Outputs used by Amhara Water Works construction Enterpise

SQN ITEM OF WORK


1 EXCAVATON WORK
1.1 Site clearing upto 20cm depth
1.2 foundation excavation ordinary soil upto 1m depth
1.3 foundation excavation black cotton soil upto 1m depth
1.4 foundation excavation ordinary soil 1_1.5m depth
1.5 foundation excavation black cotton soil 1_1.5m depth
1.6 foundation excavation above 1.5m depth ordinary soil
1.7 foundation excavation above 1.5m depth black cotton soil
1.8 pipe line trench excavation in ordinary soil upto 0.8m depth
pipe line trench excavation in black cotton soil moistened upto 0.8m
1.9
depth
1.10. Diversion weir cut-off trench excavation in ordinary soil upto 1m
1.11 Diversion weir cut-off trench excava. in ordinary soil 1_2m
1.12 Diversion weir cut-off trench excavation in ordinary soil above 2m
1.13 Diversion weir cut-off trench excava. in clay soil moistened upto 1m
1.14 Diversion weir cut-off trench excava. clay soil moistened 1_2m
1.15 Diversion weir cut-off trench excavation clay soil moistened above 2m
1.16 Weathered rock excavation
1.17 medium weathered rock excavation
1.18 Hard rock excavation
2 Back fill
Back fill in pipe line work freshly excavated soil
Back fill in pipe line work lately stayed excavated soil
Back fill and compaction in irrigation canals
3 CART AWAY
3.1 Cart away upto 50m distance
3.2 Cart away upto 100m distance
4 HARD CORING
5 CONCRETE
5.1 Concrete upto 10cm thick mixed by hand
5.2 Concrete upto 10cm thick mixed by mixer
5.3 Reinforced concrete column and wall mixed by mixer
5.4 Reinforced concrete column and wall upto 3m mixed by hand
5.5 Reinforced concrete column and wall above 3m mixed by mixer
5.6 Reinforced concrete column and wall above 3m mixed by hand
5.7 Reinforced concrete beam on ground mixed by mixer
5.8 Reinforced concrete beam on ground mixed by hand
5.9 Reinforced concrete beam mixed by mixer above 3m
5.10, Reinforced concrete beam mixed by hand above 3m
Reinforced concrete slab on ground level mixed by mixer use wheel
5.11
barrow for transportation of mix
Reinforced concrete slab on ground level mixed by mixer not use wheel
5.12
barrow for transportation of mix
Reinforced concrete slab on ground level mixed by hand use wheel
5.13
barrow for transportation of mix
Reinforced concrete slab on ground level mixed by hand not use wheel
5.14
barrow for transportation of mix
5.15 Reinforced concrete slab above 3m from ground level mixed by mixer
5.16 Reinforced concrete slab above 3m from ground level mixed by hand
5.17 cyclopean concrete including formwork
6 MASONRY WORK
6.1 Rubble masonry not dressed on both face below ground
6.2 Rubble masonry dressed on one face below ground
6.3 Masonry work above ground dressed in one side upto 3m ht
6.4 Masonry work above ground dressed in one side above 3m ht
6.5 Masonry work farm work structures dressed in one side
6.6 masonry dressed in both side for water tanker and building upto 3m ht
masonry dressed in both side for water tanker and building above 3m
6.7
ht
6.8 Dry masonry
6.9 Dry masonry dressed
6.10, Gabion work one side dressed stone
7 Pointing of massonary work
8 Cement screened
9 Rendering
10, Roof truss work 8-12m length truss
11 Roof truss work 8-12m length truss placing and binding
12 corrugated iron sheet installing with nail
13 Flashboard
14 Chip wood ceiling
15 Abujedi ceiling
Enterpise
OUTPUT Crew composition Crew1 crew2 crew3
Composition
10 m2/person/day
1.44 m3/person/day
1.23 m3/person/day
0.936 m3/person/day
0.7995 m3/person/day
0.72 m3/person/day
0.615 m3/person/day
1,368 m3/person/day
1,169 m3/person/day
1,224 m3/person/day
0.702 m3/person/day
0.468 m3/person/day
1.08 m3/person/day
0.599 m3/person/day
0.399 m3/person/day
0.51 m3/person/day
0.32 m3/person/day
0.16 m3/person/day

12 m3/person/day
10.8 m3/person/day
1.5 m3/person/day

2.5 m3/person/day
1.5 m3/person/day
1.1 m2/person/day

25 m2/8Dl/mason 8 16 24
46.25 m2/10Dl/mason 10 20 30
2,765 m2/10Dl/mason 10 20 30
1.5 m2/8Dl/mason 8 16 24
2.07 m3/10Dl/mason 10 20 30
1,125 m3/8Dl/mason 8 16 24
3,245 m3/10Dl/mason 10 20 30
1,754 m3/8Dl/mason 8 16 24
2,433 m3/10Dl/mason 10 20 30
1.22 m3/8Dl/mason 8 16 24
4.42 m3/10Dl/mason 10 20 30

3,367 m3/10Dl/mason 10 20 30

2,366 m3/8Dl/mason 8 16 24

1.82 m3/10Dl/mason 10 20 30
2,525 m3/10Dl/mason 8 16 24
1.22 m3/8Dl/mason 8 16 24
2 m3/8Dl/mason

4 m3/4Dl/mason 4 8 12
1.2 m3/4Dl/mason 4 8 12
1.3 m3/4Dl/mason 4 8 12
0.975 m3/4Dl/mason 4 8 12
0.85 m3/4Dl/mason 4 8 12
1.1 m3/4Dl/mason 4 8 12
0.825 m3/4Dl/mason 4 8 12
3.6 m3/2Dl/mason 4 8 12
2 m3/4Dl/mason 4 8 12
4 m3/4Dl/mason 4 8 12
16 m2/2dl/2plasterer 2
14 m2/2dl/plasterer 2
24 m2/2dl/plasterer 2
3 3pcs/2Dl/carpenter
16 16pcs/8Dl/carpenter
69.12 m2/2Dl/Carpenter 2 4 6
42.16 m2/2Dl/Carpenter 2 4 6
8 m2/2Dl/Carpenter 2 4 6
8.5 m2/2Dl/Carpenter 2 4 6
List of Manpower and Indexed Cost List of Equipm

Daily Indexed
NO Description No
payment Cost (Birr)

1 Crafts Men 1
1 .1 Carpenter II 400 50 1.1
1 .2 Carpenter I 360 45 1.2
1 .3 Carpenter helper 160 20 1.3
1 .4 Mason II 400 50 1.4
1 .5 Mason I 360 45 1.5
1 .6 Mason helper 160 20 1.6
1 .7 Bar bender II 320 40 1.7
1 .8 Bar bender I 280 35 1.8
1 .9 Bar bender helper 160 20 1.9
1 .10 Bar Setter I 140 17.5 1 . 10
1 .11 Water proofer I 400 50 1 . 11
1 .12 Water proofer helper 160 20 1 . 12
1 .13 Welder 320 40 1 . 13
1 .14 Welder helper 160 20 1 . 14
1 .15 Chiseller II 360 45 1 . 15
1 .16 Chiseller I 240 30 2
1 .17 Glazer 320 40 2.1
1 .18 Tiller II 440 55 2.2
1 .19 Tiller I 400 50 2.3
1 .20 Tiller helper 160 20 2.4
1 .21 Painter III 480 60 2.5
1 .22 Painter II 320 40 3
1 .23 Painter I 280 35 3.1
1 .24 Painter helper 160 20 3.2
1 .25 Brick layer 440 55 4
1 .26 Gang chief 200 25 4.1
1 .27 Plasterer II 360 45 4.2
1 .28 Plasterer I 320 40 4.3
1 .29 Plasterer 280 35 4.4
1 .30 Plasterer helper 160 20 4.5
1 .31 Plumber II 440 55 4.6
1 .32 Plumber I 400 50 4.7
1 .33 Plumber helper 160 20 4.8
1 .34 Electrician II 40 5 5
1 .35 Electrician I 400 50 5.1
1 .36 Electrician helper 240 30 5.2
1 .37 Grease boy 200 25 5.3
1 .38 Driller 400 50 5.4
1 .39 Polisher 400 50 5.5
1 .40 clerk 8 1 5.6
1.41 Powderman 8 1 5.7
1.42 Explosive expert 8 1 5.8
1.43 Service man 8 1 5.9
1.44 Material Deliverer 8 1 6
1.45 Mechanic 8 1 6.1
1.46 Electrician 8 1 6.2
1.47 Senior Mechanic 8 1 6.3
1.48 Senior Electrician 8 1 7
1.49 Plant Electrician 8 1 7.1
1.50 Asphalt Melting unit 8 1 7.2
1.51 Greasing and oiling 8 1 7.3
1.52 Material receiver&del 8 1 7.4
2 Non-Skilled Manpower 7.5
2 .1 DL I 250 31.25 7.6
2 .2 DL II (Gang leaders) 200 25 7.7
2 .3 Sledge Hammer man 240 30 7.8
3 Supervisors 7.9
3 .1 Assistant Foreman 1213.44 151.68 7 . 10
3 .2 Barbender Foreman 1213.44 151.68 7. 11
3 .3 Batch Plant forman 8 1 7. 12
3 .4 Blasting Foreman III 2103.04 262.88 7. 13
3 .5 Blasting Forman 640 80 7. 14
3 .6 Carpenter Foreman III 2103.04 262.88 8
3 .7 Chief Surveyor 2426.88 303.36 8.1
3 .8 Const. Forman (road general) 640 80 8.2
3 .9 Construction Engineer 4853.76 606.72 8.3
3.10 Earthwork Foreman 1213.44 151.68
3.11 Earthwork Superintendent 2831.36 353.92
3.12 Forman (Bldg.) 300 37.5
3.13 Gang Chief 170 21.25
3.14 Material Engineer 4853.76 606.72
3.15 Material Superintendent 2426.88 303.36
3.16 Plant Superintendent 3235.85 404.48125
3.17 Project Engineer 4853.76 606.72
3.18 Project Manager 5662.72 707.84
3.19 Quarry Forman II 1213.44 151.68
3.20 Quary Foreman III 1213.44 151.68
3.21 Road Foreman III 2426.88 303.36
3.22 Structural Engineer 4853.76 606.72
3.23 Structural Foreman III 2103.04 262.88
3.24 Structural Superintendent 2831.36 353.92
4 Technicians
4 .1 Surveyor III 2022.4 252.8
4 .2 Surveyor II 1860.48 232.56
4 .3 Surveyor I 1648 206
4 .4 Chain Man 566.4 70.8
4 .5 Rod Man 485.12 60.64
4 .6 Soil Technicain 1860.48 232.56
4 .7 Quantity Surveyor 1860.48 232.56
4 .8 Draftsman 1860.48 232.56
5 Operators and Drivers
5 .1 Dozer operator 720 90
5 .2 low bed driver 0 0
5 .3 C.T.Operator 0 0
5 .4 Equipment operator III 480 60
5 .5 Equipment operator II 440 55
5 .6 Equipment operator I 360 45
5 .7 Truck Driver 400 50
5 .8 Truck Driver I 400 50
5 .9 Grader Operator 8 1
5 .10 Roller Operator 8 1
5 .11 W. Tr Oper. 8 1
5 .12 Excavator Operator 8 1
5 .13 Loader Operator 8 1
5 .14 Dump truck Driver 8 1
5 .15 Air Comp. Oper. 8 1
5 .16 W.T. Operator 8 1
5 .17 Wagon drill op 8 1
5 .18 Crusher op II 8 1
5 .19 Crusher op I 8 1
5 .20 Asp. Dist. Operator 8 1
5 .21 Grinder operator 280 35
5 .22 Sta.Equip. Oper. 8 1
5 .23 Paver Operator 8 1
5 .24 Light vehicle Driver 8 1
5 .25 mixer operator 280 35
5 .26 vibrator operator 200 25
5 .27 Crane operator 480 60
5 .28 Stat. Equip. Oper. I 8 1
5 .29 P.R. Operator 8 1
5 .30 S.R. Operator 8 1
5 .31 Sta.Eq.Ope.II 8 1

