0% found this document useful (0 votes)
18 views2 pages

Time and Work Word File

The document consists of a series of mathematical problems related to time and work, focusing on calculating the time taken by individuals or groups to complete various tasks. It includes questions about the efficiency of workers, the division of wages based on work done, and the impact of additional workers on project completion times. The problems require knowledge of work rates and the ability to set up equations based on given data.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views2 pages

Time and Work Word File

The document consists of a series of mathematical problems related to time and work, focusing on calculating the time taken by individuals or groups to complete various tasks. It includes questions about the efficiency of workers, the division of wages based on work done, and the impact of additional workers on project completion times. The problems require knowledge of work rates and the ability to set up equations based on given data.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TIME AND WORK

1. Suman can do a piece of work in 18 days find the fraction 14. 48 men can finish a work by working it 14 hours per day
of work done by her in 12 days . in 54 days . 28 men will complete the same work by working
1 2 2 4 9 hours per day in .
(a) 1 (b) (c) 1 (d)
3 3 3 3
𝟒 (a) 72 days (b) 96 days (c) 124 days (d) 144 days
2. Sagar can of𝟗
part of a work in 28 days find the time 15. 8 men can finish a piece of work in 40 days if 2 more
taken by him to complete that work . men join them , then the work will be completed in .
(a) 61 days (b) 63 days (c) 64 days (d) None (a) 24 days (b) 28 days (c) 32 days (d) 36 days
3. Ram can do a piece of work 21 days find the time taken by 16. 15 men take 20 days to complete a job working 8 hours a
𝟒
him do 𝟕 part of that work ? day . The number of hours a day should 20 men take to
(a) 12 days (b) 14 days (C) 16 days (d) 18 days complete the same job in 12 days is .
4. 8 men can do a piece of work in 15 days in how many days (a) 6 hours (b) 10 hours (c) 8 hours (d) 9 hours
can 20 men do that work ? 17. If x men can do a piece of work in x days then the
(a) 8 days (b) 14 days (c) 16 days (d) 6 days number of days in which y men can do the same work is
𝑥2
5. Muskan can do a piece of work in 36 days part of the work (a) y (b) xy (c) 𝑥 2 𝑦 (d)
𝑦
done by her in 8 days is
18 . A pipe P can fill a tank in 20 hours and another pipe Q
(a) 1/8 (b) 1/9 (C) 2/9 (d) 3/8
can fill it in 30 hours how long will it take to fill the tank
6. 54 worker can build a wall in 18 days . How many worker
both the pipes are operated together ?
will be required to construct the same wall in 81 days ?
(a) 8 hours (b) 16 hours (c) 10 hours (d) 12 hours
(a) 10 (b)12 (c) 16 (d) 6 days
19. A and B together can do a piece of work in75 days while
7. A man did 1/3 part of a work , Rahul did 2/5 part of it and B alone can finish it in 100 days . In how many days can A
Saurabh did the rest work . If the total wages received by alone finish the same work ?
them is ₹ 10800 , then the share of Saurabh is . (a) 200 days (b) 275 days (c) 300 days (d) 325 days
(a) ₹ 2440 (b) ₹ 2880 (C) ₹ 3220 (d) ₹ 3640
20 . A lift can carry 24 children or 8 men at a time how many
8. Ram can do a piece of in 15 days while Shyam takes 20
men can go with 18 children at a time ?
days to complete it . In how many days can both of them
(a) 1 (b) 2 (C) 3 (d) 4
together do it ?
3 5 4 1
21 . 16 men finished a house in 1 month and 12 days . In
(a) 6 days (b) 7 days (C) 8 days (d) 9 days how many days 24 men can finish the same house ?
7 7 7 3
9. A, B ,C alone can do a piece of work in 4, 5 and 6 days (a) 24 days (b) 63 days (c) 28 days (d) 29 days
respectively . How long will they take to do the same work if 22. A man and a boy can do a piece of work in 36 days . If
they work together ? the man works alone for the last 10 days , then it is
23 19 19 completed in 40 days . How long will the boy take to do
(a) 1 37 days (b) 1 37 days (c) 2 37 days (d) None
10. Reena can do a piece of work in 10 days and Ruchi in 20 alone?
days . If they work together on it for 5 days , then the (a) 40 days (b) 50 days (C) 90 days (d) 80 days
𝟓
fraction of work left is : 23. Ram can do 𝟖 of a work in 15 days and Mukesh can finish
1 2 3 1
(a) 3 (b) 3 (c) 4 (d) 4 the remaining work in 5 days . In how many days both can
11. A can do a piece of work in 15 days with the help of A ,B do the work ?
1 4 3 4
𝟐
can do it in 𝟔 days .What is the time taken by B alone to do (a) 9 8 days (b) 8 7 days (C) 12 7 days (d) 11 7 days
𝟑 𝟐
it? 24. Ram can do 𝟓 part of a work in 12 days and Mohan can
1 𝟑
(a) 12 days (b) 8 days (C) 16 days (d) 12 4 days do part of this work in 15 days . In how much time both
𝟒
12. P and Q can complete a work in 20 days and 30 days will finish the work ?
respectively . They worked together on it . If total wages of 1
(a) 8 days (b) 9 days (C) 12 days (d) 9 4 days
the work is ₹ 7500 then how much money will P get ? 𝟐
(a) ₹ 4500 (b) ₹ 3500 (c) ₹ 4000 (d) ₹ 2500 25. A can do 𝟓 part of a piece of work in 9 days remaining
13. 15 men working 8 hours a day can construct a canal in 20 work is done with help of B in 6 days . find the number of
days in how many days will 12 men working 10 hours a day days in which B will finish the work alone .
will construct it ? (a) 9 days (b) 18 days (c) 12 days (d) 36 days
(a) 15 days (b) 20 days (c) 25 days (d) 30 days 26. A cistern has three pipes . The first two can fill it in 24
and 30 minutes respectively while the third can empty it in
40 min . If all the pipes be opened together , then in what (a) 150 days (b) 120 days (c) 96 days (d) 90 days
time will the empty cistern be filled ? 40. 15 men can do a piece of work in 8 days . In how many
(a) 24 hrs (b) 20 hrs (c) 18 hrs (d) 16 hrs days will 12 men do it .
27. 3 men or 5 women can do a work in 12 days . How long (a) 10 days (b) 16 days (c) 18 days (d) None
will 6 men and 5 women take to finish the work ? 41. A piece of work can be done in 30 days working 9 hours
(a) 4 days (b) 10 days (c) 15 days (d) 20 days a day . In how many days can it be done working 8 hours a
28. 12 men or 18 women can cut the crop of a field in 14 day ?
days . How many days will 8 men and 16 women together 3 3
(a) 33 4 days (b) 32 4 days (c) 32 (d) 33
take to cut the crops of the field ? 𝟏
(a) 14 days (b) 9 days (C) 10 days (d) 12 days 42. Chandan can do 𝟔 part of a piece of work in 8 days , then
𝟏
29. A, B and C can do a piece of work in 10 , 12 and 15 days he will do 𝟖 part of the work.
respectively . If B worked for 2 days and then left the work . (a) 9 days (b) 8 days (c) 48 days (d) 6 days
In how many days will A and C do the remaining work . 43. 9 Oxen or 6 horses can eat the grass in 18 days , then 18
1 1
(a) 2 days (b) 3 days (c) 2 2 days (d) 3 2 days oxen and 6 horses will eat the grass in.
30. 45 men can do a piece of work in 20 days How many (a) 12 days (b) 6 days (c) 18 days (d) 9 days
more men are needed to complete the work in 12 days ? 44. 15 men can do a piece of work in 6 days then 18 men can
(a) 75 men (b) 60 men (c) 30 men (d) 15 men do the work in .
31. If 5 persons make 120 bedsheets in 15 days then how (a) 5 days (b) 6 days (c) 8 days (d) None
many bedsheets will made by 14 persons in 5 days? 45. If 240 boys need 10 litres of ink for 75 days . Then how
(a) 112 (b) 116 (C) 140 (d) 132 long will it last if there be 10 boys more ?
32. A garrison of 360 soldiers have provisions for 7 weeks . If (a) 84 days
60 more soldiers join them , then how long will the (b) 64 days
provision last ? (c) 72 days
(a) 6 weeks (b) 8 weeks (c) 7 weeks (d) None (d) 48 days
33. A is thrice as good as a work man B . If both of them can
together finish a piece of work in 15 days ,then B alone can
do it in.
(a) 60 days (b) 20 days (c) 40 days (d) 80 days
34. A and B can do a work in 25 days and 20 days
respectively . A starts the work and after 10 days B joined
the work in how many days the work will be finished ?
2 2
(a) 8 days (b) 16 days (c) 16 days (d) 8 days
3 3
35. Mukesh types 750 words in half an hour . How many
words would be typed in 7 minutes ?
(a) 250 (b) 150 (c) 175 (d) 200
36. In a military Camp there are provision for 1000 soldiers
for 60 days . If 200 more soldiers join the amp , the
provisions will last for how many days.
(a) 25 days (b) 50 days (c) 60 days (d) 40 days
37. K and L can do a work in 15 and 20 days respectively
They work together for 5 days and leave . Calculate the
unfinished portion of the work .
(a) 5/12 (b) 1/13 (c) 7/12 (d) 1/4
𝟐
38. A can do a piece of work in 24 days and B can do of the
𝟓
same work in 12 days both work together with for 4 days .
How much work is still left ?
(a) 9/20 (b) 11/20 (c) 17/20 (d) 13/20
39. A and B together can do a piece of work in 30 days .
Together with C they can complete the same work in 24
days . In how many days can C alone complete the same
work ?