Scope and Purpose--In certain settings the routine scheduling of employees proves to be a complex problem
in combinatorics. During the past 12 years most efforts to automate scheduling have relied chiefly on one or
another variant of linear programming. We show that those approaches are disappointing in the case of the
general employee scheduling problem, since more than 4million integer variables are involved. On the other
hand, by relying on an integration of appropriate techniques from both management science and artificial
intelligence we render the general problem thoroughly tractable, permitting the routing scheduling of over
100employees for one week on an IBM PC in minutes. In this paper we speak of the approach which makes
that possible.
Abstract-The general employee scheduling problem extends the standard shift scheduling problem by
discarding key limitations such as employee homogeneity and the absence of connections across time period
blocks. The resulting increased generality yields a scheduling model that applies to real world problems
confronted in a wide variety of areas.
The price of the increased generality is a marked increase in size and complexity over related models
reported in the literature. The integer programming formulation for the general employee scheduling
problem, arising in typical real world settings, contains from one million to over four million zero-one
variables. By contrast, studies of special cases reported over the past decade have focused on problems
involving between 100 and 500 variables.
We characterize the relationship between the general employee scheduling problem and related problems,
reporting computational results for a procedure that solves these more complex problems within 98-99 “<,
optimality and runs on a microcomputer. We view our approach as an integration of management science
and artificial intelligence techniques. The benefits of such an integration are suggested by the fact that other
zero-+ne scheduling implementations reported in the literature, including the one awarded the Lancaster
Prize in 1984, have obtained comparable approximations of optimality only for problems from two to three
orders of magnitude smaller, and then only by the use of large mainframe computers.
INTRODUCTION
Employee scheduling problems arise in a variety of service delivery settings, including the scheduling
of nurses in hospitals, check encoders in banks, airline and hotel reservation personnel, telephone
operators, patrol officers and others. In their simplest form, these problems involve only the
assignment of days-off, as in some of the less complex settings for the scheduling of nurses. A typical
problem of this form requires the scheduler to give appropriate days off to each of a number of
employees who work standard shifts with differing start times while assuring that the required
number of employees are on duty throughout the day and week. Variations of this type were
addressed in Brownell and Lawrence [l] and Keith [2].
The shift scheduling problem, as in the scheduling of telephone operators, is more complex. In shift
scheduling, the scheduler works with part-time as well as full-time employees, and shift types contrast
with each other in the following attributes:
(1) duration (length)
(2) start times
(3) the number of breaks (reliefs)
(4) the placement of the breaks.
The scheduler must determine the shift types (and the number of each type to employ), and in some
cases determine which employee should receive which set of shifts. Union rules and company policy
*Fred Clover received the doctorate from Carnegie-Mellon in 1965, and served on the faculty at the University of
California, Berkeley, and the University of Texas and the University of Minnesota. He is the author of over 150 published
papers in Management Science and related fields.
tClaude McMillan received the doctorate from Ohio State University in 1955, and served on the faculty at Michigan State
University until 1965. He is the author or coauthor of a number of papers and four books in the field of management science.
563
564 FR’ED GLOVER and CLAUDE MCMILLAY
restrictions are handled in a limited fashion. Variations on this problem have been addressed in Refs
[2-81.
The objective in the shift scheduling problem generally is to approximate as closely as possible the
desired number of employees on duty, either by minimizing the overage or minimizing the “shortage/
overage” mix.
The more complex days-off and shift scheduling problem [7] comes a step closer to the general
employee scheduling problem, and some variations [3,4,8] consider also the assignment of shifts to
actual employees, but deal with that assignment of shifts to employees only after the shift types (and
number of each) have been determined.
Table 1 classifies shift scheduling problems as they are described in the literature, and indicates the
differences in: problem size and complexity, the approach employed, and the extent to which the
approach was actually being used in industry.
The more complex scheduling problem which we address has wide applicability, especially in the
supermarket, reservation oIIice and fast food fields. It differs rather dramatically from the days-off
and the shift scheduling problems by including important real world features that resist practical
solution by methods of formal analysis. We first describe the problem informally and indicate the
features that a practical solution system must have in order to deal with the problem effectively. For
comparative reference, we indicate overlaps and contrasts with other employee scheduling problems
previously examined. We report the result of applying our approach to problems from real world
settings and discuss the implications of our empirical results.
