SAMPLE
SAMPLE
Email: [email protected]
Contact No. 09615283170
BILL OF MATERIALS
Item Item Description Specification Quantity Unit Unit Cost Total Cost
I Site Works and Earth Works ₱ 128,250.00
1.1 Site Works and Earth Works Sub-Total Cost ₱ 128,250.00 ₱ 51,300.00
Clearing, Lay-Out and Mobilization 85.5 sq.m ₱ 1,500.00 ₱ 128,250.00 #REF!
Item Item Description Specification Quantity Unit Unit Cost Total Cost
II Concerete Works (Sub-Structure) ₱ 51,540.00
2.1 Column Footings Sub-Total Cost ₱ 45,770.00 ₱ 18,308.00
Portland Cement 61 bags ₱ 255.00 ₱ 15,555.00
Washed Sand (Fine Aggregates) 3 cu.m. ₱ 1,250.00 ₱ 3,750.00
Gravel G1 (Course Aggregates) 7 cu.m. ₱ 1,350.00 ₱ 9,450.00
Gravel Base Couse 2 cu.m. ₱ 650.00 ₱ 1,300.00
RSB, 12mmØ x 7.6m 39 pc ₱ 385.00 ₱ 15,015.00
Tie Wire, ga #16 7 kgs ₱ 100.00 ₱ 700.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
III Concerete Works (Super-Structure) ₱ 547,353.50
3.1 Slab on Fill Sub-Total Cost ₱ 42,000.00 ₱ 16,800.00
Portland Cement 52 bags ₱ 255.00 ₱ 13,260.00
Washed Sand (Fine Aggregates) 4 cu.m. ₱ 1,250.00 ₱ 5,000.00
Gravel G1 (Course Aggregates) 8 cu.m. ₱ 1,350.00 ₱ 10,800.00
RSB, 10mmØ x 6m 63 pc ₱ 180.00 ₱ 11,340.00
Tie Wire, ga #16 16 kgs ₱ 100.00 ₱ 1,600.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
III Concerete Works (Super-Structure)
3.3 Second Floor Concrete Column Sub-Total Cost ₱ 104,490.50 ₱ 41,796.20
Portland Cement 52 bags ₱ 255.00 ₱ 13,260.00
Washed Sand (Fine Aggregates) 2 cu.m. ₱ 1,250.00 ₱ 2,500.00
Gravel G1 (Course Aggregates) 4 cu.m. ₱ 1,350.00 ₱ 5,400.00
RSB, 16mmØ x 6m 112 pc ₱ 385.00 ₱ 43,120.00
RSB, 10mmØ x 6m 171 pc ₱ 180.00 ₱ 30,780.00
Tie Wire, ga #16 25 kg ₱ 100.00 ₱ 2,500.00
Formsworks
1/4" thk. Ordinary Plywood 9 pcs ₱ 387.00 ₱ 3,483.00
2x2x3x10 Coco Lumber 22 pcs ₱ 135.00 ₱ 2,970.00
4" Common Nails 4 kg ₱ 95.00 ₱ 380.00
1" Common Nails 1.5 kg ₱ 65.00 ₱ 97.50
Item Item Description Specification Quantity Unit Unit Cost Total Cost
IV Masonry ₱ 345,278.00
4.1 Ground Floor Wall and Partitions Sub-Total Cost ₱ 165,396.00 ₱ 66,158.40
CHB, 4" 2526 pcs ₱ 16.00 ₱ 40,416.00
Portland Cement 186 bags ₱ 255.00 ₱ 47,430.00
Washed Sand (Fine Aggregates) 15 cu.m. ₱ 1,250.00 ₱ 18,750.00
RSB, 10mmØ x 6m 325 pcs ₱ 180.00 ₱ 58,500.00
Tie Wire, ga #16 3 kgs ₱ 100.00 ₱ 300.00
4.2 Second Floor Wall and Partitions Sub-Total Cost ₱ 179,882.00 ₱ 71,952.80
CHB, 4" 2632 pcs ₱ 16.00 ₱ 42,112.00
Portland Cement 194 bags ₱ 255.00 ₱ 49,470.00
Washed Sand (Fine Aggregates) 16 cu.m. ₱ 1,250.00 ₱ 20,000.00
RSB, 10mmØ x 6m 370 pcs ₱ 180.00 ₱ 66,600.00
Tie Wire, ga #16 17 kgs ₱ 100.00 ₱ 1,700.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
