0% found this document useful (0 votes)
11 views7 pages

31 - Canteen For LB

The document is a Project Close Out Report for the construction of the New Khanki Barrage and its auxiliary works. It includes details about the contractor's temporary site facilities, specifically the labor canteen. The report signifies the completion of the project and outlines relevant aspects of the construction process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views7 pages

31 - Canteen For LB

The document is a Project Close Out Report for the construction of the New Khanki Barrage and its auxiliary works. It includes details about the contractor's temporary site facilities, specifically the labor canteen. The report signifies the completion of the project and outlines relevant aspects of the construction process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Project Close Out Report

Construction of New Khanki Barrage and Auxiliary Works

Contractor’s Temporary Site Facility


Labour canteen

You might also like