CS615 FinalTerm Mega File Solved
CS615 FinalTerm Mega File Solved
If you are given a Software Project to manage, what steps you will consider for
planning of the project. During the Implementation phase the software modules are
coded and initial unit tests are performed.
• True
• False
The final activity for a project manager is___________
All given below are the problems that affect software projects except:
Cost, effort, risks, and resources are the factors included in--------
Extent to which the program can be used in more than one program or system is
called-------
Which of the items listed below is not one of the software engineering layers?
► Process
► Manufacturing
► Methods
► Tools
► False
► True
► False
Which one the following components are purchased from a third party, are
ready for use on the current project and have been fully validated?
� Software
� Hardware
� Microsoft
� Schedule
� Effort
� Size
� Resource
development effort.
� True
� False
Adding more people to a project that is already behind schedule is a good way
to catch up.
� True
� False
Discrete portions of the project that can be charged to a single organization are
called -----------------
� Work packages
� Deliverables
� Tasks
� Activities
system into its operational components as they are seen by the user.
� Design
� Functional
� Project
� planning
� Configurability
� Reusability
� Interoperability
� pertability
� Flexibility
� Testability
� Maintainability
� Reusability
www.vustudents.ning.com
Question No. 1 Marks : 2
� True
� False
During the Implementation phase the software modules are coded and initial
unit tests are performed.
� True
� False
� True
� False
Both the software engineer and customer take an active role in software
requirements
� Recognition
� Analysis
� Modeling
called :
� Portability
� Reusability
� Configurability
� Interoperability
Cost, effort, risks, and resources are the factors included in--------
► Estimation
► Testing
► Development
► Maintenance
Extent to which the program can be used in more than one program or system is
called -------
► Portability
► Reusability
►Interoperability
►Configurability
►complexity
►content
►determinacy
►Inspection
►Walkthrough
►Auditing
Which of the items listed below is not one of the software engineering layers?
►Process
►Manufacturing
►Methods
►Tools
www.vustudents.ning.com
►True
►False
►True
►False
► Quality Planning
► Communications Planning
► Organization Planning
► Staff Acquisition
► Constraints
► Selection Criteria
► Assumptions
► Four
► Five
► Six
► Seven
► Software requirements
► Development standards
► Implicit requirements
► All of given
► Design P 107
► Implementation
► Requirements analysis
► Testing
► Quality
► Timeliness and
► Completeness of SW product
► Bibliography
► Appendix
► Developer
► Manager
www.vustudents.ning.com
Question No: 9 ( Marks: 1 ) - Please choose one
► Software developer
► Customer
► Customer site
► Company site
The model serves as the basis for the creation of ________ for the Software.
► Design
► Maintenance
► Testing
► Specifications P 95
► Model
► Specification
In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new system and
what data will be provided to the system.
► Analyst P 97
► Designer
► Coder
► Manager
► Correctness
► Consistency P 93
► Concurrency
► None of given
A software project that meets all the stated objectives is a success of _________
► Project quality
► Project requirement
Software project are carried out sequentially and that each phase is completed before
the next is taken up.
► Process
► Concept
► Practice
► None of given
► Output Design
► Input Design
► Software Selection
C. Design Phase
1. General System Review
2. Processing Requirements Identification
3. Data Base Design
4. Control Requirements
5. Output Design
6. Input Design
7. Software Selection
8. Equipment Selection/Acquisition
9. People
10. Reference Manual Identification
11. Plans
12. Design Specifications Preparation
13. Design Phase Report Preparation
Which organization has set the de facto standards for project management
techniques?
► PMBOK
► PMI
► PMA
► PMO
? Staff Acquisition
? Assumptions
? Seven
www.vustudents.ning.com
Question No: 4 ( Marks: 1 ) - Please choose one
Product quality depends on its conformance to ______
? Software requirements
? Development standards
? Implicit requirements
? All of given
? Testing
page 107
? Quality
? Timeliness and
? Completeness of SW product
? All of given
page 103
Question No: 7 ( Marks: 1 ) - Please choose one
Finally, the specification includes a ________
? Bibliography
? Appendix
? Both Bibliography and Appendix
? Reference
page 105
? User community
? Developer
? Top level management
? Manager
page 103
Question No: 9 ( Marks: 1 ) - Please choose one
A review of the Software Requirements Specification is conducted by ________
? Software developer
? Customer
? Both the software developer and the customer
page 106
Question No: 10 ( Marks: 1 ) - Please choose one
A meeting is conducted at a _________ and attended by both software engineers and
customers.