V Ceiling Works ₱ 89,174.00
5.1 Ground Floor Ceiling Sub-Total Cost ₱ 18,330.00 ₱ 7,332.00
Fiber Cement Board 19 pc ₱ 495.00 ₱ 9,405.00
Wall Angle, 0.40mmx25mmx25mmx2.40m. 21 pc ₱ 170.00 ₱ 3,570.00
Metal Furring Channel, 0.40mmx19mmx50mmx5m. 15 pc ₱ 145.00 ₱ 2,175.00
Metal Carrying Channel, 0.80mmx12mmx38mmx5m 16 pc ₱ 140.00 ₱ 2,240.00
W-Clip 70 pc ₱ 6.00 ₱ 420.00
Concrete Nails # 2 3 kg ₱ 80.00 ₱ 240.00
1/8 x 3/4 Bind Rivets 1 box ₱ 280.00 ₱ 280.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
VI Steel Structures ₱ 61,460.00
6.1 Railings Sub-Total Cost ₱ 61,460.00 ₱ 24,584.00
SS Square Tube, 2"x2" 14 pc ₱ 1,550.00 ₱ 21,700.00
SS Square Tube, 1"x1" 39 pc ₱ 960.00 ₱ 37,440.00
Welding Rod 2.0mm E6011 8 box ₱ 290.00 ₱ 2,320.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
VII Roof and Roof Framing ₱ 192,740.00
7.1 Roofing Trusses Sub-Total Cost ₱ 39,570.00 ₱ 15,828.00
C-purlins, 2"x6" x 1.5mm THK 17 pc ₱ 705.00 ₱ 11,985.00
C-purlins, 2"x3" x 1.5mm THK 37 pc ₱ 515.00 ₱ 19,055.00
RSB, 12mmØ x 6m 26 pc ₱ 250.00 ₱ 6,500.00
Welding Rod 2.0mmE6011 7 box ₱ 290.00 ₱ 2,030.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
VIII Doors and Windows ₱ 397,081.00
8.1 Doors Sub-Total Cost ₱ 119,200.00 ₱ 47,680.00
D1 Wood Panel Door w/ Glass (2.1x1.6) 1 set ₱ 35,500.00 ₱ 35,500.00
D2 Aluminum Sliding Door (2.1x2.4) 3 set ₱ 11,600.00 ₱ 34,800.00
D3 Wood Panel Door (2.1x0.8) 6 set ₱ 3,500.00 ₱ 21,000.00
D4 Alminum Sliding Door (2.1x1.2) 2 set ₱ 8,200.00 ₱ 16,400.00
D5 Panel Type Door (2.1x0.6) 1 set ₱ 4,500.00 ₱ 4,500.00
D6 Panel Type Door (2.1x0.6) 2 set ₱ 3,500.00 ₱ 7,000.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
IX Tileworks ₱ 441,881.00
9.1 Tileworks Sub-Total Cost ₱ 441,881.00 ₱ 176,752.40
Unglazed Tiles, 60cm x 60cm 94 pc ₱ 399.00 ₱ 37,506.00
Glazed Tiles, 60cm x 60cm 615 pc ₱ 595.00 ₱ 365,925.00
Tile Adhesive 88 bags ₱ 350.00 ₱ 30,800.00
Tile Grout 14 kg ₱ 100.00 ₱ 1,400.00
Washed Sand (Fine Aggregates) 5 cu.m. ₱ 1,250.00 ₱ 6,250.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
X Painting Works ₱ 48,760.00
10.1 Masonry Painting Sub-Total Cost ₱ 48,760.00 ₱ 19,504.00
Semi-Gloss Enamel Paint 24 gal ₱ 665.00 ₱ 15,960.00
Latex Primer Paint 30 gal ₱ 550.00 ₱ 16,500.00
Paint Thinner 10 gal ₱ 422.00 ₱ 4,220.00
Paint Brush 4" 31 pc ₱ 75.00 ₱ 2,325.00
Sand paper #120 31 dozen ₱ 130.00 ₱ 4,030.00
Paint Brush 2" 35 pc ₱ 35.00 ₱ 1,225.00
Paint Roller Brush (152mm) w pan 30 pc ₱ 150.00 ₱ 4,500.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
XI Plumbing ₱ 175,907.90
11.1 Plumbing Fixtures Sub-Total Cost ₱ 66,602.00 ₱ 26,640.80
Water Closet 3 set ₱ 11,750.00 ₱ 35,250.00
