AHPP Recommended Readings
AHPP Recommended Readings
Apply the regulations 3: Career Development 52 The Basis for the Regulation of the Practice of Architecture
and requirements
governing the work 8: Human Resources 464 The Function of Compensation in an Architecture Firm
environment Sidebar: Employee Benefit Programs (Pg 471)
16: Risk Management 1008 Terminology: What Does All This Mean?
Apply ethical 1: Ethics and Professional Practice 3 History of the AIA Code of Ethics
standards to comply Sidebar: The Six Canons of the AIA Code of Ethics
(Pg 4)
with accepted
principles within a
5: Organizational Development 177 Claims Avoidance
given situation Backgrounder: Copyright Law for Architects (Pg 180)
17: Agreements and AIA 1041 Prerequisites for, and Basic Terms of, a Legal Contract
Document Program Implied Terms and the Architect’s Standard of Care
(Pg 1043)
Navigating the Architect Registration Examination® (5.0) with The Architect’s Handbook of Professional Practice, 15th Edition
Identify practice 16: Risk Management 989 How Does The Architect Manage Risk
policies and Making Better Agreements (Pg 995)
methodologies for 1007 Risks for Architects
risk, legal exposures, Sidebar: A Case Study: Commercial General Liability
(Pg 1020)
and resolutions
1033 Dispute Resolution Methods: Mediation, Arbitration, and
Litigation
1044 Types of Agreement
1046 Special Considerations
1051 Legal and Risk Management Considerations
1053 Completing and Modifying the Standard
AIA Agreement Forms
Determine 15: Project Definition 961 Basis of Fees: Value, Effort, and Risk
potential risk and/or
reward of a project 16: Risk Management 989 Backgrounder: Risk in Design (Pg 1005)
and its impact on
the practice
Navigating the Architect Registration Examination® (5.0) with The Architect’s Handbook of Professional Practice, 15th Edition
Assess criteria 10: Design Project Management 589 Facilitating the Project
required to allocate Table 10.11: Example of a Milestone Chart
and manage project 621
resources
15: Project Definition 964 Types of Services
Develop and maintain 10: Design Project Management 621 The Importance of Project Work Planning
project work plan 627 The Project Work Planning Process
632 Scheduling
Interpret key 17: Agreements and 1055 Forming Relationships to Accomplish Project Goals
elements of, and AIA Document Program Figure 9.1: Relationships of Project Participants (Pg 510)
Architect-Consultant Agreements (Pg 1056)
verify adherence to
architect/consultant
agreement
Interpret key 17: Agreements and 1085 The Parts of a Construction Contract
elements of the AIA Document Program Figure 9.1: Relationships of Project Participants (Pg 510)
Owner-Contractor Agreements (Pg 1085)
owner/contractor
agreement
Interpret key 17: Agreements and 1055 Forming Relationships to Accomplish Project Goals
elements of the owner/ AIA Document Program Figure 9.1: Relationships of Project Participants (Pg 510)
Owner-Retained Consultants (Pg 1059)
consultant agreement
to integrate the
consultant work
into the project
Navigating the Architect Registration Examination® (5.0) with The Architect’s Handbook of Professional Practice, 15th Edition
Evaluate compliance 10: Design Project Management 597 Effort of Client Expectations on the Project
with construction Monitoring Client Objectives (Pg 598)
budget 634 Monitoring
Evaluate and address 5: Organizational Development 169 Common Claims Against Architects
changes in scope of Changes in Scope of Service (Pg 173)
work and scope creep
10: Design Project Management 634 Monitoring
719 Administration of the Construction Contract
Changes in the Work (Pg 726)
Evaluate project 10: Design Project Management 673 Methodologies in Construction Drawings
documentation to Figure 9.2: Characteristics of Project Delivery
Methods (Pg 512)
ensure it supports
the specified delivery 729 All
method
Identify and conform 4: Public Interest Design 159 Civic and Community Engagement: Land Use Policy,
with the requirements Zoning, and Building Codes
Planning and Zoning Commissions (Pg 159)
set forth by authorities
having jurisdiction
13: Building Codes, Standards 868 Code Enforcement
in order to obtain and Regulations 886 The Role of Government in Planning
approvals for the
Zoning (Pg 891)
project
Navigating the Architect Registration Examination® (5.0) with The Architect’s Handbook of Professional Practice, 15th Edition
Apply procedures 1: Ethics and Professional Practice 3 History of the AIA Code of Ethics
required for Limitations Imposed by Antitrust Law (Pg 3)
adherence to laws
and regulations 1: Ethics and Professional Practice 25 Art vs. Science in Architecture
relating to the project
3: Career Development 52 The Basis for the Regulation of the Practice of Architecture
13: Building Codes, Standards 858 History of the U.S. Code Documents
and Regulations Table 13.1: AIA Policy on Building Codes (Pg 859)
890 The Planning and Regulatory Environment
Identify relevant code 13: Building Codes, Standards 858 History of U.S. Code Documents
requirements for and Regulations 860 IBC and IFC Code Fundamentals
building and site types
Identify relevant 4: Public Interest Design 159 Civic and Community Engagement:
zoning and land use Land Use Policy, Zoning, and Building Codes
requirements
13: Building Codes, Standards 880 All
and Regulations Backgrounder: Form-Based Codes (Pg 895)
Identify and prioritize 9: Design Project Delivery 512 Players in the Project Delivery Project
components of the Sidebar: Program Management (Pg 511)
building program
10: Design Project Management 664 Backgrounder: Programming (Pg 664)
15: Project Definition 961 Basis of Fees: Value, Effort, and Risk
Risk (Pg 962)
Navigating the Architect Registration Examination® (5.0) with The Architect’s Handbook of Professional Practice, 15th Edition
Determine N/A
sustainable principles
to apply to design
Integrate N/A
environmental and
contextual conditions
in the project design
Navigating the Architect Registration Examination® (5.0) with The Architect’s Handbook of Professional Practice, 15th Edition
Identify and prior- 10: Design Project Management 690 Organization of Specifications
itize components Figure 10.26: Master Format 2012 Edition (Pg 691)
required to write,
maintain, and refine
project specifications
Coordinate specifica- 10: Design Project Management 696 Coordination of Drawings and Specifications
tions with construc-
tion documentation
Analyze criteria for 10: Design Project Management 606 Selecting the Team
selecting contractors 710 Preparing for the Construction Phase
Construction Observation
Evaluate the archi- 10: Design Project Management 714 Preparing for the Construction Phase
tect’s role during 719 Administration of the Construction Contract
construction Changes in the Work (Pg 726)
activities 993
1086
Evaluate construction 10: Design Project Management 719 Administration of the Construction Contract
conformance with Site Visits and Observations (Pg 719)
contract documents,
codes, regulations,
and sustainability
requirements
Determine 10: Design Project Delivery 709 Questions During the Bid Period
appropriate additional Addenda (Pg 710)
information to
supplement contract
documents
Evaluate submittals 10: Design Project Delivery 719 Administration of the Construction Contract
including shop draw- Contractor Submittals (Pg 724)
ings, samples, mock-
ups, product data,
and test results
Evaluate the 10: Design Project Delivery 719 Administration of the Construction Contract
contractor’s applica- Contractor Progress Payments (Pg 722)
tion for payment
Evaluate responses 10: Design Project Delivery 719 Administration of the Construction Contract
to non-conformance Site Visits and Observations (Pg 719)
with contract
documents