FULL-TIME/PART-TIME EMPLOYEES
As in the shift scheduling problem, it is assumed in the general employee scheduling problem that
some fraction of the work will be done by full-time employees and the remainder by part-time
employees. Full-time employees are those entitled to work a standard number of hours each week
(commonly 40) and generally work shifts of standard duration (commonly 8 hours each). The start
Table 1. A classi~~ation of the employee scheduling problems addressed by selected papers since 1972
LOW:
[I] u. formula Anaiytic 14 None
[4] 100 shifts LP and heuristics 32 None
[SJ 100 shifts Branch and bound 72 None
[I31 U. formula Analytic 21 None
[14] U. formula Analytic Cycles of 7 None
Medium:
[7] 168 shifts LP 168 NOZE
[6] 360 shifts I P and heuristics 49 Banking
[S] 300 to 400 Network and heuristics 48 Phone Co.
[3] <XXI shifts Heuristics 48 Phone Co,
[Z] <SOB shifts LP and heuristics 96 Phone Co.
times and the number and location of breaks may vary. In addition, a full-time employee may or may
not be entitled to the same start time each day worked.
In the general problem, as handled by our method, the user is given the ability to specify shift
features such as duration, start time, and the number and placement of breaks. The user is also able to
specify the number of days off and whether they should be consecutive. and to change those features
as the system is routinely used from week to week.
In addition to the above, each employee can specify (or the scheduler can specify for the employee):
(1) Minimum and maximum hours to be worked during the week.
(2) Days and hours of availability during the week.
Item (2) above means that each employee has an availability preference, specifying which days of
the week and the hours that employee can work. Since an employee’s availability changes (in some
settings, about 20”,; of the work force changes their availabilities each week), the scheduler- human
or machine-must be allowed to edit a file of employee availabilities before addressing the
composition of a new schedule each week.
Another important feature of the general problem, not treated in the standard scheduling contexts,
is that employees are non-homogeneous in ways beyond their availability preferences and thus
cannot be treated as interchangeable entities. Employees have differing skill types, skill levels and
status attributes which limit the scheduler’s freedom in assigning shifts. These include, for example,
the training required to work at various work stations. Since these change from time to time, the
system must allow the scheduler to edit each employee’s profile data.
In the general employee scheduling problem, it may also be necessary to observe seniority rules,
such as those specifying that employees with more seniority must get more hours of work and start
earlier (an early start may be considered desirable), except when other requirements would be
violated.
Union/management rules, in the general problem, can require that a specified minimum amount of
time must elapse between the time an employee works one day and begins again the next. In some
settings they may also require that certain employees, such as students, may not work beyond a
specified hour more than one night during the week.
In the simpler shift scheduling problems, it is possible to design shifts (and to determine the desired
number of each shift type) without regard to employee availabilities, employee skills and skill levels or
employee status. Descriptions of the shift scheduling problem in the literature, on the other hand,
sometimes appear to involve a more general solution capability-for example, indicating that shifts
are generated to conform to union rules, company policy, etc. What this means, in practice, is that the
shifts generated represent categories that are potentially acceptable, but there is no control over
whether those selected as a “solution” have an appropriate composition. This is entirely reasonable
for settings where restrictions are loose enough that employees can simply “sign-up” for whatever
schedule is posted, but in broader settings, such a disregard of individual differences can have dire
consequences.
In the general scheduling problem, therefore, the design of the shifts and their assignment to
specific employees must be coordinated. Designing shifts without considering whether empolyees can
be found to take those shifts will yield either a poor fit (a poor match of employees assigned to
employees wanted on duty) or, still worse, an infeasible solution.
Another significant aspect of the general employee scheduling problem is the existence of linking
constraints between time periods. In typical applications of the general problem, each day may be
construed as a block consisting of 96 fifteen-minute periods, and the assignment of employees to duty
periods during that block is not independent of assignments to employees in other blocks. In addition
to restrictions governing admissible assignments on any given day, these linking constraints imply
that there are also restrictions governing the total number of periods throughout the entire week, as
566 FRED GLOVERand CLAUDE MCMILLAN
well as governing the selection of certain types of assignments successively, or cumulatively, across
days of the week, e.g. limitations on the selection of opening and closing assignments,
In standard shift scheduling problems, by contrast, blocks such as days are construed as essentially
independent. Linking conditions either do not exist or are innocuous enough to be ignored while
composing a schedule for any given day (where, for example, the ending conditions for one day may
be used to give starting conditions for the next, which again is treated independently).