? Customer site
? Company site
page 100
Question No: 11 ( Marks: 1 ) - Please choose one
The model serves as the basis for the creation of ________ for the Software.
? Design
? Maintenance
? Testing
? Specifications
page 95
Question No: 12 ( Marks: 1 ) - Please choose one
Throughout evaluation and solution synthesis, the analyst's primary focus is on
? "What, not "how."
? Model
? Evaluation and Synthesis
? Specification
page 95
? Manager
page 97
? None of given
page 93
? Project quality
? Project fundamental purpose
? Project management myth
? Project requirement
page 82
Question No: 16 ( Marks: 1 ) - Please choose one
All of the following describe the activity list except:
? It’s an extension of the WBS
? It include all activities of the project
? It describe the WBS update
page 274
Question No: 17 ( Marks: 1 ) - Please choose one
Software project are carried out sequentially and that each phase is completed before
the next is taken up.
? The Prototyping Model
? The Incremental Model
? The Waterfall model
? The Spiral model
page 67
Question No: 18 ( Marks: 1 ) - Please choose one
Project management is a _________of constant communication and negotiation.
? Process I am not sure about it
? Concept
? Practice
? None of given
Which one the following components are purchased from a third party, are ready for
use on the current project and have been fully validated?
• Software
• Off – the – shelf
• Hardware
• Microsoft
• False
Adding more people to a project that is already behind schedule is a good way to
catch up.
• True
• False
Question No. 8 ks : 1
Discrete portions of the project that can be charged to a single organization are called
-----------------
• Work packages
• Deliverables
• Tasks
• Activities
Marks : 1
• Functional
• Project
• planning
► Quality Planning
► Communications Planning
► Organization Planning
► Staff Acquisition
► Constraints
► Selection Criteria
► Assumptions
► Four
► Five
► Six
► Seven
► Software requirements
► Development standards
► Implicit requirements
► All of given
► Design
► Implementation
► Requirements analysis
► Testing
► Quality
► Timeliness and
► Completeness of SW product
► All of given
► Bibliography
► Appendix
► Reference
► User community
► Developer
► Manager
► Software developer
► Customer
► Neutral site
► Customer site
► Company site
The model serves as the basis for the creation of ________ for the Software.
► Design
► Maintenance
► Testing
► Specifications
► Model
► Specification
Question No: 13 ( Marks: 1 ) - Please choose one
In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new system and
what data will be provided to the system.
► Analyst
► Designer
► Coder
► Manager
► Correctness
► Consistency
► Concurrency
► None of given
A software project that meets all the stated objectives is a success of _________
► Project quality
► Project requirement
Software project are carried out sequentially and that each phase is completed before
the
next is taken up.
► Process
► Concept
► Practice
► None of given
► Output Design
► Input Design
► Software Selection
Which organization has set the de facto standards for project management
techniques?
► PMBOK
► PMI
► PMA
► PMO
Spring 2009
► Quality Planning
► Communications Planning
► Organization Planning
► Staff Acquisition
► Four
► Five
► Six
► Seven
► Software requirements
► Development standards
► Implicit requirements
► All of given
► Design
► Implementation
► Requirements analysis
► Testing
► Bibliography
► Appendix
► Both Bibliography and Appendix
► Reference
► User community
► Developer
► Top level management
► Manager
► Software developer
► Customer
► Both the software developer and the customer
► Top level management
► Design
► Maintenance
► Testing
► Specifications
Question No: 12 ( Marks: 1 ) - Please choose one
Throughout evaluation and solution synthesis, the analyst's primary focus is
on
► Analyst
► Designer
► Coder
► Manager
► Correctness
► Consistency
► Concurrency
► None of given
► Project quality
► Project fundamental purpose
► Project management myth
► Project requirement
► Process
► Concept
► Practice
► None of given
► PMBOK
► PMI
► PMA
► PMO
Both the software engineer and customer take an active role in software
requirements engineering-a set of activities that is often referred to as
Requirement
Managing
Recognition
Analysis
Modeling
Spring 2009
________ identifying which quality standards are relevant to the project and
determining how to satisfy them.
