Airport and Bridge
Airport and Bridge
Wha ta r
et hedi ffer
e nteleme ntsthata ffect
sont heAi rpor tLi g
ht ing ?Ex pla i
ni n M 5. 6ECONOMI CSPANOFABRI DGEThee conomi cs panofabr i
dg eis
Brief
.Fol lowi nga ret heni nee leme ntsoft hea irportl ighting :
(1)Ai rport theonewhi chr e duc estheov eral
lc ostoft hebr idg et obeami nimum. •The
beacon(3)Apr on a nd ha nga rl ighting(5) Li ghting of l andi ng di recti
on ove r
allc ostofabr idgede pendsupont hef ollowi ngf act
or s:(
ii)Av a
ilabili
tyof
indic
ator(7)Runwa yl ighting (
9)Thr esholdl ighting .(
2)Appr oa chl i
ghting(4) skil
ledl abour .(iv)Na t
ureofs treamt obebr idg ed.(ii
i)Spa nl eng t
h. (
v)Cl i
ma te
Bounda rylight i
ng (
6)Lig hti
ngofwi nddi recti
oni ndi cator(8)Ta x iwa yl i
ghting( 1) andot he rc ondi ti
ons .(
1)c ostofma teri
ala ndi tsna tur e.•Iti snoti nt heha ndsof
Airportbe acon:Abe aconi sas t
rongbe am ofl ightwhi chi sus edt oi ndicate eng i
ne e
rst obr ingdownt hec ostofl i
vingi nde xort hepr i
c eofma ter
ia l
s,like
anyg eog raphi c
a llocation.I ti ss i
tua t
eds li
g htlya bov et hehor i
zontala nd ceme nt,s teel,t imbe re tc
.butt heyc anhe lpi nbr ingingdownt hec ostof
rotat
edt opr oduc et hef lashingl ightt oa nobs e rver.•Ther ot atinga irport bridgesbye volvinge conomi cde s
igns.•Thus ,c ons i
de ri
ngt heonl yv ariable
beacong ivesoutwhi tea ndg reenflashe sinthehor iz ontaldir ections180°a part. it
e ms,t hec ostofs upe rstr
uc t
urei nc r
e as
e sa nd t hatoft hes ub-structure
Thef lashesa rev isi
blet ot hepi lotf rom a nydi rectionofa ppr oa c
ha ndi t dec r
ea s
eswi tha ni ncreasei nt hes panl e
ng t
hs .• Themos te c
onomi cs pan
indic
atest hea pproxima t
es it
ua t
ion ofa na irporte quippe df ort heni ght lengthist ha twhi chs at
isfi
e sthefoll
owi ngi .
e.,Thec ostofs upe rs tructure=The
operati
ons .
•I trotatesa tsi
xr evolutionspe rmi nutea ndi susua llymount edov er costofs ub- structure #Thede ri
vati
onf ort hee c onomi cs panc a nbee st
a blis
hed
thetopoft het erminalbui l
dingorha ngar.Iftheobs tructioni sy e tnotc leared, ont heba s
isoff ollowinga ssumptions- (1)Thebr .ha se qua ls panl eng ths.(
ii
)
as eparatet owe rma y be pr ov i
de df ort he ins ta l
lati
on oft he r otati
ng Thec ostofs uppor tingsy s
te m ofsupe r
structur ev ariesa sthes qua reoft hes pan
beacon.•The t erm c ode be acon isus edt oi ndi catet he l ig htpr ov i
de d length.(
iii)Cos toff loori
nga ndpa rape t
sv arie sdi rectlya st hes pa n.(
iv)Cos tof
suff
ici
entlyhi ght oc learalltheobs tr
uc ti
ons.Itc ons ist
soft wo500wa t
tsbul bs onepi era ndi tsf ounda tioni sconstant.(v)Cos toft hea but me nt
withgreenc ol ourscr e
en.I tcontinuous lyfla
she saMor sec odes ig na ldesignat
Ex
pla
in Wi
dth ofc
arr
iag
e-wa
yin de
tai
l:The wi
dth of CHOI CEOFBRI DETYPETheg ene ral,t hebr idges houl dbea esthetically
carr
iagewa
yr equire
d wi l
lde pend on theintensi
tya nd vol
umeoft raf
fi
c pleasi
ngi na ppe arance,s tronge noug ht oc ar rythet raffica ndot he rinc i
de ntal
anti
cipa
tedt o uset he br i
dge.Iti sa lwayse x
presse
di nte
rmsoft raf
fi
c l
oa ds,e conomi cal,e tc.Someoft hea spec tswhi chi nflue nc et hec hoicet obe
la
nes.•Themi nimumwi dthofcarr
iagewayis4.25mf oraonelanebridg
ea nd ma debe twee ndi ff
e re
ntt ype sofbr i
dg esa rea sf ollows :(1)Appr oa che s:The
7.5m forat wol anebr i
dge.Forev er
ya ddi
ti
onallane,ami ni
mum of3. 5m forma t
ion l evela nd l eng th ofa ppr oa che sa tbr idg es it
e wi lla lso ha ve
mustbea l
lowe d.•Forc onsi
derat
ion ofs af
etya nd eff
ect
iveuti
liz
ati
on of cons i
der ablei nfluence on t he c hoice ofa pa rti
c ula rt ype ofbr idg e.