The days-off and shift scheduling problems can be readily treated as special cases of the general
problem, allowing many of the more difficult conditions to be relaxed. By assuming, during the shift
design phase, a universe of homogeneous employees without linking constraints across blocks of
time, the shift design problem is made relatively simple. Thus a system for the general scheduling
problem handles these less restrictive problems as a special case.
In real world settings, the manual scheduler (generally a supervisor) works in a highly dynamic
mode. Each week, and sometimes more frequently, a new schedule must be created to reflect the
altered employee availabilities and changes in the forecasted volume of business. To control costs,
management frequently requires that the person-hours of work assigned must not call for a dollar
expenditure out of proportion to the dollar sales forecasted.
The manual production of a schedule that respects limited and varying employee availabilities, and
yet matches the requirements, is very difficult. The consequence is that the manually produced
schedule generally calls for overages (too many on duty) at certain times during the day and week,
and- to keep labor costs within acceptable boundaries-produces corresponding shortages (too few
on duty) in others. This results in poor service: a condition which managers must seek actively to
avoid in highly competitive service industries.
Producing a schedule manually also requires a good deal of time. For example, in the supermarket
and fast food industries, our investigations indicate that it takes from 8 to 14 hours for a manager to
schedule from 70 to 100 employees for one week, depending on the seriousness devoted to the task.
The resulting schedule is likely to be substantially less than optimal. Even when all special conditions
may be met (which is often not the case for schedules produced manually), shortages and overages
often combine to yield less than desirable service or an inflated payroll.
To apply our solution method to the general employee scheduling problem, we design shifts with
deference to features specified by the user, and with deference to employee availabilities. When a shift
is selected, to augment the growing set of shifts which is generated with the goal of meeting the
requirements, the identity of the employee to take that shift is specified. This assures that employees
are only assigned shifts they are available for. In case the problem lacks a schedule that is feasible in all
respects, our approach generates a schedule that nevertheless comes as close as possible to achieving
feasibility, then helps the user identify alternative ways to deal with the limitations that created the
infeasible situations.
As we subsequently document, our procedure succeeds in solving problems in the range of 1000
times larger than those related scheduling problems previously studied in the literature.
Fundamentally, we view our procedure as an integration of management science (MS) and artificial
intelligence (AI). Among the levels of procedural generality to which such an integration is relevant,
from the micro level of computer coding to the macro level of global strategies, it is the higher levels
that have the greatest impact on solution quality and efficiency, and account for what we believe may
be unique to our approach.
Evidently, orders of magnitude of difference in the size of combinatorial problems that are
successfully treated cannot be explained by clever computer coding. Intermediate level
considerations of specific choice rules are more relevant to achieving such successes. The “structure”
on which the primary choice rules are superimposed consists of a procedure for building and
amending employee shifts which has its roots in the alternating assignment ideas of Glover [9], and
which is characterized more broadly in the context of tabu search in Glover [lo]. For this
application, we conceptually view each stage of generating a partial (or complete) set of duty
assignments
as creating
a trial solution, which is modified or elaborated by transition rules: a
standard framework. (Those interested in further details of the system at an intermediate Level of
implementation are invited to contact the authors.) The key ingredient of our approach lies in the
macro level strategies, which combine the perspectives of management science and artificial
i~teliigence in ways not commonly done. At this level, our approach consists of three main
components.
First, following an MS based perspective, we develop numerical criteria for evaluating the moves
that define possible transitions from one trial solution to another. We do not, however, settle on a
single criterion for evaluating a particular type of move. Instead, interlinking criteria and are based
on separate evaluation functions are generated which reflect both feasibility and optimaiity goals.
