The document outlines a hydro test procedure for a water treatment system managed by PT. Indo Tehnik Industri, detailing specifications such as test pressure, medium, duration, and design parameters. It includes a list of materials and components involved in the service water header and thickened sludge transfer pump, along with their respective drawings and specifications. The document serves as a technical reference for the testing and inspection of the water treatment system.

Uploaded by

Alfin Ardiansyah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views30 pages

TP WTP 095

The document outlines a hydro test procedure for a water treatment system managed by PT. Indo Tehnik Industri, detailing specifications such as test pressure, medium, duration, and design parameters. It includes a list of materials and components involved in the service water header and thickened sludge transfer pump, along with their respective drawings and specifications. The document serves as a technical reference for the testing and inspection of the water treatment system.

Uploaded by

Alfin Ardiansyah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 30

Sub Contractor : PT. Indo Tehnik Industri No.

P&ID
Test Method : HYDRO 1 RIAU-WV01-M10-PI-0
Prepare Date : 22-Nov-20 2 RIAU-WV01-M10-PI-0
TP No. : TP-WTP-095 3 RIAU-WV01-M10-PI-0
System : WATER TREATMENT SYSTEM 4
Test Pressure : 4.5 5
Test Medium : WATER 6
Test Duration : 15 min 7
DESIGN PRESSURE : 3 8
DESIGN TEMPERATUR : 50 9
Test Pressure : 4.5 10
Area : WATER TREATMENT AREA 11
Pressure Gauge 1 : 12
Range : 100 bar(g) 13
Calibrated : 14
15
Pressure Gauge 2 : 16
Range : 17
Calibrated : 18
PID No. : RIAU-WV01-M10-PI-001 19
Drawing No. : RIAU-WV01-P10-PA-0002 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
P&ID Dwg Number Iso No.
RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6
RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7
RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7
Sheet No. Rev. No. NDE REQ Remark
2 OF 2 0 N/A
1 OF 2 0 N/A
2 OF 2 0 N/A
MATERIAL Insulation Weld WELD NDE

No.
Sub.
System Dwg. No. Line. No. Service DN Sheet Rev. No. BASE SCH. AG or UG
Site Painting Joint Spool
DN
Con. (P/F/N/W) No No.
Location Method
PMC Class SIDE A Heat No. Sch. SIDE B Heat No. Type Thickness Type Actual Date Welder 1 Welder 2 Report No.
(S/F) (RT/U/PT/VT)
Percent (%)

1 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV NPT.FLG CL150 PIPE S-80 AG 1 TH F 2.00 - - 0% 0%

2 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV PIPE S-80 EL.90 S-80 AG 2 TH F 2.00 - - 0% 0%

3 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV EL.90 CL3000 PIPE S-80 AG 3 TH F 2.00 - - 0% 0%

4 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV PIPE S-80 NPT.FLG S-80 AG 4 TH F 2.00 - - 0% 0%

5 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV NPT.FLG CL150 PIPE S-80 AG 5 TH F 2.00 - - 0% 0%

6 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 2.00 2 OF 2 1 HB6 GALV PIPE S-80 CON.RED S-80 AG 6 TH F 2.00 - - 0% 0%

7 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV CON.RED CL3000 PIPE S-80 AG 7 TH F 1.00 - - 0% 0%

8 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV PIPE S-80 BALL.VLV S-80 AG 8 TH F 1.00 - - 0% 0%

9 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV BALL.VLV CL800 PIPE S-80 AG 9 TH F 1.00 - - 0% 0%

10 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV PIPE S-80 EL.90 S-80 AG 10 TH F 1.00 - - 0% 0%

11 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV EL.90 CL3000 PIPE S-80 AG 11 TH F 1.00 - - 0% 0%

12 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV PIPE S-80 NPT.FLG S-80 AG 12 TH F 1.00 - - 0% 0%

13 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV PIPE S-80 COUPLING S-80 AG 13 TH F 1.00 - -

14 ITI SERVICE WATER HEADER RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 GHD 1.00 2 OF 2 1 HB6 GALV COUPLING S-80 PIPE S-80 AG 14 TH F 1.00 - -

15 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 4.00 1 OF 2 0 HB7 CS S-80 AG 1 SW F 4.00 - - 0% 0%

16 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 4.00 1 OF 2 0 HB7 CS S-80 AG 2 BW F 4.00 - - 0% 0%