(2)
carr
iagewa
y,iti sdesi
rableofprovi
def oot
pathofa t
leas
t1.5mwi dt
hone it
her Ava il
abi l
ityoffunds :Ifthef unda va il
abl ei snots uffic
ie ntt oputupahi ghl evel
si
deofthecarriagewayfora l
lbri
dges. bridge,t hes ma lls ubme rsi
blebr idgeorc ausewa yma yber e comme nded
instead oft ot
a ll
ya bandoni ngt hepr oje ctf orl ackofmone y.
(3)Cl ima tic
conditions :Ift hee nvironme ntalc ondi tionsa reuns uita bleorunf av our able
c
ulv
ert:i
sde
fi
neda
sas
mal
lbr
idg
econs
truc
tedov
eras
tre
am whi
ch certai
nt ypesoft hebr idg esc annotbec ons tructed.Fori ns tance ,ifthec l
ima tic
rema i
nsdryf ormos tpa rtofthey ear.Ac ulver
ti sthusac ros sdrainagewor k conditionsa tbr idges itea relikel
yt oa cc eleratethepr oc essofc orrosion,t he
havingat ot a
ll engthnote xce eding6m be twee nthef ace sofa butme ntsor ste
e ltr
us sescannotbea dopt ed.(
4)Ec onomyi nc ons tr
uc tion:I fther i
veri swi de,
extremev entwa ybounda r i
eswhe nme asureda trighta ng lest ot hea xisof thee conomyi nc ons t
ruc ti
onc anbea chi evedbyput t
ingupar oa d-cum-r ail
ventwa y
.•Thec ul
vertsa repr ovideda sthec rossdr ai
nag es tr
ucturesint he bridgei nt wotiersins t
e adoft wos epa r
a tebr idg es
,na me ly,hi ghwa ybr i
dg ea nd
fol
lowingt woc a se
s:( i
)f ordr ainings ma l
lpa cket
sorc atc hme ntswi th no rai
lwa ybr i
dg e
.I twi llre sultint hee conomyi nc ons t
ruc tion.(5)Founda tions:
defi
nitestr
ea mc hannelsa nda lsowhe rethehe ightoftheba nki ssma ll(
ii
)for Thes oi lconditionsa tbr idg esit
ema ybr ingdownt hepos siblea lt
e rnativesa nd
sma l
ls t
reamswi thr i
g i
dbounda rie
sors emi-
ri
g i
dbounda ries.•Ac cordi
ngt o unde rs uchc i
rcums tanc es,t hec hoi ceofapa r
tic
ul art y peofbr idgei st obe
functi
onorpur pose,t hec ulvertsma ybec l
assif
ieda shi g hwa yc ulvert
sor ma def roms uc hlimi te
da lternat
ivesonl y .
rail
wa ycul
v erts
.Thede s
igna spectsforthesetwoc lass
eswi llbedi f
ferent.