Our use ofrnulti~l~ evaluative criteria presents a new d~~c~lt~ that MS based heuristics traditionally
have not had to face: the fact that a local o~t~murn relative to one criterion may not be a local
optimum relative to another. Rather than a stumbling block, we found this difhculty to be a source of
fertile opportunity, leading to ways out of blind alleys encountered by other procedures. To exploit
this opportunity, we formulated our approach so that each criterion was allowed to “vote”’ on
alternative moves, initially assigning equal weight to the different votes. When a “deadlock’” (local
optimum) was reached, we increased the weight of those votes that would find a different solution
preferable, thereby allowing the procedure to find new trial solutions. The procedure was further
endowed with a memory to prevent reversing the direction in which weights were changed, but allowing
the memory to decay so that choices would not be unduly influenced by decisions that should be
regarded ancient history. This method for managing memory was implements by the use of tabu lists
as described in Glover [ 1fl] and Mover et al. [ 111. Decay factors that “‘forgot” decisions beyond five to
twelve moves earlier all succeeded in avoiding cycling and producing good choices, The combined effect
of these features is implicitly to create a tolerance for “bad moves”, but only to the extent required to
avoid becoming mired down at local optima, resulting in a highly effective strategy.
Our second main component employed on AI based perspective to identify patterns in the ways
trial solutions are configured. However, in a departure from standard AI perspective, our gad was
not merely to recognize patterns but to create them. In developing this approach, we were guided by
the supposition that certain configurations-as manifested in the magnitude and distribution of
residual requirements, and available means of meeting them--would ultimately lead to better
solutions by our tools of analysis than others. Thus, we adopted the goal of identifying moves that
would lead to ~on~gurations we judged intuitively promising. This led to creating additional criteria,
based on means-end analysis to arrive at ex~luitable patterns, ~nd~~~ndent of whether moves to
attain these patterns might e~Rtribute to the objectives embodied in other criteria. These new criteria
were then incorporated into our first component strategy.
The third major component of our approach was to identify significant segments of the problem,
and then to subject each segment to its own sequence of solution phases. In this approach, we
implicitly perform what might be called a conceptual decomposition. While the problem is an
indivisible whole, we ne~~~rt~~~~ssarti~cally break it apart. After each round of evaluations and
modifications, we put it all back together-a “Humpty Dumpty” process that characteristically
yields gains throughout several repetitions. For example, after a global evaluation of an employee’s
availability versus needs yet to be filled over all periods (relative to the current state of the solution),
bias factors are generated for and against scheduling the employee in particular period blocks.
Thereupon, the blocks of time periods are treated as though independent for the purpose of
generating the next move. The succeeding global evaluation then fulfills the function of restoring the
links between different blocks. A similar procedure is applied to meeting union and seniority rules as
the solution process evolves, temporarily decoupling these considerations by bias factors and then
restoring them by global review.
Viewing our approach in terms uf these macro level strategies, it is clear there is nothing to the AI
nor MS oriented approaches that would not, in theory, provide support for our undertaking. Xn
practice, however, AI and MS approaches are usualfy implemented in a narrower fashion. It is our
impression that the approaches most often described in the literature either employ rather shallow
“‘AI/human” intuitive techniques, though sometimes in large numbers, or employ slightly deeper MS
heuristic techniques, but in very small numbers. In neither instance do we find great interlinking and
overlaying of alternative criteria. Certainly, we have not seen w~d~pr~ad implementation of multiple
568 FREDGLOVER
and CLAUDE MCMILLAN
evaluation functions, integrated and controlled to overcome local optimality and cycling, nor have
we seen the active use of pattern creation (in addition to recognition) using notions of exploitability
instead of objective gain. Formal mathematical decomposition, although too rigid and inapplicable
to discrete problems of the type we examine, has some resemblance to the third component of our
approach, if one views the decomposition as susceptible to being carried out in different ways.
We describe now the results of 10 computer solution tests, producing one schedule for one week,
for each of 10 restaurant problems, involving 100 employees, from a real world application in the fast
food industry. These tests were conducted on problems selected for benchmark runs by McDonald’s
Corporation Headquarters, Oak Brook, Illinois. These problems correspond to integer
programming problems involving roughly from l,OOO,OOO to 4,000,OOOvariables, and from 3400 to
9000 constraints, as noted in the integer programming formulation described subsequently. A
summary of the test results is provided in Table 2.
