1) Current Transformer
1) Current Transformer
Customer:
CT Serial No
SERIAL No:
BCT No:
R- Phase Y- Phase B- Phase
CT Rating
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
6 Check secondary wiring is correctly color coded and size of wires is as specified.
7 Check proper lugs have been used on terminations.
8 Check CT locations physically and secondary terminal labeling has been done correctly.
2. Electrical Tests
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
Electrical test
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
Phase A Amb.Temp. : ºC
Measured Value in Ohm Factory
Value in Ohms at % Error Remarks
BCT No Tap ºC 75º C 75 º C
S1-S2
S1-S3
CT1-C1 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C2 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C3 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C4 S1-S4
S1-S5
CT1-C5 S1-S2
CT1-C6 S1-S2
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
Phase B Amb.Temp. : ºC
Measured Value in Ohm Factory
Value in Ohms at % Error Remarks
BCT No Tap ºC 75º C 75 º C
S1-S2
S1-S3
CT1-C1 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C2 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C3 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C4 S1-S4
S1-S5
CT1-C5 S1-S2
CT1-C6 S1-S2
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
Phase C Amb.Temp. : ºC
Measured Value in Ohm Factory
Value in Ohms at % Error Remarks
BCT No Tap ºC 75º C 75 º C
S1-S2
S1-S3
CT1-C1 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C2 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C3 S1-S4
S1-S5
S1-S2
S1-S3
CT1-C4 S1-S4
S1-S5
CT1-C5 S1-S2
CT1-C6 S1-S2
Note: 1
Rc = Calculated value at 75 C
Rm = Measurement value which contained a measurement cable.
Note: 2
Calculated 75 C Rc = (Rm-Rx) x (234.5+75)
(234.5+Ta)
Rx = Resistance value of the measurement
cable. Ta = Ambient Temperature C
Note: 3
Resistance value of measurement cable Rx = Ω
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
3. Polarity Test
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
4. Ratio Test:
Phase A:
Secondary Measured
BCT No Tap Ratio Primary Test Current Measured Ratio % Error
Current
Phase B
Secondary Measured
BCT No Tap Ratio Primary Test Current Measured Ratio % Error
Current
Phase C
Secondary Measured
BCT No Tap Ratio Primary Test Current Measured Ratio % Error
Current
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
Criteria : The %age error for Magnetizing current shall be within +/- 5% of the factory Test Report.
Note: All CT cores shall be demagnetized after the tests are carried out.
Phase A
Current from
Sl.No. Voltage (V) Current (mA) Magnetizing %age Error
Curve (mA)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
Phase B
Current from
Sr.No. Voltage (V) Current (mA) Magnetizing %age Error
Curve (mA)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
Phase C
Current from
Sr.No. Voltage (V) Current (mA) Magnetizing %age Error
Curve (mA)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :
SITE TEST REPORT
Customer:
6. Burden Test:
Injected Current:
Phase Description Core-1 Core-2 Core-3 Core-4 Remarks
Terminal No.
Ratio
A Measured Voltage (V)
Calculated Burden (V)
Design Burden (VA)
Terminal No.
Ratio
B Measured Voltage (V)
Calculated Burden (V)
Design Burden (VA)
Terminal No.
Ratio
C Measured Voltage (V)
Calculated Burden (V)
Design Burden (VA)
Date :
Testing Engineer Engineer
Witnessed By
Signature: Signature:
Name : Name :