URIT-910C Engineer Training Procedure
URIT-910C Engineer Training Procedure
Procedure
URIT-910C Plus
Electrolyte Analyzer
URIT-910C Plus Electrolyte Analyzer
Liquid Crystal
Display
Probe Cover
► Buttons: Button Above For Quick Test, Button Below For Stop Or
Back.
► Cover: Describe The Flow Cell And The Internal Flow Path.
Sample Distribution
injection needle valve
Pressure
sensor
Calibration
Solution C
Two Rolls
Of Printing
Refill Solutions
2- Click The Drop-down List On The Right Side Of "Qc Name" And
Select A Qc Solution Is Used. Such As Low QC Solution: Q1.
3- Click Numeric Keys On The Left Column Of The Screen And It Will
Pop Up A Numeric Keypad. Operator Should Input The Target Value
Of Potassium (K), Sodium (Na), Chlorine (Cl), Calcium (Ica), Ph, 2
Times The Standard Deviation (2SD) In Accordance With The
Instruction. Click "Save" To Save The Settings.
1- Click The Text Box On The Right Side Of "QC Lot." And It Will Pop
Up Numeric Keypad. Operator Should Input The Corresponding
Batch Number Of QC Solution. Such As 1202001.
2- Click The Drop-down List On The Right Side Of "Qc Name" And
Select A Qc Solution Is Used. Such As Low QC Solution: C1.
3- Click Numeric Keys On The Left Column Of The Screen And It Will
Pop Up A Numeric Keypad. Operator Should Input The Target Value
Of TCO2 QC Solutions And 2 Times The Standard Deviation (2SD) In
Accordance With The Instruction.
1- Click On The Check Box On The Left Side Of "QC Name" And
Select QC Solutions To Test . Such As The Middle QC Solution: Q2.
(Note: Click “CLEAR” Can Remove The Selected QC Solution)
► Flushing Pipeline
- “Flushing Pipeline”, the
instrument will suck standard
solution A to flush the whole
pipe system.
► Electrode Protein Cleaning:
- The Instrument Will Suck The Protein Clean Solution To Flush The
Pipes.
Note: After Electrode Protein Cleaning, It Needs ISE System
Calibration, Till The Calibration Result Is Stable Can It Measure
Samples
► System Maintenance :
- Enter the password “123” if you want
to set the protein removal interval in
the manufacturer maintenance.
- Users can set the number of days
or times of instrument automatic
protein removal as required by
the hospital, and the instrument
default is separately 7 days and
100 times of test.
5- Service:
Test Data:
- According to operator needs , we can
choose first condition of search then we
press Start to review old data and easy
get it direct.
Cal Data:
- According to operator needs , we can
choose first condition of search
between (ISE & TCO2) then we press
on it to review calibration data and
easy get it direct.
Slope :
Electrode K+ Na+ Cl- Ca2+ pH
Reference range 40~ 40~ 40~ 20~ 40~
of 70 70 70 40 70
slope/(mv/dec)
Replace Bag :
- Firstly we connect New Bag
then press Replace Bag .
Normal Range
- Operator can set the range according
to actual situation and the existing
data of the instrument can be used as
a reference. Touch Save after
completing the setting to quit
Date & Time
- Operator Can Touch the
corresponding digit to modify it
when the instrument time is
incorrect.
Printer Option
- Operator Can Touch the
corresponding Item to print it or not.
Set Channel :
Plate Adjustment
- Reset Adjustment Refers To
The Position Where The Syringe
Is At “W” Hole Position During
Reposition Of The Sampling
Disc. Increase The Digit If The
Position Deviates To Left And
Vice Versa.
- Positioning Adjustment Refers To The Position Where The
Syringe Points Towards The Sample Cup During Sampling.
Increase The Digit If The Position Deviates To Left And Vice Versa
Assembly, Disassembly And Maintenance Of Main And Auxiliary
Peristaltic Pump
Assembly, Disassembly And Maintenance of Flow Cell :
Assembly, Disassembly And Maintenance of Pressure Sensor :
Assembly, Disassembly And Maintenance of Pipe Pressed Valve:
Assembly, Disassembly And Maintenance of Display Screen:
Assembly, Disassembly And Maintenance of Elevator:
Assembly, Disassembly And Maintenance of Induction Light Opt
coupler:
Solution Level Adjustment :
Head Office
Add.: No.4 East Alley, Jiuhua Road, Guilin, Guangxi 541001, P.R. China
Tel: +86-773-2288586 Fax: +86-773-2288560
Shenzhen Office
Add.: Room EJ, 24th Floor, New Baohui Building, Nanhai Road, Nanshan District, Shenzhen, P.R. China
Tel: +86-755-26050853 Fax: +86-755-86036150