The document outlines the bill of quantities for the construction project 'KAI GENUJI PALANDE PRATHAMIK ASHRAM SHALA', detailing various construction activities, their measurements, and specifications. It includes information on earthwork, concrete work, steel reinforcement, finishing work, and waterproofing, along with the respective quantities and units. The total area calculated for the building is 487.977 square meters across three floors.

Uploaded by

ranjitha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views56 pages

School Building Estimation-10.12.2023

The document outlines the bill of quantities for the construction project 'KAI GENUJI PALANDE PRATHAMIK ASHRAM SHALA', detailing various construction activities, their measurements, and specifications. It includes information on earthwork, concrete work, steel reinforcement, finishing work, and waterproofing, along with the respective quantities and units. The total area calculated for the building is 487.977 square meters across three floors.

Uploaded by

ranjitha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 56

S.

NO ITEM DESCRIPTION
1 Adj foundation level to LGL considered 1.5m min as per drawing
2 PCC for Lower ground level flooring thickness considered as 100mm
3 Rubble soling below PCC flooring thickness considered as 200mm
4 Compacted Murrum filling thickness considered as 1m

Reinforcement Chairs and other supporting reinforcement rods to be


5
included in rates which is not calculated/included.
Length in Width in Length in Width in
Ground Floor Unit Area
m m m m
Class Room 1 Sqm 9.195 7.345 67.537 8.85 6.885
Class Room 2 Sqm 6.195 7.345 45.502 5.85 6.885
Passage Sqm 15.39 1.98 30.472 15.39 1.98
Total Area in Sqm Ground Floor 143.511
Length in Width in Length in Width in
First Floor Unit Area
m m m m
Class Room 1 Sqm 6.195 7.345 45.502 5.85 6.885
Class Room 2 Sqm 6.08 7.345 44.658 5.85 6.885
Class Room 3 Sqm 6.195 7.345 45.502 5.85 6.885
Passage Sqm 18.47 1.98 36.571 18.47 1.98
Total Area in Sqm 1st Floor 172.233
Length in Width in Length in Width in
Second Floor Unit Area
m m m m
Class Room 1 Sqm 6.195 7.345 45.502 5.85 6.885
Class Room 2 Sqm 6.08 7.345 44.658 5.85 6.885
Class Room 3 Sqm 6.195 7.345 45.502 5.85 6.885
Passage Sqm 18.47 1.98 36.571 18.47 1.98
Total Area in Sqm 2nd Floor 172.233
Total Area in Sqm 487.977
Area Remarks

60.932
40.277
30.472
131.681

Area Remarks

40.277
40.277
40.277
36.571
157.402

Area Remarks

40.277
40.277
40.277
36.571
157.402
446.485
PROJECT NAME : KAI GENUJI PALANDE PRATHAMIK ASHRAM SHALA
BILL OF QUANTITIES
Unit Rate
Item No Description Unit BOQ Qty. Amount (in Rs) Remarks
(in Rs)
Earthwork in excavation by mechanical means (Hydraulic Excavator)/manual
means in foundation including dressing of sides and ramming of bottoms, for
all lift, including getting out the excavated soil and disposal of surplus soil as
1
directed within lead of 1km.

Upto 1.5m depth


(i) All kind of soil Cum QRO

(ii) Ordinary rock Cum 69.750 -

(iii) Hard rock Cum QRO


Earthwork in excavation by mechanical means (Hydraulic Excavator)/manual
means in foundation including dressing of sides and ramming of bottoms, for
all lift, including getting out the excavated soil and disposal of surplus soil as
2
directed within lead of 1km.

Upto 1.5m to 3.0m depth


(i) All kind of soil Cum QRO

(ii) Ordinary rock Cum QRO

(iii) Hard rock Cum QRO


Earth filling under floors with surplus soil, excavated from foundation and
3 taken only from outside the building plinth, in 15 cm layers, including Cum 27.900 -
ramming watering and consolidating lead up to 30 meters.
PRE CONSTRUCTION ANTI-TERMITE TREATMENT
Diluting and injecting chemical emulsion (Chloropyriphos / Lindane
emulsifiable concentrate of 20% with 1% concentration) for pre-constructional
antitermite treatment and creating a continuous chemical barrier under and
all-round the column pits, wall trenches, top surface of plinth filling, junction
4 of walls and floors, along the external perimeter of building, expansion joints, Sqm 143.512 -
over the top surface of consolidated earth on which apron is to be laid,
surroundings of pipes and conduits etc complete as per CPWD specification.
(Plinth area of the building at ground floor only shall be measured for
payment. Work shall be carried out through an approved specialized agency
and guarantee shall be given for 10 years.)
Damp proof course 40 mm thick of cement concrete 1:2:4 using stone
aggregate 20 mm nominal size with 2coats of bitumen 20/30 penetration, at
5 Sqm 143.512 -
1.65 kg per sqm
laid hot and sanded.
CEMENT CONCRETE WORK:
Providing and laying plain cement concrete (1:3:6) in foundation and
bottom layers of flooring using (1 Cement: 3 Coarse Sand (Zone-III) derived
from natural sources: 6 graded stone 20mm nominal size derived from natural
sources) of approved quality from approved quarry including mixing, lowering,
6 Cum 6.975 -
laying and compacting to proper thickness, watering and curing for the
required period, including cost of all material, labour,
conveyance, loading and unloading, taxes, royalties, scaffolding, sundries,
tools & plants etc., complete as per the direction of Engineer-in-charge
Providing and laying in position M20 grade of concrete with materials from
approved quarry including mixing, lowering, laying and compacting to proper
thickness, watering and curing for the required period, including cost of all
7 -
material, labour, conveyance, loading and unloading, taxes, royalties,
scaffolding, shuttering, sundries, tools & plants etc., complete as per the
direction of Engineer-in-charge

(i) Foundation Cum 13.898

(ii) Column -

a. upto Lower Ground Level Cum 1.490 -

b. Lower Ground Level to Roof Level Cum 18.202 -

(iii) Beam

a. Lower Ground Level Cum 9.168 -


Unit Rate
Item No Description Unit BOQ Qty. Amount (in Rs) Remarks
(in Rs)
b. Upper Ground Level Cum 14.386 -

b. First Floor & Second Floor slab Level Cum 26.910 -

(iii) Slab

a. Upper Ground Level Cum 22.456 -

b. First Floor level Cum 22.786 -

c. Second Floor level Cum 22.786 -


STEEL REINFORCEMENT WORK:
Providing, laying & binding of M.S. round reinforcement bars(Fe500) of
required diameters for straightening, cutting to size, bending, and binding the
grills, lifting and placing in position at all heights & locations as per design
complete including cost of bars, cost of binding wires 22 gauge, labour,
8
conveyance, loading and unloading, taxes, royalties, sundries, tools and
plants upto floor five level, etc. complete as per the direction of the Engineer-
in-charge. (linear measurement will be taken and quantity will be calculated
on standard weight of bars for all heights).
(i) Footing MT 0.869 -

(ii) Column MT 3.021 -

(iii) Beam MT 7.489 -

(iv) Slab MT 6.294 -


FINISHING WORK:
Providing and laying Brick/Cement concrete masonry 150mm/230mm
thick conforming to IS standard in super structure above plinth level to
second floor in cement mortar 1:4 (1 Cement: 4 Coarse Sand) including cost
9 -
of all materials, labour, conveyance, loading and unloading, taxes,
royalties,scaffolding, watering, curing, sundries, tools and plants etc. as per
the direction of the Engineer-in-charge.
(i) Lower Ground Level Cum 24.385 -

(ii) First & Second Floor Cum 66.913 -


Providing Avg. 20 mm thick cement plaster 1:6 (1 cement : 6 sand) to
outside surface of masonry, column, beams and chajjas, racking out joints,
scrapping and cleaning the surface and finishing the plastered surface smooth
10 to proper plumbs and levels and providing grooves as shown in the drawing or
as directed including cost of all materials, labour, conveyance, loading and
unloading., taxes, royalties, scaffolding, watering, curing, sundries, tools and
plants, etc., as per the direction of the Engineer-in-charge
(i) Lower Ground Level Sqm 91.288 -

(ii) First & Second Floor Sqm 490.558 -


Providing Avg. 12 mm thick cement plaster 1:6 (1 cement : 6 sand) to
inside surface of masonry, column, beams and chajjas, racking out joints,
scrapping and cleaning the surface and finishing the plastered surface smooth
11 to proper plumbs and levels and providing grooves as shown in the drawing or -
as directed including cost of all materials, labour, conveyance, loading and
unloading., taxes, royalties, scaffolding, watering, curing, sundries, tools and
plants, etc., as per the direction of the Engineer-in-charge
(i) Lower Ground Level Sqm 237.448 -