The percent of optimality figures indicated in Table 2 were arrived at as follows. With each run, no
shortages were produced. That is, during no 15minute period during the week was the number of
employees assigned to be on duty less than the desired number. In one run, during three 15-minute
periods throughout the week there was an excess of one employee, over and above the number
desired. This does not mean that fewer employees could be used, since eliminating an employee would
then create shortages in all other 15minute periods the employee worked (assuming the same
employee was on duty in these three 15-minute periods during the week). In two other runs, there was
an excess of one employee, during eight 15-minute periods during the week, over and above the
number desired. For the other seven the average was between three and eight.
In a perfect schedule, the shortages and the overages would all be zero for all periods during the
week. In the ten problems tested, periods designated for scheduling equalled 540 (out of 672 15-
minute periods for the week). Thus, in the worst case our method achieved zero shortages and zero
overages for 98 % (532 out of 540) of the total periods under consideration. We did not attempt to
obtain the very best solutions possible by our approach (if better solutions did in fact exist), but used
an automatic cut-off rule to terminate search, which accounts for the similarity of run times on
problems of different sizes.
In the papers cited that report on an application in a practical setting, comparisons of solution
quality are difficult due to different types of objective functions and a frequent lack of explicit
performance data. Partial evidence of the quality of performance is offered in Segal [8] by reporting
execution time on an IBM 360/67, which ranged from about 40 seconds to something over a minute
(the maximum was not specified) for problems with 300 to 400 variables. The other papers,
addressing a problem that comes closest to our general problem structure [2, 31, likewise report
reliance on a mainframe computer, but do not offer computation times.
In typical real world settings for fast food stores (supermarkets, banks, reservation oflices and the
like), large mainframes are not common. In fact, it is the increasing prevalence of inexpensive
computers that makes automated scheduling in these settings practical.
Our system has accordingly been written in BASIC and implemented on microcomputer systems
such as the KAYPRO II TRS 80 Model II, and the IBM PC. Because our system can handle the less
general shift specifications and constraining conditions of the standard shift scheduling problem, we
executed experimental runs to determine our execution time for problems whose sizes corresponded
to those reported in the literature. For problem profiles corresponding to those in Refs [2,3,7] our
solution times on an IBM PC with 128 K bytes of central memory did not exceed 50 seconds for
problems of up to 500 variables. These microcomputer times therefore, in fact, compare favorably to
the mainj-ame CPU time reported elsewhere.
It should be noted that solution times for our procedure, using the cutoff rule that achieves the
indicated percent of optimality figures, do not increase anywhere near linearly with the number of
integer variables. Normally the opposite effect would be expected for discrete problems such as
these-i.e. an increase far worse than linear. This atypical behavior is a key factor responsible for the
advance in the size of real world problems that can be handled successfully.
It is also of some interest to compare the performance of our approach to that achieved for other
zero-one scheduling problems and not alone for problems closely related to the class we examined.
We are prompted to make such a comparison in view of the 1984 Lanchester Prize award for a study
of zero-one problems [12]. The citation for the prize underscored the significance of effectively
handling these problems as: “Zero-one linear programming is a very important problem in
Operations Research. Efforts to solve large problems of this type have continued for over 20 years.
However, success has been elusive, and problems with hundreds of zeroone variables and no special
structure could usually not be solved in reasonable computation times”.
The award-winning study of Crowder et al. [12] represents one of the most effective attempts to
solve zero-one problems optimally, and provides a major contribution for its ability to perform well
on zero-one problems notably larger than those customarily handled. These problems, ten in
number, ranged in size from 33 to 2756 zeroone variables. The problems were solved by reliance on a
large mainframe computer (an IBM 370/168), and nearly an hour of CPU time was required to
handle the largest problem. The contrasting ability to solve problems with 4,000,OOOor more zeros
one variables to 98 y0 optimality suggests our approach establishes an appealing trade-off between
assured optimality and problem size, and encourages us to believe that gains for solving other zero-
one problems may be possible, perhaps by similar integration of management science and artificial
intelligence techniques.
CURRENT USAGE
Our system has been used in several settings for over 2 years, producing schedules substantially
superior to those an experienced scheduler can produce in any amount of time. Applying our system
to problems involving approx. 100 employees, the user is able in one to two hours to update the
forecast for the coming week, to modify the employee availabilities, and to make “manual”
assignments (using the computer) to selected personnel for whom specific work schedules are wanted
(e.g. managers). The computer then completes the process by designing and assigning shifts to
approximate the optimal match of employees on duty to employees wanted, while respecting the
constraints described above. Figure 1 shows one of the printed outputs which the user may select,
indicating by means of a bar graph the shifts assigned to employees on Sunday.