Gang chief 170 21.25


List of Equipments (Tools and Machinary) and Indexed Cost
Rental
Payment
Equipment Name No Rate(Birr
per day
) per day
Earth Work Machines
Dozer (D8) No 4000 500
Dozer( D7) No 3400 425
Excavator (1m3) No 3200 400
Excavator 0.75m3 No 2800 350
Excavator0.57m3 No 2400 300
Grader (14H) No 2400 300
Grader (140H) No 3200 400
Hand Comp. No 1 0.125
Hand Tamper No 0 0
Chain Loader No 5000 625
Wheel Loader 1 No 2300 287.5
Wheel Loader 2 No 104 13
Roller No 1200 150
S. roller No 115 14.375
Backhoe No 3200 400
Hauling
W.truck No 800 100
Dumper 31.5 31.5 3.9375
C.Truck No 115.24 14.405
low bed No 220 27.5
Dump Truck No 1200 150
Vehicle
light vehicle No 71.65 8.95625
Station Wagon(4WD) No 800 100
Paving equipments
Asp. Dist. No 128 16
Aggregate Spreader No 2000 250
Asp. Paver 7m No 113 14.125
Asphalt Plant 75 ton No 1763 220.375
Power Broom No 43 5.375
Stationay Heater No 43 5.375
Grouting Machine No 400 50
Mechanical painting machine No 2400 300
Concrete Machines
Concrete hose No 6 0.75
Barbending Jig No 1 0.125
Cutter No 2 0.25
Manhole cover Molds No 1.25 0.15625
Mixer No 300 37.5
Pipe Molds No 36 4.5
Steel Cutter No 1 0.125
Vibrator No 150 18.75
HCB production machine No 80 10
Cranes
Crane 10 tone No 2400 300
Crane 45 tone No 4000 500
Mobile Crane No 5000 625
Miscellaneous Equipments
Air Compressor No 1800 225
Crusher Set No 6700 837.5
Cuttng Torch No 19 2.375
Drill 4inch(crawler) No 2500 312.5
Hand Driller No 25 3.125
Grinder No 25 3.125
Jack Hammer No 30 3.75
Polishing machine No 50 6.25
Sledge hammer No 5 0.625
Wagon drill with compressor No 1440 180
Water Pump No 12 1.5
Welding mac. No 60 7.5
Surveying instrument No 320 40
Stationary water tank No 32 4
Hand Tools
Hand Tools Set 1 No 0.8 0.1
Hand Tools set 2 No 2 0.25
Hand Tools Set 3 No 0.5 0.0625
inary) and Indexed Cost

Description
(exc., carpentry, finishing)
(metal work, sanitary and electric
(painting)
Building

A. Sub Structure
Labor intensive
Labor
Unit output/day
Labor trade Name No UF
Excavation and
1
Earth Work
Daily labor I 10 1
Clearing of 20 cm thick
1.1 m2 100 Gang chif 1 1
top organic soil
Forman(Bldg) 1 0.5
Bulk excavation in Daily labor I 2 1
1.2 ordinary soil to a depth m3 3 Gang chief 1 1
< 1.5m Forman(Bldg) 1 0.5
Bulk excavation in Gang chief 1 0.5
1.3 ordinary soil to a depth m3 2.6 Forman(Bldg) 1 0.04
1.5m< x <3 m Daily labor I 2 1
1 0.5
Bulk excavation in Gang chief
1.4 m3 2.3
ordinary soil to a depth Forman(Bldg) 1 0.04
3m< x <4.5 Daily labor I 2 1
Bulk excavation in soft Gang chief 1 0.5
1.5 soil or sand to a depth m3 3.6 Forman(Bldg) 1 0.04
< 1.5m Daily labor I 2 1
Bulk excavation in soft Gang chief 1 0.5
1.6 soil or sand to a depth m3 3.12 Forman(Bldg) 1 0.04
1.5m< x <3m Daily labor I 2 1
Bulk excavation in soft Gang chief 1 0.5
1.7 soil or sand to a depth m3 2.76 Forman(Bldg) 1 0.04
3m< x < m3 Daily labor I 2 1
Bulk excavation in Gang chief 1 0.5
1.8 heavy soil or stiff clay m3 2.4 Forman(Bldg) 1 0.04
<1.5m Daily labor I 2 1
Bulk excavation in Gang chief 1 0.5
1.9 heavy soil or stiff clay m3 2.08 Forman(Bldg) 1 0.04
1.5m< x <3m Daily labor I 2 1
Bulk excavation in Gang chief 1 0.5
1.1.0 heavy soil or stiff clay m3 1.84 Forman(Bldg) 1 0.04
3m< x <4.5 Daily labor I 2 1
Gang chief 1 0.5
Bulk excavation for wet
1.11 m3 2.1 Forman(Bldg) 1 0.04
excavation < 1.5m
Daily labor I 2 1
Bulk excavation for wet Gang chief 1 0.5
1.12 excavation 1.5m< x m3 1.82 Forman(Bldg) 1 0.04
<3m
Bulk excavation for wet
1.12 excavation 1.5m< x m3 1.82
<3m Daily labor I 2 1
Bulk excavation for wet Gang chief 1 0.5
1.13 excavation 3m< x m3 1.61 Forman(Bldg) 1 0.04
<4.5m Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.14 ordinary soil to a depth m3 2.7 Forman(Bldg) 1 0.04
< 1.5m Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.15 ordinary soil to a depth m3 2.2 Forman(Bldg) 1 0.04
of 1.5m<X<3m Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.16 ordinary soil to a depth m3 1.6 Forman(Bldg) 1 0.04
of 3m < x 4.5 Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.17 soft soil or sand to a m3 3.24 Forman(Bldg) 1 0.04
depth < 1.5 Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.18 soft soil or sand to a m3 2.64 Forman(Bldg) 1 0.04
depth 1.5m<3m Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.19 soft soil or sand to a m3 1.92 Forman(Bldg) 1 0.04
depth 3m< x 4.5 Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.2.0 heavy soil or stiff clay m3 2.16 Forman(Bldg) 1 0.04
<1.5m Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.21 heavy soil or stiff clay m3 1.76 Forman(Bldg) 1 0.04
1.5m< x < 3m Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.22 heavy soil or stiff clay m3 1.28 Forman(Bldg) 1 0.04
3m< x <4.5 Daily labor I 2 1
Gang chief 1 0.5
Trench excavation for
1.23 m3 1.89 Forman(Bldg) 1 0.04
wet excavation < 1.5m
Daily labor I 2 1
Trench excavation for Gang chief 1 0.5
1.24 wet excavation 1.5m< x m3 1.54 Forman(Bldg) 1 0.04
<3m Daily labor I 2 1
Trench excavation for Gang chief 1 0.5
1.25 wet excavation 3m< x m3 1.12 Forman(Bldg) 1 0.04
<4.5m Daily labor I 2 1
Pit excavation in Gang chief 1 0.5
1.26 ordinary soil not m3 2.7 Forman(Bldg) 1 0.04
exceeding 150cm Daily labor I 2 1
Pit excavation in Gang chief 1 0.5
ordinary soil to the
1.27 m3 2.2 Forman(Bldg) 1 0.04
depth of 150cm < x
1.27 m3 2.2
depth of 150cm < x
300cm Daily labor I 2 1
Pit excavation in Gang chief 1 0.5
ordinary soil to the
1.28 m3 1.6 Forman(Bldg) 1 0.04
depth of 300cm < x <
450cm Daily labor I 2 1
Pit excavation in soft Gang chief 1 0.5
1.29 soil or sand to a depth m3 3.24 Forman(Bldg) 1 0.04
< 1.5m Daily labor I 2 1
Pit excavation in soft Gang chief 1 0.5
1.3.0 soil or sand to a depth m3 2.64 Forman(Bldg) 1 0.04
1.5m< x <3 Daily labor I 2 1
Gang chief 1 0.5
Pit excavation in heavy
1.31 m3 1.92 Forman(Bldg) 1 0.04
soil or stiff clay <1.5m
Daily labor I 2 1
Trench excavation in Gang chief 1 0.5
1.32 ordinary soil to a depth m3 2.16 Forman(Bldg) 1 0.04
< 1.5m Daily labor I 2 1
Pit excavation in heavy Gang chief 1 0.5
1.33 soil or stiff clay 1.5m< x m3 1.76 Forman(Bldg) 1 0.04
<3m Daily labor I 2 1
Pit excavation in heavy Gang chief 1 0.5
1.34 soil or stiff clay 3m< x m3 1.28 Forman(Bldg) 1 0.04
<4.5m Daily labor I 2 1
Gang chief 1 0.5
Pit excavation for wet
1.35 m3 1.89 Forman(Bldg) 1 0.04
excavation < 1.5m
Daily labor I 2 1
Pit excavation for wet Gang chief 1 0.5
1.36 excavation 1.5m< x m3 1.54 Forman(Bldg) 1 0.04
<3m Daily labor I 2 1
Pit excavation for wet Gang chief 1 0.5
1.37 excavation 3m< x m3 1.12 Forman(Bldg) 1 0.04
<4.5m Daily labor I 2 1
Bulk excavation in soft Gang chief 1 0.25
1.38 rock to a depth not m3 1.8 Forman(Bldg) 1 0.04
exceeding 1m Daily labor I 3 1
Bulk excavation in soft Gang chief 1 0.25
1.39 rock to a depth 1.5m< x m3 1.6 Forman(Bldg) 1 0.04
<3.0m Daily labor I 3 1
Bulk excavation in soft Gang chief 1 0.25
1.4.0 rock to a depth 3m < x m3 1.3 Forman(Bldg) 1 0.04
< 4.5m Daily labor I 3 1
Trench excavation in Gang chief 1 0.25
1.41 soft rock not exceeding m3 1.5 Forman(Bldg) 1 0.04
150cm Daily labor I 3 1
Trench excavation in Gang chief 1 0.25
1.42 soft rock to the depth of m3 1.2 Forman(Bldg) 1 0.04
150cm < 300cm
Trench excavation in
1.42 soft rock to the depth of m3 1.2
150cm < 300cm Daily labor I 3 1
Trench excavation in Gang chief 1 0.25
1.43 soft rock to the depth of m3 1 Forman(Bldg) 1 0.04
300cm < Daily labor I 3 1
Gang chief 1 0.25
Pit excavation soft rock
1.44 m3 1.5 Forman(Bldg) 1 0.04
not exceeding 150cm
Daily labor I 3 1
Pit excavation soft rock Gang chief 1 0.25
1.45 to the depth of 150cm < m3 1.2 Forman(Bldg) 1 0.04
x < 30 Daily labor I 3 1
Pit excavation soft rock Gang chief 1 0.25
1.46 to the depth of 300cm < m3 1 Forman(Bldg) 1 0.04
x < 450 Daily labor I 3 1
Bulk excavation in hard Gang chief 1 0.25
1.47 rock to a depth not m3 1 Forman(Bldg) 1 0.04
exceeding 1 Daily labor I 3 1
Bulk excavation in hard Gang chief 1 0.25
1.48 rock to a depth 1.5m< x m3 0.8 Forman(Bldg) 1 0.04
<3.0m Daily labor I 3 1
Bulk excavation in hard Gang chief 1 0.25
1.49 rock to a depth 3m < x m3 0.5 Forman(Bldg) 1 0.04
< 4.5m Daily labor I 3 1
Trench excavation in Gang chief 1 0.25
1.5.0 hard rock not exceeding m3 0.7 Forman(Bldg) 1 0.04
150cm. Daily labor I 3 1
Trench excavation in Gang chief 1 0.25
1.51 hard rock to the depth m3 0.5 Forman(Bldg) 1 0.04
of 150cm <300cm Daily labor I 3 1
Trench excavation in Gang chief 1 0.25
1.52 hard rock to the depth m3 0.3 Forman(Bldg) 1 0.04
of 300cm < Daily labor I 3 1
Pit excavation in hard Gang chief 1 0.25
1.53 rock not exceeding m3 0.7 Forman(Bldg) 1 0.04
150cm Daily labor I 3 1
Pit excavation in hard Gang chief 1 0.25
1.54 rock to the depth of m3 0.5 Forman(Bldg) 1 0.04
150cm < x <300cm Daily labor I 3 1
Pit excavation in hard Gang chief 1 0.25
1.55 rock to the depth of m3 0.3 Forman(Bldg) 1 0.04
300cm < x < Daily labor I 3 1

Trench excavation in
1.56 m3
rock under 1000 m3

Trench excavation in
1.57 m3
rock over 1000 m3
Trench excavation in
1.57 m3
rock over 1000 m3

Trench excavation in
1.58 m3
boulder to a depth 1.5m
Trench excavation in
1.59 boulder to a depth m3
1.5m<
Trench xexcavation
<3m in
1.6.0 boulder to a depth 3m< m3
x <4.5m
Pit excavation in
1.61 m3
boulder to a depth 1.5m
Pit excavation in
1.62 boulder to a depth m3
1.5m< x <3m in
Pit excavation
1.63 boulder to a depth 3m< m3
x <4.5m
Bulk excavation in
1.64 m3
boulder to a depth 1.5m
Bulk excavation in
1.65 boulder to a depth m3
1.5m< x <3m in
Bulk excavation
1.66 boulder to a depth 3m< m3
x <4.5m
Back fill around footing Gang chief 1 0.1
1.67 and masonry foundation m3 3 Forman(Bldg) 1 0.04
from t Daily labor I 3 1
Fill around footing and Gang chief 1 0.1
1.68 masonry foundation m3 3 Forman(Bldg) 1 0.04
from the sit Daily labor I 1 1
Gang chief 1 0.1
Back fill Under hard
1.69 m3 84 Forman(Bldg) 1 0.04
core from site
Daily labor I 1 1
Gang chief 1 0.1
Fill Under hard core
1.7.0 m3 84 Forman(Bldg) 1 0.04
from borrow
Daily labor I 1 1
Hauling surplus Gang chief 1 0.1
1.71 excavated material 2km m3 65.1 Forman(Bldg) 1 0.04
away Daily labor I 1 1
Hauling surplus Gang chief 1 0.1
1.72 excavated material 4km m3 51.8 Forman(Bldg) 1 0.04
away Daily labor I 1 1
Hauling surplus Gang chief 1 0.1
1.73 excavated material 6km m3 51.8 Forman(Bldg) 1 0.04
away Daily labor I 1 1
Hauling surplus Gang chief 1 0.1
1.74 excavated material 8km m3 44.1 Forman(Bldg) 1 0.04
away
Hauling surplus
1.74 excavated material 8km m3 44.1
away Daily labor I 1 1
Gang chief 1 0.1
Hand loading from
1.75 m3 5.4 Forman(Bldg) 1 0.04
stock pile, clay
Daily labor I 1 1
DL II (Gang leaders) 4 1
1.76 25cm thick hard core m3 14
Mason II 1 0.25
DL II (Gang leaders) 4 1
1.77 15cm thick hard core m3 14
Mason II 1 0.25
30-50 mm thick DL II (Gang leaders) 4 1
1.78 m3 48
blinding. Mason II 1 0.25
2 Concrete Work
Daily labor I 18 1
Bar bender I 1 0.25
Plasterer I 2 1
2.1 Light weight concrete m3 12 Vibrator operator 1 1
Mixer operator 1 1
Carpenter I 1 0.25
Forman (Bldg.) 1 0.5
Daily labor I 18 1
5cm thick C-5 lean Mixer operator 2 1
2.2 concrete (mechanical m3 240 Vibrator operator 1 1
mix) Carpenter I 1 0.25
Forman (Bldg.) 1 0.5
Daily labor I 18 1
Vibrator operator 1 1
Mixer operator 1 1
2.3 Other concrete grade m3 Plasterer I 2 1
Bar bender I 1 0.25
Carpenter I 1 0.25
Forman (Bldg.) 1 0.5
Bar bender helper 2 1
Bar bender I 1 1
2.4 Reinforcement bar m3
Bar bender II 1 1
Forman (Bldg.) 1 0.25
2.5 Formwork

Capenter helper 2 1
Footing, Mat foundation 1 1
A m2 Carpenter I
and Grade beam
Forman (Bldg.) 1 0.25

Capenter helper 2 1
Concrete shear wall and 1 1
B m2 Carpenter I
lift shaft
Concrete shear wall and
B m2
lift shaft
1 0.25
Forman (Bldg.)

Capenter helper 2 1
Zigba form work for
C m2 Carpenter I 1 1
foundation column
Forman (Bldg.) 1 0.25

Capenter helper 2 1
Zigba form work for
D suspended and ribbed m2 1 1
Carpenter I
slab
Forman (Bldg.) 1 0.25

Concrete Ancillary
2.6
Work
Expansion joint of width DL II (Gang leaders) 1 1
A 10cm with chipwood m2 Carpenter II 1 1
8mm thic
Expansion joint of width DL II (Gang leaders) 1 1
B 20cm with chipwood m2 Carpenter II 1 1
8mm thick
Expansion joint of width DL II (Gang leaders) 1 1
C 40cm with chipwood m3 Carpenter II 1 1
8mm thick
3 Masonry Work
Daily labor I 4 1
40 cm thick Stone 2 1
Mason II
3.1 foundation masonry 5.5
(1:4) Cement s Forman(Bldg.) 1 0.25

Daily labor I 4 1
50 cm thick Stone
Mason II 2 1
3.2 foundation masonry
(1:4) Cement s Forman(Bldg.) 1 0.25

Daily labor I 4 1
60 cm thick Stone Mason II 2 1
3.3 foundation masonry
(1:4) Cement s Forman(Bldg.) 1 0.25

Daily labor I 4 1
40 cm thick Semi Mason II 2 1
3.4 dressed stone masonry
foundation wall Forman(Bldg.) 1 0.25
40 cm thick Semi
3.4 dressed stone masonry
foundation wall

Daily labor I 4 1
50 cm thick Semi
Mason II 2 1
3.5 dressed stone masonry
foundation wall Forman(Bldg.) 1 0.25

Daily labor I 4 1
60 cm thick Semi
Mason II 2 1
3.6 dressed stone masonry
foundation wall Forman(Bldg.) 1 0.25

Daily labor I 4 1
50 cm thick Both side
Mason II 2 1
3.7 dressed Kotebe stone
masonry Elev. Wall Forman(Bldg.) 1 0.25

Daily labor I 4 1
50 cm thick one side Mason II 2 1
3.8 dressed Kotebe stone
masonry Elev. Wall Forman(Bldg.) 1 0.25

Daily labor I 4 1
25 cm thick dressed Mason II 2 1
3.9 Kotebe stone masonry
cladding Elev. Wall Forman(Bldg.) 1 0.25

Daily labor I 4 1
50 cm thick Both side Mason II 2 1
3.1.0 dressed Ambo stone
masonry Elev. Wall Forman(Bldg.) 1 0.25

Daily labor I 4 1
50 cm thick one side
Mason II 2 1
3.11 dressed Ambo stone
masonry Elev. Wall Forman(Bldg.) 1 0.25

Daily labor I 4 1
25 cm thick dressed Mason II 2 1
3.12 Ambo stone masonry
cladding Elev. Wall Forman(Bldg.) 1 0.25

Daily labor I 4 1
Dressed Kebena stone Mason II 2 1
3.13 masonry cladding Elev.
wall Forman(Bldg.) 1 0.25

B Super Structure
4 Concrete Work
4.1 Ribbed slab
Labor intensive Machin intensive
Equipemet Labor
Quantity
Equipement name UF Labor trade Name output/day No UF

Hand tool set 1 10 0.8


100

Hand tool set 1 2 0.8 Forman (Bldg.) 1 0.04


Grease boy 3 1 0.5
Equipment operator III 1 1
Hand tool set 1 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.6 1 1
Equipment operator III 1 1
2 0.8 Forman (Bldg.) 1
Hand tool set 2 1
2.3
Grease boy 1 1
Equipment operator III 1 1
Hand tool set 3 2 0.8 Forman (Bldg.) 1 1
Grease boy 3.6 1 1
Equipment operator III 1 1
Hand tool set 4 2 0.8 Forman (Bldg.) 1 1
Grease boy 3.12 1 1
Equipment operator III 1 1
Hand tool set 5 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.76 1 1
Equipment operator III 1 1
Hand tool set 6 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.4 1 1
Equipment operator III 1 1
Hand tool set 7 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.08 1 1
Equipment operator III 1 1
Hand tool set 8 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.84 1 1
Equipment operator III 1 1
Hand tool set 9 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.1 1 1
Equipment operator III 1 1
Hand tool set 10 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.82 1 1
1.82
Equipment operator III 1 1
Hand tool set 11 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.61 1 1
Equipment operator III 1 1
Hand tool set 12 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.7 1 1
Equipment operator III 1 1
Hand tool set 13 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.2 1 1
Equipment operator III 1 1
Hand tool set 14 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.6 1 1
Equipment operator III 1 1
Hand tool set 15 2 0.8 Forman (Bldg.) 1 1
Grease boy 3.24 1 1
Equipment operator III 1 1
Hand tool set 16 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.64 1 1
Equipment operator III 1 1
Hand tool set 17 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.92 1 1
Equipment operator III 1 1
Hand tool set 18 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.16 1 1
Equipment operator III 1 1
Hand tool set 19 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.76 1 1
Equipment operator III 1 1
Hand tool set 20 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.28 1 1
Equipment operator III 1 1
Hand tool set 21 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.89 1 1
Equipment operator III 1 1
Hand tool set 22 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.54 1 1
Equipment operator III 1 1
Hand tool set 23 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.12 1 1
Equipment operator III 1 1
Hand tool set 24 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.7 1 1
Equipment operator III 1 1
Hand tool set 25 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.2 1 1
2.2
Equipment operator III 1 1
Hand tool set 26 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.6 1 1
Equipment operator III 1 1
Hand tool set 27 2 0.8 Forman (Bldg.) 1 1
Grease boy 3.24 1 1
Equipment operator III 1 1
Hand tool set 28 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.64 1 1
Equipment operator III 1 1
Hand tool set 29 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.92 1 1
Equipment operator III 1 1
Hand tool set 30 2 0.8 Forman (Bldg.) 1 1
Grease boy 2.16 1 1
Equipment operator III 1 1
Hand tool set 31 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.76 1 1
Equipment operator III 1 1
Hand tool set 32 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.28 1 1
Equipment operator III 1 1
Hand tool set 33 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.89 1 1
Equipment operator III 1 1
Hand tool set 34 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.54 1 1
Equipment operator III 1 1
Hand tool set 35 2 0.8 Forman (Bldg.) 1 1
Grease boy 1.12 1 1
Equipment operator III 1 1
Sledge hammer 1 1
Hand tool set 1 2 0.8 1.8

Sledge hammer 1 1
Hand tool set 1 2 0.8 1.6

Sledge hammer 1 1
Hand tool set 1 2 0.8 1.3

Sledge hammer 1 1
Hand tool set 1 2 0.8 1.5

Sledge hammer 1 1
Hand tool set 1 2 0.8 1.2
1.2

Sledge hammer 1 1
Hand tool set 1 2 0.8 1

Sledge hammer 1 1
Hand tool set 1 2 0.8 1.5

Sledge hammer 1 1
Hand tool set 1 2 0.8 1.2

Sledge hammer 1 1
Hand tool set 1 2 0.8 1

Sledge hammer 1 1
Hand tool set 1 2 0.8 1

Sledge hammer 1 1
Hand tool set 1 2 0.8 0.8

Sledge hammer 1 1
Hand tool set 1 2 0.8 0.5

Sledge hammer 1 1
Hand tool set 1 2 0.8 0.7

Sledge hammer 1 1
Hand tool set 1 2 0.8 0.5

Sledge hammer 1 1
Hand tool set 1 2 0.8 0.3

Sledge hammer 1 1
Hand tool set 1 2 0.8 0.7

Sledge hammer 1 1
Hand tool set 1 2 0.8 0.5

Sledge hammer 1 1
Hand tool set 1 2 0.8 0.3

Forman(Bldg) 1 0.5
Equipment operator III 41 1 1
Driller 1 1
Blasting Forman 1 1
Forman(Bldg) 1 0.5

48
Equipment operator III 1 1
Driller 48 1 1

Blasting Forman 1 1
Forman (Bldg.) 1
250 1
Equipment operator III 2 1
Forman (Bldg.) 1 1
175
Equipment operator III 2 1
Forman (Bldg.) 1 1
115
Equipment operator III 2 1
Forman (Bldg.) 1 1
250
Equipment operator III 2 1
Forman (Bldg.) 1 1
175
Equipment operator III 2 1
Forman (Bldg.) 1 1
115
Equipment operator III 2 1
Forman (Bldg.) 1 1
250
Equipment operator III 2 1
Forman (Bldg.) 1 1
185
Equipment operator III 2 1
Forman (Bldg.) 1 1
140
Equipment operator III 2 1
Hand Compactor 1 1
Hand tool set 1 2 1

Hand Compactor 1 1
Hand tool set 1 2 1

Hand Compactor 1 1
Hand tool set 1 2 1

Hand Compactor 1 1
Hand tool set 1 2 1

Hand Compactor 1 1
Hand tool set 1 2 1

Hand Compactor 1 1
Hand tool set 1 2 1

Hand Compactor 1 1
Hand tool set 1 2 1

Hand Compactor 1 1
Hand tool set 1 2 1
Hand Compactor 1 1
Hand tool set 1 2 1

Sledge hammer 1 1
Hand Tools Set 1 4 1
Sledge hammer 1 1
Hand Tools Set 1 4 1
Hand Tools Set 1 2 1

Vibrator 1 1
Mixer 1 1 Note…. Materials are 1,
Aggregate size 20cm, 2, Pumice
3, Sand
4, Cement
5, Water

Vibrator 1 1 Note…. Materials are 1,


Mixer 1 1 Aggregate size 20cm,
2, Sand
3, Cement
4, Water
Vibrator 1 1
Mixer 1 1 Note…. Materials are 1,
Aggregate size 20cm, 2, Pumice
3, Sand
4, Cement
5, Water

Hand tool set 2 2 1


Note…. Materials are 1, Tying
wire Size 1.5 mm ….. Quat..0.02kg
2, Diameter of bar . Include wastage …1.05

Hand tool set 1 2 1


Note…. Materials are 1,
mould oil …lit ….. 0.06 2,
nails of different size ….. Kg …. 0.2 3,
Eucalyptus wood 6cm diameter.. m .. 3.6 4, Zigba
form work 2.5cm local wood... m3 ... 0.03 5, Eucalyptus
wood 4cm diameter .... m ... 2.4

Hand tool set 1 2 1 Note…. Materials are


1, mould oil …lit ….. 0.06 2,
nails of different size ….. Kg …. 0.4 3,
Eucalyptus wood 8cm diameter.. m .. 9 4,
Eucalyptus wood 6cm diameter.. m .. 12
5, Zigba form work
2.5cm local wood... m3 ... 0.03
Note…. Materials are
1, mould oil …lit ….. 0.06 2,
nails of different size ….. Kg …. 0.4 3,
Eucalyptus wood 8cm diameter.. m .. 9 4,
Eucalyptus wood 6cm diameter.. m .. 12
5, Zigba form work
2.5cm local wood... m3 ... 0.03

Hand tool set 1 2 1 Note…. Materials are


1, mould oil …lit ….. 0.06 2,
nails of different size ….. Kg …. 0.3 3,
Eucalyptus wood 8cm diameter.. m .. 12 4,
Eucalyptus wood 6cm diameter.. m .. 12
5, Zigba form work 2.5cm local
wood... m3 ... 0.03 6. Eucalyptus wood 4cm diameter ....
m ... 3

Hand tool set 1 2 1 Note…. Materials are 1,


mould oil …lit ….. 0.06 2, nails
of different size ….. Kg …. 0.3 3,
Eucalyptus wood 8cm diameter.. m .. 12 4,
Eucalyptus wood 6cm diameter.. m .. 12
5, Zigba form work 2.5cm local
wood... m3 ... 0.03

Note…. Materials are


1, Bitumen …kg ….. 0.2
2, 8 mm thick chip wood ….. m2 …. 0.11
Note…. Materials are
1, Bitumen …kg ….. 0.4
2, 8 mm thick chip wood ….. m2 …. 0.22
Note…. Materials are
1, Bitumen …kg ….. 0.8
2, 8 mm thick chip wood ….. m2 …. 0.44

Hand tool set 1 4 2 Note…. Materials are


1, Stone …............m3 …..... 1.1
2, Sand …........... m3 ...…. 0.28
3, Cement ...... Qnt.......... 1.02
4,
Water ........... M3............0.06
Hand tool set 1 4 2 Note…. Materials are
1, Stone …............m3 …..... 1.4
2, Sand …........... m3 ...…. 0.28
3, Cement ...... Qnt.......... 1.02
4,
Water ........... M3............0.06
Note…. Materials are
Hand tool set 1 4 2 1, Stone …............m3 …..... 1.1
2, Sand …........... m3 ...…. 0.28
3, Cement ...... Qnt.......... 1.02
4,
Water ...........
Note…. MaterialsM3............0.06
are
Hand tool set 1 4 2 1, Stone …............m3 …..... 1.25
2, Sand …........... m3 ...…. 0.28
3, Cement ...... Qnt.......... 1.02
4,
4,
Water ...........
Note…. MaterialsM3............0.06
are
Hand tool set 1 4 2 1, Stone …............m3 …..... 1.25
2, Sand …........... m3 ...…. 0.28
3, Cement ...... Qnt.......... 1.02
4,
Water ...........
Note…. MaterialsM3............0.06
are
Hand tool set 1 4 2 1, Stone …............m3 …..... 1.25
2, Sand …........... m3 ...…. 0.28
3, Cement ...... Qnt.......... 1.02
4,
Water ...........
Note…. Materials are M3............0.06
Hand tool set 1 4 2 1, Stone …............m3 …..... 1
2, Sand …........... m3 ...…. 0.28
3, Cement ...... Qnt.......... 1.02
4, Water ...........
M3............0.06
Note…. Materials are
Hand tool set 1 4 2 1, Stone …............kg …..... 0.81
2, Sand …........... m2 ...…. 0.14
3, Cement ...... Qnt.......... 0.51
4,
Water ...........
Note…. MaterialsM3............0.06
are
Hand tool set 1 4 2 1, Stone …............kg …..... 0.5
2, Sand …........... m2 ...…. 0.07
3, Cement ...... Qnt.......... 0.26
4, Water ...........
M3............0.02
Note…. Materials are
Hand tool set 1 4 2 1, Stone …............kg …..... 0.6
2, Sand …........... m2 ...…. 0.14
3, Cement ...... Qnt.......... 0.51
4, Water ...........
M3............0.03
Note…. Materials are
Hand tool set 1 4 2 1, Stone …............kg …..... 0.81
2, Sand …........... m2 ...…. 0.14
3, Cement ...... Qnt.......... 0.51
4,
Water
Note…............
MaterialsM3............0.06
are
Hand tool set 1 4 2 1, Stone …............kg …..... 0.3
2, Sand …........... m2 ...…. 0.07
3, Cement ...... Qnt.......... 0.26
4, Water ...........
M3............0.02
Note…. Materials are
Hand tool set 1 4 2 1, Stone …............kg …..... 0.44
2, Sand …........... m2 ...…. 0.07
3, Cement ...... Qnt.......... 0.26
4,
Water ........... M3............0.02
intensive
Equipemet
Equipement nameQuantity UF

