What Is The Sector Thinking?
What Is The Sector Thinking?
FOR INVESTMENT
A project being carried, to drill four deep wells and conduct feasibility
study and design of power plant ,up to additional 70MW. The Project is
financed by Japan’s grant (11-12 MUSD) , World Bank loan ( 10MUSD)
and Ethiopian Government contribution (10MUSD)
One of the existing geothermal well -LA 8
One of the Drilling site for the proposed Project at
Aluto Langano, near existing well LA 7
Aluto Langano Geothermal Power Plant
Anticipated Future Cooperation