0% found this document useful (0 votes)
36 views13 pages

Flare BBS

The document outlines the specifications and quantities for a construction project involving concrete and steel components, including footings, columns, and slabs. It details the grades of concrete (M30) and steel (Fe500), along with the total quantities and weights of various bar shapes and sizes. Additionally, it includes excavation and backfilling calculations, as well as quantities for PCC and shuttering area requirements.

Uploaded by

Prabhash Anant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views13 pages

Flare BBS

The document outlines the specifications and quantities for a construction project involving concrete and steel components, including footings, columns, and slabs. It details the grades of concrete (M30) and steel (Fe500), along with the total quantities and weights of various bar shapes and sizes. Additionally, it includes excavation and backfilling calculations, as well as quantities for PCC and shuttering area requirements.

Uploaded by

Prabhash Anant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

PROJECT :- GRADE OF CONCRETE :- M30 CONCRETE G

CLIENT :- Thermax GRADE OF STEEL :- Fe500 BAR LENGTH


CONSULTANT :- BBS REVISION :- 1 DEVELOPMENT LENGTH (Ld) :- 50D
TOTAL QUANTITY 56.49
STRUCTURE :- FOOTING DRAWING NO:- TB 007 C 153 ,4 LAP LENGTH :-

Total Total weight(kg)


Dia of Cutting Cutting
Bar No.of Spacing No.of cutting
Sr no. shape of bar bar length length 8 10 12 16 20 25 32
description member (mm) bars length
(mm) (mm) (m) 0.395 0.6173 0.8889 1.5802 2.4691 3.858 6.321
(m)

1 210 210 Footing Bottom 2 10 200 20 2289 2.29 45.78 28.25


1909 Both Ways

2 210 210 Footing Top 2 10 200 20 2289 2.29 45.78 28.25


1909 Both Ways
Total Wt in kg - 0.00 56.49 0.00 0.00 0.00 0.00 0.00
PROJECT :- GRADE OF CONCRETE :- M30 CONCRETE G
CLIENT :- Thermax GRADE OF STEEL :- Fe500 BAR LENGTH
CONSULTANT : BBS REVISION :- 1 DEVELOPMENT LENGTH (Ld) :-50D
TOTAL QUANTITY 143.75
STRUCTURE :- COLUMN DRAWING NO:- TB 007 C 153, 4 LAP LENGTH :-

Total Total weight(kg)


Cutting Cutting
Bar No.of Dia of Spacing No.of cutting
Sr no. shape of bar length length 8 10 12 16 20 25 32
description member bar (mm) (mm) bars length
(mm) (m) 0.395 0.6173 0.8889 1.5802 2.4691 3.858 6.321
(m)
265

Vertival
1 1860 4 12 16 2342 2.34 37.47 33.31
main Bar

265
265

Vertival
2 1860 4 16 16 2326 2.33 37.22 58.80
main Bar

265
355

3 355 355 Stirrups 4 8 52 1484 1.48 77.17 30.481

355

4 355 4 8 52 515 0.515 26.78 10.578

5 355 4 8 52 515 0.515 26.78 10.578

Total Wt in kg - 51.64 0.00 33.31 58.80 0.00 0.00 0.00


PROJECT :- GRADE OF CONCRETE :- M30 CONCRETE G
CLIENT :- Thermax GRADE OF STEEL :- Fe500 BAR LENGTH
CONSULTANT :- BBS REVISION :- DEVELOPMENT LENGTH (Ld)
50D
TOTAL QUANTITY 44.97
STRUCTURE :- Slab DRAWING NO:- TB 007 C 153, 4 LAP LENGTH :-

Total Total weight(kg)


Dia of Cutting Cutting
No.of Spacing No.of cutting
Sr no. shape of bar Bar description bar length length 8 10 12 16 20 25 32
member (mm) bars length
(mm) (mm) (m)
(m) 0.395 0.6173 0.8889 1.5802 2.4691 3.858 6.321

1 300 300 Bottom Main Bar 1 12 200 6 2492 2.49 14.95 13.29
1940

2 300 1940 300 TOP Main Bar 1 12 200 6 2492 2.49 14.95 13.29

3 940 Dist Bar 2 12 200 22 940 0.94 20.68 18.38

Total Wt in kg - 0.00 0.00 44.97 0.00 0.00 0.00 0.00


Excavation
Footin Extra
Footin Depth Stone
Footing NO.of g space for
S.NO g from S
description footing breadt Excavatio
length N.G.L Depth
h n

M M M M M M
1 Footing 1 2.5 2.5 2.1 0.3
2 Slab 1 2 1 0.6 0.15 0.3
on

Excavatio Excavatio Excavatio Volum Total


n length n breadth n depth e volume

M M M CUM CUM
3.1 3.1 2.1 20.18
2.6 1.6 0.75 3.12

Total Qty :- 23.30


BACKFILLING QUAN
NO.Of Depth Stone
Footing membe F.breadt from soling P.C.C
S.NO description r F.length h F.Depth N.G.L offset offset
M M M M M M
1 Footing 1 2.5 2.5 0.3 2.1 0.1
2 Slab 1 2 1 0.5 0.75 0.1 0.1
CKFILLING QUANTITY CALCULATION
Stone Neck Stone
soling P.C.C Column Column Column column Excavatio soling P.C.C
depth depth description length breadth depth n volume volume Volume
M M M M M CUM CUM CUM
0.1 C1,C3,C4,C6 0.40 0.4 1.7 20.18 0.729
0.15 0.1 Slab 2.00 1.0 0.5 3.12 0.35 0.247

Total QTY
Neck Backfilli Disposa
Footing column ng l
volume volume volume volume
CUM CUM CUM CUM
1.875 0.27 17.30 2.88
1.00 1.00 0.87 2.25

Total QTY - 18.18 5.12


FOOTING PCC QTY
Footin
Footin Stone Extra
Footing NO.of g PCC PCC
S.NO g S space
description footing breadt Depth length
length Depth for Pcc
h
M M M M M M M
1 Footing 1 2.5 2.5 0.1 0.1 2.7
2 Slab 1 2 1 0.1 0.1 2.2

Total Q
PCC
PCC Volum Total
breadt
depth e volume
h
M M CUM CUM
2.7 0.1 0.73
1.2 0.1 0.26

Total Qty :- 0.99


FOOTING QTY
Footin
NO.of Footin
Neck Column g Footin Volum Total
S.NO Footin g
description breadt g e volume
g length
h Depth
M M M M CUM CUM
1 Footing 1 2.00 2.00 0.30 1.20
2 Slab 1 2 1 0.50 1.00

Total QTY - 2.20

Column QTY
EL top Depth
NO.of Colum
Column Colum EL top of from Volum
S.NO Colum n
description n of Slab Footin Slab e
n breadt
length g Bottom
h
M M M M CUM
1 C1,C2,C3,C4 4 0.40 0.4 101.45 99.75 1.70 1.09
2 Slab 1 2.00 1.0 101.45 100.95 0.50 1.00

Total QTY - 2.09


Total
volume

CUM
FOOTING SHUTTRING AREA QTY
Footin
Neck NO.of Footin
g Footin Shuttrin Remar
S.NO Column Footin g
breadt g g Area k
description g length
h Depth
M M M M SQM
1 Footing 1 2.00 2.00 0.30 2.40
2 Slab 1 2 1 0.50 3.00

Total QTY - 5.40