17 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 3 BW F 1.50 - - 0% 0%

18 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 4 SW F 1.50 - - 0% 0%

19 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 5 SW F 1.50 - - 0% 0%

20 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 6 SW F 1.50 - - 0% 0%

21 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 7 SW F 1.50 - - 0% 0%

22 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 1 OF 2 0 HB7 CS S-80 AG 8 SW F 1.50 - - 0% 0%

23 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 2 OF 2 0 HB7 CS S-80 AG 1 SW F 1.50 - - 0% 0%

24 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 2 OF 2 0 HB7 CS S-80 AG 2 SW F 1.50 - - 0% 0%

25 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 2 OF 2 0 HB7 CS S-80 AG 3 SW F 1.50 - - 0% 0%

26 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.50 2 OF 2 0 HB7 CS S-80 AG 4 BW F 1.50 - - 0% 0%

27 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 5 BW F 1.00 - - 0% 0%

28 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 6 SW F 1.00 - - 0% 0%

29 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 7 SW F 1.00 - - 0% 0%

30 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 8 SW F 1.00 - - 0% 0%

31 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 9 SW F 1.00 - - 0% 0%

32 ITI THICKENED SLUDGE TRANSFER PUMP-B SUCTION RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 GDS 1.00 2 OF 2 0 HB7 CS S-80 AG 10 SW F 1.00 - - 0% 0%

33 ITI - - 0% 0%

34 ITI - - 0% 0%

35 ITI - - 0% 0%

36 ITI - - 0% 0%

37 ITI - - 0% 0%

38 ITI - - 0% 0%

39 ITI - - 0% 0%

40 ITI - - 0% 0%

41 ITI - - 0% 0%

42 ITI - - 0% 0%

43 ITI - - 0% 0%

44 ITI - - 0% 0%

45 ITI - - 0% 0%

46 ITI - - 0% 0%

47 ITI - - 0% 0%

48 ITI - - 0% 0%

49 ITI - 0% 0%

50 ITI - 0% 0%
51 ITI - 0% 0%

52 ITI 0% 0%

53 ITI 0% 0%

54 ITI 0% 0%

55 ITI 0% 0%

56 ITI 0% 0%

57 ITI 0% 0%

58 ITI 0% 0%

59 ITI 0% 0%

60 ITI

61 ITI

62 ITI

63 ITI

64 ITI

65 ITI

66 ITI

67 ITI

68 ITI

69

70 ITI

71 ITI

72

73

74

75

76

77

78

79
RT_0 RT_1 RT_1 PWHT Hardness Test (If Required) Pressure Test Holiday Test PMI (If Required)

Request Request Request Request


Request Date Result Total Film Reject Film Report No. Request Date Result Total Film Reject Film Report No. Request Date Result Total Film Reject Film Report No. (Y/N) Result Report No. Result Report No. Medium Press. (barg) Result Report No. Result Report No. Request Date
Date Date Date Date

-
PMI (If Required)

REMARK

Result Report No.


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

PACKAGE No.: TP-WTP-095

TYPE OF TEST :

HYDROSTATIC TEST

PNEUMATIC TEST

SERVICE TEST

VISUAL INSPECTION ONLY

ALTERNATIVE NDT TEST

PROJECT : RIAU GFPP 275MW IPP PROJECT

LOCATION : PEKANBARU, RIAU, THE REPUBLIC OF INDONESIA

OWNER : PT. MEDCO RATCH POWER RIAU

SUBCONTRACTOR : PT. INDO TEHNIK INDUSTRI


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

TABLE OF CONTENTS

1. Cover

2. Table of Contents

3. Pressure Test Report

4. Line Check List

5. Punch list Report

6. Marked Up P & ID

7. Isometric Drawing List

8. Isometric Drawing

9. Welding History Sheet

10. NDE & PWHT Report : N/A

11. Pressure Gauge Calibration Certificate

12. Pneumatic Test for Reinforcement Pad (If Any)


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

3. PRESSURE TEST REPORT


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

4. LINE CHECK LIST


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

5. PUNCH LIST REPORT


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

6. MARKED UP P&ID
RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

7. ISOMETRIC DRAWING LIST


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

8. ISOMETRIC DRAWING
RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

9. WELDING HISTORY SHEET


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

10. NDE & PWHT REPORT : N/A


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

11. PRESSURE GAUGE CALIBRATION CERTIFICATE :


RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

12. PNEUMATIC TEST FOR REINFORCEMENT PAD


(IF ANY)
RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

PRESSURE TEST REPORT

Test Package No. TP-WTP-095 System WATER TREATMENT SYSTEM


Sub Contractor PT. Indo Tehnik Industri Date

Test Method : þ HYDRO ¨ PNEUMATIC ¨ VISUAL ¨ SERVICE ¨ OTHER


Design Pressure : 3 BarG Test Pressure : 4.5 BarG
Design Temp. : 50 °C Actual Pressure : BarG
Test Medium : þ WATER ¨ AIR ¨ N2 ¨ Other
Duration : Holding Time : 15 min
Pressure Gauge : Range :
Calibrated Date : Certificate No. :
PRESSURE CURVE
100% HOLDING TIME (Test Pressure)

