7 - How To Using DataLink to Import Task Checklists
7 - How To Using DataLink to Import Task Checklists
___________________
DESCRIPTION:
An MPulse Administrator is excited to make use of the new Task checklist feature that has been
added to Maintenance Task records and would like to use DataLink to update their existing
Maintenance Task Records in order to take advantage of this new feature.
This document assumes that DataLink Import/Export is already installed and configured to
connect with an instance of MPulse and that the user is already familiar with importing records
using DataLink. It is strongly recommended to take a backup of the MPulse Database before
importing with DataLink as all changes are permanent.
Please see the guide titled How To: Use MPulse DataLink to Import Records linked in Additional
Information section at the end of this guide for instructions regarding importing records using
DataLink and for more information about backing up an MPulse Database.
RESOLUTION:
Background
Each Step must have a Step Label that describes the action to be performed and a Step Type
which determines what type of information the user must enter to complete the Step.
A user may import Task Checklists from Data Connections configured for use with Excel
Spreadsheets or Google Sheets.
The following example shows the fields required available for importing Task Checklists and
each row represents an individual Step in a Checklist:
A) Task ID – The ID# of an existing Maintenance Task Record to associate this Task Checklist
i) Must not be blank
B) Task Checklist ID - The unique ID# of the Task Checklist
i) Must not be blank
C) Task Checklist Description - Human-readable description of the checklist
i) Required when importing new Task Checklists
ii) Optional when updating existing Task Checklists
iii) Maximum 50 characters
D) Step Type –Specifies the type of input the user must provide to complete the step
i) Must be one of the following: Checkbox, Currency, Date, List, Memo, Number, or String
E) Step Label – Used to describe the action to be performed for this Step
i) Must not be blank
F) Required Complete – Specifies whether all Steps must be performed to complete Work
Order Records to which the associated Maintenance Task Record is linked
i) Must be either True or False
ii) Should be consistent across all Steps within the same Task Checklist
G) Required Close – Specifies whether all Steps must be performed to close Work Order
Records to which the associated Maintenance Task Record is linked
i) Must be either True or False
ii) Should be consistent across all Steps within the same Task Checklist
Before importing, it is strongly recommended to take a backup of the MPulse Database as there
is no “undo” button. Please see the guide titled How To: Use MPulse DataLink to Import
Records linked in Additional Information section at the end of this guide for more information
regarding backing up an MPulse Database.
___________________
Additional Information: