BRIDGES - B 27 26 25 24 E 11 Page 1/112
Unbridges and Underpass in E30 and E11
Roadrway Right
Roadway Left Roadrway Right
Ramp area
Remarks
Wattage Mounting Arrangement/Distanc
SN Bridge Name Road Type Model Roadway Qty Eav [lx] U0 Eav [lx] U0 Eav [lx] U0
(W) Height e MF
1 BRIDGE B 27 A Highway MX PRO 1 5P5 S05 7040.100-1M 19.1W As per Drawing 6.97m As per Drawing 16 nos 0.80 21.40 0.65 21.40 0.66 - -
2 BRIDGE B 26 A Highway MX PRO 1 5P5 S05 7040.100-1M 19.1W As per Drawing 6.97m As per Drawing 16 nos 0.80 17.60 0.69 17.70 0.68 - -
3 BRIDGE B 25 A Highway MX PRO 1 5P5 S05 7040.100-1M 19.1W As per Drawing 6.97m As per Drawing 16 nos 0.80 18.60 0.70 18.50 0.65 - -
Highway MX PRO 1 5P5 S05 7040.100-2M 37.4W 16 nos 0.80 17.80 0.47 16.70 0.61 - -
4 BRIDGE B 24 B As per Drawing 7.47m As per Drawing
Service Road MX PRO 1 5P5 S05 7040.100-1M 19.1W 15 nos 0.80 19.00 0.67 21.20 0.56 - -
Highway MX PRO 1 5P5 S05 7040.100-1M 19.1W 16 nos 0.80 16.20 0.78 18.70 0.78 - -
5 BRIDGE E 11 MX PRO 1 5P5 STE-S 7040.060-1M 11.9W As per Drawing 7.47m As per Drawing 8 nos
Service Road 0.80 17.20 0.81 21.40 0.76 - -
MX PRO 1 5P5 STE-S 7040.100-1M 19.1W 8 nos
6 BRIDGE B-31 A Highway MX PRO 1 5P5 S05 7040.100-1M 19.1W As per Drawing 7.47m As per Drawing 16 nos 0.80 18.00 0.82 18.00 0.82 - -
7 BRIDGE B 30 A Highway MX PRO 1 5P5 S05 7040.140-1M 26.8W As per Drawing 7.47m As per Drawing 24 nos 0.80 19.20 0.58 15.40 0.41 21.10 0.51
8 BRIDGE B 29 Highway MX PRO 1 5P5 S05 7040.140-1M 26.8W As per Drawing 7.47m As per Drawing 24 nos 0.80 19.20 0.69 15.20 0.42 21.40 0.69
9 BRIDGE B 12 E Highway MX PRO 1 5P5 S05 7040.100-1M 19.1W As per Drawing 7.47m As per Drawing 16 nos 0.80 20.40 0.86 20.40 0.86 - -
LIGHTING CALCULATION
Project description:
LIGHTING UNDER BRIDGES
27
26
25
24
E11
The following values are based on precise calculations performed on calibrated lamps and luminaires, and their configurations, whereby
gradual, unavoidable deviations can occur in practice. All guarantee claims are excluded for the specified data.
This exclusion of liability applies irrespective of the legal grounds for both damages and consequential damages suffered by users and third
parties.
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 1/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
Table of contents
First Page 1
Table of contents 2
1 Luminaire data
1.1 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 STE-S 7040.140-1M (22-117-10_02)
1.1.1 Data sheet 5
1.2 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 STE-S 7040.100-1M (22-117-10_02)
1.2.1 Data sheet 6
1.3 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 S05 7040.100-1M (22-120-01_02)
1.3.1 Data sheet 7
1.4 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 S05 7040.100-2M (22-120-01_02)
1.4.1 Data sheet 8
1.5 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 STE-S 7040.060-1M (22-117-10_02)
1.5.1 Data sheet 9
2 BRIDGE B 27 A
2.1 Description, BRIDGE B 27 A
2.1.1 Floor plan 10
2.2 Summary, BRIDGE B 27 A
2.2.1 Result overview, TOTAL AREA bridge 27 A l 11
2.2.2 Result overview, carriage bridge 27 A l 12
2.2.3 Result overview, TOTAL AREA bridge 27 A r 13
2.2.4 Result overview, carriage bridge 27 A r 14
2.3 Calculation results, BRIDGE B 27 A
2.3.1 Table, TOTAL AREA bridge 27 A l (E) 15
2.3.2 Table, carriage bridge 27 A l (E) 16
2.3.3 Table, TOTAL AREA bridge 27 A r (E) 17
2.3.4 Table, carriage bridge 27 A r (E) 18
2.3.5 Pseudo colours, TOTAL AREA bridge 27 A l (E) 19
2.3.6 Pseudo colours, carriage bridge 27 A l (E) 20
2.3.7 Pseudo colours, TOTAL AREA bridge 27 A r (E) 21
2.3.8 Pseudo colours, carriage bridge 27 A r (E) 22
3 BRIDGE B 26 A
3.1 Description, BRIDGE B 26 A
3.1.1 Floor plan 23
3.2 Summary, BRIDGE B 26 A
3.2.1 Result overview, TOTAL AREA bridge 26 A l 24
3.2.2 Result overview, carriage bridge 26 A l 25
3.2.3 Result overview, TOTAL AREA bridge 26 A r 26
3.2.4 Result overview, carriage bridge 26 A r 27
3.3 Calculation results, BRIDGE B 26 A
3.3.1 Table, TOTAL AREA bridge 26 A l (E) 28
3.3.2 Table, carriage bridge 26 A l (E) 29
3.3.3 Table, TOTAL AREA bridge 26 A r (E) 30
3.3.4 Table, carriage bridge 26 A r (E) 31
3.3.5 Pseudo colours, TOTAL AREA bridge 26 A l (E) 32
3.3.6 Pseudo colours, carriage bridge 26 A l (E) 33
3.3.7 Pseudo colours, TOTAL AREA bridge 26 A r (E) 34
3.3.8 Pseudo colours, carriage bridge 26 A r (E) 35
4 BRIDGE B 25 A
4.1 Description, BRIDGE B 25 A
4.1.1 Floor plan 36
4.2 Summary, BRIDGE B 25 A
4.2.1 Result overview, TOTAL AREA bridge 25 A l 37
4.2.2 Result overview, carriage bridge 25 A l 38
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 2/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
Table of contents
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 3/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
Table of contents
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 4/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
1 Luminaire data
1.1 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 STE-S 7040.140-1M (22-117-10_02)
1.1.1 Data sheet
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 5/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
1 Luminaire data
1.2 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 STE-S 7040.100-1M (22-117-10_02)
1.2.1 Data sheet
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 6/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
1 Luminaire data
1.3 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 S05 7040.100-1M (22-120-01_02)
1.3.1 Data sheet
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 7/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
1 Luminaire data
1.4 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 S05 7040.100-2M (22-120-01_02)
1.4.1 Data sheet
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 8/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
1 Luminaire data
1.5 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 STE-S 7040.060-1M (22-117-10_02)
1.5.1 Data sheet
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 9/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 BRIDGE B 27 A
2.1 Description, BRIDGE B 27 A
2.1.1 Floor plan
y [m]
440
420
400
380
360
340
320
300
280
260
240
220
7722 7742 7762 7782 7802 7822 7842 7862 7882 7902 x [m]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 10/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 BRIDGE B 27 A
2.2 Summary, BRIDGE B 27 A
2.2.1 Result overview, TOTAL AREA bridge 27 A l
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 18.2 lx
Minimum illuminance Emin 7.5 lx
Maximum illuminance Emax 26.8 lx
Uniformity Uo Emin/E̅m 1:2.43 (0.41)
Diversity Ud Emin/Emax 1:3.58 (0.28)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 11/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 21.4 lx
Minimum illuminance Emin 13.9 lx
Maximum illuminance Emax 26.9 lx
Uniformity Uo Emin/E̅m 1:1.54 (0.65)
Diversity Ud Emin/Emax 1:1.94 (0.52)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 12/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 18.3 lx
Minimum illuminance Emin 7.6 lx
Maximum illuminance Emax 26.8 lx
Uniformity Uo Emin/E̅m 1:2.4 (0.42)
Diversity Ud Emin/Emax 1:3.52 (0.28)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 13/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 21.4 lx
Minimum illuminance Emin 14.1 lx
Maximum illuminance Emax 27.1 lx
Uniformity Uo Emin/E̅m 1:1.52 (0.66)
Diversity Ud Emin/Emax 1:1.92 (0.52)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 14/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 BRIDGE B 27 A
2.3 Calculation results, BRIDGE B 27 A
2.3.1 Table, TOTAL AREA bridge 27 A l (E)
[m] 7.7
15.0 8.8
14.4
8.8
15.8
12.5 9.2 17.9
15.1
10.2 19.8
15.5 17.6
10.0 10.7 19.7
18.1 20.3
10.3 20.6 17.6
18.9 22.1
7.5 10.2 23.2 20.5
18.4 23.5 17.8
10.6 24.2 23.3
18.3 25 20.4
5.0 10.1 24 24.9 18.1
18.8 25.6 22
9 24 25.8 19.8
17.9 26 23.4 13.9
2.5 8.6 24.2 26.4 19.6
15.4 26 25.1 15.3
8.5 23.2 [26.8] 20.7 7.8
14.6 25.6 25.5 14.7
0.0 (7.5) 20.5 [26.8] 23.5 8.9
15.3 24.9 26.1 15.5
19.5 26.4 24.4 9
13.8 23.3 26.1 18
-2.5 19.7 25.8 24.1 9.5
21.9 25.6 18.9
17.8 24.9 24.1 10.6
20.3 25 18.3
-5.0 23.2 24.3 11.1
17.6 23.4 18.5
20.4 23.2 10.6
22.1 19
-7.5 17.5 20.7 10.7
20.4 18.1
19.8 11.2
17.6 15.6
-10.0 19.9 10.6
15.2
18 9.6
15.7
-12.5 9.2
14.3
9.1
-15.0 7.9
5 10 15 20 25 30 35
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 15/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
14.4
15.2
[m] 17.2
16.2
15.0 18.3
15.9 17.4
19.4
15.2 19.1
19 17.2
15.1 20
18.6 19.4
12.5 16.7 20.2 17
19 20.2
18.2 20.3 19.4
20.2 21.1 16.9
19 20.9 20.2
22.1 21.8 19.7
19.2 22 21.8 17.1
10.0 23.1 22.6 20.3
19.2 23.4 23 19.5
23.3 23.4 22.1 17.4
18.7 24.3 23.9 20.3
23.4 24.6 23.5 19.4
18.7 24.5 24.7 21.8 17.6
23.1 25.1 24.4 20.3
7.5 19.1 24.7 25.3 23 19.2
23.1 25.3 25.3 21.1 17.4
19.1 24.6 25.8 23.9 20.1
23.4 25.6 25.7 21.9 18.7
18.8 24.6 26 24.8 20.3 14.4
23.3 25.8 26.1 22.7 19.5
18.1 24.6 26.3 25.4 20.4 15.3
5.0 22.9 25.8 26.4 23.6 19.1
16.6 24.5 26.6 25.8 21.1 16.3
22.1 25.6 26.6 24.7 18.8
14.9 24.2 26.5 26.1 22.3 16
20.1 25.3 [26.9] 25.2 19.3
14.8 23.4 26.2 26.3 23.7 15.3
2.5 18.8 25.1 [26.9] 25.4 20.5
15.4 22 26 26.6 24.5 15.5
18.4 24.6 26.6 25.7 22.5
15.7 20.7 25.7 26.6 24.8 17.2
18.7 23.4 26.4 25.9 23.3
14.8 20.1 25.2 26.3 24.9 18.8
19.2 22.5 26 25.9 23.7
0.0 (13.9) 20 24.6 26.1 24.8 19.5
18.3 21.7 25.7 25.7 23.7
19.9 23.8 25.8 24.8 19.8
17.1 21 25.3 25.4 23.4
19 22.9 25.3 24.9 19.8
20.2 24.4 25.2 23.4
17.5 21.7 24.8 24.7 19.4
-2.5 19.3 23.5 24.7 23.8
20.2 24 24.5 19.5
17.3 22.1 23.6 23.7
19.4 23.1 23.6 20
20.3 22.7 23.4
17 21.9 22.2 19.9
19.7 21.9 22.3
-5.0 20.3 21.1 19.7
16.9 21.2 20.5
19.5 20.6 18.9
20.3 19.3
17 20.4 17.3
19.5 18.9
20.1 15.8
-7.5 17.3 19.3
19.2 15.7
19.6
17.4 16.4
18.6
16.8
-10.0 17.4
15.6
14.9
5 10 15 20 25 30
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 16/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
8
[m]
15.0 9
14.3
9.1
15.6
12.5 9.6 18.1
14.9
10.6 19.8
15.7 17.9
10.0 11.2 19.6
18.2 20.4
10.8 20.7 17.8
18.9 22
7.5 10.8 23.4 20.6
18.5 23.4 17.8
11.2 24.3 23.3
18.6 25 20.4
5.0 10.7 24.1 24.9 17.9
19.1 25.5 22
9.7 24.1 25.7 19.6
18.4 26.1 23.5 14.3
2.5 9.2 24.3 26.4 19.5
15.8 26 24.9 15.7
9.1 23.4 [26.8] 20.6 7.8
15.1 25.5 25.4 14.8
0.0 8.1 20.8 [26.8] 23.2 8.7
15.8 25 25.9 15.7
19.7 26.4 24.1 8.8
14.4 23.5 26 18.3
-2.5 19.8 25.8 23.9 9.2
22.1 25.5 18.9
18.1 24.9 23.9 10.3
20.4 25 18.4
-5.0 23.3 24.1 10.7
17.8 23.4 18.2
20.6 23.2 10.2
22 18.6
-7.5 17.8 20.6 10.2
20.4 17.9
19.5 10.6
17.8 15.4
-10.0 19.7 10.1
14.7
17.9 9
15.4
-12.5 8.6
14
8.6
-15.0 (7.6)
5 10 15 20 25 30 35
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 17/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
14.7
15.6
[m] 17.6
16.4
15.0 18.8
16 17.8
19.5
15.3 19.2
18.9 17.6
16 20.1
18.8 19.3
12.5 17.8 20.3 17.3
19.5 20.5
19.4 20.5 19.2
21.2 21.3 17.3
19.7 21.3 20.7
23 22.1 19.3
22.7 22.2 17.2
10.0 20.2 22.9 20.8
23.5 23.3 19.2
19.7 24.2 22.6 17.5
23.9 23.9 20.6
19.5 25 24.2 19.4
23.6 25 23.7 17.7
24.9 25 22.2
19.8 26 24.7 20.4
7.5 23.4 25.5 23.2 19.2
20.3 24.9 25.4 21.2 17.5
23.6 25.6 24.1 19.9
19.8 24.8 26.7 22 18.7
23.9 25.8 25.7 20.1 14.6
24.9 26.1 24.9 19.2
19.6 25.8 [27.1] 22.8 15.4
5.0 23.7 26.5 25.4 20.4
18 24.8 26.3 23.8 18.7
23 25.8 26.6 21.1 16.2
16.2 24.8 26.7 24.8 18.6
21.1 25.5 26.7 22.5 15.7
24.1 26.5 26 19.3
15.6 25.9 26.9 25.8 15
19.6 26 26.4 24
2.5 16.3 22.7 26.7 25.3 20.9
19 25 26.6 24.7 15.7
16.8 21.3 26.6 25.6 22.7
19.1 23.9 26.3 24.6 17.5
20.6 25.5 26.4 23.1
15.9 22.9 [27.1] 25.7 19
19.6 25 26 24.6
15.2 20.4 25.8 25.6 23.5
0.0 19 22.1 26.6 24.4 19.2
20.1 24.2 25.4 23.1
17.7 21.3 25.4 24.6 19.6
19.3 23.3 25.4 23
20.4 24.7 25.8 18.9
22.2 24.8 24.7
17.7 23.7 24.8 23.2
-2.5 19.5 24.1 24.6 18.7
20.6 23.7 23.5
17.5 22.5 23.9 18.8
19.5 23.1 23.2
20.7 22.7 19.3
17.2 22 22.4
19.3 21.9 22.6
20.5 21 18.9
-5.0 17.1 21.1 20.7
19.2 20.2 18.5
20.3 19.1
17.1 20.1 17
19.4 18.5
19.9 15.3
-7.5 17.4 18.6
19.1 14.7
19.3
17.6 15.5
18.5
15.8
17.3
-10.0 15
(14.1)
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 27.5 30.0 32.5
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 18/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
361
356
351
346
341
336
331
326
7788 7793 7798 7803 7808 7813 7818 7823 7828 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 19/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
358.6
356.1
353.6
351.1
348.6
346.1
343.6
341.1
338.6
336.1
333.6
331.1
328.6
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 20/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
336
331
326
321
316
311
306
301
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 21/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
333.3
330.8
328.3
325.8
323.3
320.8
318.3
315.8
313.3
310.8
308.3
305.8
303.3
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 22/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
3 BRIDGE B 26 A
3.1 Description, BRIDGE B 26 A
3.1.1 Floor plan
y [m]
1212
1187
1162
1137
1112
1087
1062
1037
1012
987
962
937
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 23/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
3 BRIDGE B 26 A
3.2 Summary, BRIDGE B 26 A
3.2.1 Result overview, TOTAL AREA bridge 26 A l
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 15.5 lx
Minimum illuminance Emin 7.4 lx
Maximum illuminance Emax 22.5 lx
Uniformity Uo Emin/E̅m 1:2.1 (0.48)
Diversity Ud Emin/Emax 1:3.05 (0.33)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 24/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 17.6 lx
Minimum illuminance Emin 12.2 lx
Maximum illuminance Emax 22.5 lx
Uniformity Uo Emin/E̅m 1:1.44 (0.69)
Diversity Ud Emin/Emax 1:1.85 (0.54)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 25/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 15.6 lx
Minimum illuminance Emin 7.5 lx
Maximum illuminance Emax 22.5 lx
Uniformity Uo Emin/E̅m 1:2.07 (0.48)
Diversity Ud Emin/Emax 1:2.99 (0.33)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 26/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 17.7 lx
Minimum illuminance Emin 12 lx
Maximum illuminance Emax 22.6 lx
Uniformity Uo Emin/E̅m 1:1.47 (0.68)
Diversity Ud Emin/Emax 1:1.88 (0.53)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 27/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
3 BRIDGE B 26 A
3.3 Calculation results, BRIDGE B 26 A
3.3.1 Table, TOTAL AREA bridge 26 A l (E)
9
15.1
[m] 8.6 15.2
25 13.3 15
8.5 15.1
12.2 15
9.3 16.5 14.8
15 17.3
14.1 18.1 14.9
10.2 16.6 16.6
20 19.5 13.6
17.2 19.2 16
10.7 17.9 (7.4)
18.8 20.5 14.3
18.1 19.8 15.2
10.9 18.6 8.2
19.5 20.6 12.6
17.4 20.2 15.3
15 11.1 19.1 8.3
19.4 20.9 12.1
17.4 21.1 17.1
11.2 19.9 8.3
19.8 22 14.6
18.5 21.6 19.2
10.3 21 9
10 20.2 [22.5] 17.5
17.5 21 20
8.9 21.4 10.1
19.1 21.8 18.5
14.1 19.9 19.5
8.3 20.9 11.3
16.8 20.9 16.9
12 19.1 19.4
5 8.4 20.3 10.8
15.2 20.6 17.2
12.8 18.6 19.5
8.4 19.7 10.7
15.3 20.4 17.5
14.6 17.8 18.6
7.5 19 10.2
0 15.9 19.2 16.6
13.8 16.3 16.2
17.8 9.8
14.6 17 13.6
14.4 14.9 9.1
16.1 12.1
14.6 15
-5 14.5 8.4
13.4
15.1 8.5
14.8
8.5
5 10 15 20 25 30
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 28/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
14.8
15
14.9
14.5
15.2
13.7 14.3
15.4
14.5 14.3
[m] 12.8 15.4
15.3 14.3
25 14 15.5
12.3 16 14.2
15.5 15.7
14 16.7 14.2
13.1 16.8 15.5
15.7 17 14.5
14.6 17.9 15.4
14.5 17.5 16.7 14.9
16.3 18.4 15.4
15.8 19 16.4 14.1
16.2 18.1 17.9 15.5
17.4 19.5 16.2
17.4 19.6 17 14.5
17.9 18.9 18.8 15.8
20 18.4 20.2 16.2
18.9 20.1 17.5 15
17.9 19.3 19.5 15.2
19.4 20.6 16
19.2 20.2 17.8 14
18.7 19.6 19.8 14.4
19.7 20.6 15.9
19.7 20.3 18.2 13
17.7 20.3 19.9 14.1
20 20.5 16.3
18.8 20.9 18.6 12.3
17.4 20.6 20 14.5
19.8 21.2 17.1
18.6 21.3 18.9 12.7
15 17.6 20.7 20.7 15.4
19.9 21.6 18
19 21.5 19.8 14
18.5 21 21.1 16.8
20.2 21.9 19.1
19.7 21.9 20.3 15.7
18.6 21.2 21.4 18.6
20.4 22.3 19.7
19.7 22.1 20.7 17.7
17.8 21.2 21.9 19.1
20.1 [22.5] 20.3
19 21.9 21.1 18.1
17.1 20.6 22.1 19.8
10 19.4 22.3 20.2
18.2 21.4 21.2 19
15.1 19.9 21.9 19.4
19 21.8 20
16.4 20.8 21 18.2
13.5 19.7 21.5 18.7
17.7 21.2 19.8
15 20.6 20.7 17.4
12.3 18.7 20.9 18.5
16.8 21.2 19.8
14.2 19.9 20.3 17.3
(12.2) 18.3 20.9 19
16 20.5 20
13.9 19.8 20.3 17.8
5 13 18 20.3 19.7
15.7 20.5 19.7
14.3 19.7 19.6 18.7
14 17.6 20.2 19.2
15.9 20.5 19.2
15 19.3 19.3 17.9
14.9 17.4 20 18.7
16 20 18.3
15.8 18.6 18.8 17.8
14.2 16.8 19.5 17.2
15.9 19.3 17.3
15.4 17.6 18.1 16.1
14.1 16.1 18.8 15.7
15.2 18.1 16.3
0 14.8 16.4 17.4 14.3
15.2 17.7 14.5
14.4 16.7 15.7
15.5 16.7 13
14.1 16.4 14
15.7 15.5
14.1 15.8 12.4
15.6 14.1
14.2 15.3
15.4 13
14.2 14.7
15.3
14.2 13.9
-5 15.3
14.5
15.2
14.9
14.6
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 27.5 30.0
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 29/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
8.5
[m] 13.9
8.4 15
25 12.2
8.8 15.5
14.7 16
12.9 17.2
9.6 15.6 15.6
15.9 18.5 15.6
20 10.1 18.6 17.4
18 20.1 14.4
17.6 19.5 15.6 7.9
11.1 19.5 18.3 13.5
17.9 20.5 15
20.5 18.8 8.2
15 11 19.8 11.9
17.2 21.2 16.1
21.2 20 8.1
11.4 19.6 13.2
18.7 22.1 18.5
21.6 21 8.6
10.2 20.4 16.5
17.6 [22.5] 19.9
10 21.3 21.6 9.6
9 19.4 17.9
14.5 22.2 19.9
20.1 21.2 10.4
8.3 17.1 17.6
12.1 21 19.4
19.2 20.3 10.9
5 8.4 15.3 16.9
12.7 20.6 19.8
18.6 19.8 10.7
8.4 15.2 18.1
14.5 20.5 19
17.9 19.1 10.7
(7.5) 16 17.3
0 13.8 19.4 16.6
16.5 17.9 10
14.7 17.2 14
14.5 14.8 9
16.2 11.9
14.7 14.8
-5 14.6 8.3
12.8
14.9 8.3
14.7
8.7
5 10 15 20 25 30
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 30/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
14.6
15
13.4 15.3
14.3 15.4
[m] 12.6
15.2 15.8
25 13.9 15.9
12.2 15.3 15.9
13.9 16.6 15.5
13.2 16.7
15.6 16.9 15.4
14.6 17.8
14.6 17.4 16.6 15.4
16.4 18.2
15.9 18.9 16.3 15.5
16.4 18.1 17.8 16
17.4 19.3 14.3
17.5 19.6 16.9 15.9
18.1 18.9 18.7
18.4 20.1 16.1 15
20 19 20 17.4
19.3 19.3 15.1
18.1 19.4 20.5 15.9
19.3 20.2 17.6 14
19.7 19.7 14.3
18.9 19.8 20.5 15.7
20.3 18 13
19.6 20.4 19.8 14
17.9 20.6 16.1
20 21 18.3 12.2
19 19.9 14.2
17.6 20.4 21.3 16.8
19.9 21.1 18.8 12.3
15 18.7 20.8 20.7 15.1
17.9 20 21.3 17.8
21.6 19.8 13.5
19.2 21.1 20.9 16.5
18.8 20.4 21.9 19.1
22 20.1 15.1
19.8 21.4 21.5 18.3
18.8 20.6 22.3 19.5
22.2 20.7 17.1
19.8 21.3 21.9 19.1
18.1 20.3 [22.6] 20.2
22 21.2 17.8
19.2 20.8 22.1 19.8
17.3 19.6 22.3 20.5
10 21.5 21.2 18.5
18.3 20.1 21.9 19.7
15.3 19.2 21.9 20.2
20.9 21 18.3
16.6 19.9 21.6 19
13.7 21.2 19.8
17.9 20.8 20.7 17.5
15.2 21 18.5
12.5 18.9 21.3 19.8
16.9 20.3 17.2
14.4 20.1 21 18.9
12.4 18.5 19.9
16.2 20.6 20.4 17.7
14.1 19.9 20.3 19.6
5 13.2 18.2 20.6 19.8
15.9 19.7 18.5
14.5 19.8 20.1 19.3
14.3 17.8 20.5 19.4
16.1 19.2 17.7
15.2 19.4 19.9 18.9
15.3 17.5 18.3
16.2 20.1 18.7 17.6
15.9 18.7 17.2
14.5 17 19.4 17.2
16 19.3 16
15.4 17.8 17.9 15.6
14.3 16.2 18.7 16.1
15.4 18.2 17.2 14.2
0 14.8 16.5 14.4
15.4 17.6 15.4
14.4 16.8 12.8
15.7 16.5 13.8
14.1 16.4 15.2
15.9 (12)
14.1 15.7 13.7
15.7
14.1 15.1 12.5
15.3
14.1 14.2
15.2 13.2
14.2 15
-5 14.6 14.4
15
14.7
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 27.5
[m]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 31/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
1127
1122
1117
1112
1107
1102
1097
1092
1087
7785 7790 7795 7800 7805 7810 7815 7820 7825 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 32/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
1123
1118
1113
1108
1103
1098
1093
1088
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 33/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
1101
1096
1091
1086
1081
1076
1071
1066
1061
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 34/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
1098
1093
1088
1083
1078
1073
1068
1063
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 35/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
4 BRIDGE B 25 A
4.1 Description, BRIDGE B 25 A
4.1.1 Floor plan
y [m]
1968
1943
1918
1893
1868
1843
1818
1793
1768
1743
1718
1693
1668
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 36/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
4 BRIDGE B 25 A
4.2 Summary, BRIDGE B 25 A
4.2.1 Result overview, TOTAL AREA bridge 25 A l
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.5 lx
Minimum illuminance Emin 7.9 lx
Maximum illuminance Emax 22.7 lx
Uniformity Uo Emin/E̅m 1:2.08 (0.48)
Diversity Ud Emin/Emax 1:2.86 (0.35)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 37/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 18.6 lx
Minimum illuminance Emin 13 lx
Maximum illuminance Emax 22.9 lx
Uniformity Uo Emin/E̅m 1:1.43 (0.7)
Diversity Ud Emin/Emax 1:1.77 (0.57)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 38/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.4 lx
Minimum illuminance Emin 7.2 lx
Maximum illuminance Emax 22.7 lx
Uniformity Uo Emin/E̅m 1:2.27 (0.44)
Diversity Ud Emin/Emax 1:3.14 (0.32)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 39/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 6.97 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 18.5 lx
Minimum illuminance Emin 11.9 lx
Maximum illuminance Emax 22.7 lx
Uniformity Uo Emin/E̅m 1:1.55 (0.65)
Diversity Ud Emin/Emax 1:1.9 (0.53)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 40/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
4 BRIDGE B 25 A
4.3 Calculation results, BRIDGE B 25 A
4.3.1 Table, TOTAL AREA bridge 25 A l (E)
9.7
14.9
9.5 15.7
[m] 13.4 16.1
25 10.1 15.5 16.3
14.6 17.7 15.8
17 18.5 15.8
11.1 17.7 14.4
17.8 19.4 (7.9)
19.2 20.5 17.2
20 11.3 18.9 15.6
18.7 20.5 9
20.3 21.3 16.6
11.6 19.3 14
18 21.4 9
19.9 22 16.1
11.6 20.4 12.8
15 17.4 21.3 8.8
19.6 22.1 17.8
12.3 20.9 15.2
19.3 21.6 9.8
20.6 22.6 19.9
11.2 21.6 18.3
18.7 21.7 10.9
10 20.2 [22.7] 20.7
10.3 21.5 19.1
16.1 21.3 11.7
18.3 22.3 19.6
9.2 21.3 17.3
13.3 20.4 11.2
16.4 21.9 19.6
5 9.2 21.2 17.3
13.7 19.6 11.2
16.4 21.4 20.4
9.2 20.6 18.8
15.5 19.2 11.4
17.2 20.8 19.6
8.1 19.7 18.3
0 14.7 18.2 11.2
16.1 19.1 17.5
16.5 18.1 15.2
17.2 15.6 10.2
16.6 13
15.6 9.2
-5 14.5
9.6
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 27.5 30.0
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 41/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
15.6
15.7
14.7 15.7
15.5 15.7
13.9 16.1 15.9
14.9 16.9 15.8
[m] 13.8 16.1 17.5 15.5
15.3 17.3 17.6 15.3
25 18.2 17 15.2
15.1 16.7 15.2
16.3 18.3 18.3 16.7
19.4 17.9 16.4 13.9
16.8 17.8 16.3
17.8 19.3 19.6 17.5
20.3 18.9 17.2 14.5
18.7 18.9 17.1
19.2 20 20.5 18.1
20.9 19.7 17.3 15.6
19.2 19.8 16.4
19.8 20.5 21.1 18.5
20 21.2 20.1 17.1 15.1
19.6 20.4 15.6
20.2 21.1 21.3 18.5
21.8 20.4 16.7 14
19 20.6 15
19.7 21.1 22 18.6
21.7 21 16.8 13.1
18.1 20.4 15
19.2 21.2 21.8 19.4
21.9 21 17.7 (13)
18 20.2 16
18.9 21.3 22.1 19.7
22.2 21.4 18.6 14.4
15 18.6 20.2 17.4
19.5 21.4 22.4 20.5
22.3 21.9 19.8 16
19.9 20.4 19
20.4 21.5 22.5 21.1
22.5 22.1 20.5 17.9
19.5 20.9 19.9
20.2 21.6 22.7 21.3
22.3 22.2 20.8 18.5
19.2 21.1 20.3
19.8 21.8 22.7 21.3
22.6 22.2 20.4 19.1
10 17.5 20.4 19.7
18.4 20.9 [22.9] 21
21.7 22.3 19.9 18.4
15.7 19.4 18.7
17 20.4 22.2 21.2
21.5 21.8 19.9 17.2
14.2 18.6 18.6
15.8 20.2 22 20.8
21.5 21.6 19.9 17.2
13.5 17.5 19
15.3 19.3 22.2 20.9
20.8 21.7 20.4 17.7
14.2 17.1 20
5 15.6 19.1 21.5 21.1
20.6 21.2 20.4 18.9
15.3 17.3 19.9
16.4 18.9 21.3 20.4
20.3 20.8 20 18.5
16.3 17.5 19.6
16.9 18.6 20.9 20
19.6 20.4 19.1 18.5
15.7 17.4 18.2
16.6 17.9 20.1 19.3
18.6 19.6 18 17
15.2 16.8 16.5
15.9 17.2 18.9 18.3
0 18.5 16.7 15.2
15.8 17.7
15.8 18.2 17.3 15.2
16.2 17.8 15.9 13.7
16.5 16.9 14.6
16.3 16 13.1
16 14.9
15.7 13.9
15.3
-5 14.8
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 42/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
9.8
13.6
10.3 15.6
[m] 14.6 17.7
25 11.8 16.9 18.4
17.7 19.4 17.6
18.9 20.4 17.2
11.9 18.8 15.3
18.9 20.4 8.5
20.1 21.2 16.5
20 12.4 19.1 13.8
18.4 21.4 8.6
19.8 22 15.8
11.9 20.1 12.5
17.6 21.2 8.5
19.5 21.9 17.4