75%

Design Pressure

25%

0%
5 minutes 5 minutes 15 minutes 5 minutes

TEST RESULT : ACCEPTED REJECTED


Comment :

Sub-Contractor LOTTE E&C MEDCO RATCH POWER RIAU


Name

Signature

Date
RIAU GFPP 275MW IPP PROJECT
PUNCH LIST REPORT
Area : WATER TREATMENT AREA Date :

System : WATER TREATMENT SYSTEM Subcontractor : PT. Indo Tehnik Industri

Test Package No. : TP-WTP-095

Sht. Rev. Cleared By Verified By Verified By


No Drawing No. No. No. Description Cat. Issued By Subcon Contractor Owner

Category Legend
"A" To complete before test
"B" To complete before Commissioning
"C" To complete before Turn over

Prepared By PT. ITI Reviewed by Lotte Construction Inspected by Lotte QC Witnessed by MRPR
RIAU GFPP 275MW IPP PROJECT
Line Check List
Area / Location : WATER TREATMENT AREA P&ID No. : RIAU-WV01-M10-PI-001

System : WATER TREATMENT SYSTEM Drawing Number : RIAU-WV01-P10-PA-0002

Test Package No. : TP-WTP-095

ITEM / DESCRIPTION OF CHECKS Yes No N/A Remarks

1. Check system complies with P&ID's and Isometrics

Check that all NDT / Stress relieving requirements as per specification have been met and
2.
recorded and all welded attachments installed

3. Check that cerrectly bolts and gaskets are installed at all mechanical joints

Check that all vents and drains are installed


4.
(Add temporary vents and drains for testing as required)
Check piping for correct schedule and type and ratings of forged steel fittings and
5.
reinforcement is correct
Check valve materials, use specification reference in piping material spec. tags and name
6.
plates
Check that all pressure connections are installed correctly as per specification and all
7.
thermo-wells are installed
Check for correct direction of flow through filters and strainers traps, check valves, globe
8.
valves and control valves
Check orifice valve tap orientation and that taps and plugs have been seal welded and
9.
unused tapped holes area plugged and welded
Check that instrument connections installed and any delicate in line instrumentation
10.
excluded from test
Check all pipe supports are correcly installed all temporary pipe supports removed and any
11.
additional supports fitted

12. Check all relief valves, bursting discs and specified control valves have been removed

13. Check that gags on spring supports and expansion joints are in position

Check that all chainwheels and extended spindles and locking devices required for specified
14.
valves have been installed

15. Check that there is no spring in pipe work affecting pumps or vessels

Check that all sprinkler heads, rosettes and nozzles have been removed and connections
16.
plugged

17. Visual check for weld surface

NOTE :

Prepared by PT. ITI Reviewed by Lotte Construction Inspected by Lotte QC Witnessed by MRPR
RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

PROJECT RIAU GFPP 275MW IPP PROJECT

ISOMETRIC DRAWING LIST

Test Package No. TP-WTP-095 System WATER TREATMENT SYSTEM

Sub Contractor PT. Indo Tehnik Industri Date

No. P&ID Drawing No. Iso No. Sheet No. Rev. No. Remark

1 RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 0

2 RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0

3 RIAU-WV01-M10-PI-001 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0

10

11

12

13

14

15

16

17

18

19

20

Sub-Contractor Consortium Owner

Name

Signature

Date
RIAU GFPP 275MW IPP PROJECT
WELDING HISTORY SHEET
Test Package No.: TP-WTP-095

Welder RT Status
Sheet Rev. Joint Thk Weld Shop/ RT AFTER NDE
No. Dwg. No. ISO No. Matl Size RT PWHT MT / PT PT AFTER PWHT UT Remark
No. No. No. (sch) Type Field PWHT %
01 02 R0 R1 R2

1 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 1 HB6 S-80 TH F 2 - - ¨ 0% ¨ ¨ ¨ ¨