Kitchen Sink 1 set ₱ 3,935.00 ₱ 3,935.00
Lavatory 3 set ₱ 1,739.00 ₱ 5,217.00
Stainless Steel Double Sink 1 set ₱ 9,490.00 ₱ 9,490.00
Faucet 10 set ₱ 349.00 ₱ 3,490.00
Shower Head 3 set ₱ 2,490.00 ₱ 7,470.00
Faucet 7 set ₱ 250.00 ₱ 1,750.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
XI Plumbing
11.3 Sewerline Works Sub-Total Cost ₱ 10,559.00 ₱ 4,223.60
100mm ∅ PVC PIPE 5 set ₱ 1,010.00 ₱ 5,050.00
50mm ∅ PVC PIPE 2 set ₱ 393.00 ₱ 786.00
PVC WYE (100mm) 3 set ₱ 173.00 ₱ 519.00
PVC Elbow 45° (100mm) 4 pcs ₱ 31.00 ₱ 124.00
PVC Elbow 90° (100mm) 5 pcs ₱ 92.00 ₱ 460.00
PVC Elbow 90° (50mm) 5 pcs ₱ 39.00 ₱ 195.00
PVC Elbow 45° (50mm) 4 pcs ₱ 27.00 ₱ 108.00
Sanitary Tee 17 pcs ₱ 59.75 ₱ 1,015.75
PVC Coupling (100mm) 10 pcs ₱ 59.00 ₱ 590.00
PVC Coupling (50mm) 10 pcs ₱ 45.00 ₱ 450.00
PVC Clean Out w/ plug & sealing ring 100mm 1 pcs ₱ 98.50 ₱ 98.50
PVC P-Trap w/ plug & sealing ring 50mm 1 pcs ₱ 108.75 ₱ 108.75
uPVC Solvent Cement 2 cans ₱ 280.00 ₱ 560.00
Vulca Seal (1/4 L) 2 cans ₱ 247.00 ₱ 494.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
XII ELECTRICAL WORKS ₱ 184,182.11
12.1 Electrical Works 1 lot 8% ₱ 184,182.11 ₱ 73,672.84
TOTAL COST OF MATERIALS ₱ 2,663,607.51 ₱ 1,065,443.00
TOTAL ₱ 2,663,607.51
Prepared by:
BILL OF MATERIALS
Item Item Description Specification Quantity Unit Unit Cost Total Cost
I Site Works and Earth Works ₱ 189,400.00
1.1 Site Works and Earth Works Sub-Total Cost ₱ 128,250.00 ₱ 51,300.00
Clearing, Lay-Out and Mobilization 85.5 sq.m ₱ 1,500.00 ₱ 128,250.00 ₱ 61,150.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
II Concerete Works (Sub-Structure) ₱ 84,292.00
2.1 Column Footings Sub-Total Cost ₱ 45,770.00 ₱ 18,308.00
Portland Cement 61 bags ₱ 255.00 ₱ 15,555.00
Washed Sand (Fine Aggregates) 3 cu.m. ₱ 1,250.00 ₱ 3,750.00
Gravel G1 (Course Aggregates) 7 cu.m. ₱ 1,350.00 ₱ 9,450.00
Gravel Base Couse 2 cu.m. ₱ 650.00 ₱ 1,300.00
RSB, 12mmØ x 7.6m 39 pc ₱ 385.00 ₱ 15,015.00
Tie Wire, ga #16 7 kgs ₱ 100.00 ₱ 700.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
III Concerete Works (Super-Structure) ₱ 815,775.50
3.1 Slab on Fill Sub-Total Cost ₱ 42,000.00 ₱ 16,800.00
Portland Cement 52 bags ₱ 255.00 ₱ 13,260.00
Washed Sand (Fine Aggregates) 4 cu.m. ₱ 1,250.00 ₱ 5,000.00
Gravel G1 (Course Aggregates) 8 cu.m. ₱ 1,350.00 ₱ 10,800.00
RSB, 10mmØ x 6m 63 pc ₱ 180.00 ₱ 11,340.00
Tie Wire, ga #16 16 kgs ₱ 100.00 ₱ 1,600.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
III Concerete Works (Super-Structure)
3.4 Stairs Sub-Total Cost ₱ 24,484.00 ₱ 9,793.60
Portland Cement 16 bags ₱ 255.00 ₱ 4,080.00
Washed Sand (Fine Aggregates) 1 cu.m. ₱ 1,250.00 ₱ 1,250.00