Excavator0.57m3 1 1

Excavator0.57m3 1 1

Excavator0.57m3 1 1

Excavator0.57m3 1 1

Excavator0.57m4 1 1

Excavator0.57m5 1 1

Excavator0.57m6 1 1

Excavator0.57m7 1 1

Excavator0.57m8 1 1

Excavator0.57m9 1 1

Excavator0.57m10 1 1
Excavator0.57m11 1 1

Excavator0.57m12 1 1

Excavator0.57m13 1 1

Excavator0.57m14 1 1

Excavator0.57m15 1 1

Excavator0.57m16 1 1

Excavator0.57m17 1 1

Excavator0.57m18 1 1

Excavator0.57m19 1 1

Excavator0.57m20 1 1

Excavator0.57m21 1 1

Excavator0.57m22 1 1

Excavator0.57m23 1 1

Excavator0.57m24 1 1

Excavator0.57m25 1 1
Excavator0.57m26 1 1

Excavator0.57m27 1 1

Excavator0.57m28 1 1

Excavator0.57m29 1 1

Excavator0.57m30 1 1

Excavator0.57m31 1 1

Excavator0.57m32 1 1

Excavator0.57m33 1 1

Excavator0.57m34 1 1

Excavator0.57m35 1 1
Air Compressor 1 1
Drill 4inch(crawler) 1 1

Air Compressor 1 1
Drill 4inch(crawler) 1 1

Excavator (1m3) 1 1

Dozer (D8) 1 1
Excavator (1m3) 1 1
Dozer (D8) 1 1
Excavator (1m3) 1 1
Dozer (D8) 1 1
Excavator (1m3) 1 1
Dozer (D8) 1 1
Excavator (1m3) 1 1
Dozer (D8) 1 1
Excavator (1m3) 1 1
Dozer (D8) 1 1
Excavator (1m3) 1 1
Dozer (D8) 1 1
Excavator (1m3) 1 1
Dozer (D8) 1 1
Excavator (1m3) 1 1
Dozer (D8) 1 1
Basic Material Prices

Transpo
Source rt cost
Type of Materials Unit (Per
Place
Unit/km)

1. Cement
Cement -Muger Qtls Mugher 0.80
Cement - OPC Mugar Qtls Mugher 0.50
Cement - PPC Mugar Qtls Mugher 1.00
Cement - PPC Mesebo Qtls Mesebo 1.00
Cement - OPC Mesebo Qtls Mesebo 1.00
Cement - PPC Derba Qtls Derba 1.00
Cement - OPC Derba Qtls Derba 1.00
Cement - PPC Dangote Qtls Dangote 1.00
Cement - PPC Ethio Qtls Ethio 1.00
Cement - PPC Habesha Qtls Habesha 1.00
Cement - OPC Dangote Qtls Dangote 1.00
2. Aggrigate course and fine
Sand (hauling distance less than 5km in Addis Ababa) m3 0.5
Sand (hauling distance more than 5km in Addis Ababa m3 0.5
Gravel (02) Material Price at Crusher Site m3 0.5
Fino (00) material price at crusher site m3 0.5
3. Reinfercement bar
Reinforcement Bar -Ethiopia: 6mm kg 0.2
Reinforcement Bar - Ethiopia: 8mm kg 0.2
Reinforcement Bar Ethiopia: 10mm kg 0.2
Reinforcement Bar -Ethiopia: 12mm kg 0.2
Reinforcement Bar -Ethiopia: 14mm kg 0.2
Reinforcement Bar -Ethiopia: 16mm kg 0.2
Reinforcement Bar -Ethiopia: 20mm kg 0.2
Reinforcement Bar(Ethiopia): 24mm kg 0.2
Reinforcement Bar -Ethiopia: 30mm kg 0.2
Reinforcement Bar (Ethiopia): 32mm kg 0.2
Black annealed wire -1.5mm kg 0.2
4. Roof
G-32 C.I.Sheet roof cover m2 0.2
G-30 C.I.Sheet roof cover m2 0.2
G-28 C.I.Sheet roof cover m2 0.2
0.30 mm thick Galvanized EGA 300 roof cover. m2 0.2
0.35 mm thick Galvanized EGA 300 roof cover. m2 0.2
0.40 mm thick Galvanized EGA 300 roof cover. m2 0.2
0.50 mm thick Galvanized EGA 300 roof cover. m2 0.2
0.60 mm thick Galvanized EGA 300 roof cover. m2 0.2
0.70 mm thick Galvanized EGA 300 roof cover. m2 0.2
0.80 mm thick Galvanized EGA 300 roof cover. m2 0.2
1.00 mm thick Galvanized EGA 300 roof cover. m2 0.2
0.30 mm thick Galvanized EGA 500 roof cover. m2 0.2
0.35 mm thick Galvanized EGA 500 roof cover. m2 0.2
0.40 mm thick Galvanized EGA 500 roof cover. m2 0.2
0.50 mm thick Galvanized EGA 500 roof cover. m2 0.2
0.60 mm thick Galvanized EGA 500 roof cover. m2 0.2
0.70 mm thick Galvanized EGA 500 roof cover. m2 0.2
5. Other
Cylinderical lock pc A.A 0.0002
Flat sheet metal(1mm thick) m 2
A.A 0.0149
0.8MM thick ribbed sheet m2 A.A 0.0149
RHS(20*10*1mm)(Grill) kg A.A 0.0019
Screw for hinges (100 pcs.) packet A.A 0.0019
Electrode ( 2.5 mm ) -100Pcs packet A.A 0.0019
Anchor ( iron mongery ) pcs A.A 0.0019
Plastic Paint lit A.A 0.0005
Plastic Paint gal A.A 0.0076
Anti rust lit A.A 0.0019
Anti rust Gal A.A 0.0076
Material Prices
Transporta
Distanc tion Cost Loadin Total
Material
e from (From g /Un- costLinked
cost at Date Remark
site(K source to loading to Break
Source site) - Birr costs
m) Down
Per Unit

231.00 532 425.600 1.00 657.6


1000 50 25.000 4.00 1029
500 534 534.000 4.00 1038
235 535 535.000 4.00 774
320 536 536.000 4.00 860
680 537 537.000 4.00 1221
400 538 538.000 4.00 942
450 539 539.000 4.00 993
425 540 540.000 4.00 969
425 541 541.000 4.00 970
480 542 542.000 4.00 1026

1000 20 10.000 31.25 1041.25


942 545 272.500 31.25 1245.75
875 50 25.000 50.00 950
835 547 273.500 31.25 1139.75
0.2
111.81 549 109.800 0.10 221.71
111.81 550 110.000 0.10 221.91
111.81 551 110.200 0.10 222.11
111.81 552 110.400 0.10 222.31
111.81 553 110.600 0.10 222.51
111.81 554 110.800 0.10 222.71
111.81 555 111.000 0.10 222.91
111.81 556 111.200 0.10 223.11
111.81 557 111.400 0.10 223.31
111.81 558 111.600 0.10 223.51
62 569 113.800 0.10 175.9

73.81 571 114.200 0.10 188.11


87.22 572 114.400 0.10 201.72
101.76 573 114.600 0.10 216.46
95.01 574 114.800 0.10 209.91
109.22 575 115.000 0.10 224.32
123.11 576 115.200 0.10 238.41
151.2 577 115.400 0.10 266.7
179.29 578 115.600 0.10 294.99
207.39 579 115.800 0.10 323.29
235.48 580 116.000 0.10 351.58
291.67 581 116.200 0.10 407.97
112.8 590 118.000 0.10 230.9
129.7 591 118.200 0.10 248
146.21 592 118.400 0.10 264.71
179.59 593 118.600 0.10 298.29
213 594 118.800 0.10 331.9
246.38 595 119.000 0.10 365.48