(ii) First & Second Floor Sqm 662.483 -


Providing average 6 mm thick cement plaster under ceiling, chajja and
beam proportion 1:4 cement mortar including chipping slurring etc.
12 Sqm 446.485 -
complete.as per the direction of the
Engineer-in-charge
Providing and applying 2 coats acrylic based weather coat paint
(exterior quality) over a coat of primer of approved brand & shade over the
13 surfaces including preparation of surface, with cost of all materials, labour, Sqm 505.454 -
conveyance, taxes, royalties, scaffolding, watering, curing, sundries, tools and
plants, etc., as per the direction of the Engineer-in-charge.
Unit Rate
Item No Description Unit BOQ Qty. Amount (in Rs) Remarks
(in Rs)
Providing and applying 2 coats of textured paint over a coat of primer of
approved brand & shade over the surfaces including preparation of surface,
14 with cost of all materials, labour, conveyance, taxes, royalties, scaffolding, Sqm 1410.626 -
watering, curing, sundries, tools and plants, etc., as per the direction of the
Engineer-in-charge.
Supplying and fixing ____________ doors, and other frames, including all
fittings and fixed in position with anchor fastener on each sides ,S.S screw ,
15 grooves and making arrangement as shown on drawing, applying anti-termite Nos 8.000 -
paint on surfaces touching masonry or concrete etc. complete and as per the
direction of Engineer-in-charge .
Providing and fixing of factory made 67 series uPVC 2-track Sliding
window (White Colour) complete, comprising uPVC multi-chambered frame
having uPVC roller track on top and uPVC sash. All corners of frame and sash
will be fusion welded and duly reinforced with G.I. section 1.2 mm. After
16 placing 4mm float or prescribed glass in the sash, uPVC glazing bead, Nos 25.000 -
interlock, EPDM gasket, brush will be provided including hardware, i.e., touch
lock and rollers & proper drainage system shall be provided. Window will be
fixed to the wall with 100mm long and 8mm dia. Fasteners and complete in
all respect as per direction of Engineer-In-Charge.
WATERPROOFING TO TERRACE
Providing and laying integral cement based waterproofing treatment upto 112
17 mm thickness including preparation of surface as required for treatment of Sqm 172.233
roof, balconies, terraces etc. consisting of following operations.
B) Laying brickbat coba using broken brick/brick bats 25mm to 100 mm size
with cement mortar upto 50% 1:5 (1cement : 5 coarse sand) admixed with
proprietary waterproofing compound conforming to IS:2645 over 20mm thick
layer of cement mortar mix 1:5 (1 cement 5 coarse sand) admixed with
proprietary waterproofing compound conforming to
to IS:2645 to required slope and treating similarly the adjoining walls upto
300mm height including rounding of junciton of walls and slabs.
C)After two days of proper curing Providing & laying IPS in C.M 1:4 and
finishing the surface with China ceramic chips and curing it with ponding for
minimum 07 days including watta.
Please Note : Area in plan will be measured and paid for. Watta will not be
paid seperately
The rate shall including cost of all materials, labour, conveyance, loading and
unloading., taxes, royalties, scaffolding, watering, curing, sundries, tools and
plants, etc., as per the direction of the
Engineer-in-charge
FLOORING -
Filling with Murrum soil under Plinth Beam in layers (each layer should not
exceed 150mm) including compacting each layer by rolling/ ramming and
18 watering, all complete as per drawing and direction of Engineer-in-charge. The Cum 143.512
rate shall including cost of all materials, labour, conveyance, loading and
unloading., taxes, royalties, watering, sundries, tools and plants, etc.
Filling with Rubble as per drawing under Plinth Beam including compacting
each layer by rolling/ ramming and watering, all complete as per drawing and
19 direction of Engineer-in-charge. The rate shall including cost of all materials, Cum 28.702 -
labour, conveyance, loading and unloading., taxes, royalties, watering,
sundries,
Providing tools
and and plants,
laying etc.cement concrete (1:3:6) in foundation and
plain
bottom layers of flooring using (1 Cement: 3 Coarse Sand (Zone-III) derived
from natural sources: 6 graded stone 20mm nominal size derived from natural
sources) of approved quality from approved quarry including mixing, lowering,
20 Cum 14.351
laying and compacting to proper thickness, watering and curing for the
required period, including cost of all material, labour,
conveyance, loading and unloading, taxes, royalties, scaffolding, sundries,
tools & plants etc., complete as per the direction of Engineer-in-charge
Providing and laying vitrified tile of approved quality, colour of approx 600
x600 mm in proper line and level in 1:6 sand cement mix including filling the
joints with white cement not before cleaning the slab free of dust and with
21 Sqm 446.485 -
water jet spray complete, including cost of all material, labour, conveyance,
loading and unloading, taxes, royalties, sundries, tools & plants etc., complete
as per the direction of Engineer-in-charge
Providing and fixing in position 100 mm high straight edge Vitrified Tile
skirting of similar
colour of flooring in 1:3 sand cement mix flushed to the wall including filling
22 the joints with white cement not before cleaning the surface free of dust and Rm 213.000 -
cleaning it with water jet spray complete including cost of all material, labour,
conveyance, loading and unloading, taxes, royalties, sundries, tools & plants
etc., complete as per the direction of Engineer-in-charge
Unit Rate
Item No Description Unit BOQ Qty. Amount (in Rs) Remarks
(in Rs)
PLUM CONCRETE RETAINING WALL
Earthwork in excavation by mechanical means (Hydraulic Excavator)/manual
means in foundation including dressing of sides and ramming of bottoms, for
all lift, including getting out the excavated soil and disposal of surplus soil as
1 -
directed within lead of 1km.

Upto 1.5m depth


(i) All kind of soil Cum QRO

(ii) Ordinary rock Cum 12.572

(iii) Hard rock Cum QRO


CEMENT CONCRETE WORK:
Providing and laying plain cement concrete (1:3:6) in foundation and
bottom layers of flooring using (1 Cement: 3 Coarse Sand (Zone-III) derived
from natural sources: 6 graded stone 20mm nominal size derived from natural
sources) of approved quality from approved quarry including mixing, lowering,
4 Cum 3.143 -
laying and compacting to proper thickness, watering and curing for the
required period, including cost of all material, labour,
conveyance, loading and unloading, taxes, royalties, scaffolding, sundries,
tools & plants
Filling etc., complete
with Rubble as per the
as per drawing direction
under PlinthofBeam
Engineer-in-charge
including compacting
each layer by rolling/ ramming and watering, all complete as per drawing and
5 direction of Engineer-in-charge. The rate shall including cost of all materials, Cum 23.941 -
labour, conveyance, loading and unloading., taxes, royalties, watering,
sundries, tools and plants, etc.
Providing and laying in position M20 grade of concrete with materials from
approved quarry including mixing, lowering, laying and compacting to proper
thickness, watering and curing for the required period, including cost of all
6 Cum 17.237 -
material, labour, conveyance, loading and unloading, taxes, royalties,
scaffolding, shuttering, sundries, tools & plants etc., complete as per the
direction of Engineer-in-charge
Filling with soil as instructed by Engineer-in-charge under Plinth Beam in
layers (each layer should not exceed 150mm) including compacting each
layer by rolling/ ramming and watering, all complete as per drawing and
7 Cum 43.138 -
direction of Engineer-in-charge. The rate shall including cost of all materials,
labour, conveyance, loading and unloading., taxes, royalties, watering,
sundries, tools and plants, etc.
STEEL REINFORCEMENT WORK:
Providing, laying & binding of M.S. round reinforcement bars(Fe500) of
required diameters for straightening, cutting to size, bending, and binding the
grills, lifting and placing in position at all heights & locations as per design
complete including cost of bars, cost of binding wires 22 gauge, labour,
8 MT 0.105 -
conveyance, loading and unloading, taxes, royalties, sundries, tools and
plants upto floor five level, etc. complete as per the direction of the Engineer-
in-charge. (linear measurement will be taken and quantity will be calculated
on standard weight of bars for all heights).
-