No human intervention is required during the scheduling. Disregarding the improvement in the
schedules produced, the process trims 6 to 12 hours off the time required each week for a supervisor to
prepare a schedule manually, and this labor savings by itself can pay for the computer in a reasonable
period of time.
A more detailed description of the conditions which were respected in the solutions cited above (the
schedules produced using our approach) is as follows:
(1) The number of employees on duty (and not taking a lunch or quarter-hour break) in each 15-
570 FRED GLOVERand CLAUDE~C~ILLAN
5 7 8 9 10 11 $2 13 fl if 16 17 18 19 20 21 22 23 26
-hrs -wk
5
E?!L :...:...:.,.:...:,..:...:...:...:...:...:...:...:...:...:...:...:...:,..:...:
18 + : <I*******B*-*~~*.**t*~*.*******> : : : : ; ; : : : : 7.75 40
:...:,..:...:...:...:..*....:...:...:...:...:,..:...:...:.,.:...:...:...:...:
Ill . : <*-•*.*B******-, : : : : ; : : : : : : : : : 4 19.23
:...:...:...:...:..*:...:..,:...:...:...:...:...:...:...:.,.:...:...:...:...:
117 : : : <**.*I-I-.*-SIB-I-*> : : : : : : ; : : : : : 6.75 19.75
:...:...:...:...:...:..,:**.:...:...:...:...:...:...:...:...:...:...:...:...:
128 : : : :<.+.r*.-9.*---r, : : : : : ; : : : : : : 4 16.75
:...:..,....:...:.,.:...:...:...:...:...:...:...:...:...:...:...:...:..*:...:
120 : : : : <I**..--**-*Lj*-..I, : ; : ; : : : : ; ; ; 6.75 17.5
:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:
t10 : : : : : <I*t-*-s--*-t-LL-----*-a****-**> : : : : : : : 7.5 33.25
:...:...:...:...:...:...:...:.*.:...:...:...:...:...:...:...;...:... :...:...:
0 1 : : : : : <***-•---6---***ICL--****--.6.---, : : : ‘: : : 8 CO
:...:...:...:..,:...:...:...:...:...:...:...:...:...:,..:...:...:...:...:.‘.:
12 : ! : : : : ;<a-.-6.---**.LL---****-.--6-----*> : : : ; : 8 40
:...:,..:...:...:...:,..:...:...:...:*..:...:...:...:...:...:...:...:...:*..:
t3 : : : : : : : :(--*-*-6****-&L**-----**--6-“---*, : : : : 8 39.23
:.,.:.,.:...:...:...:...:,..:...:...:‘..:...:...:..~:...:...:...:...:...:...:
ItI : : : : : : : : :<**---*~**--~~*-.--*---*6*-*-**> : : : 7.3 35.75
:...:..,:...:...:...:...:..,:...:...:‘..:...:,..:...:..*:...:...:...:~..:.‘.:
86 : : : : : : : : : <*-----B-*---*-&-*----*----6---->: : : 8 37.3
:...:...:...:..,:...:...:...:...:...:...:...:...:...:*..:...:...:...:...:...:
112 : : : : : : : : : : (I-•-B-----I.-LL-I------~-6----> : : 7.3 23.73
:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:
114 : : : : : : : : : : (**..--91.--*-rr-1L.a-*---8--B===> : a 16
:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:...:*..:..*:
Y-32 : : : : : : : : : : : <I-*I---B---.---&--*--*&t-==-, : 1.3 16
:..*:...:...:...:...:...:...:...:...:...:...:.,.:...:...:...:...:*..:*..:.~*:
t22 : : : : : : : : : : : :<.**--*--*.6-*-*> : : : : 4.23 17.3
:,..:...:...:...:...:...:...:...:...:*..:...:...:~...~.................*:..‘: 1 . . . .