12.5 20.6 14.8
15 19.2 21.6 9.5
20.6 22.4 19.6
11.5 21.4 17.9
18.9 21.9 10.6
20.3 [22.7] 20.4
10.7 21.4 18.8
16.7 21.5 11.3
10 18.7 22.4 19.5
9.6 21.3 17.2
13.8 20.6 11
16.7 21.9 19.5
9.4 21.1 17
13.9 19.8 10.9
16.6 21.5 20.4
5 9.3 20.7 18.6
15.6 19.5 11.2
17.4 21.1 19.7
8.3 19.8 18.2
14.8 18.6 10.9
16.4 19.4 17.6
(7.2) 18.2 15.2
0 12.3 16.9 10
13.7 17.5 15.7
14.3 17 12.9
15 15.8 9
15.1 14.3
15.8 9.3
-5 15.5
9.1
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 27.5 30.0
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 43/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
14.3
15.1
13.8 16.2
15.1 17.3
14.6 16.6 18
16 18.1 18
[m] 16.1 17.5 19 17.6
17.3 19 19.2 17.1
25 20 18.6 16.9
17.9 18.5 16.8
18.6 19.7 20.2 17.9
20.7 19.4 17.3 14.9
19.2 19.4 16.6
19.5 20.2 20.8 18.2
21.1 19.9 17 15
19.4 19.9 15.7
19.8 20.6 21.1 18.3
21.3 20.1 16.5 14
19.3 20.3 15
19.8 21 21.3 18.3
20 21.7 20.3 16.4 13
18.2 20.3 14.7
19.2 21 21.7 18.6
21.7 20.8 17 12.6
18 20.1 15.3
19 21.1 21.8 19.4
21.9 21 18.1 13.6
18.2 20.4 16.7
19.3 21.6 22 20
22.5 21.4 19.2 15.2
19.5 20.3 18.3
20.1 21.5 22.5 20.6
22.4 21.9 20.1 17
15 19.8 20.8 19.6
20.3 21.7 22.6 21.2
22.5 22 20.5 18.2
19.4 20.9 19.9
20 21.6 [22.7] 21.1
22.3 22.1 20.5 18.6
18.5 20.5 19.8
19.1 21.3 22.5 20.9
22 22 19.9 18.6
16.5 19.9 18.9
17.7 20.7 22.3 20.8
21.7 21.8 19.6 17.3
10 15 18.9 18.4
16.4 20.2 22.1 20.8
21.4 21.6 19.8 17
13.8 18.1 18.7
15.6 19.8 22 20.9
21.2 21.6 20.3 17.1
14.2 17.5 19.6
15.8 19.4 21.7 20.9
20.9 21.4 20.3 18.3
15.1 17.5 19.9
16.4 19.2 21.5 20.6
20.6 21 20 18.4
16.2 17.8 19.6
5 17.1 19 21.2 20.2
20.1 20.6 19.5 18.2
16.2 17.9 18.6
17.1 18.5 20.5 19.5
19.1 19.9 18.4 17.4
15.4 17.2 17
16.2 17.5 19.5 18.5
18 19 17.1 15.7
14.3 16.3 15.5
14.8 16.5 18.3 17.6
16.9 17.9 16.2 14.1
(11.9) 15.1 14.7
12.7 15.2 17.1 16.9
0 16.9 15.8 13
13.2 15.5
13.7 15.8 16.4 14.7
14.2 15.8 15.9 13.6
14.7 15.7 15.3
14.8 15.9 14.5
14.9 15.8
15.2 15.4
15.6
-5 15
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 44/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
1914
1909
1904
1899
1894
1889
1884
1879
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 45/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
1915
1910
1905
1900
1895
1890
1885
1880
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 46/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
1885
1880
1875
1870
1865
1860
1855
1850
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 47/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
1887
1882
1877
1872
1867
1862
1857
1852
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 48/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
5 BRIDGE B 24 B
5.1 Description, BRIDGE B 24 B
5.1.1 Floor plan
y [m]
2949
2899
2849
2799
2749
2699
2649
2599
2549
2499
2449
7566 7616 7666 7716 7766 7816 7866 7916 7966 8016 x [m]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 49/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
5 BRIDGE B 24 B
5.2 Summary, BRIDGE B 24 B
5.2.1 Result overview, TOTAL AREA B 24 r
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.4 lx
Minimum illuminance Emin 6.8 lx
Maximum illuminance Emax 22.7 lx
Uniformity Uo Emin/E̅m 1:2.42 (0.41)
Diversity Ud Emin/Emax 1:3.35 (0.3)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 50/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.7 lx
Minimum illuminance Emin 10.2 lx
Maximum illuminance Emax 20.2 lx
Uniformity Uo Emin/E̅m 1:1.63 (0.61)
Diversity Ud Emin/Emax 1:1.97 (0.51)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 51/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 20.3 lx
Minimum illuminance Emin 7.6 lx
Maximum illuminance Emax 28.2 lx
Uniformity Uo Emin/E̅m 1:2.68 (0.37)
Diversity Ud Emin/Emax 1:3.72 (0.27)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 52/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 21.2 lx
Minimum illuminance Emin 11.8 lx
Maximum illuminance Emax 28 lx
Uniformity Uo Emin/E̅m 1:1.8 (0.56)
Diversity Ud Emin/Emax 1:2.37 (0.42)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 53/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.9 lx
Minimum illuminance Emin 5.4 lx
Maximum illuminance Emax 24.3 lx
Uniformity Uo Emin/E̅m 1:3.13 (0.32)
Diversity Ud Emin/Emax 1:4.5 (0.22)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 54/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 17.8 lx
Minimum illuminance Emin 8.3 lx
Maximum illuminance Emax 22.8 lx
Uniformity Uo Emin/E̅m 1:2.15 (0.47)
Diversity Ud Emin/Emax 1:2.75 (0.36)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 55/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 19 lx
Minimum illuminance Emin 9.6 lx
Maximum illuminance Emax 27.2 lx
Uniformity Uo Emin/E̅m 1:1.98 (0.51)
Diversity Ud Emin/Emax 1:2.82 (0.35)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 56/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 19 lx
Minimum illuminance Emin 12.7 lx
Maximum illuminance Emax 25.2 lx
Uniformity Uo Emin/E̅m 1:1.5 (0.67)
Diversity Ud Emin/Emax 1:1.99 (0.5)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 57/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
7
865 1 4
2 3
Horizontal illuminance
No. Measuring surface Grid E̅m Emin Emax Uo Ud
1.1 TOTAL AREA B 24 r 12 x 40 16.4 lx 6.8 lx 22.7 lx 0.41 0.30
1.2 carriage B 24 r 7 x 15 16.7 lx 10.2 lx 20.2 lx 0.61 0.51
1.3 TOTAL AREA B 24 r 11 x 49 20.3 lx 7.6 lx 28.2 lx 0.37 0.27
1.4 carriage B 24 r 5 x 15 21.2 lx 11.8 lx 28 lx 0.56 0.42
1.5 TOTAL AREA B 24 l 9 x 14 16.9 lx 5.4 lx 24.3 lx 0.32 0.22
1.6 carriage B 24 l 7 x 15 17.8 lx 8.3 lx 22.8 lx 0.47 0.36
1.7 TOTAL AREA B 24 l 5 x 15 19 lx 9.6 lx 27.2 lx 0.51 0.35
1.8 carriage B 24 l 3 x 15 19 lx 12.7 lx 25.2 lx 0.67 0.50
Summary 18.1 lx 5.4 lx 28.2 lx 0.30 0.19
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 58/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
5 BRIDGE B 24 B
5.3 Calculation results, BRIDGE B 24 B
5.3.1 Table, TOTAL AREA B 24 r (E)
(6.8)
7.7
8.2 9
9.3 10.5
10.6 10.3 12
11.6 11.9 13.4
14.5 12.4 13.7 14.2
15 13.7 14.9 14.6
14.8 15.1 15.5 15.6
18.9 15.8 17.7
18.6 15 16.3
16.1 17.1 16.3 20.6
20.6 17.1 18 21.5
20.5 16 17.4 17.1
16.6 18.2 16.9 20
[m] 21.2 18.1 17.2 20.8
21.1 16.8 17.9 18.2
50 17.1 18.9 17.4 17.7
19.2 18.8 16.5 17.6
19.2 17.3 18.3 18.9
17.6 19.3 17.6 15.8
15.7 18.2 16.1 15
16.6 17.7 18.6 19.1
18.3 19.1 17.8 15.1
13.5 17 16.2 14.1
15 17.6 19.1 18.9
18.7 19.3 17.9 15.2
13.2 16.3 16.7 14.3
14.5 17.8 19.3 18.8
19 19.2 18 15.7
13.1 16 17.6 14.8
14.7 17.8 19.4 18.6
19.5 19 18.2 17.5
14.1 16.1 19 17.2
15.6 17.9 19.8 18.1
19.5 18.9 18 20.3
16.8 16.7 19.6 20.7
40 17.7 18 19.8 17.8
19.1 18.9 17.7 22.2
20.2 17.7 19.2 [22.7]
20.3 17.8 19.4 17.7
18.4 18.8 17.3 22
20.9 18.9 18.4 22.4
21.2 17.6 18.7 17.6
17.5 18.2 16.6 20.2
21 18.8 16.4 20.6
21 17.2 17.6 17.1
16.8 17.4 15.7 16.7
18.2 18.5 14.5 16.4
18.2 16.6 16.9 16.3
16.1 16.6 14.5 13.8
14.2 17 12.9 12.8
14.9 16.1 16.1 15.5
16.1 15.8 13.7 11.9
11.1 15.2 12.2 10.8
12.5 15.4 16.1 14.7
30 15.9 15.8 13 10.9
9.8 13.4 11.5 9.9
11.1 14.6 16.4 14.8
15.7 16.3 12.9 10.1
8.8 12.3 11.4 9
10.2 13.9 16.5 15.2
15.6 16.6 13.5 10.1
8.1 11.7 12 9
9.6 13.4 16.5 15.6
15.2 16.5 14 10.8
8.2 11.1 12.6 9.8
9.7 12.8 16.3 15.8
14.7 16.4 14.8 11.7
9.1 11.2 13.7 10.8
10.4 12.8 15.9 16
14.6 16.2 15.5 13.1
10 12 15.4 12.2
11.4 13.7 15.7 16.2
15.6 16.1 16.3 15.4
11.9 12.5 17.3 15.3
20 13.2 14.4 16.6 16.2
16.2 17 16.8 18.7
15.4 14.1 18.9 19.2
16 15.5 17.3 17
17.1 17.6 17.5 21.7
19.5 16 19.4 22.2
19.3 16.4 18.2 17.6
17.6 18.8 17.8 22
21.5 17.9 19.4 22.2
21.3 17.1 18.8 18.5
17.7 19.5 18 21.2
21.8 18.7 18.2 21.5
21.5 17.5 19 19.3
17.8 19.9 18.2 18.6
19.9 19 17.3 18.2
19.8 17.8 19 19.7
18.1 19.9 18.2 16.4
16.3 18.6 16.6 15.5
17 18 19.1 19.7
18.6 19.7 18.1 15.5
10 13.8 17.3 16.5 14.4
15.2 17.8 19.3 19.3
18.8 19.5 18.1 15.3
13.2 16.4 16.8 14.4
14.6 17.7 19.4 18.9
19 19.2 18 15.9
13.1 15.9 17.6 14.8
14.5 17.7 19.3 18.6
19.2 18.8 18.1 17.4
13.9 15.8 18.8 16.9
15.3 17.5 19.4 17.9
19 18.5 17.7 20.1
16.4 16.2 19.5 20.1
17.4 19.1 17.4
Part1
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 59/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
5 BRIDGE B 24 B
5.3 Calculation results, BRIDGE B 24 B
5.3.1 Table, TOTAL AREA B 24 r (E)
17.2 17.4 22
17 18.3 18.2 17.3
19.6 16.9 18.8 22.1
19.6 16.9 18.4
17.3 17.7 16.5 21.5
20.2 18 17.7 21.4
20.4 16.4 17.3 16.4
0 16.6 15.3 19.4
17.7 16 19.5
15.7 15.7 15.4 15.2
14.8 15.2 13.9 15.5
14.3 13.9 12.7 15.1
13.6 12.1 12
12.2 10.5 11.1
10.5 9.6
9.1 8.6
8
7.2
5 10 15 20 25 30 35 40
[m]
Illuminance [lx]
Part2
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 60/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
(10.2) 12
[m] 14 15.4 16
55 17.4 16 16.2 17.7
16.6 18.1
19.5 17.6 19 18
50 18 16.2
19 19.1 18.1
15.8 17.4
45 19.2 19.5 17.1
16.1 17.6 18.7 17.9
19.3 19.4 19.2
40 18.4 17
19.9 17.6
17 17.3 16.8
35 17.5 16.2 16.6 14.6
16.1 16.1 12.6
12 13.8 15.5 13.5
30 15.7 16.6 11.5
10.4 12.3 16.3 15
25 14.7 15.8 13.4
12 16.1 16.3
14 16.2 17.8
20 17.5 17.6
17.7 16.8 17.6 19.2
17.8 19.3
15 [20.2] 18 19.9 18.8
18.2 19.3 16.9
16 17.4 19.4 18.3
10 18.9 19.2 17
15.5 17.2 18.4 17.7
5 18.7 18.7 19.3
19 16.5 17.4 16
15.7 15.3 16.2
0 14.3 12.3
(10.2)
5 10 15 20 25 30 35
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 61/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
15.3
[m] 16.5
55 18.1 17.4
19.8 18.4
20.8 20.6 18.5
23.4 20.9 19.1
24.1 20.5 21.2
22.9 20.8 23.2
25.6 23.6 24.3
26.6 22.6 22.2
23.9 21.9 23.9
26.3 25.7 24.5
26.9 23.8 22
25.1 21.9 22.6 23.6
50 27.4 26.4 22.4
27.7 24.3 21.4
24.2 22.4 21.5 21.4
25.7 26.5 20.4
25.6 24.3 21.8
22.4 22.9 21 19.1
23.3 25 19.1 16.3
23.6 23.7 22.1
20.2 23.2 20.7 17.2
21.1 23.7 18.4 14.6
21.8 22.9 22.5
18.3 22.6 21.1 16.1
19.4 23.1 18.5 13.3
45 20.8 22.7 22.5
17.3 22.1 21.3 15.8
18.6 22.5 18.8 12.8
20.3 23.1 22.3
17.6 22.4 21.7 16.2
18.7 22.4 19.5 13.4
20.2 23.3 22.4
18.9 23.2 22.4 17.5
19.7 22.2 21.1 14.7
20.6 23.1 23.2
20.6 23.4 23.6 19.3
21.4 22.1 23.2 16.4
21.9 22.6 24.3
40 22.4 25.4 21.8
23.6 22.6 22.8 18.3
22.4 24.1 25.5
24.2 23.8 25.8 24
26.2 23.7 22.7 19.7
23 24.1 26
25.7 26 25.5 24.1
28 25.2 23 19.5
23.8 24.1 25.5
25.8 27.8 25.1 23.7
27.6 26.1 22.7 19.1
23.8 22.5 24.9
26.2 27.4 22.6 23.2
35 27.8 25.8 21.4 18.9
22.9 20.7 22
24.5 27.1 20.4 20.4
25.2 25 20.6 16.8
22 19.8 19.1
21.6 24.4 18.6 17.3
21.8 22.9 19.8 14.6
20.8 18.5 16.6
18.4 21.5 17 14.5
18.8 20.9 19.3 12.3
19.4 17.7 14.7
15.4 19.1 15.9 12.4
16 19.3 18.2 10.2
30 18.2 16.8 13.6
13.5 16.7 14.9 11.2
14.2 17.7 16.9 8.9
17.2 15.7 12.6
12.5 15.3 13.9 10.4
13.2 16.6 16.1 8.2
16.8 14.9 11.8
11.9 14.3 13.4 10
12.6 15.6 16.2 7.8
16.4 15 11.5
11.3 13.5 13.4 9.7
12.2 14.9 16.3 (7.6)
15.9 15.5 11.6
25 11.3 13.3 14 9.9
12.4 14.6 16.4 7.7
15.6 16.2 12.1
11.5 13.7 14.9 10.3
12.9 15.3 16.4 8.2
16.3 16.8 13
12.2 14.5 16 11
13.7 16.3 17 8.9
17.5 17.9 14.2
13.7 15.4 17.7 12.4
15 17.3 18.2 10.2
18.5 19.1 16.2
16.1 16.6 19.6 14.5
20 17.2 18.2 19.5 12.3
19.2 20.7 18.8
18.9 18.4 21.8 17.3
20 19.5 20.3 14.5
19.8 22.4 21.8
21.8 20.6 24.3 20.5
23 21 20.9 16.7
20.8 23.2 24.9
24.5 23.3 25.1 23.1
26.3 23 21.7 18.5
22.5 23.9 25.3
25.7 26.2 25.5 23.1
27.4 25.2 22.9 18.2
15 23.7 24 25.9
26.7 27.2 25 23.6
28.1 25.8 22.9 18.8
23.7 23 24.8
27.2 27.7 23.2 23
22.4
Part1
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 62/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
23.3
19.4
19.6
18.1
Part2
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 63/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
5 10 15 20 25 30 35
[m]
Illuminance [lx]
Part3
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 64/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
[m]
Part4
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 65/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
20.521.2
20.8 23
[m] 26.926.4 24.2
50 22.721.4
21.9 23.3 18.4
22.322.3
45 18.922.1 18.9
23.3 24.6
40 24.1 24 25.3
23 24.1
27.625.3 24.3
35 20.618.6
19.7 19.8 15.4
30 17.615.3
13.415.5 (11.8)
16.5 15
25 12.715.4 11.9
17 18.4
16.318.7 16.7
20 19.823.7
25.7 24.9 25.4
15 23 23.5
[28] 25.9 22.8
23.321.9
10 21 23.2 17.7
22.322.3
20.722.5 19.7
5 22.424.8
27.125.2 25.3
0 21.7 21
20
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0 27.5 30.0 32.5
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 66/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
19.8 19.2
[m] 17.2 16.6
50 21.3 20.9 16.1 14.1
19.3 18.9 11.4 9.6
14.7 16.4 18.5 17.7 7.5
45 18.5 20.5 18 18.7
15.6 17.1 20.2 19.2 13.2
40 18.9 20.6 19.6 21.3
23.3 21.3 19.9 17.3 14.8
18.8 17.7 14.1 12
35 19.7 18.8 16.6 13.8 8.9
17.5 16.9 10.9 8.5
12 13.3 15.7 13.1 5.9
30 10.2 7.9
15.5 17.5
10.1 12.1 17.3 15 (5.4)
25 14.8 17.4 12.3 10.3
12.1 13.9 18 17.6 7.8
16.5 19 17.7 17.6
20 12.3
20.5 20.3 19.6 19.6
20.3 21.5 21.3 23
15 [24.3] 22.4 21.9 20.2 15.2
21.5 22.3 17.9 16.2
16.2 17.9 22.7 20.2 11.5
10 17.1 14.6
20.4 22.5
15.1 17.1 22.4 21.2 11.1
5 19.5 21.5 21.1 21
22.1 20.6 21 13.8
20 20.6
0 19 18.8 21.5 13.8
17.9 15.6
12.9 10.8
-5 7.9
5 10 15 20 25 30 35 40
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 67/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
19 17.2 16.6
[m] 16.2 14.5
50 21.2 19.3 11.9 10.1
18.7 18.4
16.9 18.4 17.6 17.2 17.6
45 20.1 20
16.7 18.9 19.3 19.7
21 20.6 21.6
40 20.1 19 18.4 15.8
18.8 18 14
20.6 18 15.5 12.5
35 9.9
16.7 15.7
15.2 16.4 13.3 10.5
30 17.2 16.8 (8.3)
12.7 15.1 14.8 12.1
17.3 17.8 9.7
25 12.6 15.1 16.6 14.7
17.6 18.3 13.2
15.8 17.9 18.5 19.8
20 19.9 20.6 21.9
21.9 20.9 20.2 20.4
15 21.7 22.3 21.1
21.7 21.5 20.7 17.9
22.5 [22.8] 15.5
10 17.6 20.1 21 18.3
22.4 22.3 15.9
17.3 19.5 21.3 21.4
5 21.3 21.1 22.5
20.5 19 20 20 20.8
0 18.8 18.1
16.1 13.5
11.6
5 10 15 20 25 30 35
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 68/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
15.9
16.9
17.2
[m] 22.6 22.3
22.2 26.2
50 18.8
18.7 20
20 19.6
45 19.3
14.7 20.9
19 19.5
19.8
40 19 23.5
20.2 [27.2]
19.5
23.2 22.5
22.5 24.7
35 17.5
16.8 16.8
17.5 15.2
30 15.9
10.6 14.1
13.9 11.5
14.8
25 (9.6) 14.5
13.4 12.9
15.9
12.9 18.4
20 16.1 20
17.4
22 23.4
21.6 27.1
15 19.5
23.5 21.4
22.3 22.7
19.5
10 16.3 20.1
19.5 18
18.9
16.3 20.9
5 18.5 22.1
18.4
22.9 22.8
20.4 26
0 16.4
17.1
18.1
5 10 15 20 25 30 35
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 69/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
16.8
17.4
[m] 22.7 24
50 18.7
20 19.8
19.3
45 18.4 20.2
19.7
20.2 25
40 19.5
23.2 23.4
35 17.3
17.7 16.2
15.8
30 13.4 12.9
14.8
(12.7) 13.8
25
16.1
15.7 19.1
20 17.8
22 [25.2]
19.5
15 21.8
22.8
19.6
10 19 19.1
19
18.3 21.3
5 18.6
21.2 24.4
0 16.2
17.3
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 70/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
2732
2722
2712
2702
2692
2682
2672
2662
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 71/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
2724
2714
2704
2694
2684
2674
2664
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 72/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
2726
2721
2716
2711
2706
2701
2696
2691
2686
2681
2676
2671
2666
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 73/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
2727
2722
2717
2712
2707
2702
2697
2692
2687
2682
2677
2672
2667
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 74/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
2726
2721
2716
2711
2706
2701
2696
2691
2686
2681
2676
2671
2666
2661
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 75/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
2723
2718
2713
2708
2703
2698
2693
2688
2683
2678
2673
2668
2663
7780 7785 7790 7795 7800 7805 7810 7815 7820 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 76/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
2728
2723
2718
2713
2708
2703
2698
2693
2688
2683
2678
2673
2668
2663
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 77/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2724
2719
2714
2709
2704
2699
2694