Quality Planning
Communications Planning
Organization Planning
Staff Acquisition
Four
Five
Six
Seven
Software requirements
Development standards
Implicit requirements
All of given
Design
Implementation
Requirements analysis
Testing
Quality
Timeliness and
Completeness of SW product
All of given
Bibliography
Appendix
Both Bibliography and Appendix
Reference
Software developer
Customer
Both the software developer and the customer
Top level management
The model serves as the basis for the creation of ________ for the Software.
Design
Maintenance
Testing
Specifications
In problem evaluation area of effort, once problems have been identified, the
___________determines what information is to be produced by the new
system and what data will be provided to the system.
Analyst
Designer
Coder
Manager
Correctness
Consistency
Concurrency
None of given
Project quality
Project fundamental purpose
Project management myth
Project requirement
Software project are carried out sequentially and that each phase is
completed before the next is taken up.
Process
Concept
Practice
None of given
Output Design
Input Design
The software test plan
Software Selection
Which organization has set the de facto standards for project management
techniques?
PMBOK
PMI
PMA
PMO
PMA
h1. Basit is the project manager working on the Resource Planning process. He
should consider all of the following when developing the resource
requirements output except:
WBS
Supply purchase policies
Resource rates
Special knowledge and talents
2. All of the following are true regarding the tools and techniques of activity
sequencing except:
GERT uses analogous methods
GERT allows for loops
GERT is a conditional diagramming method
GERT allows for conditional branches
3. Pervaiz Elahi is a project manager for Changing Tides Video games. He has
produced a project network diagram and has updated the activity list. Which
process have he just finished?
The Activity Sequencing process, which identifies all the specific
activities of the project
The Activity Sequencing process, which identifies all the activities
dependences
The activity duration Estimating process, which diagram project
network time estimates
The activity duration Estimating process, which identifies all the
dependent activities of the project
4. Pervaiz Elahi is a project manager for Changing Tides Video games. He has
gathered the inputs of for the Activity Duration Estimation process. He will
employ which tools and techniques to produce the outputs for this process?
Activity list, analogous estimating, quality based durations, and
alternatives identification
Activity list, analogous estimating, expert judgment, and quality based
durations
Expert judgment, analogous estimating, quality based durations,
and reserve time
Expert judgment, alternative identification, quality based durations, and
reserve time
5. As a project manager, you know that all of the following are true
concerning analogous estimating techniques except:
It’s a qualitatively based estimating technique
It’s a Top-down estimating technique
It’s a tool and technique of Activity Duration Estimating and Cost
Estimating
It’s a form of expert judgment
9. The organization structure that provides the project manager with the most
authority over the project team is:
Functional
Balanced matrix
Strong matrix
Projectized
13. If you know expected value is 500 and the standard deviation is 12, you
can ay with approximately a 95 percent confidence rating which of the
following?
The activity will take between 488 and 512 days
The activity will take between 464 and 536 days
The activity will take between 494 and 506 days
The activity will take between 476 and 524 days
14. If your expected value is 110 and the standard deviation is 12, which of the
following is true?
There is approximately a 99 percent chance of completing this activity
between 86 and 134 days
There is approximately a 68 percent chance of completing this
activity between 98 and 122 days
There is approximately a 95 percent chance of completing this activity
between 98 and 122 days
There is approximately a 75 percent chance of completing this activity
between 86 and 134 days
15. Which of the following tools and techniques shows the impacts of one
decision over another as well as the probability and cost of each risk along a
logical path?
Simulation
Decision tree
Probability / impact risk matrix
Sensitivity analysis
16. All of the following strategies are tools and techniques of Risk Response
Planning used to reduce or control risk except?
Mitigation
Simulation
Avoidance
Acceptance
19. The resources assigned to them will significantly influences the duration of
most activities.
True
False
Objectives
This assignment has been designed so that you would be able to understand
the Planning and WBS.