131 : : : : : : : : : : : : <*--*-*-P-*-~--L--> ; : ; 1.73 16
:...:...:...:...:...:...:...:...:...:...:...:...:.......:...:.......:...:...:
#lb : : : : : : : : : : : : : <**.*****--~.L-E-t*> : ; 3 20
:...:...:...:...:...:...:...:...:...:...:...:...:...~...:...:.......:..*:...:
t30 : : : : : : : : : : : : : : :<-*****-r-*~**-z> : 6.25 16
:*..:...:...:...:,..:.*.:...:...:...:...: .. . ... ... .. .. . . ... ... .. .. . ... .. .....
3 6 7 8 3 IO If. 12 13 14 13 16 17 18 19 20 21 22 23 24
required 00000C112222334455556666666666666666666677779999111111999999998677664433~~00
000000
assigned 000000~22223344555566666666666666676666777799991111111999999988776644333300
0000000
short ~~~~~o~~ooo~~~oooo~oo~O~oooo~~~oooo~oooooooooooo~ooooooooooooooooooooooooooo o
Over ~~11~~~0~~~~ 10~~~~000~1~~~000~0000000 4
Fig. I. Schedulefor Sunday. In this example, the problem size is substantially smaller than in typical
appli~tions, both in terms of number of employees and period requirements. At 18:30 it is apparent 10
employ~s are assigned (No. 2,5,6, I I, f2,14,16,22,31 and 32) whiie 9 are required, yielding an average of
one person for that 15minute period. B means 15 minute break, LL means 30 minute lunch.
minute period must come as dose as possible to satisfying the demand for employees in that
period.
(2) All shifts assigned must be members of a feasible set specified by management rules: from 2 to 8
hours duration; with Oto 2 quarter-hour breaks, and Oor 1 half-hour break-depending on the
duration of the shift; and with the placement of the breaks specified by reference to “windows”
within which they may be moved, as specified by management.
(3) No employee can be assigned to more than one shift on any day.
(4) No employee can work less than his or her minimum required number of hours during the
week, nor more than the maximum.
(5) No employee will work less than his or her minimum desired (as opposed to required) number
of hours during the week unless there is not enough work to go around. in this latter ease, the
desired m~n~mum is a goaf where employees with greater seniorities have their goals respected
first.
(6) No employee can work over 6 shifts during the week.
(7) Closing and opening rules:
(a) No employee can “close” more than 2 nights in a week, and never two nights in succession
(closing means working later than a specified hour).
(b) No employee can close one night and “open” the nextday (opening means working earlier
than a specified hour).
(c) No student can close more than once during the days Sunday through Thursday.
The general employee scheduling problem 571
(8) Other things being equal, employees with more seniority must be assured more work and an
earlier start.
(9) During certain periods of the day those on duty must represent a specified minimal set of skills
and skill levels.
The constraints
We define:
S = the set of acceptable shift types
S,, = the set of shifts which employee e is available to take on day d
P, = the number of quarter-hour periods in shift s
‘ad = 1 if employee e is assigned shift s on day d; 0 otherwise (decision variable)
A,, = 1 if period p is a duty period for a schedule s; 0 otherwise
Dpd = demand, in projected numbers of employees required to be on duty in period p of day rl
upd= goal programming deviation variable for falling short of the projected demand
upd= goal programming deviation variable for exceeding the projected demand
U, = maximum quarter-hour periods of work for employee e during the week
L, = minimum quarter-hour periods of work for employee e during the week
G, = the desired (goal) minimum quarter-hour periods of work for employee e during the week
ye = a goal programming deviation variable that allows employee e to work less than G, periods if
there is not enough work to go round.
Then the preceding conditions can be modeled by the following constraints, which are numbered
to provide a direct correspondence.
The composition of Sed assures that condition (2) above is satisfied, independently of the other
constraints. Therefore. we do not include a corresponding constraint (2) in our formulation.
Note that conditions (7), (8) and (9) are not modeled in the preceding constraints. Modeling them is
straightforward but tedius, requiring the use of additional notation without adding to the basic
understanding of the requirements conveyed by their verbal description.
by quarter-hour periods throughout the week, plus a weighted function of each employee’s hours
below the desired minimum.
We define:
WU = a weight to penalize falling below forecasted requirements (yielding a shortage)
WV = a weight to penalize exceeding the forecasted requirements (yielding an overage)
W, = a weight to penalize falling below the desired (as opposed to required hours for employee e
to work during the week).