TOTAL COST FOR CONSTRCUTION OF KAI GENUJI PALANDE PRATHAMIK ASHRAM SHALA -
SCHOOL BUILDING MEASUREMENT SHEET
Length Width Depth
S.No Item Description Unit Nos
(m) (m) (m)
1 Foundation - PCC 1:3:6
C1 & C7 Cum 2 2.800 1.400 0.150
C2, C4, C6, C8, C10, C12 Cum 6 1.950 1.800 0.150
C3, C5, C9, C11 Cum 4 1.650 1.600 0.150
C13 Cum 1 1.500 1.050 0.150
C14, C15, C16 Cum 3 1.350 1.350 0.150
2 Foundation - RCC M20
C1 & C7 Cum 2 2.570 1.285 0.300
C2, C4, C6, C8, C10, C12 Cum 6 1.720 1.570 0.150
C3, C5, C9, C11 Cum 4 1.420 1.370 0.150
C13 Cum 1 1.270 0.935 0.150
C14, C15, C16 Cum 3 1.120 1.120 0.150
C1 & C7 Cum 2 1.285 1.510 0.600
C1 & C7 Cum 2 1.285 0.300 0.600
C2, C4, C6, C8, C10, C12 Cum 6 0.475
C3, C5, C9, C11 Cum 4 0.268
C13 Cum 1 0.935 0.860 0.300
C13 Cum 1 0.935 0.300 1.050
C14, C15, C16 Cum 3 0.110
3 Column - RCC M20 upto Lower Ground Level
C2, C4, C6, C8, C10, C12 Cum 6 0.450 0.300 0.900
C3, C5, C9, C11 Cum 4 0.380 0.300 1.000
C14, C15, C16 Cum 3 0.300 0.300 1.130
4 Column - RCC M20 from Lower Ground Level to Roof Level
C1 & C7 Cum 2 0.450 0.300 9.600
C2, C4, C6, C8, C10, C12 Cum 6 0.450 0.300 9.600
C3, C5, C9, C11 Cum 4 0.380 0.300 9.600
C13 Cum 1 0.300 0.300 9.600
C14, C15, C16 Cum 3 0.300 0.300 9.600
5 Beam - RCC M20 Lower Ground Level
1,6 Cum 1 5.445 0.450 0.230
2,7 Cum 1 2.700 0.450 0.230
3,5,8,10 Cum 1 2.700 0.450 0.230
4,9 Cum 1 2.758 0.450 0.230
11 Cum 1 5.595 0.450 0.230
12 Cum 1 5.780 0.450 0.230
13 Cum 1 5.895 0.450 0.230
14,17 Cum 1 1.680 0.450 0.230
15 Cum 1 6.745 0.600 0.230
16,18 Cum 1 6.885 0.600 0.230
TB1 Cum 3 1.680 0.450 0.230
TB2 Cum 3 6.445 0.450 0.230
TB2 Cum 2 6.745 0.450 0.230
6 Beam - RCC M20 Upper Ground Level
1 Cum 1 5.445 0.600 0.230
1C Cum 1 1.500 0.600 0.230
2 Cum 1 2.700 0.450 0.230
3 Cum 1 2.700 0.450 0.230
4,5 Cum 2 2.758 0.450 0.230
6 Cum 1 5.445 0.600 0.230
6C Cum 1 1.500 0.600 0.230
7 Cum 1 2.700 0.450 0.230
8 Cum 1 2.700 0.450 0.230
9,10 Cum 2 2.758 0.450 0.230
11 Cum 1 5.595 0.450 0.230
11C Cum 1 1.500 0.450 0.230
12 Cum 1 5.780 0.450 0.230

13 Cum 1 5.895 0.450 0.230


14 Cum 1 1.680 0.450 0.230
15 Cum 1 6.745 0.600 0.230
16 Cum 1 1.680 0.450 0.230
17 Cum 1 6.745 0.600 0.230
18 Cum 1 6.885 0.600 0.230

19,22 Cum 2 1.680 0.450 0.230

20,23 Cum 2 6.445 0.600 0.230


21,24 Cum 2 6.745 0.600 0.230

25 Cum 1 1.680 0.600 0.230

26 Cum 1 6.445 0.600 0.230


7 Beam - RCC M20 First Floor Slab Level
1 Cum 1 5.445 0.600 0.230
1C Cum 1 1.500 0.600 0.230
2 Cum 1 2.700 0.450 0.230
3 Cum 1 2.700 0.450 0.230
4,5 Cum 2 2.758 0.450 0.230
6 Cum 1 5.445 0.600 0.230
6C Cum 1 1.500 0.600 0.230
7 Cum 1 2.700 0.450 0.230
8 Cum 1 2.700 0.450 0.230
9,10 Cum 2 2.758 0.450 0.230
11 Cum 1 5.595 0.450 0.230
11C Cum 1 1.500 0.450 0.230
12 Cum 1 5.780 0.450 0.230

13 Cum 1 5.895 0.450 0.230


14 Cum 1 1.680 0.450 0.230
15 Cum 1 6.745 0.600 0.230
16 Cum 1 6.885 0.600 0.230
19,22 Cum 2 6.745 0.600 0.230
17,20 Cum 2 1.680 0.450 0.230
17A Cum 1 1.680 0.450 0.230
18,21 Cum 2 6.445 0.600 0.230
23 Cum 1 1.680 0.600 0.230
24 Cum 1 6.445 0.600 0.230
8 Beam - RCC M20 Second Floor Slab Level
1 Cum 1 5.445 0.600 0.230
1C Cum 1 1.500 0.600 0.230
2 Cum 1 2.700 0.450 0.230
3 Cum 1 2.700 0.450 0.230
4,5 Cum 2 2.758 0.450 0.230
6 Cum 1 5.445 0.600 0.230
6C Cum 1 1.500 0.600 0.230
7 Cum 1 2.700 0.450 0.230
8 Cum 1 2.700 0.450 0.230
9,10 Cum 2 2.758 0.450 0.230
11 Cum 1 5.595 0.450 0.230
11C Cum 1 1.500 0.450 0.230
12 Cum 1 5.780 0.450 0.230
13 Cum 1 5.895 0.450 0.230
14 Cum 1 1.680 0.450 0.230
15 Cum 1 6.745 0.600 0.230
16 Cum 1 6.885 0.600 0.230
19,22 Cum 2 6.745 0.600 0.230
17,20 Cum 2 1.680 0.450 0.230
17A Cum 1 1.680 0.450 0.230
18,21 Cum 2 6.445 0.600 0.230
23 Cum 1 1.680 0.600 0.230
24 Cum 1 6.445 0.600 0.230
9 Slab M20
Cum 1 135.662 0.130
Upper Ground Level
1 50.558 0.100
Deductions for Column Cum
Cum 1 146.680 0.130
First Floor level
1 39.541 0.100
Deductions for Column Cum
Cum 1 146.680 0.130
Second Floor level
1 39.541 0.100
Deductions for Column Cum

10 Flooring
Lower Ground Level
Compacted Murrum Filling Cum 1 15.390 9.325 1.000
Rubble Soling Cum 1 15.390 9.325 0.200
PCC Cum 1 15.390 9.325 0.100
11 Block work
Lower Ground Level Cum 2 24.715 3.200 0.150
Cum 1 6.885 3.200 0.150
Deductions for Door Cum -2 1.200 2.100 0.150
Deductions for Windows Cum -7 1.200 1.500 0.150
First & Second Floor Cum 4 27.335 3.200 0.150
Cum 4 6.885 3.200 0.150
Deductions for Door Cum -6 1.200 2.100 0.150
Deductions for Windows Cum -18 1.200 1.500 0.150
Parapet wall Cum 2 27.795 1.000 0.150
Parapet wall for Passage Cum 1 19.350 1.000 0.150
Parapet wall for Passage Cum 2 22.430 1.000 0.150
12 External Plastering 20mm thk
Lower Ground Level Sqm 1 34.040 3.200
Deductions for Door Sqm -2 1.200 2.100
Deductions for Windows Sqm -7 1.200 1.500
First & Second Floor Sqm 4 27.335 3.200
Sqm 4 6.885 3.200
Deductions for Door Sqm -6 1.200 2.100
Deductions for Windows Sqm -18 1.200 1.500
Parapet wall Sqm 4 27.795 0.900
Parapet wall for Passage Sqm 1 19.350 1.000
Parapet wall for Passage Sqm 2 22.430 1.000
13 Internal Plastering 12mm thk
Lower Ground Level Sqm 1 64.820 3.200
Sqm 2 6.885 3.200
Deductions for Door Sqm -2 1.200 2.100
Deductions for Windows Sqm -5 1.200 1.500
First & Second Floor Sqm 4 27.335 3.200
Sqm 4 6.885 3.200
Beam Plastering
Lower Ground Level Sqm 1 95.429
First & Second Floor Sqm 1 176.558
Deductions for Door Sqm -6 1.200 2.100
Deductions for Windows Sqm -18 1.200 1.500
Parapet wall for Passage Sqm 1 19.350 1.000
Parapet wall for Passage Sqm 2 22.430 1.000
14 Painting with 2 coats (External)
Lower Ground Level Sqm 1 34.040 3.200
Deductions for Door Sqm -2 1.200 2.100
Deductions for Windows Sqm -7 1.200 1.500
First & Second Floor Sqm 4 27.335 3.200
Sqm 4 6.885 3.200
Deductions for Door Sqm -6 1.200 2.100
Deductions for Windows Sqm -18 1.200 1.500
Parapet wall Sqm 4 1.200 0.900
Parapet wall for Passage Sqm 1 19.350 1.000
Parapet wall for Passage Sqm 2 22.430 1.000

13 Painting with 2 coats (Internal)


Lower Ground Level Sqm 1 64.820 3.200
Sqm 2 6.885 3.200
Deductions for Door Sqm -2 1.200 2.100
Deductions for Windows Sqm -5 1.200 1.500
First & Second Floor Sqm 4 27.335 3.200
Sqm 4 6.885 3.200
Beam Painting
Lower Ground Level Sqm 1 95.429
First & Second Floor Sqm 1 176.558
Deductions for Door Sqm -6 1.200 2.100
Deductions for Windows Sqm -18 1.200 1.500
Ceiling painting Sqm
Parapet wall for Passage Sqm 1 19.350 1.000
Parapet wall for Passage Sqm 2 22.430 1.000
15 Virtified flooring Sqm
16 Brickbat coba waterproofing Sqm
17 Damp Proof course Sqm 1 15.390 9.325
18 Anti-Termite Treatment Sqm 1 15.390 9.325
19 Reinforcement MT
Footing MT
Column MT
Beam MT
Slab MT
HEET
Quantity Remarks