2689
2684
2679
2674
2669
2664
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 78/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
6 BRIDGE E 11
6.1 Description, BRIDGE E 11
6.1.1 Floor plan
y [m]
3584
3559
3534
3509
3484
3459
3434
3409
3384
3359
3334
3309
3284
7644 7669 7694 7719 7744 7769 7794 7819 7844 7869 7894 7919 7944 x [m]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 79/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
6 BRIDGE E 11
6.2 Summary, BRIDGE E 11
6.2.1 Result overview, TOTAL AREA E 11 r
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.2 lx
Minimum illuminance Emin 7.2 lx
Maximum illuminance Emax 23.1 lx
Uniformity Uo Emin/E̅m 1:2.24 (0.45)
Diversity Ud Emin/Emax 1:3.21 (0.31)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 80/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
6 BRIDGE E 11
6.2 Summary, BRIDGE E 11
6.2.1 Result overview, TOTAL AREA E 11 r
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 81/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 18.7 lx
Minimum illuminance Emin 14.6 lx
Maximum illuminance Emax 22.9 lx
Uniformity Uo Emin/E̅m 1:1.29 (0.78)
Diversity Ud Emin/Emax 1:1.57 (0.64)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 82/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 83/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface -0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 20.8 lx
Minimum illuminance Emin 12 lx
Maximum illuminance Emax 27.9 lx
Uniformity Uo Emin/E̅m 1:1.73 (0.58)
Diversity Ud Emin/Emax 1:2.32 (0.43)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 84/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 85/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 21.4 lx
Minimum illuminance Emin 16.2 lx
Maximum illuminance Emax 27 lx
Uniformity Uo Emin/E̅m 1:1.32 (0.76)
Diversity Ud Emin/Emax 1:1.67 (0.6)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 86/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 87/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 15.1 lx
Minimum illuminance Emin 7.1 lx
Maximum illuminance Emax 19.5 lx
Uniformity Uo Emin/E̅m 1:2.14 (0.47)
Diversity Ud Emin/Emax 1:2.76 (0.36)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 88/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 89/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.2 lx
Minimum illuminance Emin 12.6 lx
Maximum illuminance Emax 19.4 lx
Uniformity Uo Emin/E̅m 1:1.28 (0.78)
Diversity Ud Emin/Emax 1:1.54 (0.65)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 90/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 91/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.8 lx
Minimum illuminance Emin 13.3 lx
Maximum illuminance Emax 20.5 lx
Uniformity Uo Emin/E̅m 1:1.26 (0.79)
Diversity Ud Emin/Emax 1:1.54 (0.65)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 92/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 93/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 17.2 lx
Minimum illuminance Emin 14 lx
Maximum illuminance Emax 20.4 lx
Uniformity Uo Emin/E̅m 1:1.23 (0.81)
Diversity Ud Emin/Emax 1:1.46 (0.69)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 94/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 95/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
8
7 5
6 2
1 4
3
Horizontal illuminance
No. Measuring surface Grid E̅m Emin Emax Uo Ud
1.1 TOTAL AREA E 11 r 10 x 14 16.2 lx 7.2 lx 23.1 lx 0.45 0.31
1.2 carriage E 11 r 7 x 15 18.7 lx 14.6 lx 22.9 lx 0.78 0.64
1.3 TOTAL AREA E 11 r 8 x 14 20.8 lx 12 lx 27.9 lx 0.58 0.43
1.4 carriage E 11 r 5 x 15 21.4 lx 16.2 lx 27 lx 0.76 0.60
1.5 TOTAL AREA E 11 l 9 x 14 15.1 lx 7.1 lx 19.5 lx 0.47 0.36
1.6 carriage E 11 l 7 x 15 16.2 lx 12.6 lx 19.4 lx 0.78 0.65
1.7 TOTAL AREA E 11 r 5 x 15 16.8 lx 13.3 lx 20.5 lx 0.79 0.65
1.8 carriage E 11 r 3 x 15 17.2 lx 14 lx 20.4 lx 0.81 0.69
Summary 17.5 lx 7.1 lx 27.9 lx 0.40 0.25
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 96/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
6 BRIDGE E 11
6.3 Calculation results, BRIDGE E 11
6.3.1 Table, TOTAL AREA E 11 r (E)
[m] 7.9
13.6 15.3 15.5 15.8
15.8 15.6 15.4 12.2
27.5 7.3
8.9 14 15.8 16.9 17.9
17.7 16.7 15.6 12.7
7.9
25.0 8.9 13.1 15.8 18.2
19.9 19.6 17.6 15.3
11.9 7.9
22.5 9.6 14.1 16.9 19.5
21.4 20.9 18.8 16.5
12.9 8.5
10.8 16.7 19 20.6
20.0 22.1 21.7 20.3 18.8
15.1 9.6
10.8 17.5 20.2 21.7
[23.1] 22.7 21.3 20
17.5 15.8 9.9
11.6 18.5 20.6 21.6
22.5 22.2 21.5 20.3
15.0 16.1 9.8
11.6 18.5 20.6 21.7
22.5 22.3 21.4 20.2
16.4 9.8
12.5 11.1 17.9 20.2 21.4
22.4 22 20.8 19.8
16 9.8
10.0 11.3 17.4 19.5 20.7
22 21.6 20.1 18.8
15.5 9.7
7.5 10.1 14.9 17.6 19.7
21.6 21 18.8 16.5
13.3 8.6
9.2 13.3 16.1 18.5
5.0 20.2 19.7 17.5 15.1
11.5 7.8
9.2 14 15.9 17.2 18.4
2.5 18.1 16.7 15.4 12.1
7.6
8.6 14.2 15.5 15.5
15.9 15.8 15.6 15.5
0.0 12 (7.2)
2 4 6 8 10 12 14 16 18 20 22
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 97/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 4 6 8 10 12 14
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 98/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 4 6 8 10 12 14 16
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 99/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 4 6 8 10
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 100/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 4 6 8 10 12 14 16 18 20 22
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 101/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 4 6 8 10 12 14
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 102/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
2 3 4 5 6 7 8 9 10 12
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 103/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
22.5 16 16.6 17
17.6 18.5 18.7
20.0
18.7 19 19.4
17.5
19.8 19.4 20.3
15.0 19.8 19.7 [20.4]
19.9 19.3 20.3
12.5
18.7 19 19.5
10.0
17.8 18.6 18.6
7.5 16.1 16.6 17
2 3 4 5 6 7
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 104/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
3448.6
3446.1
3443.6
3441.1
3438.6
3436.1
3433.6
3431.1
3428.6
3426.1
3423.6
3421.1
3418.6
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 105/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
3448.8
3446.3
3443.8
3441.3
3438.8
3436.3
3433.8
3431.3
3428.8
3426.3
3423.8
3421.3
3418.8
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 106/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
3447.3
3444.8
3442.3
3439.8
3437.3
3434.8
3432.3
3429.8
3427.3
3424.8
3422.3
3419.8
3417.3
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 107/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
3447.5
3445.0
3442.5
3440.0
3437.5
3435.0
3432.5
3430.0
3427.5
3425.0
3422.5
3420.0
3417.5
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 108/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
3450.7
3448.2
3445.7
3443.2
3440.7
3438.2
3435.7
3433.2
3430.7
3428.2
3425.7
3423.2
3420.7
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 109/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
3450.9
3448.4
3445.9
3443.4
3440.9
3438.4
3435.9
3433.4
3430.9
3428.4
3425.9
3423.4
3420.9
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 110/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
3452.7
3450.2
3447.7
3445.2
3442.7
3440.2
3437.7
3435.2
3432.7
3430.2
3427.7
3425.2
3422.7
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 111/112
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES
Project number : PR25-035_$
Date : 21.01.2025
y [m]
3450.4
3447.9
3445.4
3442.9
3440.4
3437.9
3435.4
3432.9
3430.4
3427.9
3425.4
3422.9
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 27 26 25 24 E 11 Page 112/112
LIGHTING CALCULATION
Project description:
LIGHTING UNDER BRIDGES:
12
29
30
31
The following values are based on precise calculations performed on calibrated lamps and luminaires, and their configurations, whereby
