VSA 19 Points Checksheet
VSA 19 Points Checksheet
3 Understanding of Team
MR/NPD HOD
Customer events (sample approval, trial dates, SOP at customer end) and
4 vendor's events (sample submission, pilot lot submission, SOP) to be NPD HOD
mentioned in timing plan
5 Activities matching with procedure and APQP matrix
NPD HOD
6 Evidence of review by project leader and top management in the timing plan
NPD HOD
7 MOM or record of reviews (for evidence)
NPD HOD
8 Micro timing plan matching with MACRO plan (wrt timing)
NPD HOD
9 Capturing delays in plan v/s actual in timing plans
NPD HOD
RFQ register (status of the enquiries to be checked) /Part handover sheet from
10 marketing to NPD(For Developent) NPD HOD
16 Cut off criteria for taking action as per latest AIAG manual
NPD HOD
Review plan for FMEA and evidence of review as per decided criteria and at
17 decided frequency NPD HOD
35 Noise level : Are the persons in High noise level wearing PPE's? Y/N Press Shop/Weld
Shop/Dispatch HOD's
36 Condition and height of Working / Inspection table Press Shop/Weld
Shop/Dispatch HOD's
37 Tool/Jig/Fixture storage in racks Press Shop/Weld
Shop/Dispatch HOD's
38 Daily maintenance check sheet filled by operator: Y/N Press Shop/Weld
Shop/Dispatch HOD's
39 Cross checking of above check sheet by supervisor: Y/N Press Shop/Weld
Shop/Dispatch HOD's
40 List of Pokayoke available: Y/N Press Shop/Weld
Shop/Dispatch HOD's
41 Cross checking of Pokayoke: Y/N Press Shop/Weld
Shop/Dispatch HOD's
42 Poka Yoke failure analysis (to be defined in procedure, analysis to be checked) Press Shop/Weld
Shop/Dispatch HOD's
43 press: trimming, blanking & hole punching punches
Press Shop HOD's
44 Welding electrodes dressing frequency
Weld Shop HOD's
45 Display of Work Instruction (Operation Standard) for easy assess ability to Press Shop/Weld
operator Shop/Dispatch HOD's
46 Press Shop/Weld
Display of critical process parameters and quality parameters
Shop/Dispatch HOD's
47 Understanding of WI & quality check points by operator (WI to be In local
language/ operator's langage so that operator can read and understand it) Press Shop/Weld
Shop/Dispatch HOD's
48 Operator wise operator monitoring plan for all production areas (shift wise)
(Inspectors to be covered or not?) Press Shop/Weld
Shop/Dispatch HOD's
49 Check record of operator monitoring as per check sheet covering all the
activities to be done by operator during working time Press Shop/Weld
Shop/Dispatch HOD's
50 Training plan for operators for weak areas Press Shop/Weld
Shop/Dispatch HOD's
51 Condition of packing (bin/trolley) used in WIP Press Shop/Weld
Shop/Dispatch HOD's
52 Guidelines for repairing of bins/trolley Press Shop/Weld
Shop/Dispatch HOD's
53 safety standards available? Press Shop/Weld
Shop/Dispatch HOD's
54 Awareness of safety to operators Press Shop/Weld
Shop/Dispatch HOD's
55 PPEs as per standard Press Shop/Weld
Shop/Dispatch HOD's
Sr. No. Check Points Responsibility
1 General condition of machines are proper like wiring condition, cover and dust. Jitender/Bipul
2 Oil/water/coolant leakage around the machine Jitender
3 Procedure for preventive and breakdown maintenance of machines and tools. Jitender/Bipul
4 PM of machine : frequency, plan, plan vs actual, history card, check sheet filled
or not, breakdown analysis, break down points covered in PM check Jitender/Bipul
sheet or not, Spares (list and availability)
5 PM of Tool: frequency, plan, plan vs actual, history card, check sheet filled or
not, breakdown analysis, break down points covered in PM check sheet or not, Jitender/Bipul
Spares (list and availability)
6 List of Pokayoke available: Y/N
Jitender/Bipul
7 Cross checking of Pokayoke: Y/N
Jitender/Bipul
8 Poka Yoke failure analysis (to be defined in procedure, analysis to be checked)
Jitender/Bipul
9 Door sensors on machines
Jitender
10 Double hand operation
Jitender
11 Insulating jacket on barrel, Jam bar/drop bar (in plastic molding General -
Machine guards, Photo guard sensors, emergency switch :
Jitender
3 Evidence of conducting audits as per plan (check sheet records) (in all shifts) Dinesh/Abhinav
4 Evidence of improvement in case of issues identified (NC's reported) Dinesh/Abhinav
5 NC summary report (for internal audits) Dinesh/Abhinav
6 Evidence of conducting audit as per control plan during process audit. Abhnav
Evidence of checking actual working as per operation standard during process
7 audit Abhnav
8 Evidence of coducting audit ( genuineness of record) Abhnav
Evidence of checking effectiveness of countermeasures of customer and
9 horizontal deployment Abhnav
10 Evidence of checking effectiveness of countermeasures of in-house defects
during process audit & horizontal deployment Abhnav
11 Last audit NC closure Abhnav
12 Procedure for handling customer complaints, in-process failure and supplier
defects
Abhnav
21 Updation of PFMEA
Abhnav
22 Evidence of onsite verification of countermeasures (to checked for min three
months) Abhnav
3
Master copies of the controlled documents Chandan/Abhinav
Master list of documents (control plans, operation standard, inspection
4 standards) with latest revision nos Chandan/Abhinav
5
All Product and process parameters are mentioned in the control plan Chandan
Reference of WI, sample size, checking frequency, checking method, boundary
6 samples & Poka Yoke are defined in the control plan Chandan