6.975
1.176
3.159
1.584
0.236
0.820
13.898
1.981 Rectangular Foundation
2.430 Rectangular Foundation
1.167 Rectangular Foundation
0.178 Rectangular Foundation
0.564 Rectangular Foundation
2.328 Eccentric Foundation
0.463 Stub colum
2.849 Truncated pyramid portion
1.072 Truncated pyramid portion
0.241 Eccentric Foundation
0.295 Stub colum
0.330 Truncated pyramid portion
1.490
0.729
0.456
0.305
18.202
2.592
7.776
4.378
0.864
2.592
9.168
0.564
0.279
0.279
0.285
0.579
0.598
0.610
0.174
0.931
0.950
0.522
2.001
1.396
14.386
0.751
0.207
0.279
0.279
0.571
0.751
0.207
0.279
0.279
0.571
0.579
0.155
0.598
0.610
0.174
0.931
0.174
0.931
0.950
0.348
1.779
1.862
0.232
0.889
13.455
0.751
0.207
0.279
0.279
0.571
0.751
0.207
0.279
0.279
0.571
0.579
0.155
0.598
0.610
0.174
0.931
0.950
1.862
0.348
0.174
1.779
0.232
0.889
13.455
0.751
0.207
0.279
0.279
0.571
0.751
0.207
0.279
0.279
0.571
0.579
0.155
0.598
0.610
0.174
0.931
0.950
1.862
0.348
0.174
1.779
0.232
0.889
68.029
17.636
5.056
-0.236
19.068
3.954
-0.236
19.068
3.954
-0.236

143.512
28.702
14.351
91.298
23.726
3.305
-0.756
-1.890
52.483
13.219
-2.268
-4.860
8.339
2.903
6.729
581.846
108.928
-5.040
-12.600
349.888
88.128
-15.120
-32.400
100.062
19.350
44.860
964.141
207.424
44.064
-5.040
-9.000
349.888
88.128

95.429
176.558
-15.120
-32.400
19.350
44.860
505.454
108.928
-5.040
-12.600
349.888
88.128
-15.120
-32.400
4.320
19.350
44.860

1410.626
207.424
44.064
-5.040
-9.000
349.888
88.128

95.429
176.558
-15.120
-32.400
446.485
19.350
44.860
446.485
172.233
143.512
143.512
17.673
0.869
3.021
7.489
6.294
PLUM CONCRETE RETAINING WALL
Length Width Depth
S.No Item Description Unit Nos
(m) (m) (m)
1 Excavation Cum 1 12.325 1.700 0.600
2 PCC 1:3:6 Cum 1 12.325 1.700 0.150
3 Plum concrete
60% Rubble Cum 0.6 12.325 0.925 3.500
40% M20 concrete Cum 0.4 12.325 0.925 3.500
4 150mm dia Weep hole Rm 27 1.000
5 Filling Cum 1 12.325 1.000 3.500
6 Copping Beam Cum 1 12.325 0.450 0.230
7 Reinforcement Kgs
3# 12mm dia Top & Bottom Kgs 6 12.325 0.889

8mm dia 150 C/C stirrups Kgs 83 1.196 0.395


Quantity Remarks

12.572
3.143

23.941
15.961
27.000
43.138
1.276
104.950
65.733

39.217
Dia of Bar Cut length
S.No Bar Mark Nos Item Description Spacing No of Bar
in mm in m
1 Footing
2 Longitudinal Bar 12 100 15 2.662
Stub colum-
C1 & C7 2 12 4 2.347
Longitudinal Bar
Stub colum-
2 12 6 2.347
Longitudinal Bar
C2, C4, C6, C8, C10, C12 6 Longitudinal Bar 12 100 18 1.812
C3, C5, C9, C11 4 Longitudinal Bar 12 100 16 1.512
1 Longitudinal Bar 12 100 11 1.362
Stub colum-
2 12 4 2.062
C13 Longitudinal Bar

Stub colum-
2 12 4 2.062
Longitudinal Bar
C14, C15, C16 3 Longitudinal Bar 12 100 13 1.212
2 Transverse Bar 12 100 28 1.377
C1 & C7
2 Stub-Stirrups 8 150 10 3.236
C2, C4, C6, C8, C10, C12 6 Transverse Bar 12 100 19 1.662
C3, C5, C9, C11 4 Transverse Bar 12 100 16 1.462
1 Transverse Bar 12 100 15 1.027
C13
1 Stub-Stirrups 8 150 10 2.536
C14, C15, C16 3 Transverse Bar 12 100 13 1.212
2 Column
C1 & C7 2 Longitudinal Bar 16 6 7.894
C1 & C7 2 Longitudinal Bar 12 4 7.502

Footing C2, C4, C6, C8, C10, C12 6 Longitudinal Bar 16 6 9.394
Level to
C2, C4, C6, C8, C10, C12 6 Longitudinal Bar 12 4 9.002
First Slab
Level C3, C5, C9, C11 4 Longitudinal Bar 12 10 9.002
C13 1 Longitudinal Bar 12 8 7.502
C14, C15, C16 3 Longitudinal Bar 12 8 9.002
C1 & C7 2 Longitudinal Bar 12 10 4.332
C2, C4, C6, C8, C10, C12 6 Longitudinal Bar 12 10 5.832
First Slab to
Second Slab C3, C5, C9, C11 4 Longitudinal Bar 12 10 5.832
Level
C13 1 Longitudinal Bar 12 8 4.332
First Slab to
Second Slab
Level

C14, C15, C16 3 Longitudinal Bar 12 8 5.832


C1 & C7 2 Stirupps 8 150 64 1.426
C1 & C7 2 Stirupps 8 300 33 0.634
C2, C4, C6, C8, C10, C12 6 Stirupps 8 150 74 1.426
C2, C4, C6, C8, C10, C12 6 Stirupps 8 300 38 0.634
Footing
Level to C3, C5, C9, C11 4 Stirupps 8 150 74 1.286
Second Slab C3, C5, C9, C11 4 Stirupps 8 300 38 0.612
Level
C13 1 Stirupps 8 150 64 1.126
C13 1 Stirupps 8 300 33 1.126
C14, C15, C16 3 Stirupps 8 150 74 1.126
C14, C15, C16 3 Stirupps 8 300 38 1.126
3 Lower Ground Level-Beam
4 Upper Ground Level-Beam
5 First & Second Floor Level-Beam
6 Slab
Upper Ground Level- slab
Main Bar 4 8 130 58 4.029
S1 Extra Bar at Top support 4 8 130 14 2.523
Distribution Bar 4 8 300 11 7.320
Main Bar 2 8 150 50 4.029
S2 Extra Bar at support 2 8 150 12 2.523
Distribution Bar 2 8 300 11 7.320
Main Bar 1 8 150 50 1.681
S3 Extra Bar at Top support 1 Plum wall portion 8 150 4 0.763
Distribution Bar 1 8 230 8 1.955
Main Bar 1 8 150 11 2.911
S3 Extra Bar at Top support 1 Plum wall portion 8 150 8 1.685
Distribution Bar 1 8 230 10 1.475
Main Bar 3 8 150 42 2.911
S3 Extra Bar at support 3 Passage 8 150 8 1.685
Distribution Bar 3 8 230 10 6.170

First & Second Floor Level-Slab


Main Bar 4 8 150 50 5.029
S2
S2 Extra Bar at support 4 8 150 16 3.273
Distribution Bar 4 8 300 15 7.320
Main Bar 8 8 150 50 4.029
S2 Extra Bar at support 8 8 150 16 2.523
Distribution Bar 8 8 300 15 7.320
Main Bar 2 8 150 11 2.911
S3 Extra Bar at support 2 Passage 8 150 8 1.685
Distribution Bar 2 8 0.23 10 1.475
Main Bar 6 8 150 42 2.911
S3 Extra Bar at support 6 Passage 8 150 84 1.685
Distribution Bar 6 8 0.23 11 6.170
unit weight in Total weight
kg/m in kg
868.865
0.889 70.996

0.889 16.692

0.889 25.038

0.889 173.976
0.889 86.028
0.889 13.319

0.889 14.664

0.889 14.664

0.889 42.021
0.889 68.552
0.395 25.564
0.889 168.438
0.889 83.180
0.889 13.695
0.395 10.017
0.889 42.021
3021.176
1.580 149.670 6.4 6.4 6.306 9.6
0.889 53.354 6.4 6.4 6.306
1.580 534.330 1.5 6.4 7.9 7.806
0.889 192.066 1.5 6.4 7.9 7.806
0.889 320.112 1.5 6.4 7.9 7.806
0.889 53.354 6.4 6.4 6.306
0.889 192.066 1.5 6.4 7.9 7.806
0.889 77.022 3.2 3.2 3.106 9.6
0.889 311.076 1.5 3.2 4.7 4.606
0.889 207.384 1.5 3.2 4.7 4.606
0.889 30.809 3.2 3.2 3.106
0.889 124.431 1.5 3.2 4.7 4.606
0.395 72.098 0.11 0.144
0.395 16.528 0.0925
0.395 250.092 0.11 0.144
0.395 57.096 0.0925
0.395 150.360 0.11 0.133
0.395 36.744 0.075
0.395 28.465
0.395 14.677
0.395 98.739
0.395 50.703
889.969
2251.493
4347.580

1097.276
0.395 369.216
0.395 55.812
0.395 127.220
0.395 159.146
0.395 23.920
0.395 63.610
0.395 33.200
0.395 1.205
0.395 6.178
0.395 12.648
0.395 5.325
0.395 5.826
0.395 144.879
0.395 15.975
0.395 73.116