Assignment
Instructions: Please make bold the correct option only
4. WBS Is Not:
The WBS should contains 100% of the work defined by the scope or
contract
Development of WBS should involve the entire project team
A listing of tasks or activities
Should captures all deliverables (Internal, External, Interim) in terms of
work to be completed
6. Obtaining forma project plan approval and sign-off is important for all of
the following reason except:
Stakeholders are aware of the specific details regarding project
schedule, budgets, and risk
Stakeholders will be more likely to cooperate
Stakeholders are aware of the project details, which makes them more
likely to participate in future project decisions
Stakeholders are able to recommend a project planning
methodology to follow throughout the remaining process group
7. All of the following are true regarding the project plan except:
Some of its input and outputs from other planning processes
It’s used to guide the project Executing and Controlling processes and
it is the baseline used to measure project performance
It consists of one document that should be formally approved and
signed by stakeholder
It contains things like the WBS, project schedule , and resource
assignment
11. Usman is project manager for a new website for a local zoo. He needs to
perform Quantitative Risk Analysis. He will use all of the following tools and
techniques to accomplish this except:
Overall risk ranking for the project
List of prioritized risk
Inputs to other processes
List of risks for additional analysis and management
12. Which of the following describes the cost of quality associated with
scrapping, rework, and downtime?
Internal failure
External failure
Prevention cost
Appraisal cost
13. Choudhary & Brothers hardware vendor left you voicemail saying that a
snowstorm in the Midwest will prevent your equipment from arriving on time.
You identified a risk response for this risk and have arranged for a local
company to lease you the needed equipment until yours arrives. This is an
example of which risk response strategy?
Transference
Acceptance
Mitigation
Avoidance
14. What document outlines the action steps to be taken if an identified risk
event should occur?
Project plan
Corrective action Plan
Contingency Plan
Risk response plan
15. Tools and techniques for risk identification include all but:
Checklist
Risk assessment
Interviewing
Assumption analysis
20. Receivers in the communications model filter their information through all
of the following except:
Culture
Knowledge of subject
Conflict
Language
Quiz Solution:
a) Change adaptive
b) Faulty
c) Correctness
d) Both Change adaptive and Correctness
a) White box
b) Gray box
c) Blue box
d) Black box
a) White Box
b) Black Box
c) Integration testing
d) None of given
4- How do the dynamic testers confirm that the executions of a program (other
than the expected execution of a program) are running accurately?
a) Some important program input are selected from the set of all and
executed
b) It is hard to confirm that
c) The execution of the program other that the intended execution is
useless to test
d) None of given
a) Formal testing
b) Dynamic testing
c) Static testing
d) Unit testing
a) True
b) False
10- Which of the following testing approach is used to test the software
functionality that previously worked as desired, stops working or no longer
works in the same way that was previously planned?
a) Integration testing
b) Unit testing
c) Regression testing
d) Dynamic testing
12- Which of the following testing is required when it needs to test the
software after combining the modules into a group?
a) Unit
b) Regression
c) White box
d) Integration
a) True
b) False
15- There is no difference between software quality assurance and software
testing
a) True
b) False
Cost, effort, risks, and resources are the factors included in--------
► Estimation
► Testing
► Development
► Maintenance
Page No. 222
► complexity
► content
► determinacy
► content and determinacy
The software quality assurance activity which is performed to check errors in logic,
function, or implementation for any representation of the software is called :
► Inspection
► Formal technical review(s)
► Walkthrough
► Auditing
Which of the items listed below is not one of the software engineering layers ?
► Process
► Manufacturing
► Methods
► Tools
Question No: 9 ( Marks: 2 ) - Please choose one
► True
► False
► True
► False
Total Questions: 8
Project life-cycle-based
Scheduled
None of given
Deliverable-based (handouts pdf file, page 277)
Question # 2 of 8
Predecessor activities need to ------------ before the next can begin. After a
predecessor activity is completed, the successor activity becomes the
predecessor for another activity.
Select correct option:
Both start and end
End (handouts, page 297)
Start
None of given
Question # 3 of 8
Each …………. can be subdivided into sub tasks.
Select correct option:
None of given
Program
Task (handouts, page 275)
Project
Question # 4 of 8
Using PERT and CPM, -----------------------, helps you complete a project on
time. By using these techniques, you can determine the latest time by when an
activity should start to be completed on time.
