-80 AG 4 BW F 1.50 - - 0% 0%
27 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 5 BW F 1.00 - - 0% 0%
28 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 6 SW F 1.00 - - 0% 0%
29 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 7 SW F 1.00 - - 0% 0%
30 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 8 SW F 1.00 - - 0% 0%
31 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 9 SW F 1.00 - - 0% 0%
32 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 10 SW F 1.00 - - 0% 0%
33 ITI - - 0% 0%
34 ITI - - 0% 0%
35 ITI - - 0% 0%
36 ITI - - 0% 0%
37 ITI - - 0% 0%
38 ITI - - 0% 0%
39 ITI - - 0% 0%
40 ITI - - 0% 0%
41 ITI - - 0% 0%
42 ITI - - 0% 0%
43 ITI - - 0% 0%
44 ITI - - 0% 0%
45 ITI - - 0% 0%
46 ITI - - 0% 0%
47 ITI - - 0% 0%
48 ITI - - 0% 0%
49 ITI - 0% 0%
50 ITI - 0% 0%
51 ITI - 0% 0%
52 ITI 0% 0%
53 ITI 0% 0%
54 ITI 0% 0%
55 ITI 0% 0%
56 ITI 0% 0%
57 ITI 0% 0%
58 ITI 0% 0%
59 ITI 0% 0%
60 ITI
61 ITI
62 ITI
63 ITI
64 ITI
65 ITI
66 ITI
67 ITI
68 ITI
69
70 ITI
71 ITI
72
73
74
75
76
77
78
79
RT_0 RT_1 RT_1 PWHT Hardness Test (If Required) Pressure Test Holiday Test PMI (If Required)
-
PMI (If Required)
REMARK
TEST PACKAGE
TYPE OF TEST :
HYDROSTATIC TEST
PNEUMATIC TEST
SERVICE TEST
TEST PACKAGE
TABLE OF CONTENTS
1. Cover
2. Table of Contents
6. Marked Up P & ID
8. Isometric Drawing
TEST PACKAGE
TEST PACKAGE
TEST PACKAGE
TEST PACKAGE
6. MARKED UP P&ID
RIAU GFPP 275MW IPP PROJECT
TEST PACKAGE
TEST PACKAGE
8. ISOMETRIC DRAWING
RIAU GFPP 275MW IPP PROJECT
TEST PACKAGE
TEST PACKAGE
TEST PACKAGE
TEST PACKAGE
TEST PACKAGE
75%
Design Pressure
25%
0%
5 minutes 5 minutes 15 minutes 5 minutes
Signature
Date
RIAU GFPP 275MW IPP PROJECT
PUNCH LIST REPORT
Area : WATER TREATMENT AREA Date :
Category Legend
"A" To complete before test
"B" To complete before Commissioning
"C" To complete before Turn over
Prepared By PT. ITI Reviewed by Lotte Construction Inspected by Lotte QC Witnessed by MRPR
RIAU GFPP 275MW IPP PROJECT
Line Check List
Area / Location : WATER TREATMENT AREA P&ID No. : RIAU-WV01-M10-PI-001
Check that all NDT / Stress relieving requirements as per specification have been met and
2.
recorded and all welded attachments installed
3. Check that cerrectly bolts and gaskets are installed at all mechanical joints
12. Check all relief valves, bursting discs and specified control valves have been removed
13. Check that gags on spring supports and expansion joints are in position
Check that all chainwheels and extended spindles and locking devices required for specified
14.
valves have been installed
15. Check that there is no spring in pipe work affecting pumps or vessels
Check that all sprinkler heads, rosettes and nozzles have been removed and connections
16.
plugged
NOTE :
Prepared by PT. ITI Reviewed by Lotte Construction Inspected by Lotte QC Witnessed by MRPR
RIAU GFPP 275MW IPP PROJECT
TEST PACKAGE
No. P&ID Drawing No. Iso No. Sheet No. Rev. No. Remark
10
11
12
13
14
15
16
17
18
19
20
Name
Signature
Date
RIAU GFPP 275MW IPP PROJECT
WELDING HISTORY SHEET
Test Package No.: TP-WTP-095
Welder RT Status
Sheet Rev. Joint Thk Weld Shop/ RT AFTER NDE
No. Dwg. No. ISO No. Matl Size RT PWHT MT / PT PT AFTER PWHT UT Remark
No. No. No. (sch) Type Field PWHT %
01 02 R0 R1 R2
Welder RT Status
Sheet Rev. Joint Thk Weld Shop/ RT AFTER NDE
No. Dwg. No. ISO No. No. No. No. Matl (sch) Type Field Size RT PWHT % PWHT MT / PT PT AFTER PWHT UT Remark
01 02 R0 R1 R2
TEST PACKAGE
No. ISO No. Sheet No NDE REQ (%) TOTAL BW RT DONE TOTAL SW PT DONE TOTAL TH Remark
1 10GHD11-BR001-DN50-HB6 2 OF 2 N/A 0 0 0 0 14
2 10GDS22-BR001-DN25-HB7 1 OF 2 N/A 2 0 6 0 0
3 10GDS22-BR001-DN25-HB7 2 OF 2 N/A 2 0 8 0 0
10
11
12
13
14
15
16
17
18
19
20
Name
Signature
Date