gradual, unavoidable deviations can occur in practice. All guarantee claims are excluded for the specified data.
This exclusion of liability applies irrespective of the legal grounds for both damages and consequential damages suffered by users and third
parties.
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 1/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
1 Luminaire data
1.1 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 S05 7040.100-1M (22-120-01_02)
1.1.1 Data sheet
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 2/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
1 Luminaire data
1.2 AEC ILLUMINAZIONE SRL, MX PRO 1 5P5 S05 7040.140-1M (22-120-01_02)
1.2.1 Data sheet
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 3/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 BRIDGE B-31 A
2.1 Description, BRIDGE B-31 A
2.1.1 Floor plan
y [m]
552
532
512
492
472
452
432
275 295 315 335 355 375 395 415 435 x [m]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 4/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 BRIDGE B-31 A
2.2 Summary, BRIDGE B-31 A
2.2.1 Result overview, TOTAL AREA B 31 l
275 295 315 335 355 375 395 415 435 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 17 lx
Minimum illuminance Emin 9.2 lx
Maximum illuminance Emax 21.5 lx
Uniformity Uo Emin/E̅m 1:1.84 (0.54)
Diversity Ud Emin/Emax 1:2.34 (0.43)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 5/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
275 295 315 335 355 375 395 415 435 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 18 lx
Minimum illuminance Emin 14.7 lx
Maximum illuminance Emax 21.4 lx
Uniformity Uo Emin/E̅m 1:1.22 (0.82)
Diversity Ud Emin/Emax 1:1.45 (0.69)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 6/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
275 295 315 335 355 375 395 415 435 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 17 lx
Minimum illuminance Emin 9.4 lx
Maximum illuminance Emax 21.5 lx
Uniformity Uo Emin/E̅m 1:1.81 (0.55)
Diversity Ud Emin/Emax 1:2.3 (0.44)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 7/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
275 295 315 335 355 375 395 415 435 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 18 lx
Minimum illuminance Emin 14.8 lx
Maximum illuminance Emax 21.4 lx
Uniformity Uo Emin/E̅m 1:1.22 (0.82)
Diversity Ud Emin/Emax 1:1.45 (0.69)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 8/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 BRIDGE B-31 A
2.3 Calculation results, BRIDGE B-31 A
2.3.1 Table, TOTAL AREA B 31 l (E)
[m] 14.4 14.7 14.9 15.8 16.3 15.8 14.9 15.4 15.1 10.4
25.0
15.6 15.8 16.2 17.3 17.8 17.3 16.2 15.8 15.1 10.6
22.5 15.6 16.3 17.4 18.8 19.4 18.8 17.4 16.7 15.7 11.1
20.0 16.8 17.3 18 19.5 20.3 19.5 18.2 17.9 17.2 12.1
17.5 17.6 18.1 18.8 20.5 21.3 20.3 18.6 18.2 17.4 12.1
17.8 18.3 19.1 20.7 21.3 20.4 18.7 17.8
15.0 16.7 11.7
16.9 17.8 19.1 20.9 [21.5] 20.6 18.9 17.7 16.4 11.6
12.5
17.2 17.9 18.9 20.6 21.3 20.5 18.9 18.3 17.3 12.1
10.0 17.8 18.2 18.8 20.6 21.3 20.2 18.6 18.1 17.1 11.7
7.5 17.6 17.8 18.3 19.7 20.2 19.3 17.8 17.3 16.3 11.3
16.1 16.7 17.6 18.9 19.3 18.5 17.1 16.2
5.0 15.1 10.7
15.4 15.8 16.3 17.4 17.8 17.1 16.1 15.8 15.1 10.4
2.5
15.4 15.1 15 15.9 16.2 15.6 14.8 14.9 14 (9.2)
2 4 6 8 10 12 14 16 18 20
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 9/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 4 6 8 10 12 14
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 10/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
[m] (9.4) 14.2 14.8 14.8 15.6 16.2 15.8 14.9 15.1 15.2
25.0
10.6 15.2 15.8 16.1 17.2 17.8 17.4 16.3 15.7 15.3
22.5 10.9 15.3 16.2 17.2 18.6 19.3 18.9 17.5 16.6 16
20.0 11.5 16.3 17.3 17.8 19.3 20.2 19.7 18.3 17.8 17.5
17.5 12 17.3 18.1 18.6 20.2 21.1 20.5 18.8 18.1 17.7
12.4 17.5 18.3 18.9 20.5 21.3 20.6 18.8
15.0 17.9 17
11.8 16.6 17.7 19 20.7 [21.5] 20.9 19.1 17.7 16.7
12.5
11.9 16.8 17.9 18.7 20.4 21.3 20.7 19 18.3 17.7
10.0 12.4 17.6 18.2 18.6 20.4 21.3 20.4 18.7 18.1 17.5
7.5 12.3 17.4 17.9 18.3 19.6 20.3 19.5 18 17.3 16.7
11.4 15.9 16.7 17.5 18.8 19.4 18.7 17.4
5.0 16.3 15.5
10.8 15.2 15.8 16.3 17.3 17.8 17.3 16.2 15.8 15.5
2.5
10.7 15.2 15.3 15 15.8 16.3 15.8 14.9 14.8 14.4
2 4 6 8 10 12 14 16 18 20
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 11/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 4 6 8 10 12 14
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 12/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
498.8
496.3
493.8
491.3
488.8
486.3
483.8
481.3
478.8
476.3
473.8
471.3
317 319 321 323 325 327 329 331 333 335 337 339 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 13/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
499.0
496.5
494.0
491.5
489.0
486.5
484.0
481.5
479.0
476.5
474.0
471.5
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 14/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
499.8
497.3
494.8
492.3
489.8
487.3
484.8
482.3
479.8
477.3
474.8
472.3
354 356 358 360 362 364 366 368 370 372 374 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 15/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
497.5
495.0
492.5
490.0
487.5
485.0
482.5
480.0
477.5
475.0
472.5
357 359 361 363 365 367 369 371 373 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 16/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
3 BRIDGE B 30 A
3.1 Description, BRIDGE B 30 A
3.1.1 Floor plan
y [m]
1248
1238
1228
1218
1208
1198
1188
1178
1168
1158
1148
246 271 296 321 346 371 396 421 446 471 496 521 546 571 x [m]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 17/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
3 BRIDGE B 30 A
3.2 Summary, BRIDGE B 30 A
3.2.1 Result overview, TOTAL AREA B 30 l
246 271 296 321 346 371 396 421 446 471 496 521 546 571 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 21 lx
Minimum illuminance Emin 11.5 lx
Maximum illuminance Emax 28.3 lx
Uniformity Uo Emin/E̅m 1:1.83 (0.55)
Diversity Ud Emin/Emax 1:2.46 (0.41)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 18/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
246 271 296 321 346 371 396 421 446 471 496 521 546 571 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 19.2 lx
Minimum illuminance Emin 11.1 lx
Maximum illuminance Emax 26.6 lx
Uniformity Uo Emin/E̅m 1:1.73 (0.58)
Diversity Ud Emin/Emax 1:2.4 (0.42)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 19/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
246 271 296 321 346 371 396 421 446 471 496 521 546 571 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.9 lx
Minimum illuminance Emin 6.3 lx
Maximum illuminance Emax 28.4 lx
Uniformity Uo Emin/E̅m 1:2.69 (0.37)
Diversity Ud Emin/Emax 1:4.5 (0.22)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 20/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
246 271 296 321 346 371 396 421 446 471 496 521 546 571 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 15.4 lx
Minimum illuminance Emin 6.3 lx
Maximum illuminance Emax 25.6 lx
Uniformity Uo Emin/E̅m 1:2.46 (0.41)
Diversity Ud Emin/Emax 1:4.08 (0.24)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 21/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
246 271 296 321 346 371 396 421 446 471 496 521 546 571 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used High indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 21.1 lx
Minimum illuminance Emin 10.7 lx
Maximum illuminance Emax 27.6 lx
Uniformity Uo Emin/E̅m 1:1.97 (0.51)
Diversity Ud Emin/Emax 1:2.58 (0.39)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 22/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
3 BRIDGE B 30 A
3.3 Calculation results, BRIDGE B 30 A
3.3.1 Table, TOTAL AREA B 30 l (E)
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 23/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
0 2 4 6 8 10 12
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 24/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
0 2 4 6 8 10 12 14 16
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 25/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
0 2 4 6 8 10 12
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 26/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 3 4 5 6 7 8 9
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 27/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
1215
1210
1205
1200
1195
1190
1185
1180
1175
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 28/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
1216
1211
1206
1201
1196
1191
1186
1181
1176
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 29/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
1217
1212
1207
1202
1197
1192
1187
1182
1177
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 30/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
1217
1212
1207
1202
1197
1192
1187
1182
1177
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 31/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
1217
1212
1207
1202
1197
1192
1187
1182
1177
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 32/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
4 BRIDGE B 29
4.1 Description, BRIDGE B 29
4.1.1 Floor plan
y [m]
2046
2036
2026
2016
2006
1996
1986
1976
1966
1956
1946
231 256 281 306 331 356 381 406 431 456 481 506 531 x [m]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 33/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
4 BRIDGE B 29
4.2 Summary, BRIDGE B 29
4.2.1 Result overview, TOTAL AREA B 29l
231 256 281 306 331 356 381 406 431 456 481 506 531 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 21 lx
Minimum illuminance Emin 13.4 lx
Maximum illuminance Emax 26.6 lx
Uniformity Uo Emin/E̅m 1:1.57 (0.64)
Diversity Ud Emin/Emax 1:1.99 (0.5)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 34/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
231 256 281 306 331 356 381 406 431 456 481 506 531 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 19.2 lx
Minimum illuminance Emin 13.2 lx
Maximum illuminance Emax 24 lx
Uniformity Uo Emin/E̅m 1:1.46 (0.69)
Diversity Ud Emin/Emax 1:1.82 (0.55)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 35/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
231 256 281 306 331 356 381 406 431 456 481 506 531 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 16.8 lx
Minimum illuminance Emin 6.3 lx
Maximum illuminance Emax 25.9 lx
Uniformity Uo Emin/E̅m 1:2.67 (0.37)
Diversity Ud Emin/Emax 1:4.11 (0.24)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 36/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
231 256 281 306 331 356 381 406 431 456 481 506 531 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 15.2 lx
Minimum illuminance Emin 6.3 lx
Maximum illuminance Emax 23.7 lx
Uniformity Uo Emin/E̅m 1:2.4 (0.42)
Diversity Ud Emin/Emax 1:3.73 (0.27)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 37/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
231 256 281 306 331 356 381 406 431 456 481 506 531 x [m]
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 21.4 lx
Minimum illuminance Emin 14.7 lx
Maximum illuminance Emax 25.6 lx
Uniformity Uo Emin/E̅m 1:1.45 (0.69)
Diversity Ud Emin/Emax 1:1.74 (0.58)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 38/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
4 BRIDGE B 29
4.3 Calculation results, BRIDGE B 29
4.3.1 Table, TOTAL AREA B 29l (E)
2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5 25.0
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 39/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
0 2 4 6 8 10 12
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 40/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 4 6 8 10 12 14 16
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 41/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
0 2 4 6 8 10 12
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 42/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 3 4 5 6 7 8
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 43/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2014
2009
2004
1999
1994
1989
1984
1979
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 44/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2014
2009
2004
1999
1994
1989
1984
1979
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 45/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2015
2010
2005
2000
1995
1990
1985
1980
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 46/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2015
2010
2005
2000
1995
1990
1985
1980
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 47/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
2015
2010
2005
2000
1995
1990
1985
1980
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 48/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
5 BRIDGE B 12 E
5.1 Description, BRIDGE B 12 E
5.1.1 Floor plan
y [m]
2792
2782
2772
2762
2752
2742
2732
2722
2712
2702
2692
2682
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 49/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
5 BRIDGE B 12 E
5.2 Summary, BRIDGE B 12 E
5.2.1 Result overview, TOTAL AREA B 12 l
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 17.6 lx
Minimum illuminance Emin 8.8 lx
Maximum illuminance Emax 22.4 lx
Uniformity Uo Emin/E̅m 1:2 (0.5)
Diversity Ud Emin/Emax 1:2.54 (0.39)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 50/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 20.4 lx
Minimum illuminance Emin 17.6 lx
Maximum illuminance Emax 22.2 lx
Uniformity Uo Emin/E̅m 1:1.16 (0.86)
Diversity Ud Emin/Emax 1:1.26 (0.79)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 51/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 17.6 lx
Minimum illuminance Emin 8.7 lx
Maximum illuminance Emax 22.5 lx
Uniformity Uo Emin/E̅m 1:2.02 (0.49)
Diversity Ud Emin/Emax 1:2.59 (0.39)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 52/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
General
Calculation algorithm used Average indirect fraction
Height of evaluation surface 0.00 m
Height (phot.centre) [m]: 7.47 m
Maintenance factor 0.80
Illuminance
Average illuminance E̅m 20.4 lx
Minimum illuminance Emin 17.6 lx
Maximum illuminance Emax 22.3 lx
Uniformity Uo Emin/E̅m 1:1.16 (0.86)
Diversity Ud Emin/Emax 1:1.26 (0.79)
Type No.\Make
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 53/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
5 BRIDGE B 12 E
5.3 Calculation results, BRIDGE B 12 E
5.3.1 Table, TOTAL AREA B 12 l (E)
2 4 6 8 10 12 14 16
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 54/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
1 2 3 4 5 6 7 8 9 10
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 55/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2 4 6 8 10 12 14 16
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 56/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
[m]
19.8 19.3 18.6 18.9 (17.6)
32.5
19.6 20.2 20.1 20.1 18.4
30.0
20 20.9 21 20.1 17.8
27.5
21.4 21.8 21.4 20.8 18.6
25.0 [22.3] 22.1 21.5 21.6 20.3
1 2 3 4 5 6 7 8 9 10
[m]
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 57/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
2764
2759
2754
2749
2744
2739
2734
2729
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 58/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
2764
2759
2754
2749
2744
2739
2734
2729
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 59/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
y [m]
2764
2759
2754
2749
2744
2739
2734
2729
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 60/61
Object : LIGHTING CALCULATION
Installation : LIGHTING DESIGN UNDER BRIDGES E11 E30
Project number : PR25-035_$
Date : 22.01.2025
2760
2755
2750
2745
2740
2735
2730
0 2 3 5 7.5 10 15 20 30
Illuminance [lx]
AEC ILLUMINAZIONE
BRIDGES - B 12 29 30 31 Page 61/61