Select correct option:
Individually
Combination
Individual and Combine (handouts, page 296)
None of given
Question # 6 of 8
Risk analysis and management are a series of steps that help a software
team to understand and manage ------------------------.
Select correct option:
Question # 8 of 8
To ------------------- risks from occurring, the project team prepares the risk plan
before the commencement of the project.
Select correct option:
1. Which organization has set the de facto standards for project management
techniques?
A. PMBOK
B. PMO
C. PMI
D. PMA
Answer: C
The Project Management Institute (PMI) is the industry-recognized standard
for project management practices.
2. The VP of marketing approaches you and requests that you change the
visitor logon screen on the company's website to include a username with at
least six characters. This is considered:
A. Project initiation
B. Ongoing operations
C. A project
D. Project execution
Answer: B
Projects exist to create a unique product or service. The logon screen in this
question is not a unique product. A minor change has been requested,
indicating this is an ongoing operation function. Some of the criteria for
projects are that they are unique, temporary with definitive start and end
dates, and considered complete when the project goals are achieved.
7. Which of the following brings together a set of tools and techniques used to
describe, organize, and monitor the work of project activities?
A. Project managers
B. Guide to the PMBOK
C. Project management
D. Stakeholders
Answer: C
Project management brings together a set of tools and techniques to organize
project activities. Project managers are the ones responsible for managing the
project processes.
9. You are the project manager for a large construction project. The project
objective is to construct a set of outbuildings to house the Olympic support
team that will be arriving in your city 18 months from the project start date.
You've been given a budget of $12 million to complete this project. Resources
are easily attained. Which of the triple constraints is the primary constraint for
this project?
A. Time, because the date cannot be moved
B. Money, because the budget is set at $12 million
C. Resources, because they're not fixed
D. Quality, because the buildings have to be functional and safe
Answer: A
The primary constraint on this project is time because the date absolutely
cannot move. The Olympics are scheduled to begin on a certain date, and this
can't be changed. The budget is also a constraint because it's set at $12
million, but in this example, it would be a secondary constraint. It's important
that the project manager understands the priority of the constraints and
manages to them.
10. You are the project manager for a large construction project. The project
objective is to construct a set of outbuildings to house the Olympic support
team that will be arriving in your city 18 months from the project start date.
Resources are not readily available as they are currently assigned to other
projects. Jack, an expert crane operator, is needed for this project two months
from today. Which of the following skills will you use to get Jack assigned to
your project?
A. Negotiation and influencing skills
B. Communication and organizational skills
C. Communication skills
D. Problem-solving skills
Answer: A
Negotiation and influencing skills are needed to convince Jack's boss and
come to agreement concerning his assignment.
11. You are a project manager with technical expertise in the pharmaceutical
industry. You've decided to try your hand at project management in the
entertainment industry. Which of the following is true?
A. You will likely be successful because communication skills are your
strong suit. You anticipate having technical experts on your project
team to address industry specifics that you're not familiar with.
B. You will likely be successful because your organizational skills are
excellent. You anticipate having technical experts on your project team to
address industry specifics that you're not familiar with.
C. You will probably be successful because you have a friend in the
entertainment industry that has briefed you on all the important aspects of this
project that you'll need to know. You anticipate having technical experts on
your project team to address industry specifics that you're not familiar with.
D. You will probably not be successful because you have little knowledge of
the entertainment industry even though you anticipate having technical
experts on your project team to address industry specifics that you're not
familiar with.
Answer: A
Project management processes span industries. A project manager can take
these skills across industries and apply them successfully. Technical
experience in the industry doesn't hurt, but it's not required. The most
important skill any project manager can have is communication skills. Poor
communication skills might lead to an unsuccessful conclusion no matter how
strong the project manager's other skills are.
12. You are managing a project to install a new postage software system that
will automatically print labels and administer postage for certified mailings,
overnight packages, and other special mailing needs. You've attempted to
gain the cooperation of the business analyst working on this project and need
some answers. She is elusive and tells you that this project is not her top
priority. To avoid situations like this in the future, you should:
A. Establish the business analyst's duties well ahead of due dates and tell her
you'll be reporting on her performance to her functional manager.
B. Establish the business analyst's duties well ahead of due dates and tell her
you are expecting her to meet these expectations because the customer is
counting on the project meeting due dates to save significant costs on their
annual mailings.
C. Negotiate with the business analyst's functional manager during the
planning process to establish expectations and request to participate in
the business analyst's annual performance review.
D. Negotiate with the business analyst's functional manager during the
planning process to establish expectations and inform the functional manager
of the requirements of the project. Agreement from the functional manager will
assure the cooperation of the business analyst.
Answer: C
Negotiate with the functional manager to participate in the business analyst's
annual performance review.
13. The amount of authority a project manager possesses can be related to:
A. The project manager's communication skills
B. The organizational structure
C. The amount of authority the manager of the project manager possesses
D. The project manager's influencing skills
Answer: B
The level of authority the project manager has is determined by the
organizational structure. For instance, in a functional organization, the project
manager has little to no authority, but in a projectized structure, the project
manager has full authority.
15. You have been assigned to a project in which the objectives are to direct
customer calls to an Interactive Voice Response system before being
connected to a live agent. You are in charge of the media communications for
this project. You report to the project manager in charge of this project and the
VP of marketing, who share responsibility for this project. Which
organizational structure do you work in?
A. Functional organization
B. Weak matrix organization
C. Projectized organization
D. Balanced matrix organization
Answer: D
Employees in a balanced matrix often report to two or more managers.
Functional managers and project managers share authority and responsibility
for projects. There is a balance of power between the functional managers
and project managers.
16. You have been assigned to a project in which the objectives are to expand
three miles of the north-south highway through your city by two lanes in each
direction. You are in charge of the demolition phase of this project, and you
report to the project manager in charge of this project. You have been hired
on contract and will be released at the completion of the demolition phase.
What type of organizational structure does this represent?
A. Functional organization
B. Weak matrix organization
C. Projectized organization
D. Balanced matrix organization
Answer: C
Projectized organizations are focused on the project itself. One issue with this
type of structure is determining what to do with project team members when
they are not actively involved on the project. One alternative is to release
them when they are no longer needed.
17. What are the five project management process groups, in order?
A. Initiation, Executing, Planning, Controlling, and Closing
B. Initiation, Controlling, Planning, Executing, and Closing
C. Initiation, Planning, Controlling, Executing, and Closing
D. Initiation, Planning, Executing, Controlling, and Closing
Answer: D
Remember the acronym that sounds like syrup of ipecac: IPECC.
18. You have been assigned to a project in which the objectives are to expand
three miles of the north-south highway through your city by two lanes in each
direction. You are interested in implementing a new project process called
design-build in order to speed up the project schedule. The idea is that the
construction team will work on the first mile of the highway reconstruction at
the same time the design team is coming up with plans for the third mile of the
reconstruction rather than completing all design before any construction
begins. This is an example of:
A. Managing the projects as a program
B. Fast tracking
C. Progressive elaboration
D. Collocation
Answer: B
Fast tracking is starting a new phase before the phase you're working on is
completed. This compresses the project schedule, and the project is
completed sooner as a result.
19. During which project management process are risk and stakeholder's
ability to influence project outcomes the highest at the beginning of the
process?
A. Planning
B. Executing
C. Initiation
D. Controlling
Answer: C
The Initiation process is where stakeholders have the greatest ability to
influence outcomes of the project. Risk is highest during this stage because of
the high degree of unknown factors.
Question # 3 of 10
Insufficient identification is a
Select correct option:
Technology-related problems
Process-related problems
People-related problems
Product-related problems
Insufficient identification: Unidentified, partially identified, and unplanned risks
pose a threat to the success of a software project. You need to intensively
identify risks and evolve a risk management plan such that the project is
completed successfully, on time.
Question # 4 of 10
________of the system is an effort to better understand data and control flow,
functional processing, operational behavior, and information content
Select correct option:
Specifications
Design
Model
Evaluation and Synthesis
During the evaluation and solution synthesis activity, the analyst creates
models of the system in an effort to better understand data and control flow,
functional processing, operational behavior, and information content. The
model serves as a foundation for software design and as the basis for the
creation of specifications for the Software. The customer may be unsure of
precisely what is required.
The developer
Question # 5 of 10
These all are Product Transition Factors except
Select correct option:
Interoperability
Configurability
Expandability
Testability
Question # 6 of 10
Inefficient project management style is a
Select correct option:
Product-related problems
Technology-related problems
Process-related problems
People-related problems
Inefficient project management style: the project manager needs to lead by
example. The team members absorb the work culture, work ethic, and attitude
of the project manager and implement it in their work style. If you display a
lack of leadership qualities and weak ideals, the motivation levels decrease
across software team.
Question # 7 of 10
Question # 8 of 10
Software design is actually a multi step process that focuses on distinct
attributes of a program, these are
Select correct option:
Data structure, and Software architecture
Interface representations, and procedural detail
Both of given
None of given
Software design is actually a multi step process that focuses on four distinct
attributes of a program:
– Data structure,
– Software architecture,
– Interface representations, and procedural (algorithmic) detail.
Question # 9 of 10
Question # 10 of 10
McCall (MCC77) and his colleagues proposed some software quality factors
based on _________ most important aspects of a software product:
Select correct option:
4
3
6
5
There are a number of factors that determine the quality of a software product. These
factors can be measured either directly or indirectly. McCall (MCC77) and his
colleagues proposed some software quality factors based on three most important
aspects of a software product:
1. Product operation
2. Product revision and
3. Product transition
Prepare closedown report: The project closedown report contains the results of
the causal analysis that you do for the project. This contains an analysis of what went
wrong, what went right, and what you could have done better in the software
project. contains an analysis of what went wrong, what went right, and what
Question # 2 of 10
Project Quality Management includes the --------------- required to ensure
that the project will satisfy the needs for which it was undertaken
Select correct option:
Time
Cost
Processes
None of the given
Project Quality Management includes the processes required to ensure that the project
will satisfy the needs for which it was undertaken. It includes “all activities of the
overall management function that determine the quality policy, objectives, and
responsibilities and implements them by means such as quality planning, quality
assurance, quality control, and quality improvement, within the quality system.
Question # 3 of 10
-------------- completion and settlement of the contract, including resolution
of any open items.
Select correct option:
Contract Administration
Source Selection
None of the given
Contract Closeout
Source Selection
None of the given
Contract Closeout
Contract Administration
Contract Administration—managing the relationship with the seller.
Question # 5 of 10
Decisions also have a --------------------- element to them—the “right”
decision may not be the “best” decision if it is made too early or too late.
Select correct option:
Cost
Quality
Time
None of the given
Decisions also have a time element to them—the “right” decision may not be the
“best” decision if it is made too early or too late.
Question # 6 of 10
-----------is the ability to encourage by "push or pull" technical people to
produce to their best ability.
Select correct option:
Evaluating
Motivation
None of the given
Monitoring
Motivation: The ability to encourage (by "push or pull") technical people to produce
to their best ability.
Question # 7 of 10
Technology-related problems
Process-related problems
People-related problems
Product-related problems
Question # 8 of 10
Most software project manager’s practice a lot of management techniques
that are of doubtful authenticity are called
Select correct option:
Question # 9 of 10
Leader
Manager
Specialist
None of the given
Strong leadership motivation may sound an obvious trait for a leader. After all,
only those who want the weighty responsibilities and grueling pressures of leadership
are likely to strive for it.
Question # 10 of
We can classify the problems that affect software projects into _________
categories
Select correct option:
3
4
5
6
You can classify the problems that affect software projects into the following four
categories:
• People-related problems
• Process-related problems
• Product-related problems
• Technology-related problems
Question # 1 of 10
Insufficient identification is a
Select correct option:
Technology-related problems
Process-related problems
People-related problems
Product-related problems
Question # 2 of 10
Technology-related problems include _______
Select correct option:
Question # 3 of 10
What is one of the problems with project management software?
Select correct option:
Question # 4 of 10
The check-in and checkout facilities provide___________
Select correct option:
Best control
Component control
SCI control
Synchronization control
Question # 5 of 10
McCall (MCC77) and his colleagues proposed some software quality factors
based on most important aspects of a software product:
Select correct option:
Product operation
Product revision and
Product transition
All of the given
Synchronization control helps to ensure that parallel changes performed by
two different people do ___________.