5196.596
0.395 794.584
0.395 165.488
0.395 346.968
0.395 1273.168
0.395 255.136
0.395 693.936
0.395 50.592
0.395 21.300
0.395 23.304
0.395 579.516
0.395 670.896
0.395 321.708
11.1

11.1
1 Reinforcement schedule For Lower Ground Level

No Bottom steel straight full span Bottom steel curtailed 2


Beam of
Nos Bea Dia Cut unit Total
Clear Dia of
ms Nos of Lengt weigh Weight Nos
Span Bar
Bar h t kg/m in Kgs
1,6 1 3 12 6.195 5.445 7.347 0.889 19.592 1 12
2,7 1 2 12 3.380 2.700 4.532 0.889 8.057
3,8 1 3 16 3.380 2.700 4.916 1.580 23.305 2 12
5,10 1 3 16 3.438 2.758 4.974 1.580 23.578 2 12
4,9 1 2 12 3.438 2.758 4.589 0.889 8.159
11 1 2 12 6.195 5.595 7.347 0.889 13.061 1 12
12 1 2 16 6.380 5.780 7.916 1.580 25.018 2 12
13 1 3 16 6.495 5.895 8.031 1.580 38.073 1 16
14,17 1 2 12 2.210 1.680 3.362 0.889 5.977
15 1 3 16 7.345 6.745 8.881 1.580 42.103 2 16
16,18 1 3 16 7.345 6.885 8.881 1.580 42.103 2 16
TB1 3 2 12 2.210 1.680 3.362 0.889 17.931
TB2 3 2 12 7.345 6.445 8.497 0.889 45.317 1 12
TB2 2 2 12 7.345 6.745 8.497 0.889 30.212 1 12
Total Weight in Kgs 342.486
2 Reinforcement schedule For Upper Ground Level

No Bottom steel straight full span Bottom steel curtailed 2


Beam of
Nos Bea Dia Cut unit Total
Clear Dia of
ms Nos of Lengt weigh Weight Nos
Span Bar
Bar h t kg/m in Kgs
1 1 4 16 6.195 5.445 7.731 1.580 48.868 2 16
1C 1 2 16 1.500 1.500 3.036 1.580 9.595
1C 1 1.500 1.500
2 1 2 12 3.380 2.700 4.532 0.889 8.057
3 1 2 12 3.380 2.700 4.532 0.889 8.057
4,5 2 2 12 3.438 2.758 4.589 0.889 16.318
6 1 4 20 6.195 5.445 8.115 2.469 80.148 2 16
6C 1 2 16 1.500 1.500 3.036 1.580 9.595
6C 1 1.500 1.500
7 1 2 12 3.380 2.700 4.532 0.889 8.057 1 12
8 1 2 12 3.380 2.700 4.532 0.889 8.057 1 12
9,10 2 2 12 3.438 2.758 4.589 0.889 16.318 1 12
11 1 2 16 6.195 5.595 7.731 1.580 24.434 1 12
11C 1 2 16 1.500 1.500 3.036 1.580 9.595
1.500 1.500
12 1 4 16 6.380 5.780 7.916 1.580 50.037 1 16
12 1 6.380 5.780 1 12

13 1 4 16 6.495 5.895 8.031 1.580 50.764 1 16

13 1 6.495 5.895 1 12
14 1 2 12 1.980 1.680 3.132 0.889 5.568
15 1 3 20 7.345 6.745 9.265 2.469 68.630 1 20
16 1 2 12 7.345 1.680 8.497 0.889 15.106
17 1 4 16 7.345 6.745 8.881 1.580 56.137 1 16
17 1 7.345 6.745 1 12
18 1 3 20 7.345 6.885 9.265 2.469 68.630 2 16

19,22 2 2 12 1.980 1.680 3.132 0.889 11.136

20,23 2 5 20 7.345 6.445 9.265 2.469 228.765 3 20

21,24 2 4 20 7.345 6.745 9.265 2.469 183.012 2 16

25 1 2 12 1.980 1.680 3.132 0.889 5.568

26 1 3 20 7.345 6.445 9.265 2.469 68.630 2 20


Total Weight in Kgs ###
3 Reinforcement schedule For First Floor Slab Level

No Bottom steel straight full span Bottom steel curtailed 2


Beam of
Nos Bea Dia Cut unit Total
Clear Dia of
ms Nos of Lengt weigh Weight Nos
Span Bar
Bar h t kg/m in Kgs
1 1 4 16 6.195 5.445 7.731 1.580 48.868
1C 1 2 16 1.500 1.500 3.036 1.580 9.595
1.500 1.500
2 1 2 12 3.380 2.700 4.532 0.889 8.057
3 1 2 12 3.380 2.700 4.532 0.889 8.057
4,5 2 2 12 3.438 2.758 4.589 0.889 16.318
6 1 4 16 6.195 5.445 7.731 1.580 48.868
6C 1 2 16 1.500 1.500 3.036 1.580 9.595
1.500 1.500
7 1 2 12 3.380 2.700 4.532 0.889 8.057 1 12
8 1 2 12 3.380 2.700 4.532 0.889 8.057 1 12
9,10 2 2 12 3.438 2.758 4.589 0.889 16.318 1 12
11 1 3 16 6.195 5.595 7.731 1.580 36.651 1 12
11C 1 2 16 1.500 1.500 3.036 1.580 9.595
1.500 1.500
12 1 4 16 6.380 5.780 7.916 1.580 50.037 1 16
6.380 5.780 1 12

13 1 4 16 6.495 5.895 8.031 1.580 50.764 1 16


6.495 5.895 1 12
14 1 2 12 1.980 1.680 3.132 0.889 5.568
15 1 3 20 7.345 6.745 9.265 2.469 68.630 1 20
16 1 4 20 7.345 6.885 9.265 2.469 91.506 2 16
19,22 2 4 20 7.345 6.745 9.265 2.469 183.012
17,20 2 2 12 1.980 1.680 3.132 0.889 11.136
17A 1 2 12 1.980 1.680 3.132 0.889 5.568
18,21 2 5 20 7.345 6.445 9.265 2.469 228.765 3 20
23 1 2 12 1.980 1.680 3.132 0.889 5.568
24 1 3 20 7.345 6.445 9.265 2.469 68.630 2 20
Total Weight in Kgs 997.220
4 Reinforcement schedule For Second Floor Slab Level

No Bottom steel straight full span Bottom steel curtailed 2


Beam of
Nos Bea Dia Cut unit Total
Clear Dia of
ms Nos of Lengt weigh Weight Nos
Span Bar
Bar h t kg/m in Kgs
1 1 4 16 6.195 5.445 7.731 1.580 48.868
1C 1 2 16 1.500 1.500 3.036 1.580 9.595
1.500 1.500
2 1 2 12 3.380 2.700 4.532 0.889 8.057
3 1 2 12 3.380 2.700 4.532 0.889 8.057
4,5 2 2 12 3.438 2.758 4.589 0.889 16.318
6 1 4 16 6.195 5.445 7.731 1.580 48.868
6C 1 2 16 1.500 1.500 3.036 1.580 9.595
1.500 1.500
7 1 2 12 3.380 2.700 4.532 0.889 8.057 1 12
8 1 2 12 3.380 2.700 4.532 0.889 8.057 1 12
9,10 2 2 12 3.438 2.758 4.589 0.889 16.318 1 12
11 1 3 16 6.195 5.595 7.731 1.580 36.651 1 12
11C 1 2 16 1.500 1.500 3.036 1.580 9.595
1.500 1.500
12 1 4 16 6.380 5.780 7.916 1.580 50.037 1 16
6.380 5.780 1 12

13 1 4 16 6.495 5.895 8.031 1.580 50.764 1 16


6.495 5.895 1 12
14 1 2 12 1.980 1.680 3.132 0.889 5.568
15 1 3 20 7.345 6.745 9.265 2.469 68.630 1 20
16 1 4 20 7.345 6.885 9.265 2.469 91.506 2 16
19,22 2 4 20 7.345 6.745 9.265 2.469 183.012
17,20 2 2 12 1.980 1.680 3.132 0.889 11.136
17A 1 2 12 1.980 1.680 3.132 0.889 5.568
18,21 2 5 20 7.345 6.445 9.265 2.469 228.765 3 20
23 1 2 12 1.980 1.680 3.132 0.889 5.568
24 1 3 20 7.345 6.445 9.265 2.469 68.630 2 20
Total Weight in Kgs 997.220
Extra Steel a
ttom steel curtailed 2/3L Anchor Bar at Top
At Left support
unit
Cut Total Dia Cut unit Total Dia Cut unit
weigh No No
Lengt Weight of Lengt weight Weight of Lengt weigh
t s s
h in Kgs Bar h kg/m in Kgs Bar h t kg/m
kg/m
3.630 0.889 3.227 2 10 6.205 0.617 7.660 2 12 1.815 0.889
2 10 3.390 0.617 4.185 2 12 0.900 0.889
1.800 0.889 3.200 2 10 3.390 0.617 4.185 2 16 0.900 1.580
1.838 0.889 3.268 2 10 3.448 0.617 4.256 2 16 0.919 1.580
2 10 3.448 0.617 4.256 2 16 0.919 1.580
3.730 0.889 3.316 2 10 6.205 0.617 7.660 2 16 1.865 1.580
3.853 0.889 6.850 2 10 6.390 0.617 7.889 2 16 1.927 1.580
3.930 1.580 6.210 2 10 6.505 0.617 8.031 2 16 1.965 1.580
2 10 2.220 0.617 2.741 2 12 0.560 0.889
4.497 1.580 14.212 2 10 7.355 0.617 9.080 2 16 2.248 1.580
4.590 1.580 14.507 2 10 7.355 0.617 9.080 2 16 2.295 1.580
2 10 2.220 0.617 8.222
4.297 0.889 11.458 2 10 7.355 0.617 27.241 2 12 2.148 0.889
4.497 0.889 7.994 2 10 7.355 0.617 18.160 2 12 2.248 0.889
74.242 122.646

Extra Steel a
ttom steel curtailed 2/3L Anchor Bar at Top
At Left support
unit
Cut Total Dia Cut unit Total Dia Cut unit
weigh No No
Lengt Weight of Lengt weight Weight of Lengt weigh
t s s
h in Kgs Bar h kg/m in Kgs Bar h t kg/m
kg/m
3.630 1.580 11.473 2 10 6.205 0.617 7.660 4 20 1.815 2.469
2 10 1.510 0.617 1.864
4 20 1.470 2.469 14.519
2 10 3.390 0.617 4.185 2 16 0.900 1.580
2 10 3.390 0.617 4.185 2 12 0.900 0.889
2 10 3.448 0.617 8.512 2 12 0.919 0.889
3.630 1.580 11.473 2 16 6.181 1.580 19.535 4 20 1.815 2.469
2 16 1.486 1.580 4.696
4 20 1.470 2.469 14.519
1.800 0.889 1.600 2 10 3.390 0.617 4.185 2 20 0.900 2.469
1.800 0.889 1.600 2 10 3.390 0.617 4.185 2 12 0.900 0.889
1.838 0.889 3.268 2 10 3.448 0.617 8.512 2 12 0.919 0.889
3.730 0.889 3.316 2 10 6.205 0.617 7.660 2 16 1.865 1.580
2 10 1.510 0.617 1.864
2 16 1.486 1.580 4.696
3.853 1.580 6.089 2 10 6.390 0.617 7.889 2 16 1.927 1.580
3.853 0.889 3.425
3.930 1.580 6.210 2 10 6.505 0.617 8.031 2 16 1.965 1.580
3.930 0.889 3.493
2 10 1.990 0.617 2.457 2 12 0.560 0.889
4.497 2.469 11.103 2 10 7.355 0.617 9.080 2 16 2.248 1.580
2 10 7.355 0.617 9.080 2 12 0.560 0.889
4.497 1.580 7.106 2 10 7.355 0.617 9.080 2 16 2.248 1.580
4.497 0.889 3.997
4.590 1.580 14.507 2 10 7.355 0.617 9.080 2 16 2.295 1.580
2 10 1.990 0.617 4.914 2 12 0.560 0.889
4.297 2.469 63.654 2 12 7.347 0.889 26.123 3 20 2.148 2.469
4.497 1.580 28.423 2 12 7.347 0.889 26.123 2 20 2.248 2.469
2 10 1.990 0.617 2.457 2 12 0.560 0.889
4.297 2.469 21.218 2 12 7.347 0.889 13.061 2 20 2.148 2.469
201.955 238.152

Extra Steel a
ttom steel curtailed 2/3L Anchor Bar at Top
At Left support
unit
Cut Total Dia Cut unit Total Dia Cut unit
weigh No No
Lengt Weight of Lengt weight Weight of Lengt weigh
t s s
h in Kgs Bar h kg/m in Kgs Bar h t kg/m
kg/m
2 20 6.165 2.469 30.444 4 20 1.815 2.469
2 20 1.470 2.469 7.259
4 20 1.470 2.469 14.519
2 10 3.390 0.617 4.185 2 16 0.900 1.580
2 10 3.390 0.617 4.185 2 12 0.900 0.889
2 10 3.448 0.617 8.512 2 12 0.919 0.889
2 20 6.165 2.469 30.444 5 20 1.815 2.469
2 20 1.470 2.469 7.259
5 20 1.470 2.469 18.148
1.800 0.889 1.600 2 10 3.390 0.617 4.185 2 16 0.900 1.580
1.800 0.889 1.600 2 10 3.390 0.617 4.185 2 12 0.900 0.889
1.838 0.889 3.268 2 10 3.448 0.617 8.512 2 12 0.919 0.889
3.730 0.889 3.316 2 10 6.205 0.617 7.660 3 16 1.865 1.580
2 10 1.510 0.617 1.864
3 16 1.486 1.580 7.045
3.853 1.580 6.089 2 10 6.390 0.617 7.889 2 16 1.927 1.580
3.853 0.889 3.425
3.930 1.580 6.210 2 10 6.505 0.617 8.031 2 16 1.965 1.580
3.930 0.889 3.493
2 10 1.990 0.617 2.457 2 12 0.560 0.889
4.497 2.469 11.103 2 10 7.355 0.617 9.080 2 16 2.248 1.580
4.590 1.580 14.507 2 12 7.347 0.889 13.061 2 20 2.295 2.469
2 12 7.347 0.889 26.123 2 20 2.248 2.469
2 10 1.990 0.617 4.914 2 12 0.560 0.889
2 10 1.990 0.617 2.457 2 12 0.560 0.889
4.297 2.469 63.654 2 12 7.347 0.889 26.123 3 20 2.148 2.469
2 10 1.990 0.617 2.457 2 12 0.560 0.889
4.297 2.469 21.218 2 12 7.347 0.889 13.061 2 20 2.148 2.469
139.483 274.059

Extra Steel a
ttom steel curtailed 2/3L Anchor Bar at Top
At Left support
unit
Cut Total Dia Cut unit Total Dia Cut unit
weigh No No
Lengt Weight of Lengt weight Weight of Lengt weigh
t s s
h in Kgs Bar h kg/m in Kgs Bar h t kg/m
kg/m
2 20 6.165 2.469 30.444 4 20 1.815 2.469
2 20 1.470 2.469 7.259
4 20 1.470 2.469 14.519
2 10 3.390 0.617 4.185 2 16 0.900 1.580
2 10 3.390 0.617 4.185 2 12 0.900 0.889
2 10 3.448 0.617 8.512 2 12 0.919 0.889
2 20 6.165 2.469 30.444 5 20 1.815 2.469
2 20 1.470 2.469 7.259
5 20 1.470 2.469 18.148
1.800 0.889 1.600 2 10 3.390 0.617 4.185 2 16 0.900 1.580
1.800 0.889 1.600 2 10 3.390 0.617 4.185 2 12 0.900 0.889
1.838 0.889 3.268 2 10 3.448 0.617 8.512 2 12 0.919 0.889
3.730 0.889 3.316 2 10 6.205 0.617 7.660 3 16 1.865 1.580
2 10 1.510 0.617 1.864
3 16 1.486 1.580 7.045
3.853 1.580 6.089 2 10 6.390 0.617 7.889 2 16 1.927 1.580
3.853 0.889 3.425
3.930 1.580 6.210 2 10 6.505 0.617 8.031 2 16 1.965 1.580
3.930 0.889 3.493
2 10 1.990 0.617 2.457 2 12 0.560 0.889
4.497 2.469 11.103 2 10 7.355 0.617 9.080 2 16 2.248 1.580
4.590 1.580 14.507 2 12 7.347 0.889 13.061 2 20 2.295 2.469
2 12 7.347 0.889 26.123 2 20 2.248 2.469
2 10 1.990 0.617 4.914 2 12 0.560 0.889
2 10 1.990 0.617 2.457 2 12 0.560 0.889
4.297 2.469 63.654 2 12 7.347 0.889 26.123 3 20 2.148 2.469
2 10 1.990 0.617 2.457 2 12 0.560 0.889
4.297 2.469 21.218 2 12 7.347 0.889 13.061 2 20 2.148 2.469
139.483 274.059
Extra Steel at Top (L/3)
T8 Stirrups near supports (For L/3)
eft support At Right support
unit
Total Dia Cut unit Total Dia Cut
No Spac No of weigh
Weight in of Leng weight Weight in of Lengt
s ing Bar t
Kgs Bar th kg/m Kgs Bar h
kg/m
3.227 2 12 1.815 0.889 3.227 200 8 10 1.346 0.395
1.600 2 16 0.900 1.580 2.844 250 8 5 1.346 0.395
2.844 2 16 0.900 1.580 2.844 150 8 7 1.346 0.395
2.905 2 16 0.919 1.580 2.905 150 8 7 1.346 0.395
2.905 2 12 0.919 0.889 1.634 250 8 5 1.346 0.395
5.894 2 16 1.865 1.580 5.894 200 8 10 1.346 0.395
6.089 2 16 1.927 1.580 6.089 200 8 11 1.346 0.395
6.210 2 16 1.965 1.580 6.210 200 8 11 1.346 0.395
0.996 2 16 0.560 1.580 1.770 250 8 3 1.346 0.395
7.106 2 16 2.248 1.580 7.106 200 8 12 1.646 0.395
7.253 2 16 2.295 1.580 7.253 200 8 12 1.646 0.395
2 12 0.737 0.889 3.929 200 8 4 1.346 0.395
11.458 2 12 2.148 0.889 11.458 200 8 12 1.346 0.395
7.994 2 12 2.248 0.889 7.994 200 8 12 1.346 0.395
66.481 71.157

