The document is a checklist for the LFL Mission 2020 'Smart Network' audit, detailing various compliance categories and check points related to health, safety, environment, and quality. It includes sections for mandatory policies, equipment status, and operational efficiency, with specific attention to critical issues such as fire safety and equipment maintenance. The checklist is structured to assess the site’s adherence to standards and record auditor remarks for each category.

Uploaded by

atspmo2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views2 pages

LFL Check Sheet

The document is a checklist for the LFL Mission 2020 'Smart Network' audit, detailing various compliance categories and check points related to health, safety, environment, and quality. It includes sections for mandatory policies, equipment status, and operational efficiency, with specific attention to critical issues such as fire safety and equipment maintenance. The checklist is structured to assess the site’s adherence to standards and record auditor remarks for each category.

Uploaded by

atspmo2
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Check Sheet for LFL Mission 2020 "Smart Network”

MP: Auditor name & Mobile Visit Date:

EB/Non EB SAP ID: Site Name:


EB DC or
EB Hrs at Site Eb 3Ph/1Ph
Availble
Make __________________ Make __________ Make __________________________
Nos of BB at
AH Capacity _____________ DG Set KVA ___________ SMPS Nos of SMR Running _____________
Site
Nos of BB _______________ Auto Yes / NO Nos of Emtry Slot Faulty __________
Owner/ Neighbopur
MW / Fiber
Issue If any

Status Final Status


Sr No Category Sub Category Check Points Severity Auditor Remark
Ok/Not ok (Open/Closed)

Mandatory policies (HSE&F, Environment, Quality)


1 HSEF Compliance Major
framed and displayed prominently

Indexed Hard Copies of all Statutory and


2 HSEF Compliance Major
Regulatory Compliances

3 Quality Compliance No Stacking / Storage of material in and around LFL Major

4 HSEF Compliance Floor Plan framed and displayed prominently Major

5 HSEF Compliance Emergency Exit signages marked Major

6 Quality P&U Power Utilitzation Efficiency (PUE) of LFL Major

7 Quality DG Exigency Fuel Storage and Linkage Plan Major

Fire Hydrant System and Fire Supression System


8 HSEF Fire Major
availability and working condition
Mandatory Certification (Wireman License) of LFL
9 HSEF Compliance Major
Technician
Availability and Usage of Calibrated / Valid TMIs
10 Quality Tools Major
and PPEs
11 Quality Access Security and Access Control Major

12 Quality P&U Any Open Audit Observation Major

13 Quality P&U OEM PM Timely Execution and Records Major

14 Quality P&U Innovation and Best Practices Major

15 P&U Access Door locking & SAS system working condition Major

16 ISP Active Equipment empty slots covered by Dummy plates Critical

Nos of BB Communicated __________


17 P&U Battery Battery Cummunication Yes/No Major Nos of BB Non Communicated ______

18 ISP Cables Patch cords & cable routing in Rack/cable Tray Major

19 HSEF Compliance SNOC Number Displayed in the Facility Major

Vegitation & Combustible & waste material


20 HSEF Compliance Major
arround Facility (req.3 Pics)

21 HSEF Compliance NE/Rigger PPE complaince as per RJIO standered Major

22 HSEF Compliance NE/Rigger Tools/tackels with Blower status Major

EMF signage Boards at site EMF New / Old Three/ Not availble
23 Infra Compliance Critical
Danger Signages Board at site Danger on meter Box Yes/No

24 P&U DG Oil spillage inside & arround the DG set Critical

25 P&U DG DG body earthings & Connections Critical

26 P&U DG Dg Locking Critical

DG Fuel Sensor working Everest Fuel Stock In Ltr ______


27 P&U DG Major Physically stock in Ltr ______
DG Fuel Staock at site

28 P&U DG DG Operation in Auto mode Major


GCU
DGSB Avilbale Yes/NO
29 P&U DG Major
Cagging Done Yes/No

30 P&U Earthing Condition of Earth pits & cable connections Critical

31 P&U Earthing Earth pits resitance value less than 2 Ohm Critical
1
OFC armour earthing at cable entry point-
32 FIBRE Fiber Critical
Roxtec/Tray

33 FIBRE Fiber Sealing of Duct outside shelter/ODC with end plugs Critical

Water leakage inside facility(server/Eqp./HT-TL


34 Infra Infra Hygiene Critical
room)

35 Infra ODC Cable entries/holes sealing at Roxtec(from Inside ) Major

36 P&U PAC PAC working status Major

37 P&U Smoke Smoke detector working Major

38 P&U SMPS Alarm condition on SMPS controller Major

39 P&U SMPS Rectifier’s working condition Major

40 P&U SMPS Cable connection properly Tighten / Labeling Major

Faulty Battery
41 Others P&U faulty SMR Major
Faulty Active Material If Faulty Material Laying at site
Router AG1 Fillter Ok / Nok
42 Others Active Major
CDU Fillter Ok / Nok

Joine visited at site Auditor Name : Verification For Closure:


NE & Rigger Name Name: Closure Date:

Supervisor Name Date : Auditor's Sign:

Infra engg Name Sign: Auditor decalred that above PP closed 100%