Select correct option:
Question # 8 of 10
Before requirements can be analyzed, modeled, or specified they must be
gathered through a/an _________
Select correct option:
Elicitation process
Interviewing
Meeting
None of given
Question # 9 of 10
The quality of software is said to be high if it meets the
Select correct option:
Question # 10 of 10
A review of the Software Requirements Specification is conducted by ________
Select correct option:
Software developer
Customer
Both the software developer and the customer
Top level management
Question # 1 of 10
Question # 2 of 10
Question # 4 of 10
You can use the Item Traceability Matrix to identify _______ at the end of each phase
• SCIs
• SCM
• Design
• Construction
You can use the Item Traceability Matrix to identify SCIs at the end of each phase
Question # 5 of 10
Defined scope is a
• Technology-related problems
• Product-related problems
• Process-related problems
• People-related problems
Question # 6 of 10 ( Start time: 09:33:13 AM ) Total Marks: 1
• Discovery
• Refinement
• Design
• Specification
Software requirements engineering is a process of discovery, refinement,
modeling and specification.
Question # 7 of 10
The model serves as the basis for the creation of ________ for the Software.
• Design
• Maintenance
• Testing
• Specifications
The model serves as a foundation for software design and as the basis for the creation
of specifications for the Software.
Question # 8 of 10
Most software project manager’s practice a lot of management techniques that are of
doubtful authenticity are called
• Goals
• Objective
• Design
• Goals and objectives of the software
Question # 1
Individually
Combine
Individually and combine
None of the above
Question # 2
Predecessor activities need to end before the next can begin. After a
predecessor activity is completed, the successor activity becomes
the predecessor for another activity (P# 297)
Question # 4
Question # 5
► Process
► Manufacturing
► Methods
► Tools
Software engineering layers (P# 130)
Process
A quality focus
Method
Tools
Question # 6
-------------------is a software engineering task that bridges the gap
between system level requirements engineering and software
design.
►Cost Analysis
►Design analysis
►Risk analysis
►Requirements analysis
Question # 7
---------- is path finding,----------- is path following
► Leadership, Management
► Leader, Leadership
► Management, Leadership
► Manager, Management
Question # 8
Discrete portions of the project that can be charged to a
single organization are called -----------------
► Work packages
► Deliverables
► Tasks
► Activities
Question # 9
The first step in project planning is to --------------------
► Determine the budget
► Select a team organizational model
► Determine the project constraints
► Establish the objectives and scope
Question # 10
The software quality assurance activity which is performed to check
errors in logic, function, or implementation for any representation of
the software is called :
► Inspection
► Formal technical review(s)
► Walkthrough
► Auditing
1. Addition
2. Integration
3. Verification
4. Extinction
4 Formal types of project ending:
- Addition
- Starvation
- Integration
- Extinction
Q 2. The primary focus of _______________ is to ensure that the final software
product offers all the functionality and performance that the customer wanted
1. Training test
2. User acceptance test
3. Implementation test
4. Support test
The primary focus of user acceptance test is to ensure that the final software product
offers all the functionality and performance that the customer wanted. Therefore, the
customer tests the software product for issues such as aesthetics, user friendless, and
scalability.
Technology-related problems
1. Overestimated savings from reusable components and new tools and methods:
2. Switching tools in mid way
3. Integrating different software products in cross-platform implementation
1. Technology-related problems
2. Process-related problems
3. People-related problems
o Product-related problems
People-related problems are
• Low motivation
• Problem employees
• Unproductive work environment
• Inefficient project management style:
• Lack of stakeholder interest
Ineffective project sponsorship by management
1. Elicitation process
o Interviewing
o Meeting
o None of given
Q 8 . ________of the system is an effort to better understand data and control flow,
functional processing, operational behavior, and information content
1. Specifications
2. Design
3. Model
4. Evaluation and Synthesis
During the evaluation and solution synthesis activity, the analyst creates models of the
system in an effort to better understand data and control flow, functional processing,
operational behavior, and information content.
Q 9 Both the software engineer and customer take an active role in software
requirements engineering-a set of activities that is often referred to as
1. Analysis
o Specification
o Design
o System acceptance
Both the software engineer and customer take an active role in software requirements
engineering-a set of activities that is often referred to as analysis.
Q 10. A review of the Software Requirements Specification is conducted by
________
1. Software developer
2. Customer
3. Both the software developer and the customer
o Top level management