14 a) List and explain the essential components of a simple open cycle gas turbine (7)
plant? How inter cooling and regeneration help in improving thermal efficiency
of the plant?
b) With neat sketches, explain the different ways in which gas turbine-steam turbine (7)
combinations are achieved.
Module III
15 a) With a neat sketch, explain the working of a liquid metal cooled fast breeder (8)
reactor. Enumerate its advantages and disadvantages also.
b) List the different moderators used in a nuclear power plant. What properties make (6)
them suitable as moderators?
OR
16 a) Explain the working of a gas cooled reactor with a neat sketch. Enlist the (8)
advantages and disadvantages of the same.
b) Differentiate between nuclear fission and nuclear fusion. Give examples for both. (6)
Module IV
17 a) Explain about horizontal axis wind turbines with a neat sketch. Where are they (8)
preferred?
b) Explain the factors to be considered while selecting the site for a hydroelectric (6)
power plant.
OR
18 a) Explain the construction and working of a geothermal power plant. (8)
b) Mention the advantages and disadvantages of wind as a non-conventional energy. (6)
Module V
19 a) Draw the load curve and explain its significance. (6)
b) Summarize power plant economics and explain the fixed and operating cost of a (8)
power station.
OR
20 A generating station has a maximum demand of 30 MW, a load factor of 0.6, a (14)
plant capacity of 0.48, and a plant use factor of 0.82. Find: (i) The daily energy
produced. (ii) The reserve capacity of the plant. (iii) The maximum energy that
could be produced if the plant were running all the time. (iv) The maximum energy
that could be produced daily, if the plant when running according to operating
schedule were fully loaded.
****