1) Current Transformer

The document is a site test report for current transformers, detailing the testing procedures, results, and inspections conducted on the transformers at a substation. It includes sections on mechanical checks, electrical tests, insulation resistance, winding resistance, polarity, ratio tests, magnetization curve measurements, and burden tests. The report is structured with specific criteria and results for each test, ensuring compliance with standards.

Uploaded by

A Farad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views12 pages

1) Current Transformer

The document is a site test report for current transformers, detailing the testing procedures, results, and inspections conducted on the transformers at a substation. It includes sections on mechanical checks, electrical tests, insulation resistance, winding resistance, polarity, ratio tests, magnetization curve measurements, and burden tests. The report is structured with specific criteria and results for each test, ensuring compliance with standards.

Uploaded by

A Farad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 12

SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 1 of 12
Panel Name: Equip. No.: Dwg. Ref.

CURRENT TRANSFORMER TEST

General Data and Information

Bay No Rated Voltage


CT No Make
Mfg Year Type

CT Serial No
SERIAL No:
BCT No:
R- Phase Y- Phase B- Phase

CT Rating

BCT NO. Tap Ratio Vk Ie Rct Class Burden

1. Mechanical Check and Visual Inspection

Sr.No Description Done Remarks


1 Inspect for any physical damage/ defects.
2 Check Name Plate information for correctness
3 Check outdoor secondary wiring terminations are installed in moisture proof enclosure.
4 Check tightness of all bolted connections (torque wrench method)
5 Check that all grounding cables are securely connected.

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 2 of 12
Panel Name: Equip. No.: Dwg. Ref.

6 Check secondary wiring is correctly color coded and size of wires is as specified.
7 Check proper lugs have been used on terminations.
8 Check CT locations physically and secondary terminal labeling has been done correctly.

2. Electrical Tests

Sr.No Description Done Remarks


Insulation resistance test, as following:
1 a. Primary to ground 5KV DC for one minute.
b. Primary to Secondary 2.5 KV DC for one minute.
c. Secondary to ground and core to core 1KV DC for one minute.
2 Winding resistance measurement.(ambient temperature shall be recorded; winding
resistance shall be referred to 75º C)
3 Polarity test or flick test with battery.
4 Ratio test.
5 Magnetizing current test (minimum two points above knee point).
6 Loop resistance measurement test (burden test).
7 Phase identification test.
Verify secondary circuits, terminals, shorting/isolating links by primary injection of CTs.
8 Installation of ct direction is as per the approved drawings and required weather proof
labels are available and check single point earth for each CT Circuit.
9 Note: It is necessary to demagnetize CT cores after all tests.

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 3 of 12
Panel Name: Equip. No.: Dwg. Ref.

Electrical test

1. Insulation Resistance Test:


Criteria : More than 1000 M Ohms for Primary – Secondary / Earth
More than 10 M Ohms for Secondary - Earth and between secondary’s.
Applied IR Value in Gega Ohms
Applied Between R Phase Y Phase B Phase Result
Voltage V DC
Primary - Earth 5000 V
Primary - Secondary CT1-C1
Primary - Secondary CT1-C2
Primary - Secondary CT1-C3
Primary - Secondary CT1-C4 2500 V
Primary - Secondary CT1-C5
Primary - Secondary CT1-C6
Secondary CT1-C1 - Earth
Secondary CT1-C2 - Earth
Secondary CT1-C3 - Earth
Secondary CT1-C4 - Earth
Secondary CT1-C5 - Earth
Secondary CT1-C6 - Earth
CT1-C1 – CT1-C2
CT1-C1 – CT1-C3
CT1-C1 – CT1-C4
CT1-C1 – CT1-C5
CT1-C1 – CT1-C6
1000 V
CT1-C2 – CT1-C3
CT1-C2 – CT1-C4
CT1-C2 – CT1-C5
CT1-C2 – CT1-C6
CT1-C3 – CT1-C4
CT1-C3 – CT1-C5
CT1-C3 – CT1-C6
CT1-C4 – CT1-C5
CT1-C4 – CT1-C6
CT1-C5 – CT1-C6

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 4 of 12
Panel Name: Equip. No.: Dwg. Ref.