Gravel G1 (Course Aggregates) 2 cu.m. ₱ 1,350.00 ₱ 2,700.00
RSB, 12mmØ x 7.6m 29 pcs ₱ 250.00 ₱ 7,250.00
RSB, 10mmØ x 6m 9 pcs ₱ 180.00 ₱ 1,620.00
Tie Wire, ga #16 7 kgs ₱ 100.00 ₱ 700.00
Formsworks
1/4" thk. Ordinary Plywood 12 pcs ₱ 387.00 ₱ 4,644.00
2x2x3x10 Coco Lumber 14 pcs ₱ 135.00 ₱ 1,890.00
4" Common Nails 3 kg ₱ 95.00 ₱ 285.00
1" Common Nails 1 kg ₱ 65.00 ₱ 65.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
III Concerete Works (Super-Structure)
3.7 Roof Beam Sub-Total Cost ₱ 83,033.50 ₱ 33,213.40
Portland Cement 49 bags ₱ 255.00 ₱ 12,495.00
Washed Sand (Fine Aggregates) 3 cu.m. ₱ 1,250.00 ₱ 3,750.00
Gravel G1 (Course Aggregates) 6 cu.m. ₱ 1,350.00 ₱ 8,100.00
RSB, 16mmØ x 6m 55 pc ₱ 385.00 ₱ 21,175.00
RSB, 10mmØ x 6m 95 pc ₱ 180.00 ₱ 17,100.00
Tie Wire, ga #16 15 kg ₱ 100.00 ₱ 1,500.00
Formworks and Scaffoldings (30 1 lot ₱ 18,913.50 ₱ 18,913.50
Item Item Description Specification Quantity Unit Unit Cost Total Cost
IV Masonry ₱ 441,982.00
4.1 Ground Floor Wall and Partitions Sub-Total Cost ₱ 165,396.00 ₱ 66,158.40
CHB, 4" 2526 pcs ₱ 16.00 ₱ 40,416.00
Portland Cement 186 bags ₱ 255.00 ₱ 47,430.00
Washed Sand (Fine Aggregates) 15 cu.m. ₱ 1,250.00 ₱ 18,750.00
RSB, 10mmØ x 6m 325 pcs ₱ 180.00 ₱ 58,500.00
Tie Wire, ga #16 3 kgs ₱ 100.00 ₱ 300.00
4.2 Second Floor Wall and Partitions Sub-Total Cost ₱ 179,882.00 ₱ 71,952.80
CHB, 4" 2632 pcs ₱ 16.00 ₱ 42,112.00
Portland Cement 194 bags ₱ 255.00 ₱ 49,470.00
Washed Sand (Fine Aggregates) 16 cu.m. ₱ 1,250.00 ₱ 20,000.00
RSB, 10mmØ x 6m 370 pcs ₱ 180.00 ₱ 66,600.00
Tie Wire, ga #16 17 kgs ₱ 100.00 ₱ 1,700.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
V Ceiling Works ₱ 161,926.00
5.1 Ground Floor Ceiling Sub-Total Cost ₱ 18,330.00 ₱ 7,332.00
Fiber Cement Board 19 pc ₱ 495.00 ₱ 9,405.00
Wall Angle, 0.40mmx25mmx25mmx2.40m. 21 pc ₱ 170.00 ₱ 3,570.00
Metal Furring Channel, 0.40mmx19mmx50mmx5m. 15 pc ₱ 145.00 ₱ 2,175.00
Metal Carrying Channel, 0.80mmx12mmx38mmx5m 16 pc ₱ 140.00 ₱ 2,240.00
W-Clip 70 pc ₱ 6.00 ₱ 420.00
Concrete Nails # 2 3 kg ₱ 80.00 ₱ 240.00
1/8 x 3/4 Bind Rivets 1 box ₱ 280.00 ₱ 280.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
V Ceiling Works
5.2 Second Floor Ceiling Sub-Total Cost ₱ 70,844.00 ₱ 28,337.60
Fiber Cement Board 40 pc ₱ 495.00 ₱ 19,800.00
Wall Angle, 0.40mmx25mmx25mmx2.40m. 59 pc ₱ 170.00 ₱ 10,030.00
Metal Furring Channel, 0.40mmx19mmx50mmx5m. 134 pc ₱ 145.00 ₱ 19,430.00
Metal Carrying Channel, 0.80mmx12mmx38mmx5m 99 pc ₱ 140.00 ₱ 13,860.00
W-Clip 494 pc ₱ 6.00 ₱ 2,964.00
1/8 x 3/4 Bind Rivets 15 box ₱ 280.00 ₱ 4,200.00
Concrete Nails # 2 7 kg ₱ 80.00 ₱ 560.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
VI Steel Structures ₱ 94,152.00
6.1 Railings Sub-Total Cost ₱ 61,460.00 ₱ 24,584.00
SS Square Tube, 2"x2" 14 pc ₱ 1,550.00 ₱ 21,700.00
SS Square Tube, 1"x1" 39 pc ₱ 960.00 ₱ 37,440.00
Welding Rod 2.0mm E6011 8 box ₱ 290.00 ₱ 2,320.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
VII Roof and Roof Framing ₱ 257,705.00
7.1 Roofing Trusses Sub-Total Cost ₱ 39,570.00 ₱ 15,828.00
C-purlins, 2"x6" x 1.5mm THK 17 pc ₱ 705.00 ₱ 11,985.00
C-purlins, 2"x3" x 1.5mm THK 37 pc ₱ 515.00 ₱ 19,055.00
RSB, 12mmØ x 6m 26 pc ₱ 250.00 ₱ 6,500.00
Welding Rod 2.0mmE6011 7 box ₱ 290.00 ₱ 2,030.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
VIII Doors and Windows ₱ 608,650.00
8.1 Doors Sub-Total Cost ₱ 119,200.00 ₱ 47,680.00
D1 Wood Panel Door w/ Glass (2.1x1.6) 1 set ₱ 35,500.00 ₱ 35,500.00
D2 Aluminum Sliding Door (2.1x2.4) 3 set ₱ 11,600.00 ₱ 34,800.00
D3 Wood Panel Door (2.1x0.8) 6 set ₱ 3,500.00 ₱ 21,000.00
D4 Alminum Sliding Door (2.1x1.2) 2 set ₱ 8,200.00 ₱ 16,400.00
D5 Panel Type Door (2.1x0.6) 1 set ₱ 4,500.00 ₱ 4,500.00
D6 Panel Type Door (2.1x0.6) 2 set ₱ 3,500.00 ₱ 7,000.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
IX Tileworks ₱ 486,681.00
9.1 Tileworks Sub-Total Cost ₱ 441,881.00 ₱ 176,752.40
Unglazed Tiles, 60cm x 60cm 94 pc ₱ 399.00 ₱ 37,506.00
Glazed Tiles, 60cm x 60cm 615 pc ₱ 595.00 ₱ 365,925.00
Tile Adhesive 88 bags ₱ 350.00 ₱ 30,800.00
Tile Grout 14 kg ₱ 100.00 ₱ 1,400.00
Washed Sand (Fine Aggregates) 5 cu.m. ₱ 1,250.00 ₱ 6,250.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
X Painting Works ₱ 149,560.00
10.1 Masonry Painting Sub-Total Cost ₱ 48,760.00 ₱ 19,504.00
Semi-Gloss Enamel Paint 24 gal ₱ 665.00 ₱ 15,960.00
Latex Primer Paint 30 gal ₱ 550.00 ₱ 16,500.00
Paint Thinner 10 gal ₱ 422.00 ₱ 4,220.00
Paint Brush 4" 31 pc ₱ 75.00 ₱ 2,325.00
Sand paper #120 31 dozen ₱ 130.00 ₱ 4,030.00
Paint Brush 2" 35 pc ₱ 35.00 ₱ 1,225.00
Paint Roller Brush (152mm) w pan 30 pc ₱ 150.00 ₱ 4,500.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
XI Plumbing ₱ 175,907.90
11.1 Plumbing Fixtures Sub-Total Cost ₱ 66,602.00 ₱ 26,640.80
Water Closet 3 set ₱ 11,750.00 ₱ 35,250.00
Kitchen Sink 1 set ₱ 3,935.00 ₱ 3,935.00
Lavatory 3 set ₱ 1,739.00 ₱ 5,217.00
Stainless Steel Double Sink 1 set ₱ 9,490.00 ₱ 9,490.00
Faucet 10 set ₱ 349.00 ₱ 3,490.00
Shower Head 3 set ₱ 2,490.00 ₱ 7,470.00
Faucet 7 set ₱ 250.00 ₱ 1,750.00
Item Item Description Specification Quantity Unit Unit Cost Total Cost
XI Plumbing
Labor Cost ₱ 6,150.00
Foreman 1 3 day ₱ 600.00 ₱ 1,800.00
Plumber 1 3 day ₱ 550.00 ₱ 1,650.00
Laborer 2 3 day ₱ 450.00 ₱ 2,700.00
Equipment Rental
Item Item Description Specification Quantity Unit Unit Cost Total Cost