•The
i
ndi vi
dualc ostofe achc ulvertma ybes ma l
l.Buti na l
limpor t
anthi ghwayor 6.13MAXI MUM FLOOD DI SCHARGEWhe reverpos s
ible,thema xi
mum
rail
wa yprojects,thet otalcostofa llcrossdrai
na ges t
ructure si nthef orm of fl
ooddischarg
ea tbridgesitei sfoundoutf rom atl e
a s
ttwodi ff
erentme thods
culvert
swillbes ubs t
antial
.•Int hisc hapte
r,thetopicofc ul
v er tsandc auseways andt hehigheroft het wodi ff
erentme thodsdi ff
erbymor ethan50% t he
wi
llbebr
ief
lyde
scr
i d.Ty
be pes
:ar
chboxpi
pes
labs
cuppe
rs(
1) ma xi
mum de si
gndi scharg
ei slimitedto1. 5t i
me sthel owe re st
imate.•Itis
Ar
chc
ulv
ert
s:Anar
chc
ulv
ertofs
tonema
sonr
yma
ybea
dopt
edf
ors
pan consi
deredreas
onablet ode s
ignbr i
dgesforfloodsoccurringonc ein100y e
a r
s
r
ang
esof2m t
o6m.
•Fi
g.6.
3.1s
howsa
nar
chc
ulv
ert
.Thea
rchc
ulv
erti
s andtode s
ignculve
rtsforfloodsoc curri
ngonc ei
n20y ears.Thede signa spect
s
providedwiththea butments,wingwa l
lsa ndparapet.(2)Boxc ulverts:In shouldhoweverensurethatt hel ik
elydama gesduet or ar
e rfloodsa r
ebr ought
downt ot heminimum pos siblee xt
ent.
•Fol lowinga ret het wome thodsof
caseofboxc ulver
ts,therect
a ngul
arboxe sareformedofma sonry,R.C.C.or
calc
ulat
ingthema xi
mum f looddi s
charge:(1)Di r
e c
tme thodofc al
culati
ngt he
ste
el.TheR. C.C.boxc ulv
e rt
sa r
ev eryc ommona ndtheyc onsis
toft he
ma xi
mum f l
ooddischa r
ge.( 2)I ndir
ectme thodofc al
cula t
ingt hema xi
mum
fol
lowingtwoc ompone nts
:•(
i)Theba rrelorboxs ect
ionofsuffi
cie
ntlengthto
accommoda tetheroadwa yandt hekerbs.
(ii
)Thewi ngwa ll
ssplayedat45°for f
looddi
scha
rge
.Di
rec
tMe
thodofCa
lcul
ati
ngt
heMa
ximum Fl
ood
ret
a i
ningtheemba nkme nt
sa nda l
soforguidingthefl
owofwa teri
ntoa ndout Di
scha
rge•I
ndi
rec
tme
thod,t
hea
reaofc
ros
s-s
ect
ionupt
othehi
ghe
stf
lood
oftheba r
rel
. l
e velorH. F.
L.a ndt hev el
ocityofflowa r
edi ed.Themul tipli
cati
onofa r
e aand
velocityg iv
e st he ma xi
mum f l
ood di s
cha rge.(
1)Me asurement ofa r
ea
:Followingpr ocedurei sadopte dtome asuret hea r
eaofc ross
-sec
tionupt othe
PRELI MI NARY DATA TO BECOLLECTEDThec a r
efulinvesti
ga t
iona t
H. F.L.atbridges i
te:Thei nf
or ma t
ionr egardingt hehe ightoft hehi ghestfl
ood
thepr eliminarys tagea voidsma nye xperi
enc ea tal aters ta
ge.He nce ,the
l
e veli scaref
ull
yg athereda ndi ti sc onfi
rme d,whe r
e verpos si
ble,byf l
ood
i
nv est
igationpr ocessshouldbec arr
iedoutdi agrama ndwi t
he xtre
mec a reto
ma rks.Ifthereisr ailwayt r
ac kne art hebr idg es i
te,thes i
gnsoft hehi ghest
avoidt heoc currenceofs eriousmi st
ak esint hepr oj
e ct.Followingda tas hould
fl
ooddi sc
hargewoul dua l
lybea vailableint hef orm ofma r
kingsonr ail
way
bec ol
le c
teda nds ui
tablya na l
ysedbyt hec ha rg
eoft hei nv es
tigat
ionofabr idg e
cross-drai
nagewor ks.Howe ver,incaseofne wr oadforma t
ioninr ail
wa yc r
oss
-
sit
e:(
1) a vai
labil
ity of e lect
r i
c powe r,
(2) a va i
labilit
y of ma teria
ls of
dra i
na gewor k
s.Howe ve
r,inc as
eofne wr oa df ormationi nunde vel
ope dor
constructi
on;(3)a vai
labil
ityofs kil
leda nduns ki