2 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 2 HB6 S-80 TH F 2 - - ¨ 0% ¨ ¨ ¨ ¨
3 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 3 HB6 S-80 TH F 2 - - ¨ 0% ¨ ¨ ¨ ¨
4 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 4 HB6 S-80 TH F 2 - - ¨ 0% ¨ ¨ ¨ ¨
5 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 5 HB6 S-80 TH F 2 - - ¨ 0% ¨ ¨ ¨ ¨
6 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 6 HB6 S-80 TH F 2 - - ¨ 0% ¨ ¨ ¨ ¨
7 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 7 HB6 S-80 TH F 1 - - þ 0% ¨ ¨ ¨ ¨
8 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 8 HB6 S-80 TH F 1 - - ¨ 0% ¨ ¨ ¨ ¨
9 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 9 HB6 S-80 TH F 1 - - ¨ 0% ¨ ¨ ¨ ¨
10 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 10 HB6 S-80 TH F 1 - - ¨ 0% ¨ ¨ ¨ ¨
11 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 11 HB6 S-80 TH F 1 - - ¨ 0% ¨ ¨ ¨ ¨
12 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 12 HB6 S-80 TH F 1 - - ¨ 0% ¨ ¨ ¨ ¨
13 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 13 HB6 S-80 TH F 1 - - ¨ 0% ¨ ¨ ¨ ¨
14 RIAU-WV01-P10-PA-0002 10GHD11-BR001-DN50-HB6 2 OF 2 1 14 HB6 S-80 TH F 1 - - ¨ 0% ¨ ¨ ¨ ¨
15 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0 1 HB7 S-80 SW F 4 - - ¨ 0% ¨ ¨ ¨ ¨
16 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0 2 HB7 S-80 BW F 4 - - ¨ 0% ¨ ¨ ¨ ¨
17 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0 3 HB7 S-80 BW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
18 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0 4 HB7 S-80 SW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
19 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0 5 HB7 S-80 SW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
20 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0 6 HB7 S-80 SW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
21 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0 7 HB7 S-80 SW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
22 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 1 OF 2 0 8 HB7 S-80 SW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
23 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 1 HB7 S-80 SW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
24 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 2 HB7 S-80 SW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
25 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 3 HB7 S-80 SW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨
RIAU GFPP 275MW IPP PROJECT
WELDING HISTORY SHEET
Test Package No.: TP-WTP-095

Welder RT Status
Sheet Rev. Joint Thk Weld Shop/ RT AFTER NDE
No. Dwg. No. ISO No. No. No. No. Matl (sch) Type Field Size RT PWHT % PWHT MT / PT PT AFTER PWHT UT Remark
01 02 R0 R1 R2

26 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 4 HB7 S-80 BW F 1.5 - - ¨ 0% ¨ ¨ ¨ ¨


27 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 5 HB7 S-80 BW F 1 - - ¨ 0% ¨ ¨ ¨ ¨
28 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 6 HB7 S-80 SW F 1 - - ¨ 0% ¨ ¨ ¨ ¨
29 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 7 HB7 S-80 SW F 1 - - ¨ 0% ¨ ¨ ¨ ¨
30 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 8 HB7 S-80 SW F 1 - - ¨ 0% ¨ ¨ ¨ ¨
31 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 9 HB7 S-80 SW F 1 - - ¨ 0% ¨ ¨ ¨ ¨
32 RIAU-WV01-P10-PA-0002 10GDS22-BR001-DN25-HB7 2 OF 2 0 10 HB7 S-80 SW F 1 - - ¨ 0% ¨ ¨ ¨ ¨
Total Joint BW 4 Total Joint SW/FW, TH 28 Total DI BW 8 Total DI SW/FW 21 RT : 0 PT : 0 0
RIAU GFPP 275MW IPP PROJECT

TEST PACKAGE

PROJECT RIAU GFPP 275MW IPP PROJECT

NDE RELEASE RECORD

Test Package No. TP-WTP-095 System WATER TREATMENT SYSTEM

Sub Contractor PT. Indo Tehnik Industri Date

No. ISO No. Sheet No NDE REQ (%) TOTAL BW RT DONE TOTAL SW PT DONE TOTAL TH Remark

1 10GHD11-BR001-DN50-HB6 2 OF 2 N/A 0 0 0 0 14

2 10GDS22-BR001-DN25-HB7 1 OF 2 N/A 2 0 6 0 0

3 10GDS22-BR001-DN25-HB7 2 OF 2 N/A 2 0 8 0 0

10

11

12

13

14

15

16

17

18

19

20

Sub-Contractor Consortium Owner

Name

Signature

Date