XII ELECTRICAL WORKS ₱ 257,854.95
12.1 Electrical Works 1 lot 8% ₱ 184,182.11 ₱ 73,672.84
Prepared by:
1st MONTH 2nd MONTH 3rd MONTH 4th MONTH 5th MONTH
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120
11 8
Column Footing Slab on Fill Suspended Slab SF Beam Plumbing Fixtures Masonry Painting
8 7 17 4 18 28
Tileworks
56
GANTT CHART WITH S CURVE 1ST MONTH 2ND MONTH 3RD MONTH 4TH MONTH 5TH MONTH
Work
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
Item Activity Amount % Wt
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
1
2
3
4
5
6
7
8
9
Days 100%
I 1.1 Site Works and Earth Works 5 ₱ 189,400.00 4.98% 17 17 17 17 17
30%
VI 6.1 Railings 11 ₱ 94,152.00 2.47% 5 5 5 5 5 5 5 5 5 5 5
20%
7.2 Roofing 11 ₱ 189,151.00 4.97% 5 5 5 5 5 5 5 5 5 5 5
₱ 3,804,812.35 100.00%
306 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
% Periodic Schedule 5.64% 4.42% 3.42% 4.19% 4.88% 4.13% 4.21% 4.22% 5.86% 5.18% 6.08% 5.08% 5.60% 5.57% 5.56% 4.06% 5.31% 5.63% 5.03% 5.93%
Physical Progress Accomplishments
% Commulative Schedule 5.64% 10.06% 13.48% 17.67% 22.55% 26.68% 30.89% 35.11% 40.97% 46.15% 52.23% 57.31% 62.91% 68.48% 74.04% 78.10% 83.41% 89.04% 94.07% 100.00%
This week ₱ 214,591.42 ₱ 168,172.71 ₱ 130,124.58 ₱ 159,421.64 ₱ 185,674.84 ₱ 157,138.75 ₱ 217,254.79 ₱ 179,587.14 ₱ 222,962.00 ₱ 197,089.28 ₱ 231,332.59 ₱ 193,284.47 ₱ 213,069.49 ₱ 211,928.05 ₱ 211,547.57 ₱ 154,475.38 ₱ 202,035.54 ₱ 214,210.94 ₱ 191,382.06 ₱ 225,625.37
Financial Progress Accomplishments
To Date ₱ 214,591.42 ₱ 382,764.13 ₱ 512,888.71 ₱ 672,310.35 ₱ 857,985.19 ₱ 1,015,123.94 ₱ 1,232,378.73 ₱ 1,411,965.87 ₱ 1,634,927.87 ₱ 1,832,017.15 ₱ 2,063,349.74 ₱ 2,256,634.21 ₱ 2,469,703.70 ₱ 2,681,631.75 ₱ 2,775,006.67 ₱ 2,929,482.05 ₱ 3,173,593.98 ₱ 3,387,804.92 ₱ 3,579,186.98 ₱ 3,804,812.35
ARILLO CONSTRUCTION
Marong Lambunao, Iloilo
Email: [email protected]
Contact No. 09615283170
1st MONTH 2nd MONTH 3rd MONTH 4th MONTH 5th MONTH
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120
11 8
Column Footing Slab on Fill Suspended Slab SF Beam Plumbing Fixtures Masonry Painting
8 7 17 4 18 28
Tileworks
56
GANTT CHART WITH S CURVE 1ST MONTH 2ND MONTH 3RD MONTH 4TH MONTH 5TH MONTH
Work
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
Item Activity Amount % Wt
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
1
2
3
4
5
6
7
8
9
Days
₱ 3,804,812.35 100.00%
306 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
% Periodic Schedule 5.64% 4.42% 3.42% 4.19% 4.88% 4.13% 4.21% 4.22% 5.86% 5.18% 6.08% 5.08% 5.60% 5.57% 5.56% 4.06% 5.31% 5.63% 5.03% 5.93%
Physical Progress Accomplishments