We seek, therefore, to:
The preceding formulation is not the only or most general our procedure can be made to handle,
but represents the model applied to the 10 real world problems whose solution statistics we have
reported. In this application, shortages were penalized more than overages by a ratio of WU to WVof
roughly 4 to 1. Minimum desired employee hours were satisfied automatically by setting We to an
internally computed parameter based on WU, WV and the user-seized seniority factor for
employee e.
The number of variables in the integer programming formulation is of course independent of such
parameter choices, and is potentially immense. If all possible placements of lunch and quarter-hour
breaks were incfuded in the schedules, the total number would amount to hundreds of millions of
variables (see the Appendix). However, the admissibility of ah such possibilities, or even uniformly
structured subsets of all possibilities such as those resulting from the standard assumption of
homogeneous employees, would permit variables to be aggregated and thus effectively shrink their
number to a minute fraction of those otherwise required. The simplifying homogeneity feature of
Buffa [3] and [15], for example, makes it possible in these instances to deal with only about 300 to
500 variables in total.
In the setting of the general employee scheduling problem, where such implicit aggregation is not
possible, we have created a component for our solution method that counts the total number of
variables precisely for the real world examples we reported in Table 2. These same counting rules
were applied to data of the other papers to ensure that all reported and inferred numbers of variables
were derived by the same means.
CONCLUSIONS
Given the best of today’s state-of-the-art codes for solving ve;y large scale integer programming
problems, the general employee scheduling problem clearly does not lend itself to practical solution by
standard procedures.
It is encouraging both in view of the practical signi~cance of the general problem, and its
combinatorial complexity, that a method which combines elements of management science and
artificial intelligence techniques can generate solutions of exceedingly high quality in very modest
amounts of time. It is also noteworthy that such results have been achieved on a microcomputer.
The ‘*leap” in size by comparison to previous comparable scheduling applications reported in the
literature demonstrates that the effective sofution of truly large-scale scheduiing applications is
possible, contrary to widespread belief. It is inviting to believe that similar gains may be possible for
other combinatorial zero-one applications, perhaps by similar strategies.
REFERENCES
I. W. S. Brownell and J. M. Lawerre, Scheduling of workforce required in continuous operations under alternative labor
policies. ‘~g~zc Sci. 22, 597-605 (1976).
7 E. C. Keith, Operator scheduling. AfEE Trarrs. II, 37-41 ji979).
; : E. S. Buffa, M. J. Cosgrove and 8. J. Lute. An integrated work shift scheduling system. Deci.~.Sci. 7, 6X-630 (1976).
4. W. B. Henderson and W. L. Berry, Heuristic methods for telephone operator shift scheduling: an experimental analysis.
Mgmr Sci. 22, 1372-1380 (19761.
The general employee scheduling problem 573
5. W. B. Henderson and W. L. Berry. Determining optimal shift schedules for telephone traffic exchange operators. De&.
sci. 8, 3741 (1977).
6. V. A. Mabert and A. Raedels, The detail scheduling of a part-time work force: a case study of teller staffing. Decis. Sci. 8,
109-120 (1977).
I. J. G. Morris and M. J. Showalter, Simple approaches to shift, days-off and tour scheduling problems. Mgmt Sci. 29,942-
950 (1983).
8. M. Segal, The operator-scheduling problem: a network-flow approach. Opns Res. 22, 8088823 (1974).
9. F. Glover, Heuristics for integer programming using surrogate constraints. Deck. Sci. 8, 156-166 (1977).
10. F. Glover, Future paths for integer programming and links to artificial intelligence. Comgut. Opns Res. 13,533-549 (1986).
11. F. Glover, C. McMillan and B. Novick, Interactive decision software and computer graphics for architectural and space
planning. Annls Opns Res. Algorithms Software Optim. In press.
12. H. Crowder, E. Johnson and M. Padberg, Solving large scale O-l linear programming problems. Opns Res. 31, 803-834
(1983).
13. J. M. Lowerre, Work stretch properties for the scheduling of continuous operations under alternative labor policies.
Mgmt Sci. 23, 963-971 (1977).
14. K. R. Baker and M. J. Magazine, Workforce scheduling with cyclic demands and days-offconstraints. Mgmt Sci. 24, l6ll
167 (1977).
APPENDIX