Extra Steel at Top (L/3)


T8 Stirrups near supports (For L/3)
eft support At Right support
unit
Total Dia Cut unit Total Dia Cut
No Spac No of weigh
Weight in of Leng weight Weight in of Lengt
s ing Bar t
Kgs Bar th kg/m Kgs Bar h
kg/m
17.926 2 16 1.815 1.580 5.736 150 8 13 1.646 0.395
150 10 4 1.630 0.617

2.844 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395


1.600 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395
3.268 2 12 0.919 0.889 3.268 130 8 8 1.346 0.395
17.926 2 20 1.815 2.469 8.963 130 8 15 1.646 0.395
130 10 5 1.63 0.617

4.444 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395


1.600 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395
3.268 2 12 0.919 0.889 3.268 200 8 6 1.346 0.395
5.894 2 16 1.865 1.580 5.894 200 8 10 1.346 0.395
180 8 4 1.346 0.395

6.089 2 16 1.927 1.580 6.089 180 8 12 1.346 0.395

6.210 2 16 1.965 1.580 6.210 180 8 12 1.346 0.395

0.996 2 16 0.560 1.580 1.770 200 8 4 1.346 0.395


7.106 2 16 2.248 1.580 7.106 150 8 16 1.646 0.395
0.996 2 16 0.560 1.580 1.770 200 8 4 1.346 0.395
7.106 2 16 2.248 1.580 7.106 150 8 16 1.646 0.395

7.253 2 16 2.295 1.580 7.253 150 8 16 1.646 0.395


1.991 3 20 0.560 2.469 8.296 200 8 4 1.346 0.395
31.827 3 20 2.148 2.469 31.827 150 10 15 1.63 0.617
22.206 2 20 2.248 2.469 22.206 150 8 16 1.646 0.395
0.996 2 20 0.560 2.469 2.765 200 8 4 1.646 0.395
10.609 2 20 2.148 2.469 10.609 150 8 15 1.646 0.395
162.155 146.536

Extra Steel at Top (L/3)


T8 Stirrups near supports (For L/3)
eft support At Right support
unit
Total Dia Cut unit Total Dia Cut
No Spac No of weigh
Weight in of Leng weight Weight in of Lengt
s ing Bar t
Kgs Bar th kg/m Kgs Bar h
kg/m
17.926 2 16 1.815 1.580 5.736 130 10 15 1.630 0.617
130 10 5 1.630 0.617

2.844 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395


1.600 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395
3.268 2 12 0.919 0.889 3.268 200 8 6 1.346 0.395
22.407 2 16 1.815 1.580 5.736 130 10 15 1.630 0.617
130 10 5 1.630 0.617

2.844 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395


1.600 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395
3.268 2 12 0.919 0.889 3.268 200 8 6 1.346 0.395
8.841 2 16 1.865 1.580 5.894 200 8 10 1.346 0.395
180 8 4 1.346 0.395

6.089 2 16 1.927 1.580 6.089 180 8 12 1.346 0.395

6.210 2 16 1.965 1.580 6.210 180 8 12 1.346 0.395

0.996 2 16 0.560 1.580 1.770 200 8 4 1.346 0.395


7.106 2 16 2.248 1.580 7.106 150 8 16 1.646 0.395
11.333 2 20 2.295 2.469 11.333 150 8 16 1.646 0.395
22.206 2 20 2.248 2.469 22.206 150 8 16 1.646 0.395
1.991 3 20 0.560 2.469 8.296 200 8 4 1.346 0.395
0.996 2 12 0.560 0.889 0.996 200 8 4 1.346 0.395
31.827 3 20 2.148 2.469 31.827 150 10 15 1.630 0.617
0.996 2 20 0.560 2.469 2.765 200 8 4 1.646 0.395
10.609 2 20 2.148 2.469 10.609 150 8 15 1.646 0.395
164.957 139.509

Extra Steel at Top (L/3)


T8 Stirrups near supports (For L/3)
eft support At Right support
unit
Total Dia Cut unit Total Dia Cut
No Spac No of weigh
Weight in of Leng weight Weight in of Lengt
s ing Bar t
Kgs Bar th kg/m Kgs Bar h
kg/m
17.926 2 16 1.815 1.580 5.736 130 10 15 1.630 0.617
130 10 5 1.630 0.617

2.844 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395


1.600 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395
3.268 2 12 0.919 0.889 3.268 200 8 6 1.346 0.395
22.407 2 16 1.815 1.580 5.736 130 10 15 1.630 0.617
130 10 5 1.630 0.617

2.844 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395


1.600 2 12 0.900 0.889 1.600 200 8 6 1.346 0.395
3.268 2 12 0.919 0.889 3.268 200 8 6 1.346 0.395
8.841 2 16 1.865 1.580 5.894 200 8 10 1.346 0.395
180 8 4 1.346 0.395

6.089 2 16 1.927 1.580 6.089 180 8 12 1.346 0.395

6.210 2 16 1.965 1.580 6.210 180 8 12 1.346 0.395

0.996 2 16 0.560 1.580 1.770 200 8 4 1.346 0.395


7.106 2 16 2.248 1.580 7.106 150 8 16 1.646 0.395
11.333 2 20 2.295 2.469 11.333 150 8 16 1.646 0.395
22.206 2 20 2.248 2.469 22.206 150 8 16 1.646 0.395
1.991 3 20 0.560 2.469 8.296 200 8 4 1.346 0.395
0.996 2 12 0.560 0.889 0.996 200 8 4 1.346 0.395
31.827 3 20 2.148 2.469 31.827 150 10 15 1.630 0.617
0.996 2 20 0.560 2.469 2.765 200 8 4 1.646 0.395
10.609 2 20 2.148 2.469 10.609 150 8 15 1.646 0.395
164.957 139.509
pports (For L/3) T8 Stirrups Elsewhere Remarks

Total Dia No Cut unit Total


Spa
Weight of of Lengt weight Weight
cing
in Kgs Bar Bar h kg/m in Kgs
5.318 300 8 13 1.346 0.395 6.913
2.659 300 8 7 1.346 0.395 3.722
3.722 150 8 13 1.346 0.395 6.913
3.722 150 8 13 1.346 0.395 6.913
2.659 300 8 7 1.346 0.395 3.722
5.318 300 8 13 1.346 0.395 6.913
5.849 300 8 14 1.346 0.395 7.445
5.849 300 8 14 1.346 0.395 7.445
1.595 300 8 5 1.346 0.395 2.659
7.803 300 8 16 1.646 0.395 10.404
7.803 300 8 16 1.646 0.395 10.404
6.381 300 8 5 1.346 0.395 7.976
19.143 300 8 15 1.346 0.395 23.929
12.762 300 8 16 1.346 0.395 17.016
90.583 122.374 889.969

Remarks
pports (For L/3) T8 Stirrups Elsewhere

Total Dia No Cut unit Total


Spa
Weight of of Lengt weight Weight
cing
in Kgs Bar Bar h kg/m in Kgs
8.454 150 8 25 1.646 0.395 16.257
4.025 150 10 8 1.63 0.617 8.049

3.191 250 8 8 1.346 0.395 4.254


3.191 250 8 8 1.346 0.395 4.254
8.508 250 8 8 1.346 0.395 8.508
9.754 150 8 25 1.646 0.395 16.257
5.031 130 10 9 1.63 0.617 9.056

3.191 250 8 8 1.346 0.395 4.254


3.191 250 8 8 1.346 0.395 4.254
6.381 250 8 8 1.346 0.395 8.508
5.318 250 8 16 1.346 0.395 8.508
2.127 180 8 7 1.346 0.395 3.722

6.381 200 8 20 1.346 0.395 10.635

6.381 200 8 21 1.346 0.395 11.167

2.127 250 8 5 1.346 0.395 2.659


10.404 250 8 19 1.646 0.395 12.355
2.127 250 8 5 1.346 0.395 2.659
10.404 250 8 19 1.646 0.395 12.355

10.404 250 8 19 1.646 0.395 12.355


4.254 250 8 5 1.346 0.395 5.318
30.185 150 10 30 1.63 0.617 60.370
20.809 250 8 19 1.646 0.395 24.710
2.601 250 8 5 1.646 0.395 3.251
9.754 250 8 18 1.646 0.395 11.705
178.193 265.420 2251.493

pports (For L/3) T8 Stirrups Elsewhere Remarks

Total Dia No Cut unit Total


Spa
Weight of of Lengt weight Weight
cing
in Kgs Bar Bar h kg/m in Kgs
15.093 130 10 29 1.630 0.617 29.179
5.031 130 10 9 1.630 0.617 9.056

3.191 250 8 8 1.346 0.395 4.254


3.191 250 8 8 1.346 0.395 4.254
6.381 250 8 8 1.346 0.395 8.508
15.093 130 10 29 1.630 0.617 29.179
5.031 130 10 9 1.630 0.617 9.056