% Commulative Schedule 5.64% 10.06% 13.48% 17.67% 22.55% 26.68% 30.89% 35.11% 40.97% 46.15% 52.23% 57.31% 62.91% 68.48% 74.04% 78.10% 83.41% 89.04% 94.07% 100.00%
This week ₱ 214,591.42 ₱ 168,172.71 ₱ 130,124.58 ₱ 159,421.64 ₱ 185,674.84 ₱ 157,138.75 ₱ 217,254.79 ₱ 179,587.14 ₱ 222,962.00 ₱ 197,089.28 ₱ 231,332.59 ₱ 193,284.47 ₱ 213,069.49 ₱ 211,928.05 ₱ 211,547.57 ₱ 154,475.38 ₱ 202,035.54 ₱ 214,210.94 ₱ 191,382.06 ₱ 225,625.37
Financial Progress Accomplishments
To Date ₱ 214,591.42 ₱ 382,764.13 ₱ 512,888.71 ₱ 672,310.35 ₱ 857,985.19 ₱ 1,015,123.94 ₱ 1,232,378.73 ₱ 1,411,965.87 ₱ 1,634,927.87 ₱ 1,832,017.15 ₱ 2,063,349.74 ₱ 2,256,634.21 ₱ 2,469,703.70 ₱ 2,681,631.75 ₱ 2,775,006.67 ₱ 2,929,482.05 ₱ 3,173,593.98 ₱ 3,387,804.92 ₱ 3,579,186.98 ₱ 3,804,812.35
Project Title : PROPOSED TWO-STOREY RESIDENTIAL B
Location : MARONG LAMBUNAO ,ILOILO
Owner : MS. JEANETTE C. ARILLO
GANTT CHART WITH S
Item
I 1.1
II 2.1
2.2
III 3.1
3.2
3.3
3.4
3.5
3.6
3.7
IV 4.1
4.2
V 5.1
5.2
VI 6.1
VII 7.1
7.2
VIII 8.1
8.2
IX 9.1
X 10.1
XI 11.1
11.2
11.3
11.4
XII 12.1
306
306
% Periodic Schedul
hysical Progress Accomplishments
% Commulative Sche
hysical Progress Accomplishments
% Commulative Sche
This week
nancial Progress Accomplishments
To Date
CONSTRUCTION
lo
[email protected]
70
L BUILDING
1
5
Column Footi
8
5
5
Wall Footings
H S CURVE 1
Amount % Wt
1
2
3
4
5
6
7
8
₱ 189,400.00 4.98% 17 17 17 17 17
₱ 67,630.00 1.78% 4 4 4
₱ 16,662.00 0.44% 4 4 4
₱ 75,810.00 1.99%
₱ 162,445.00 4.27% 9 9 9
₱ 233,648.00 6.14%
₱ 50,052.00 1.32%
₱ 141,444.50 3.72%
₱ 81,047.00 2.13%
₱ 198,491.50 5.22%
₱ 106,485.50 2.80%
₱ 208,334.00 5.48%
₱ 39,198.00 1.03%
₱ 122,728.00 3.23%
₱ 94,152.00 2.47%
₱ 68,554.00 1.80%
₱ 189,151.00 4.97%
₱ 196,750.00 5.17%
₱ 411,900.00 10.83%
₱ 486,681.00 12.79%
₱ 149,560.00 3.93%
₱ 95,402.00 2.51%
₱ 214,591.42
₱ 122,776.00 3.23%
₱ 16,709.00 0.44%
₱ 21,946.90 0.58%
₱ 257,854.95 6.78%
₱ 3,804,812.35 100.00%
17 17 17 17 17 17 17 17
To Date ₱ 214,591.42 ₱ 3
1st MONTH
10 15 20
olumn Footing Slab on Fill
8 7
4 Waterline
3 Works
Sewerline
Works
1ST MONTH
10
11
12
13
14
15
16
17
18
19
20
21
22
23
9
4 4 4 4 4
4 4
8 8 8 8 8 8
9 9 9 9 9 9 9 9 9
9 9 9 9 9 9
₱ 679,919.97
₱ 520,498.33
₱ 390,373.75
4 4 4
8 8 8 8
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
9 9 9 9 9 9 9 9
9 9 9 9 9
6 6
8 8 8 8 8 8 8 8 8 8 8 8 8 8
₱ 1,022,733.56
₱ 865,594.81
₱ 679,919.97
3 3
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
Railings
11
SF Beam
4
Septic Vault
9
8
6
39
ONTH
8
6
40
8
6
41
8
6
42
8
6
43
8
6
44
8
6
45
9
46
9
47
9
48
9
49
9
50
9
51
9
52
53
4
5 5 5 5 5 5 5 5
₱ 1,642,537.49
₱ 1,419,575.49
₱ 1,239,988.35
3 3 3 3 3 3 3 3 3 3 3 3 3 3