295.00 532 0.106 0.00 295.1064


217.39 532 1.245 1.50 220.135

23.90 532 1.011 0.02 24.9308


50.00 532 1.011 0.02 51.0308
85.00 532 1.011 0.02 86.0308
12.00 532 1.011 0.01 13.0208
14.13 532 0.266 0.03 14.426
56.52 532 4.043 0.13 60.6882
50.43 532 1.011 0.03 51.4708
201.74 532 0.152 0.13 202.022
Labor, Equipment and Machinary composition standards or Norms
Crew
Crew
Item Types of work designatio No UF
composition
n
1 EXCAVATION - A
In ordinary soil Gang chif 1 0.5
1.1 EX-A1
(Labor intensive) Building labor 2 1
In ordinary soil Excavator 1 1
1.2 EX-A2
(Machine intensive) Excavator operator 1 1
In ordinary soil Dozer H.P 1 1
1.3 EX-A3
(Machine intensive) Dozer Operator 1 1
Gang chif 1 0.25
In soft rock
1.4 EX-A4 Building labor 2 1
(Labor intensive)
Sledg hammer Ma 1 1
In soft rock Excavator 1 1
1.5 EX-A5
(Machine intensive) Excavator operator 1 1
Gang chif 1 0.25
In soft rock
1.6 EX-A6 Building labor 2 1
(Machine intensive)
Sledg hammer Ma 1 1
In Buolder Dozer H.P 1 1
1.7 EX-A7
(Machine intensive) Dozer Operator 1 1
Hard rock Building labor 2 1
1.8 EX-A8
(Labor intensive) Sledg hammer Ma 1 1
Gang chif
Building laborer 2 1
Hard rock
1.9 EX-A9 Jack hammer opera 2 1
(Machine intensive)
Sledg hammer Ma 1 1
Compressor 1 1
2 FILL - B
Back fill Gang chif 1 1
2.1 F-B1
(Labor intensive) Building labor 1 1
Back fill Loader 1 1
2.1 F-B2
(Machine intensive) Loader operator 1 1
Selected Excavated Gang chif 1 1
2.3 F-B3
fill (Labor intensive) Building labor 5 1
Selected Excavated Loader 1 1
2.4 fill (Machine F-B4
intensive) Loader operator 1 1
Gang chif 1 1
Selected Borrowed Building labor 6 1
2.5 F-B5
fill (Labor intensive) Hand compactor 1 1
Hand compactor op 1 1
Grader 1 1
Selected Borrowed Grader operator 1 1
2.6 fill (Machine F-B6
intensive) Buller 1 1
Water tank 1 1
3 DISPOSAL - C
Gang chif 1 0.17
3.1 Wheel and spread D-C1
Building labor 4 1
Load and cartaway Gang chif 1 1
3.2 D-C2
(Manual loading) Building labor 6 1
Loader 1 1
Load and cartaway Loader operator 1 1
3.3 D-C3
(Machine loading) Damp truck 1
Damp truck ddriver 1
4 HARDCOR - D
Mason 1 1.25
4.1 Hard core laying HC- D1
Building labor 0.9 1.4
Mason 0.8 1.55
4.2 Dust Blinding HC- D2
Building labor 0.7 1.7
5 CONCRETE - E
Forman 1 1
Mixing, Hauling and Plasterers 2 1.1
4.1 casting in Manual C-E1 Compactor 1 0.25
operation Bar bender 1 0.25
Building labor 24 1
Forman 1 1
Plasterers 2 1.1
Mechanical Mix
4.2 C-E2 Carpenter 1 0.25
labor transport
Bar bender 1 0.25
Building labor 13 1
Forman 1 1
Plasterers 2 1
Carpenter 1 1
Mechanical Mix
4.3 C-E3 Bar bender 1 1
Crane lift
Building labor 1 1
Crane operator 1 1
Lower crane 1 1
6 FORMWORK - F
Forman 1 0.25
Cutting and fixing
6.1 FW - F1 Carpenter 1 1
woodn zgiba
Helper (DL) 2 1
Forman 1 0.25
6.2 ….rough FW - F2 Carpenter 2 1
Helper (DL) 2 1
Forman 1 0.25
6.3 …atterned FW - F3 Carpenter 1 1
Helper (DL) 2 1
STEEL
7 REINFORCEMENT -
G
Forman 1 0.25
Cutting , typing and
7.1 SR - G1 Bar bender 1 1
placing
Helper (DL) 2 1
8 STON MASONRY - II
Forman 1 0.25
8.1 Commen masonry ST - H1 Mason 1 1
Helper (DL) 2 1
Forman 1 0.25
Dressed stone
8.2 ST - H2 Mason 1 1
masonry
Helper (DL) 2 1
BRICK AND BLOCK
9
WORK - I
Forman 1 0.25
Brick and block
9.1 BW - I1 Mason 1 1
laying
Helper (DL) 2 1
10 DUMP PROOF - J
Forman 1 0.25
10.1 Bitumen paint DP - J1 Proofer 1 1
Helper (DL) 1 1
Forman 1 0.25
Bitumen paint with
10.2 DP - J2 Proofer 1 1
Asphalt felt
Helper (DL) 2 1
11 WATER PROOF - K
Forman 1 0.25
11.1 Concrete painting WP - K1 Proofer 1 1
Helper (DL) 1 1
Forman 1 0.25
11.2 Heavy duty coating WP - K2 Proofer 1 1
Helper (DL) 2 1
Forman 1 0.25
11.3 Heavy duty patching WP - K3 Proofer 1 1
Helper (DL) 2 1
Forman 1 0.25
11.4 Heat reflecting paint WP - K4 Proofer 1 1
Helper (DL) 2 1
ROOF AND WALL
12
CLADDING - L
Forman 1 0.25
Corrugated steel
12.1 RWC - K1 Carpenter 1 1
sheet
Helper (DL) 2 1
Forman 1 0.25
12.2 EGA Sheet RWC - K2 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
12.3 Ribbed sheet RWC - K3 Carpenter 1 1
12.3 Ribbed sheet RWC - K3
Helper (DL) 2 1
Forman 1 0.25
Gutters and down
12.4 RWC - K4 Carpenter 1 1
pipe
Helper (DL) 2 1
CARPENTRY AND
13
JOINERY - M
Forman 1 0.25
13.1 Truss and purlin CJ - M1 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
Coiling (chip wood
13.2 CJ - M2 Carpenter 1 1
ceiling)
Helper (DL) 2 1
Forman 1 0.25
13.3 Door and Window CJ - M3 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
Cupboards and
13.4 CJ - M4 Carpenter 1 1
cabinate
Helper (DL) 2 1
Forman 1 0.25
13.5 Rails and skirting CJ - M5 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
Carpenter 1 1
13.6 Rails and balusters CJ - M6 Chiseler 1 1
Welder 1 0.17
Helper (DL) 2 1
14 STEEL SECTION - N
Forman 1 0.25
Steel truss and Welder 1 1
14.1 purlin (labor SS - N1 Carpenter 1 1
mounted) Welding machine 1 0.17
Building Labor 2 1
Forman 1 0.25
Welder 1 1
Steel truss and Welding machine 1 1
14.2 purlin (crane SS - N2
mounted) Mobile crane 1 0.17
Crane operator
Building Labor 2 1
Forman 1 0.25
Carpenter 1 1
14.3 Anchor bolts SS - N3
Welder 1 1
Helper (DL) 1 0.17
Forman 1 0.25
14.4 M - Bolts SS - N4 Welder 1 1
Helper (DL) 1 1
15 METALWORK - O
Forman 1 0.25
15.1 Metal profile window MW - O1 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
15.2 Metal profile Door MW - O2 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
Heavy duty steel
15.3 MW - O3 Carpenter 1 1
Door
Helper (DL) 2 1
Forman 1 0.25
15.4 Fance grill MW - O4 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
15.5 Guards rails MW - O5 Carpenter 1 1
Helper (DL) 2 1
PLASTERING AND
16
PAINTING - P
Forman 1 0.25
16.1 Plastering PP - P1 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
16.2 Pointing PP - P2 Carpenter 1 1
Helper (DL) 2 1
Forman 1 0.25
16.3 Rendering PP - P3 Carpenter 1 1
Helper (DL) 2 1
FLOOR AND WALL
17
FINISH - Q
Forman 1 0.25
Mason 1 1
Precast cement and
17.1 PWF - Q1 Helper (DL) 1 1
terrazzo tile
Grinder 1 1
Grinder operator 1 1
Forman 1 1
17.2 Marble floor PWF - Q2 Tiler 1 1
Helper (DL) 1 1
Forman 1 0.25
Tiler 1 1
17.3 Marble wall cladding PWF - Q3 Helper (DL) 1 1
Grinder 1 1
Grinder operator 1 1
Forman 1 0.25
17.4 Cement screed PWF - Q4 Plasterer 2 1
Building Labor 1 1
Forman 1 0.25
17.5 Plastic tile PWF - Q5 Tiler 1 1
Helper (DL) 1 1
Forman 1 0.17
Ceramic and mosaic
17.6 PWF - Q6 Tiler 1 1
tile
Helper (DL) 1 1
18 PAINTING - R
Forman 1 0.17
18.1 Painting P - R1 Painter 1 1
Helper (DL) 1 1
19 GLLAZING - S
Glazer 1 1
19.1 Cutting and fixing P - R1
Helper (DL) 1 1
SANITERY
20
INSTALLATION - T
Forman 1 0.25
Plumber 1 1
20.1 Steel and pip laying SI - T1
Building Labor 1 1
Chiseler 1 1
Forman 1 0.25
Concrete pip laying
20.2 SI - T2 Mason 1 1
(Dia 10 - 40cm)
Laborer 2 1
Forman 1 0.25
Concrete pip laying
20.3 SI - T3 Mason 1 1
(Dia 40_50cm)
Building Labor 4 1
Forman 1 0.25
Concrete pip laying
20.4 SI - T4 Mason 1 1
Dia 50cm and above
Building Labor 5 1
Forman 1 0.25
20.5 PVC Pip laying SI - T5 Plumber 1 1
Helper (DL) 1 1
Forman 1 0.25
Plumber 1 1
20.6 Fixing fixtures SI - T6
Helper (DL) 2 1
Chiseler 1 1
Forman 1 0.25
Plumber 1 1
20.7 Fixing valves SI - T7
Helper (DL) 2 1
Chiseler 1 1
ELECTRICAL
21
INSTALLATION - U
Installing light and Electrician 1 1
21.1 EL1 - U1
socket point Helper (DL) 1 1
Mounting Electrician 1 1
21.2 EL1 - U2
distribution bourdes Helper (DL) 1 1
Electrician 1 1
21.3 Fixing fixtures EL1 - U3
Helper (DL) 1 1
Electrician 1 1
21.4 Laying cables EL1 - U4
Helper (DL) 1 1
Avara.
pay
Rent
per day

8
5

8
5
10

8
5
10

5
10

8
5

8
5
145
10
8
5
8
5

2
-1

24
20
22
20
5
24
20
22
20
5
24
20
22
20
5

24
22
5
24
22
5
24
20
5
24
20
5

24
21
5
24
21
5

24
21
5

24
22
5
22
21
5

24
22
5
24
22
5
24
22
5
24
22
5

24
22
5
24
22
5
24
22
5
24
22
5

24
22
5
24
22
5
24
22
5
24
22
5
24
22
5
24
22
20
27
5

24
22
20
27
5
24
22
20
27

5
24
22
20
27
24
22
20
24
22
5
24
22
5
24
22
5
24
22
5
24
22
5

24
22
5
24
22
5
24
22
5

24
21
5
40
13
24
21
5
24
21
5
40
15
24
21
5
24
21
5
24
21
5

24
21
5

26
5

25
24
5
18
25
24
5
25
24
5
25
24
5
25
24
5
40
35
8
20
40
35
8
20

24
5
24
5
24
5
24
5
INTRODUCTION

The basic cost elements incorporated in each unit cost are mainly grouped in Dire
costs .

Direct costs are : - Material costs


- Labour costs
- Equipment & Machinery costs

Indirec costs are : - Overhead costs


- Profit costs

Material cost : - This cost includes material , transportation , sales , & insuranc
Here all building materials are listed and it is suggested that pur
costs should be collected and listed at list once or twice in a yea
Also an expensive or aboundetly used types of building materials sh
be identified and / or short listed in order to know their market p
list four times in a year .
In the determination of this cost different factors witch affect the
quantity of materials like shrinkage , wastage , void spaces , denis
concrete qualities and WCR are also considered .

