Create Gantt Chart and Cash Flow Using Excel With a File

The document provides instructions on creating a Gantt chart and cash flow using an automated Excel sheet. It explains the components of the sheet, including bar charts and cash flow generation, and details the steps for inputting data to visualize project schedules and progress. Additionally, it includes links to further resources and contact information for Planning Engineer FZE.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

Create Gantt Chart and Cash Flow Using Excel With a File

The document provides instructions on creating a Gantt chart and cash flow using an automated Excel sheet. It explains the components of the sheet, including bar charts and cash flow generation, and details the steps for inputting data to visualize project schedules and progress. Additionally, it includes links to further resources and contact information for Planning Engineer FZE.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Planning Engineer FZE Project Management & Planning Services and Training

‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

Create Gantt Chart and Cash Flow using Excel with a sample file

How to create a Time Schedule, Gantt chart, Bar chart, and Cash Flow using the
attached Excel.
This Microsoft Excel sheet is fully automated and it will create the cash flow and draw
the Gantt chart for you.

What is a Gantt Chart?


A Gantt chart is a type of bar chart, developed by Henry Gantt in the 1910s, that illustrates a
project schedule.
Gantt charts illustrate the start and finish dates of the terminal elements and summary
elements of a project. Terminal elements and summary elements comprise the work
breakdown structure of the project.
Some charts also show the dependency (i.e. precedence network) relationships between
activities. Gantt charts can be used to show the current schedule status using percent-
complete shadings and a vertical “TODAY” line.

How is my Microsoft Gantt chart working:


1- The sheet is based on working days, the first step is to identify the holidays
and weekends.
2- Fill in the budget cost, planned start, planned finish, the activity duration (working days),
planned value, and the planned % as of data date will be calculated automatically based on
step no.1.
3- Fill in the actual date and the actual % completed and all other values will be filled
automatically.
4- Cash flow will be created automatically.
This is the view of the sheet.

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
[email protected] https://planningengineer.net/
Page 1 of 6
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

What is the component of the sheet?


1. Bar Chart
Add the activity name, budgeted cost, planned start, and planned finish in the Excel sheet for the not
started activities then all these columns will be calculated automatically

2. Data sheet
In the holidays columns put the year holidays and choose the weekend holidays.

There are a variety of holidays on the list.

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
[email protected] https://planningengineer.net/
Page 2 of 6
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

3. Cash Flow
This cash flow is automatically generated from the budgeted cost inserted and it is distributed on the
duration in weeks.

How does it work?


1. Add new activity, put 1M as a budget cost, and the planned start.

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
[email protected] https://planningengineer.net/
Page 3 of 6
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

2. Once you add the planned finish, all these data are calculated.

The bar chart shows the activities in the timeline.

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
[email protected] https://planningengineer.net/
Page 4 of 6
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

3. Give the activity the actual 10% and observe what is the difference.

The bar chart shows the actual % of work and the remaining work. It also shows that the
remaining work is delayed because it exceeds the planned dates.

This is the legend of the chart, once you change the data date the chart will be changed.

Watch this video

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
[email protected] https://planningengineer.net/
Page 5 of 6
Planning Engineer FZE Project Management & Planning Services and Training
‫بالنينغ إنجينير م م ح‬ ‫خدمات وتدريب إدارة المشروعات والتخطيط‬

Article Link: https://planningengineer.net/create-gantt-chart-and-cash-flow-using-excel-with-


sample-file/

---------------

Useful links:

Join our email Newsletter, we send useful free content regularly:


https://planningengineer.net/newsletter/

Our Services https://planningengineer.net/our-services/

Our Courses: https://planningengineer.net/lp-courses/

Free Arabic Basic Course Playlist:


https://youtube.com/playlist?list=PL7qHhNmknL6F5IOHAsNnPVMt1X-fvYe3J

---------------

Keep in Touch:

WhatsApp: +201277767728

Email: [email protected]

English YouTube Channel: https://www.youtube.com/c/PlanningengineerNet/videos

Arabic YouTube Channel: https://www.youtube.com/@planningengineer3906

Linked in: https://www.linkedin.com/company/planning-engineer-est/

Facebook Page: https://www.facebook.com/PlanningEngineerDotNet

Facebook Group: https://www.facebook.com/groups/1138400132963230

Twitter: https://twitter.com/PlanningEEst

Instagram: https://www.instagram.com/planningengineerest/

TikTok: https://www.tiktok.com/@planningengineerest

---------------

Business Centre, Sharjah


+971 563 444 875
Publishing City Free Zone, Sharjah,
[email protected] https://planningengineer.net/
Page 6 of 6

You might also like