lle
dl abourf ordiffe
rentj obof
spa r
selyinhabite
da reas,thee ngineerdur ingi nvesti
gationha st ode cidethe
thec onstructi
on:(4)cha racteri
stic
sa ndhy draulicda taofs tream orr i
v er
;(5)
heightoft hehi ghestflooddi schargebyc ont acti
ngt hee l
de r
lyinha bit
a nt
sof
detail
sofpubl i
cut i
li
tyser vi
c e
ss ucha stele
phonec a
ble s,wa te
rlines,etc.tobe
thea reaandbyobs ervingther i
v e
rba nk s
,de pos it
sofde brisont re
et runksetc
accommoda t
edi nthebr idgec ross-secti
on:(
6)de tail
soft hee xi
sti
ngbr idgeson
thes amer iver;
(7)fac i
li
tiesr equire
df orhous ingl abourdur i
ngt hebr idg e
constructi
on.( 8)locati
onoft hene arestG.T. S.be nchma rkwi t
hi tsreduc ed 6.14 MOVABLE- SPAN SUPER- STRUCTURE I nc ase ofbr idgeswi th
l
e vel
.(
9)me ansoft ranspor ttoc a
rryt hema ter
ials(
10)na meoft her i
v era nd mov able-s
pa nsupe r-s
tructures,itiss oa rra
ngedt ha tthes upe r-structureoft he
l
oc ati
onoft hebr idgesit
e(12)na v i
gati
ona lrequireme nts bridgedoe snotr ema ininaf ixedpos i
tionpe rma nently.Buti tispos s
ibleto
mov et hesuper-str
uc t
ur esoa st oputt hebr i
dgeoutofus e,whe nne ce s
sary.
•It
some ti
me ssoha ppenst hatthes hi
psma yhavet opa s
sthr oug ht hehi ghl eve
l
Se
lec
tionofbr
idg
esi
te(
2)Fr
eeboa
rd:I
fther
ive
risus
edf
orna
vig
ati
on
bridgesr equir
ingt hepr ov i
sion ofv eryhi ghc learanc e.
•Suc h br idgeswi l
l
pur pose ,thes ites houldbes uc ht ha tsuffici
entf r
e eboardi sa vail
ableunde r requirev ery hi gha pproache sorhi ghlyg rade da ppr oa che se veni ft he
bridgef ort hepa ss
ag eofboa ts ,shipsors teame rs(3)Fi r
me mba nkme ntsor ma ximum c learancei stobepr ovi
de di nthemi ddl epor tiononl y .Whe rethe
ri
v erba nks:Thee mba nk me ntsont heups treams i
dea nddowns treams ideof traff
icont hebr i
dg eissucht ha tsuspensionoftra f
ficf oras hor tdur ationont he
bridges ites houl dbef irm,hi g h,pe rma ne nt,soli
d,s tr
a i
ghta ndwe ll
-define d. roadorr a i
lwaywi l
lnotma t
e r
ial
lya f
fecttheov eralltraffic,t hehi ghl eve
l
Suc he mba nk me ntsa r
enotdi sturbe da tthet imeofhe a v
yf l
oods ,andt he ydo bridgesa r
ebui ltwithde ckswi thmi nimum c l
ear anc ea bov eH. F.L.f ornor mal
nota llowt hec our s
eofr i
ve rtoa l
ter.(
4)Founda ti
ons :Thena tureofs oilatt he passageofwa t
e ra ndt hemi ddleoneort wos pa nsort hee ntires pa nwi llbe
bedofr i
v era tbr idgesiteshoul dbes uc htha tgoodf ounda ti
onsa r eavail
abl ea t provide d withg i
rderswhi chc an be mov e
df orc le
a ring t he na vigat
ion
reasona bl ede pt hsfort hes ubstruc t
ur esofbr idge.Thes i
tesubje cttomi nimum vessels
.•Itshoul dber eme mbe redtha tthemov a blebr idge sr epre sentspe c
iall
y
scours houl dpr eferabl
ybec hos en.(5)La rg etri
buta ri
es:The res houldnotbe designeds tr
ucturesa ndi tisthe ref
or ene ce
ssar
yt opa yspe ciala ttentiont othe
conf l
ue nc eofl a r
g etributariesi nt hev icinityofbr idges i
te.(
6)Ma t
erial
sa nd ma chineryi nvolveda ndt hehous i
ng ,ope r
ation a ndma intena nc eofs uch
labour :Thes iteoft hepr opos edbr idges houl dbes ol ocatedtha tthema terials ma chinery.
andl abourr equi re
df ort hec ons t
ruc ti
onofbr i
dgea reea s
il
ya vail
able.The
tr
a nspor tc ha rgesf orma teri
a lsa nd l aboura tt hebr i
dg es iteshoul d be
mi nimum. (7)Mi nimum obs truc ti
ont owa terwa y:The res houldbemi nimum 6.15.8 Ca ble-Stated Br i
dg es•Thec a ble-s
taye d bridgesbe ca mepopul ari n
obs tr
uc tiont ona turalwa t
erwa ys oa stoha vemi nimum a ffl
ux .(
8)Ri ght-ang le Franc edur i
ngt hee arli
e rpa rtofe ight e
ent hc entury.Howe ver
,a ft
ert he
(
squa re )c r
os si
ng :
Atbr idges ite,thedi recti
onoff lowofwa ters houldbene a rly collapseoft heDr ybur gh- Abbe yBr idge,U. K. .in1818a ndt heSa aleRiver
perpe ndi culart ot hec entre-l
ineofbr idge.Suc hac rossi
ngi sknowna sther ight Bridg e,Ge rma nyi n1824,t heFr e nc hs cientis
tNa iverr ec omme ndedt hat
-ang l
ec rossi
ngors quar ecrossingornor ma lcross
ing . suspe nsionbr i
dgebebui lta sa lte
r nativ etoc a ble
-st
a yedbr idg es.
•AfterWor l
d
Wa rI I,theEur opea nc ommuni tyr e viewe dt hede ve l
opme ntofc able-s
tayed
bridge .Thef i
rstmode rnc able-stayedbr idgewa stheSt orms undBr i
dgebui l
tin
LI NEAR WATERWAYOFA BRI DGE•Themos ti
mportantfactortobe 1955i nSwe den.•Thel ong ests uspens ionbr idg einthewor ldi sAk as
hiKa ikyo
de ci
de di nthede s
ignofbr i
dgesisthede ter
mi nationofthewa t
erwayr e
quired Bridg ei nJ apan,whi c hwa sc ons tructe di n1998.Thi sbri
dg ei sal
sok nowna s
fort hebr idgeorc ulve
rt.•Thea reaunde rabr i
dg ethr
oughwhi chthewa t
er thePe arlBr i
dg e.•Itc arriessixl ane sofr oadwa y.Itha sas pa nof1991m a nd
flowsi scalle
dt henaturalwater
wa yofabr idge.Fori mport
antandbi gbridges
, totalleng thof3911m.I tli
nk st hec i
tyofKobeont hema inlandofHons hut o
i
ts houl d be de si
gnedt oc ar
ry wa tera tt he t i
me ofma ximum f l
ood Iwa yaonAwa jiIsl
a ndbyc ros s
ingt hebus yAk a
shiSt ra i
t.•Thef i
rstthree
dischar ge.
•Thel e
ngthoft hebridgea vail
ablebe tweentheextremee dgeofa ma jorc a ble-st
a y
e dbr i
dge sc ons t
ruc tedi nt heUni tedSt ate swe rethePa so-
wa ters urfacea tthehi ghestfl
ood l evel
,me as
ur eda tri
ghta ngl
e stot he Ke nne wi ckBr idgebui l
tin1978a c rosst heCol umbiaRi verinWa s
hington,the
abut me ntfacesisknowna sli
nearwa t
erway.•Followingist
her el
ati
onbe t
we en LulingBr i
dgebui l
tin1983a c rosstheMi s
sis
sippiRi verinLoui s
iana;andt he
wa terwa y,ma ximum fl
ooddi s
charg eandpe rmissibl
ev e
loci
ty:
•A=Q/ Vwhe re Ea stHunt ingtonBr idgebui l
ti n1985a crosstheOhi oRi ve rinWe stVi r
ginia.