Labour cost : - Crew formation and production outputs are basic parameters in
rmination of this labour cost . The type of construction activities d
wether conditions & distances are measure factors that affects thi
Crews directly involved in the construction activities are mainly gr
Skilled & Un - skilled labourers .
- Skilled labourers are : - Office & Site engineers , Formen , Mas
Carpenters , Painters , Plumbers , Electricians , Welders , Mac
operators , Chislers , Plasterers , Decorators , etc .
- Un - skilled labourers are : - Helpers , Daily labourers , etc .

Equipment & Machinery cost : - It is also a direct cost to be considered in some


activities where machineries and equipments are involved . It is c
on the basis of knowing the rental rates of machinories , or by c
the depreciation values machineries , fuel costs , and wages of m
operators .
From simple to complex types of machineries & equipments involv
this construction firms are : - vibrating , cutting , washing , weldin
drilling machines , concrete mixers , graders , dozers , loaders , sc
dumpers , rollers , trucks , cranes , pick - ups , automobils , pum
crushers , generators , etc .

Overhead cost : - This cost includes costs of temporary office & store buildings c
at the construction sites , depreciation of office equipments & fur
water , lightning , telephone , & postage charges , costs of tools
ladders , scaffolds , buckets , facades , hoes , water hoses , barr
etc .
The total sum of the above expences are called the overhead cos
project and this is distributed among different items of the constr
activities . Most likely it is estimated to be some percentage of t
rial and labour costs in which it depends up on the type of proj
or grade of contractors . For more informetion refer table No. 1

Profit cost : - Similarly the profit cost of a construction project is calculated b


some percentage of the " Direct costs " which depends up on the
of projects . It is most likely smaller in percent for large scale p
or ( high grade of contractors ) and bigger for small scale project
grade of contractors ) . Refer Tabel No. 1 . 1
YOUTUB CHANNEL
t cost are mainly grouped in Direct & Indirect A
MANAYE AMHARIC TUTORIA
TELEG
CHANNEL C
ENGINEER FOR ALL P
0983598974/0912960

ransportation , sales , & insurance charges .


sted and it is suggested that purchasing
ed at list once or twice in a year .
used types of building materials should
in order to know their market price , at

different factors witch affect the quality &


ge , wastage , void spaces , denisities ,
also considered .

outputs are basic parameters in the dete -


he type of construction activities done ,
e measure factors that affects this cost .
nstruction activities are mainly grouped in

& Site engineers , Formen , Masons ,


rs , Electricians , Welders , Machine
s , Decorators , etc .
elpers , Daily labourers , etc .

ect cost to be considered in some construction


equipments are involved . It is calculated
al rates of machinories , or by considering
es , fuel costs , and wages of machine
machineries & equipments involved under
ating , cutting , washing , welding , and
s , graders , dozers , loaders , scrapers ,
es , pick - ups , automobils , pumps ,

mporary office & store buildings constructed


ciation of office equipments & furnitures ,
& postage charges , costs of tools like
cades , hoes , water hoses , barrels ,

ences are called the overhead cost of the


mong different items of the construction
mated to be some percentage of the mate
depends up on the type of project and /
ore informetion refer table No. 1.1

construction project is calculated by taking


costs " which depends up on the type
maller in percent for large scale projects
and bigger for small scale projects or ( low
bel No. 1 . 1
ANNEL
ABEBE
HARIC TUTORIALS
TELEGRAM
L CIVIL
R FOR ALL PHONE
8974/0912960925

Table No. 1.1 Percentage of Overhead & Profit costs

GRADE OF
CONTRACTORS
Grade 1
Grade 2
Grade 3
Grade 4
Grade 5 - 10
Percentage of Overhead & Profit costs

OVERHEAD COST ( % ) OF PROFIT COST (%) OF


( Mat . + Lab . costs ) ( Mat. + Lab. + Equ. costs )
35% 8%
30% 8%
25% 10%
20% 10%
15% 15%
Tackoff sheet G+5 RC WATER TANKER

Project:- G+4 RC Tower Page:- 01


Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
A.SUB STRUCTURE
1.EXCAVATION & EARTH WORK
1.01. Clear & Remove top soil
Site clearing with depth 20cm
1 9.4 L=7.65M, W=6.65M, D=0.2M
8.4
78.96 m2…………………………………………..Total site clearance
1.02 Bulk excavation
1 9.4 Bulck excavation with depth 50cm
8.4 with working space 1 m
0.5
39.48 m3……………………………………..Total bulck excavation
1.03 pit excavation
4 2.4 Pitch excavation with a depth of 2.95m
2.4 from OGL
2.25
51.84 m3………………………………………….Total pit excavation
1.04 Trench excavation
2 3.6 On axis 1 & 2
1 with working space 0.25m
0.2 depth of 0.9m from OGL
1.44
2 2.6 On axis A & B
1 with working space 0.25m
0.2 depth of 0.9m from OGL
1.04
2.48 m3………...…………………………...Total trench excavation
93.8 M3…………………….Total excavation except site clearance
2 Concrete work
2.01 Lean concrete(C-5 and depth 50mm)
A) Base of Footing pad
4 1.4 F1
1.4
7.84 m2

Project:- G+4 RC Tower Page:- 02


Project No:- 1 Bill No:- 01
Tackoff sheet G+5 RC WATER TANKER

Dimention
Timizing Squaring Discription
(LXWXD)
B) Base of masonry
2 5.55 On axis 1 & 2
0.5
5.55
2 4.55 On axis A & B
0.5
4.55
10.1
C) Base of Grade Beam
2 5.55 On axis 1 & 2
0.3
3.33
2 4.55 On axis A & B
0.3
2.73
6.06
24 m2………………………………………….Total lean concrete
2.02 C-25 Concrete
A) Footing pad
4 1.4 F1
1.4
0.3
2.35 m3
B) Footing column
4 0.45 C1
0.45
2.5
2.03
C) Grade Beam
2 6.45 On axis 1 & 2
0.3 consider 0.1m depth from GB(from OGL)
0.1
0.39

Project:- G+4 RC Tower Page:- 03


Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
2 4.85 On axis A & B
Tackoff sheet G+5 RC WATER TANKER

0.3 consider 0.1m depth from GB(from OGL)


0.1
0.29
0.68
5.06 m3…………………………..Total sub structure C-25 Concrete
3 Masonry work
2 5.55 On axis 1 & 2
0.5 With 1:4 Mortar ratio
0.9
5
2 4.55 On axis A & B
0.5 With 1:4 Mortar ratio
0.9
4.1
9.1 m3………………………………………………...Total masonry

78.96 Site clearance(Depth 0.2m)


93.8 Total excavation except site clearance(T.E)
24 Lean concrete(DDT) (Depth 0.05m)
5.06 (C-25) Concrete(DDT)
9.1 Masonry(DDT)

4 Back fill
Back fill = T.E - DDT
78.44 Total back fill excluding of site clearance
5 Cart away
Cartaway = T.E - Back fill
and site clearance (cosider 0.2 depth of site ckearance)
31.152 Total Cartaway

Project:- G+4 RC Tower Page:- 04


Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
6 Formwork
A) Footing pad
4 1.45 F1
0.3 F1 have 4 pices and one footing have four faces
6.96 then 4*4*1.4*0.3…… footing depth 0.3m
Tackoff sheet G+5 RC WATER TANKER

B) Footing column
4 2.5 C1
0.5 C1 have 4 pices and one Column have four faces
20 and foundation column height 2.55m
C) Grade Beam side formworks
2 6.5 On axis 1 & 2
0.1
1.3 In this case outer and inner face of beam is equal but, Isn't
2 5.45 On axis A & B
0.1
1.09
2.39

29.35 m2…………………………..Sub structure total formwork

78.96 Total site clearance


39.48 Total bulck excavation
51.84 Total pit excavation
2.48 Total trench excavation
24 Total lean concrete
5.06 Total sub structure C-25 Concrete
9.1 Total masonry (With 1:4 Mortar ratio)
29.35 Sub structure total formwork
78.44 Total back fill excluding of site clearance
31.152 Total Cartaway

Project:- G+4 RC Tower Page:- 05


Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
B.SUPPER STRUCTURE
1. CONCRETE WORK
1.01. Column(C-25) 1:2:3
4 0.45 C1
0.45
15
12.15
Tackoff sheet G+5 RC WATER TANKER

1.02. Beam(C-25) 1:2:3


A) Graed beam
2 6.45 On axis 1 & 2
0.3
0.35 consider 0.1m depth from GB(from OGL)(above substructed)
1.35
2 5.45 On axis A & B
0.3
0.35 consider 0.1m depth from GB(from OGL)(above substructed)
1.14
2.49
B) First floor to fivth floor
10 5.55 On axis 1 & 2
0.3
0.45
7.49
10 4.55 On axis A & B
0.3
0.45
6.14
13.63

1.03. Slab(C-25) 1:2:3


1 7.65
6.65
0.19
9.67
37.94 Supper structure total C-25 concrete

Project:- G+4 RC Tower Page:- 06


Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
2. plastering 1:3
2.01. Beam
A) Graed beam
2 6.45 On axis 1 & 2
0.35 consider 0.1m depth from GB(from OGL)(above substructed)
13.55
2 5.45 On axis A & B
0.35 consider 0.1m depth from GB(from OGL)(above substructed)
11.45
B) 1ST_5TH Floor beam include top tie beam
12 6.45 On axis 1 & 2
Tackoff sheet G+5 RC WATER TANKER

0.45 consider 0.1m depth from GB(from OGL)(above substructed)


139.32
12 5.45 On axis A & B
0.45 consider 0.1m depth from GB(from OGL)(above substructed)
117.72
282.04
2.02. Column
4 15 C1
0.45
108
2.03. Slab
1 7.65 L=7.65 & W=6.65 with both face
6.65
101.75
491.79 Supper structure total plastering
3 Formwork
2.01. Beam
A) Graed beam
2 6.45 On axis 1 & 2
0.35 consider 0.1m depth from GB(from OGL)(above substructre)
9.03
2 5.45 On axis A & B
0.35 consider 0.1m depth from GB(from OGL)(above substructed)
7.63
16.66
B) 1ST_5TH Floor beam include top tie beam
10 6.45 On axis 1 & 2
0.45 consider 0.1m depth from GB(from OGL)(above substructed)
87.08 Must cosider bottom and side formwork.. Separetly
10 5.45 On axis A & B
0.45 consider 0.1m depth from GB(from OGL)(above substructed)
73.58
160.66
2.02. Column
4 15 C1
0.5 Must cosider largest and shortest side formwork.. Separetly
120
2.03. Slab
A) soffit form work
1 7.7 L=7.65 & W=6.65 with both face
6.7
103.18 soffit form work
400.5 Supper structure total Formwork
Tackoff sheet G+5 RC WATER TANKER

37.94 Supper structure total C-25 concrete


491.79 Supper structure total plastering
400.5 Supper structure total Formwork

Project:- G+4 RC Tower Page:- 02


Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
Tackoff sheet G+5 RC WATER TANKER