3.191 250 8 8 1.346 0.395 4.254


3.191 250 8 8 1.346 0.395 4.254
6.381 250 8 8 1.346 0.395 8.508
5.318 250 8 16 1.346 0.395 8.508
2.127 180 8 7 1.346 0.395 3.722

6.381 200 8 20 1.346 0.395 10.635

6.381 200 8 21 1.346 0.395 11.167

2.127 250 8 5 1.346 0.395 2.659


10.404 250 8 19 1.646 0.395 12.355
10.404 250 8 19 1.646 0.395 12.355
20.809 250 8 19 1.646 0.395 24.710
4.254 250 8 5 1.346 0.395 5.318
2.127 250 8 5 1.346 0.395 2.659
30.185 150 10 30 1.630 0.617 60.370
2.601 250 8 5 1.646 0.395 3.251
9.754 250 8 18 1.646 0.395 11.705
178.646 279.916 2173.790

pports (For L/3) T8 Stirrups Elsewhere Remarks

Total Dia No Cut unit Total


Spa
Weight of of Lengt weight Weight
cing
in Kgs Bar Bar h kg/m in Kgs
15.093 130 10 29 1.63 0.617 29.179
5.031 130 10 9 1.63 0.617 9.056

3.191 250 8 8 1.346 0.395 4.254


3.191 250 8 8 1.346 0.395 4.254
6.381 250 8 8 1.346 0.395 8.508
15.093 130 10 29 1.63 0.617 29.179
5.031 130 10 9 1.63 0.617 9.056

3.191 250 8 8 1.346 0.395 4.254


3.191 250 8 8 1.346 0.395 4.254
6.381 250 8 8 1.346 0.395 8.508
5.318 250 8 16 1.346 0.395 8.508
2.127 180 8 7 1.346 0.395 3.722

6.381 200 8 20 1.346 0.395 10.635

6.381 200 8 21 1.346 0.395 11.167

2.127 250 8 5 1.346 0.395 2.659


10.404 250 8 19 1.646 0.395 12.355
10.404 250 8 19 1.646 0.395 12.355
20.809 250 8 19 1.646 0.395 24.710
4.254 250 8 5 1.346 0.395 5.318
2.127 250 8 5 1.346 0.395 2.659
30.185 150 10 30 1.63 0.617 60.370
2.601 250 8 5 1.646 0.395 3.251
9.754 250 8 18 1.646 0.395 11.705
178.646 279.916 2173.790
PCC RCC
Total
Depth of
Depth of Length+.115 Width+.115+ Length+.115
Raft(d) in
Foundatio +.115 in m .115 In m +.115 in m
m
n in m
F1 0.900 0.300 F1 2.800 1.400 F1 2.570
F2 0.600 0.150 F2 1.950 1.800 F2 1.720
F3 0.500 0.150 F3 1.600 1.650 F3 1.370
F4 0.600 0.150 F4 1.950 1.800 F4 1.720
F5 0.500 0.150 F5 1.600 1.650 F5 1.370
F6 0.600 0.150 F6 1.950 1.800 F6 1.720
F7 0.900 0.300 F7 2.800 1.400 F7 2.570
F8 0.600 0.150 F8 1.950 1.800 F8 1.720
F9 0.500 0.150 F9 1.600 1.650 F9 1.370
F10 0.600 0.150 F10 1.950 1.800 F10 1.720
F11 0.500 0.150 F11 1.600 1.650 F11 1.370
F12 0.600 0.150 F12 1.950 1.800 F12 1.720
F13 0.450 0.150 F13 1.500 1.050 F13 1.270
F14 0.370 0.150 F14 1.350 1.350 F14 1.120
F15 0.370 0.150 F15 1.350 1.350 F15 1.120
F16 0.370 0.150 F16 1.350 1.350 F16 1.120
RCC

Lower
Width+.115+ Width In Depth in Width In Depth in
Ground Nos
.115 In m m m m m
Level

1.170 C1 0.450 0.300 0.135 1,6 0.230 0.450 1


1.570 C2 0.450 0.300 0.135 2,7 0.230 0.450 1
1.420 C3 0.380 0.300 0.114 3,8 0.230 0.450 1
1.570 C4 0.450 0.300 0.135 5,10 0.230 0.450 1
1.420 C5 0.380 0.300 0.114 4,9 0.230 0.450 1
1.570 C6 0.450 0.300 0.135 11 0.230 0.450 1
1.170 C7 0.450 0.300 0.135 12 0.230 0.450 1
1.570 C8 0.450 0.300 0.135 13 0.230 0.450 1
1.420 C9 0.380 0.300 0.114 14,17 0.230 0.450 1
1.570 C10 0.450 0.300 0.135 15 0.230 0.600 1
1.420 C11 0.380 0.300 0.114 16,18 0.230 0.600 1
1.570 C12 0.450 0.300 0.135 TB1 0.230 0.450 3
0.820 C13 0.300 0.300 0.090 TB2 0.230 0.450 3
1.120 C14 0.300 0.300 0.090 TB2 0.230 0.450 2
1.120 C15 0.300 0.300 0.090
1.120 C16 0.300 0.300 0.090
Upper
Width Depth Width In
Ground Nos First Slab Level
In m in m m
Level

5.445 1 0.230 0.600 1 5.445 1.060 1 0.230


2.700 1C 0.230 0.600 1 1.500 1.060 1C 0.230
2.700 2 0.230 0.450 1 2.700 0.910 2 0.230
2.758 3 0.230 0.450 1 2.700 0.910 3 0.230
2.758 4,5 0.230 0.450 2 2.758 0.910 4,5 0.230
5.595 6 0.230 0.600 1 5.445 1.060 6 0.230
5.780 6C 0.230 0.600 1 1.500 1.060 6C 0.230
5.895 7 0.230 0.450 1 2.700 0.910 7 0.230
1.680 8 0.230 0.450 1 2.700 0.910 8 0.230
6.745 9,10 0.230 0.450 2 2.758 0.910 9,10 0.230
6.885 11 0.230 0.450 1 5.595 0.910 11 0.230
1.680 11C 0.230 0.450 1 1.500 0.910 11C 0.230
6.445 12 0.230 0.450 1 5.780 0.910 12 0.230
6.745 13 0.230 0.450 1 5.895 0.910 13 0.230
14 0.230 0.450 1 1.680 0.910 14 0.230
15 0.230 0.600 1 6.745 1.060 15 0.230
16 0.230 0.450 1 1.680 0.910 16 0.230
17 0.230 0.600 1 6.745 1.060 19,22 0.230
18 0.230 0.600 1 6.885 1.060 17,20 0.230
19,22 0.230 0.450 2 1.680 0.910 17A 0.230
20,23 0.230 0.600 2 6.445 1.060 18,21 0.230
21,24 0.230 0.600 2 6.745 1.060 23 0.230
25 0.230 0.600 1 1.680 1.060 24 0.230
26 0.230 0.600 1 6.445 1.060
Depth in Second Width In Depth in
Nos Length Nos
m Slab Level m m

0.600 1 5.445 1.060 1 0.230 0.600 1 5.445 1.060


0.600 1 1.500 1.060 1C 0.230 0.600 1 1.500 1.060
0.450 1 2.700 0.910 2 0.230 0.450 1 2.700 0.910
0.450 1 2.700 0.910 3 0.230 0.450 1 2.700 0.910
0.450 2 2.758 0.910 4,5 0.230 0.450 2 2.758 0.910
0.600 1 5.445 1.060 6 0.230 0.600 1 5.445 1.060
0.600 1 1.500 1.060 6C 0.230 0.600 1 1.500 1.060
0.450 1 2.700 0.910 7 0.230 0.450 1 2.700 0.910
0.450 1 2.700 0.910 8 0.230 0.450 1 2.700 0.910
0.450 2 2.758 0.910 9,10 0.230 0.450 2 2.758 0.910
0.450 1 5.595 0.910 11 0.230 0.450 1 5.595 0.910
0.450 1 1.500 0.910 11C 0.230 0.450 1 1.500 0.910
0.450 1 5.780 0.910 12 0.230 0.450 1 5.780 0.910
0.450 1 5.895 0.910 13 0.230 0.450 1 5.895 0.910
0.450 1 1.680 0.910 14 0.230 0.450 1 1.680 0.910
0.600 1 6.745 1.060 15 0.230 0.600 1 6.745 1.060
0.600 1 6.885 1.060 16 0.230 0.600 1 6.885 1.060
0.600 2 6.745 1.060 19,22 0.230 0.600 2 6.745 1.060
0.450 2 1.680 0.910 17,20 0.230 0.450 2 1.680 0.910
0.450 1 1.680 0.910 17A 0.230 0.450 1 1.680 0.910
0.600 2 6.445 1.060 18,21 0.230 0.600 2 6.445 1.060
0.600 1 1.680 1.060 23 0.230 0.600 1 1.680 1.060
0.600 1 6.445 1.060 24 0.230 0.600 1 6.445 1.060
C1 1 C2 2 C3 3 C4 4 C5

LGL 0.450 5.445 0.300 2.700 0.380 2.700 0.300 2.758 0.380
UGL

C13 11 C14 12 C15 13 C16


0.300 5.595 0.300 5.780 0.300 5.895 0.300

0.116
5 C6

2.758 0.300 0.000


ECCENTRIC FOOTING C1 &
FOOTING C1 & C7, C13