A=Wa t
e r
wa yinm s qQ=Ma ximum f looddi sc
ha rgeinm pe rsecond•V = Atpr esent,a bout15ma jorc abl e
-s t
a ye dbr i
dg esha vebe enc onstr
uctedint he
Pe rmissibleveloci
tyi nm pe rs econd.•Thel i
nea rwater
wa yisobt ai
neda s Uni tedSt ate
s.•Thel onge s
tc a ble-stay edbr i
dg ei stheSul ongBr idgeov erthe
foll
ows :L=A/d riverYa ngtzei nChi nal i
nk ingNa ntonga ndCha ngshu.Itwa ss t
rate
di n2003
IMPORTANC OFBEARI NG I ts houl dber e me mbe redt hatthes uc cessful
func ti
oni ngofabr idg epr ima ri
lyde pe ndsoni tsbe ari
ng s.I tisobs ervedt ha t
faul t
yde si
gnori mpr ope rwor k i
ngoft hebe a r
ingsi sthema inc auseoff ailureof
ma nybr i
dg e
st hatha vec ollapsed.•Thede s i
gnofbe ar
ingt obea doptedf ora
pa rti
c ularbridgewi llma inlyc ol
laps e
d.Thede s
ignofbe aringt obea dopt edfor
apa rticularbridgewi llma inlyde pendont het ypeofs uppor ts,lengthoft he
spa na nd the ty pe ofs upe r-
structur e.•The be a r
ingsf orm a ni mpor t
ant
compone ntofabr idg ea ndhe nc e,e x
t remec ar
ea nds ki
llshoul dbee xer
c isedin
itsde sign,e xecut
iona ndma intena nce .Forma jorbr idges,t hec ostofbe a ri
ng s
roug hl ywor ksoutt oa bout10t o15pe rcentoft het otalc ostoft hebr i
dg e.
He nce ,thereisa mpl es copeofa chie vinge conomybyde signi
ngt hebe a ri
ng s
pr ope rlyc ar
e f
ull
y .
? •6.22FREE AND FI XED BEARI NGSThet e r
msf re e
be aringa ndfixedbe aringa reus edt oi ndicatet hef unc t
ionwhi chi sex ecuted
from apa rt
icularbe a ri
ng .Af r eebe aringi sfreet os li
deormov eorr olla ndi t
thusa llowslong it
udi na lmov eme ntoft heg ir
de r.•Af ixedbe aringi sfixedi n
pos it
ion,Buti tr ota tesa ccordingt ot hede fl
ectionoft hes tr
uc turewhi chi s
be ings uppor t
ingbyi t.Thusaf ixedbe aringa l
lowsf r
eea ng ularmov eme nta nd
i
tdoe snotpe rmita nyl ong itudinalmov eme ntoft heg ir
de r.Thede s
ignoff ixe d
be aringde pendsont hel engthofs pa n,t ypeofs upportsa ndt ypeofs upe r-
str
ucture Ty
. pes.
(1)
ceme nt mor t
ar pa d(2) Ex pa ns
ion be ar
ing(
3)Knuckle
bearing(5)Roc ke
rbe ar
ing(
7)Ne oprenebe ari
ngpa ds(
9)Sol eplateonc urved
bed pl ate beari
ng(
11)Pi n beari
ng(13)La mina t
e de last
ome ri
cbe ari
ng (1)
ceme ntmor tarpad:Thi si
sthecheapestt
y peoffixedbe ari
ngwhi chisadopted
forroa dg i
rderbri
dgesofsma l
lspans.Itconsi
stsof30mm t hic
kc ementgrout
padofpr oporti
on1:1.•Thedowe lba rsi
ns uff
icientnumbe randofdi ameter
about25 mm a re provi
dedt oc onne ctthe s uper-s
tructuretot he be d
block.•Thel e
ngthoft hepa disma dee qualt ot hewi dthofg ir
dera ndits
breadtha longthespaniskeptinsuchawa ytha tt
hepr e
s s
ureont hepaddoe s
note xceed18N/ mm.Thedowe lbarsarede s
ignedt otakeupt helongit
udinal
forc
esi nshe a
r.