Project:- G+4 RC Tower Page:- 02


Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
Tackoff sheet G+5 RC WATER TANKER

Project:-
G+5 RC water tanker Page:- 02
Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
Tackoff sheet G+5 RC WATER TANKER

Project:-
G+5 RC water tanker Page:- 02
Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
Tackoff sheet G+5 RC WATER TANKER

Project:-
G+5 RC water tanker Page:- 02
Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)

Project:-
G+5 RC water tanker Page:- 02
Tackoff sheet G+5 RC WATER TANKER

Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWXD)
Tackoff sheet G+5 RC WATER TANKER

Project No:-

arance
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER

ucted)

ucted)

ucted)

ucted)
Tackoff sheet G+5 RC WATER TANKER

ucted)

ucted)

uctre)

ucted)

ucted)

ucted)

eparetly
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER
Tackoff sheet G+5 RC WATER TANKER

Project:-
G+5 RC water tanker Page:- 02
Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWLD)
Tackoff sheet G+5 RC WATER TANKER

Project:-
G+5 RC water tanker Page:- 02
Project No:- 1 Bill No:- 01

Dimention
Timizing Squaring Discription
(LXWLD)
Bar schedul for G+4 RC Tower
No. bar
Dia Lengt per
DR.No Location Type Shape
(mm) h(m) membe
r
A) SUB
STRUCTURE
ST - 03 1.1 Footing pad F1 10 1.7 27
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)
16 4.5 6
1.2 Foundation C1
ST - 03 12 4.5 2
column
Stirrup 8 1.7 14
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)
On axis 1&2
Top 14 8 6
Bttom 16 6.2 6
Stirrup 10 1.4 39
ST-02 1.3 Grade beam
On axis A&B
Top 14 7.2 6
Bttom 14 7.2 4
Stirrup 10 1.4 43
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)

B) SUPPER
STRUCTURE
16 3.8 6
GF
12 3.8 2
Stirrup 8 1.58 14
16 3.8 6
1ST
12 3.8 2
Stirrup 8 1.58 14
16 3.8 6
1.1 Elevation 2ND
ST - 03 12 3.8 2
column
Stirrup 8 1.58 14
16 3.8 6
3RD
12 3.8 2
Stirrup 8 1.58 14
16 4 6
4TH
12 4 2
Stirrup 8 1.58 14
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)
On axis 1&2
Top 16 6.2 4
Bttom 16 6.2 6
Stirrup 10 1.4 39
ST-03 1.2 1ST Floor beam
On axis A&B
Top 14 7.2 6
Bttom 14 7.2 4
Stirrup 10 1.4 43
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)
On axis 1&2
Top 14 6.2 4
Bttom 14 6.2 4
Stirrup 8 1.4 31
ST - 03 1.3 2nd floor
On axis A&B
Top 14 7.2 4
Bttom 14 7.2 3
Stirrup 8 1.4 38
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)
On axis 1&2
Top 14 6.2 3
Bttom 14 6.2 3
Stirrup 8 1.4 31
ST - 03 1.4 3rd & 4th floor
On axis A&B
Top 14 7.2 3
Bttom 14 7.2 3
Stirrup 8 1.4 38
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)
On axis 1&2
Top 14 6.2 3
Bttom 16 6.2 5
Stirrup 10 1.4 76
ST-03 1.5 Toptie beam
On axis A&B
ST-03 1.5 Toptie beam

Top 16 7.2 4
Bttom 16 7.2 8
Stirrup 10 1.4 110
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)
X-axis strip 1&3
Top 10 2.98 72
Bttom 10 7.62 36
X-axis strip 2
Top 12 2.98 32
Bttom 12 7.62 16
ST-03 1.6 Slab
Y-axis strip A&C
Top 10 3 20
Bttom 12 6.62 29
Y-axis strip B
Top 12 3 20
Bttom 12 6.62 20
Total Length(M)
Weight per meter(kg/m)
Total weight(kg)

Sum
hedul for G+4 RC Tower

No. of Totel Total length


membe No. of
r bar Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24 Ø28 Ø32

4 108 183.6
Total Length(M) 0 0 183.6 0 0 0 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 0 113.2 0 0 0 0 0 0 0
4 24 108
4 8 36
4 56 95.2
Total Length(M) 0 95.2 0 36 0 108 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 37.6 0 31.968 0 170 0 0 0 0

2 12 96
2 12 74.4
2 78 109.2

2 12 86.4
2 8 57.6
2 86 120.4
Total Length(M) 0 0 229.6 0 240 74.4 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 0 141.6 0 290.08 117 0 0 0 0
0 38 255 31.97 290.1 288 0 0 0 0

4 24 91.2
4 8 30.4
4 56 88.5
4 24 91.2
4 8 30.4
4 56 88.5
4 24 91.2
4 8 30.4
4 56 88.5
4 24 91.2
4 8 30.4
4 56 88.5
4 24 96
4 8 32
4 56 88.5
Total Length(M) 0 442 0 153.6 0 460.8 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 175 0 136.4 0 727 0 0 0 0

2 8 49.6
2 12 74.4
2 78 109.2

2 12 86.4
2 8 57.6
2 86 120.4
Total Length(M) 0 0 229.6 0 144 124 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 0 141.6 0 174 196 0 0 0 0

2 8 49.6
2 8 49.6
2 62 86.8

2 8 57.6
2 6 43.2
2 76 106
Total Length(M) 0 193 0 0 200 0 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 76.2 0 0 241.73 0 0 0 0 0

4 12 74.4
4 12 74.4
4 124 174

4 12 86.4
4 12 86.4
4 152 213
Total Length(M) 0 386 0 0 321.6 0 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 152 0 0 388.71 0 0 0 0 0

2 6 37.2
2 10 62
2 152 212.8
2 8 57.6
2 16 115.2
2 220 308
Total Length(M) 0 0 520.8 0 37.2 234.8 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 0 321.2 0 44.962 371 0 0 0 0

1 72 214.6
1 36 274.3

1 32 95.36
1 16 121.92

4 80 216
2 58 383.96

2 40 108
1 20 132.4
Total Length(M) 0 0 704.9 841.64 0 0 0 0 0 0
Weight per meter(kg/m) 0.222 0.39 0.617 0.888 1.2087 1.579 2.47 3.552 4.835 6.315
Total weight(kg) 0 0 434.7 747.38 0 0 0 0 0 0

Sum 0 441 1152 915.74 1140 1582 0 0 0 0


Item
DESCRIPTION UNIT Quantity RATE AMOUNT
No.
G+4 RC Water tanker
A-SUB STRUCTURE
1 Clearing
EXCAVATION & site
of the EARTH WORK
20 cm thick top
1.1 organic soil m2 78.96
1.2 Bulk
To theexcavation
depth of notinexceeding
ordinary1m
soilordinary
soil m3 39.48
1.3 Trench
To excavation
the depth of not exceeding 1m ordinary
soil m3 2.48
1.4 pit excavation
To the depth of Above 1.5m ordinary soil m3 51.84
2.0 - CONCRETE WORK
2.1 Lean concrete m2 24
2.2 R.C, C-25, 365kg of cement per m3 m 3
5.06
3.0 - Back fill m 3
78.44
4.0 - Cart-away m3 31.15
5.0 - Formwork
6.1 Total sub structure formwork m2 29.35
6.0 - Reinforcement
6.1 Footing pad
Reinforcement Bar Ethiopia: 10mm kg 113.22
Black anneald wire(1%/kg)(1kg = 100kg) kg 1.13
6.2 Foundation column
Reinforcement Bar - Ethiopia: 8mm kg 37.57
Reinforcement Bar Ethiopia: 12mm kg 31.97
Reinforcement Bar -Ethiopia: 16mm kg 170.50
Black anield wair(1%/kg)(1kg = 100kg) kg 2.40
6.3 Grade beam
Reinforcement Bar Ethiopia: 10mm kg 141.59
Reinforcement Bar -Ethiopia: 14mm kg 290.08
Reinforcement Bar -Ethiopia: 16mm kg 117.45
Black anield wair(1%/kg)(1kg = 100kg) kg 5.49
7.0 - Formwork
7.1 Footing pad m2 6.96
7.2 Foundation column m 2
20.00
7.3 Grade beam m 2
2.39

B- SUPER STRUCTURE
1.0 - CONCRETE WORK
1.1 R.C, C-25, 365kg of cement per m3
1.1.1 In elevation column m3 12.15
1.1.2 Gread beam m 3
2.49
1.1.3 1ST _ 4TH Floor include top-tie beam m3 13.63
1.1.4 Slab m 3
9.67
1.2 Plastering ratio(1:3)
1.2.1 In elevation column m3 108.00
1.2.2 Gread beam m 3
25.00
1.2.3 1ST _ 5TH Floor include top-tie beam m 3
257.04
1.2.4 Slab m3 101.75
2.0 - Reinforcement
2.1 Elevation column
Reinforcement Bar - Ethiopia: 8mm kg 174.60
Reinforcement Bar -Ethiopia: 12mm kg 136.40
Reinforcement Bar -Ethiopia: 16mm kg 727.45
Black anield wair(1%/kg)(1kg = 100kg) kg 10.38
2.2 1ST Floor beam
Reinforcement Bar Ethiopia: 10mm kg 141.59
Reinforcement Bar Ethiopia: 14mm kg 174.05
Reinforcement Bar -Ethiopia: 16mm kg 195.75
Black anield wair(1%/kg)(1kg = 100kg) kg 5.11
2.3 2nd Floor beam
Reinforcement Bar Ethiopia: 8mm kg 76.25
Reinforcement Bar Ethiopia: 14mm kg 241.73
Black anield wair(1%/kg)(1kg = 100kg) kg 3.18
2.4 3RD_4TH Floor beam
Reinforcement Bar Ethiopia: 8mm kg 152.50
Reinforcement Bar Ethiopia: 14mm kg 388.71
Black anield wair(1%/kg)(1kg = 100kg) kg 5.41
2.5 Top tie beam
Reinforcement Bar Ethiopia: 10mm kg 321.16
Reinforcement Bar Ethiopia: 14mm kg 44.96
Reinforcement Bar -Ethiopia: 16mm kg 370.67
Black anield wair(1%/kg)(1kg = 100kg) kg 7.37
2.4 Slab
Reinforcement Bar Ethiopia: 10mm kg 434.68
Reinforcement Bar Ethiopia: 12mm kg 747.38
Black anield wair(1%/kg)(1kg = 100kg) kg 11.82
3.0 - Formwork
3.1 Elevation column m2 120.00
3.2 Gread beam m 2
16.66
3.3 1ST _ 4TH Floor include top-tie beam m 2
160.66
3.4 Soffit formwork m 2
103.18