2. Secondary Winding Resistance Check

Criteria : Within +/- 5% of Factory test Report

Phase A Amb.Temp. : ºC
Measured Value in Ohm Factory
Value in Ohms at % Error Remarks
BCT No Tap ºC 75º C 75 º C
S1-S2
S1-S3
CT1-C1 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C2 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C3 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C4 S1-S4
S1-S5
CT1-C5 S1-S2
CT1-C6 S1-S2

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 5 of 12
Panel Name: Equip. No.: Dwg. Ref.

Phase B Amb.Temp. : ºC
Measured Value in Ohm Factory
Value in Ohms at % Error Remarks
BCT No Tap ºC 75º C 75 º C
S1-S2
S1-S3
CT1-C1 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C2 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C3 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C4 S1-S4
S1-S5
CT1-C5 S1-S2
CT1-C6 S1-S2

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 6 of 12
Panel Name: Equip. No.: Dwg. Ref.

Phase C Amb.Temp. : ºC
Measured Value in Ohm Factory
Value in Ohms at % Error Remarks
BCT No Tap ºC 75º C 75 º C
S1-S2
S1-S3
CT1-C1 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C2 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C3 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C4 S1-S4
S1-S5
CT1-C5 S1-S2
CT1-C6 S1-S2

Formula to convert winding resistance to reference temperature at 75  C for copper winding.

Note: 1
Rc = Calculated value at 75  C
Rm = Measurement value which contained a measurement cable.

Note: 2
Calculated 75  C Rc = (Rm-Rx) x (234.5+75)
(234.5+Ta)
Rx = Resistance value of the measurement
cable. Ta = Ambient Temperature  C

Note: 3
Resistance value of measurement cable Rx = Ω

NOTE: See Attached CT Analyzer Test Report

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 7 of 12
Panel Name: Equip. No.: Dwg. Ref.

3. Polarity Test

Polarity Checked and Found Ok


Terminal Tap
Phase A Phase B Phase C
S1-S2
S1-S3
CT1-C1 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C2 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C3 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C4 S1-S4
S1-S5
CT1-C5 S1-S2
CT1-C6 S1-S2

NOTE: See Attached CT Analyzer Test Report

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 8 of 12
Panel Name: Equip. No.: Dwg. Ref.

4. Ratio Test:

Phase A:
Secondary Measured
BCT No Tap Ratio Primary Test Current Measured Ratio % Error
Current

Phase B
Secondary Measured
BCT No Tap Ratio Primary Test Current Measured Ratio % Error
Current

Phase C
Secondary Measured
BCT No Tap Ratio Primary Test Current Measured Ratio % Error
Current

NOTE: See Attached CT Analyzer Test Report

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 9 of 12
Panel Name: Equip. No.: Dwg. Ref.

5. Magnetization Curve Measurement:

Criteria : The %age error for Magnetizing current shall be within +/- 5% of the factory Test Report.

Note: All CT cores shall be demagnetized after the tests are carried out.

Phase A
Current from
Sl.No. Voltage (V) Current (mA) Magnetizing %age Error
Curve (mA)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

NOTE: See Attached CT Analyzer Test Report

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 10 of 12
Panel Name: Equip. No.: Dwg. Ref.

Phase B

Current from
Sr.No. Voltage (V) Current (mA) Magnetizing %age Error
Curve (mA)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

NOTE: See Attached CT Analyzer Test Report

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 11 of 12
Panel Name: Equip. No.: Dwg. Ref.

Phase C
Current from
Sr.No. Voltage (V) Current (mA) Magnetizing %age Error
Curve (mA)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

NOTE: See Attached CT Analyzer Test Report

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT

Customer:

Name of Substation: Contract No. :


CURRENT TRANSFORMER - TEST REPORT Page 12 of 12
Panel Name: Equip. No.: Dwg. Ref.

6. Burden Test:

Injected Current:
Phase Description Core-1 Core-2 Core-3 Core-4 Remarks
Terminal No.
Ratio
A Measured Voltage (V)
Calculated Burden (V)
Design Burden (VA)
Terminal No.
Ratio
B Measured Voltage (V)
Calculated Burden (V)
Design Burden (VA)
Terminal No.
Ratio
C Measured Voltage (V)
Calculated Burden (V)
Design Burden (VA)

Note: See Attached Burden Test Report

7. Testing Equipment’s Used


Item Test Equipment Serial Number Calibration date Calibration due date
1
2

Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :