An IFC Data Preparation Workflow
An IFC Data Preparation Workflow
net/publication/334448038
CITATION READS
1 949
4 authors:
Some of the authors of this publication are also working on these related projects:
All content following this page was uploaded by Georgios Nektarios Lilis on 13 July 2019.
Kyriakos Katsigarakis1, Georgios Nektarios Lilis1, Georgios Giannakis1 and Dimitrios Rovas2
1Technical University of Crete, Greece
2University College London, London, UK
(see example in part I of Figure 2). Two intersecting wall CBIP External Virtual
opening volumes next to each other, attached to the same Space space
boundaries boundaries
building space (see example in part II of Figure 2), pro-
duce 2nd -level space boundaries which also intersect with Internal space boundaries
III. CBIP tool results
each other (space boundary surface duplication). For all of
2nd-level space boundary partitions
these reasons, methods for detection and semi-automatic of a slab of a real building model.
correction of these inaccuracies have been proposed (Lilis Detected by CBIP tool.
Displayed using Solibri Model
et al. 2015). Viewer.