SEF Project Proposal 2022-23

The project titled 'Completion of Pathway and Acquisition of Office Furniture' aims to improve the learning environment at Veterans Elementary School in South Cotabato by constructing a pathway and acquiring office furniture for the school head. The total project cost is P 71,428.57, benefiting 137 learners and 11 teachers, with a planned implementation timeframe from November to December 2022. The project is supported by the Local Government Unit of Surallah and involves several stages from planning to evaluation.

Uploaded by

lyrinxegluma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views4 pages

SEF Project Proposal 2022-23

The project titled 'Completion of Pathway and Acquisition of Office Furniture' aims to improve the learning environment at Veterans Elementary School in South Cotabato by constructing a pathway and acquiring office furniture for the school head. The total project cost is P 71,428.57, benefiting 137 learners and 11 teachers, with a planned implementation timeframe from November to December 2022. The project is supported by the Local Government Unit of Surallah and involves several stages from planning to evaluation.

Uploaded by

lyrinxegluma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Republic of the Philippines

Department of Education
SOCCSKSARGEN REGION
SCHOOLS DIVISION OF SOUTH COTABATO
SURALLAH II DISTRICT
Veterans elementary school

I. Project Description
A. Project Title: Completion of Pathway and Acquisition of Office
Furniture
B. Project Proponent: EDDIE C. DEMETILLO
C. Project Cost: P 71,428.57
D. Project Site: Veterans Elementary School, Brgy. Veterans, Surallah,
South Cotabato
E. Project Beneficiaries: 137 Learners and 11 Teachers
F. Time Frame: November-December 2022

II. Project Rationale:

The Veterans Elementary School is located along the National Highway


going
to T’Boli. At present, it has 137 learners and 11 teachers who are enjoying
the school facilities and amenities. The school aims to improve its office
and
learning environment to motivate pupils to come and learn in the school.
It
also aims to provide protection against bad weather condition.

The school has started the construction of pathway from the classroom to

main gate. Unfortunately, the school has insufficient fund for its full

implementation.

Upon the availability of fund from the Local Government Unit of Surallah,
the construction of path way may be resumed for its completion.
Republic of the Philippines
Department of Education
SOCCSKSARGEN REGION
SCHOOLS DIVISION OF SOUTH COTABATO
SURALLAH II DISTRICT
Veterans elementary school

III. Project Objectives:


1. To improve learning environment of the school through construction of
school path way.

2. To acquire office table and chair through SEF of LGU Surallah


IV. Project Description:
This project will be used as a pathway of the learners and teachers from
the
classroom to main gate of the school. It will protect them during rainy and hot
season.
The office table and chair will be used by the school head.

V. Personnel Involved:
Principal
Teachers
VI. Strategies for Implementation:

Stage I Planning Consultative


Contact of a person involved in the preparation of
Program of works
Stage II Preparation Staff Conference
Organization of committee
Stage III Implementation of the completion of Pathway and Purchase
of Office Table and Chair
Republic of the Philippines
Department of Education
SOCCSKSARGEN REGION
SCHOOLS DIVISION OF SOUTH COTABATO
SURALLAH II DISTRICT
Veterans elementary school

Stage IV Evaluation of Accomplishment Reports

VII. Implementing Agencies: DepEd-Veterans Elementary School


VIII. Expected Outputs:

1. Completed school pathway and Purchased Office table and chair

IX. Budgetary Requirements:

Source: Local School Board Fund ( Php 71,428.57)

1. Acquisition of Construction Supplies

Material Quantit Unit Unit Price Total


y
Cement 50 bag 240.00 12,000.00
CHB 500 pc 9.00 4,500.00
RSB 9mmm 20 L 100.00 2,000.00
Tire wire 3 kg 80.00 240.00
GI Pipe 2” 6 L 1,200.00 7,200.00
Sand 3 3 Load 2,500.00 7,500.00
Paint (Baguio 15 Gal. 650.00 9,750.00
Green)
Paint Brush 6” 4 pc 60.00 240.00
Lacquer Thinner 1 Gal 600.00 600.00
Angle Bar 2” 10 L 600.00 6,000.00
Marine Plywood 7 pc 900.00 6,300.00
(1/2)
TOTAL 56, 330.00

2. Acquisition of Office Furniture


Republic of the Philippines
Department of Education
SOCCSKSARGEN REGION
SCHOOLS DIVISION OF SOUTH COTABATO
SURALLAH II DISTRICT
Veterans elementary school

Materials Quantity Unit Unit Price Total


Office Table 1 set 15,000.00 15,098.57
and Chair
Total 15,098.57
Grand Total Php 71,428.57

Prepared by:

EDDIE C. DEMETILLO
Principal I

RECOMMENDING APPROVAL:

JOSEPH P. LATORZA
P-II / LSB Co-Chairman

APPROVED:

HON. PEDRO M. MATINONG, JR.


Municipal Mayor/ LSB Chairman