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
Roofing Trusses
8
Plumbing Fixtures
18
64
65
66
67
68
4 4 4 4 4 4 4 4 4 4 4
6 6 6 6
5 5 5
5 5 5 5 5 5 5 5
₱ 2,070,959.36
₱ 1,839,626.77
₱ 1,642,537.49
3 3 3 3
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
Roofing
10
Tileworks
56
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
4TH MON
6 6
9 9 9 9 9 9 9 9 9 9 9
₱ 2,689,241.37
₱ 2,477,313.32
5 5 5 5 5 5 5 5 5 5 5
₱ 2,264,243.83
14 14
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
3 3
5 5
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
PE
84
85
86
87
4TH MONTH
88
89
90
91
92
93
94
95
96
97
98
₱ 2,929,482.05
₱ 2,775,006.67
₱ 2,689,241.37
14 14 14 14 14 14 14 14 14
10 10 10 10 10 10
3 3 3 3 3 3 3 3 3
7 7 7 7 7 7
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
Windows
28
112
113
₱ 3,586,796.60
₱ 3,395,414.54
₱ 3,181,203.60
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
17 17 17 17 17 17 17 17 17 17 17 17 17 17 17
10 10 10 10 10 10 10
7 7 7 7 7 7 7
17 17 17 17 17 17 17
% 5.93%
% 100.00%
% 100.00%
191,382.06 ₱ 225,625.37
,579,186.98 ₱ 3,804,812.35
₱ 214,591.42 ₱ 390,373.75 ₱ 520,498.33 ₱ 679,919.97 ₱ 865,594.81 ₱ 1,022,733.56
₱ 1,239,988.35 ₱ 1,419,575.49 ₱ 1,642,537.49 ₱ 1,839,626.77 ₱ 2,070,959.36 ₱ 2,264,243.83
₱ 2,477,313.32 ₱ 2,689,241.37 ₱ 2,775,006.67 ₱ 2,929,482.05 ₱ 3,181,203.60 ₱ 3,395,414.54
₱ 3,586,796.60 ₱ 3,804,812.35
5.64% ### ### ### ### ### ### ### ### ### ### ### ###
### ### ### ### ### ### ###
ARILLO CONSTRUCTION
Marong Lambunao, Iloilo
Email: [email protected]
Contact No. 09615283170
Railings
11
13 Roofing Trusses
8
15
Column Footing
8
4 Slab on Fill
7
7 Suspended Slab
17
10 SF Beam
4
Plumbing Fixtures
18
Masonry Painting
28
Sewerline Waterline
Wall Footings
5
3 Works
3
5 Works
6 Septic Vault
9
Roofing
10
18
Tileworks
56
Second Floor Concrete Column 1st Month 2nd Month 3rd Month 4th Month 5th Month
Activity MP Work Days Amount % of Total % of Work Days 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week
14.575 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
% Periodic Schedule 13.58% 3.81% 3.81% 4.26% 3.72% 4.06% 3.77% 2.87% 6.00% 10.22% 9.45% 8.13% 8.13% 7.60% 7.31% 7.09% 6.77% 5.41% 5.14% 5.14%
This week ₱ 516,609.81 ₱ 145,018.83 ₱ 145,018.83 ₱ 162,144.78 ₱ 141,564.90 ₱ 154,367.30 ₱ 143,596.94 ₱ 109,253.82 ₱ 228,187.02 ₱ 388,702.15 ₱ 359,450.74 ₱ 309,408.36 ₱ 309,408.36 ₱ 289,132.75 ₱ 278,017.90 ₱ 269,764.26 ₱ 257,775.91 ₱ 205,948.04 ₱ 195,582.47 ₱ 195,582.47
₱ 37,880.00 ₱ 492,440.00
₱ 10,830.00 ₱ 32,490.00
₱ 8,569.25 ₱ 25,707.75
₱ 17,381.46 ₱ 69,525.86
₱ 516,609.81 ₱ 145,018.83 ₱ 145,018.83 ₱ 162,144.78 ₱ 141,564.90 ₱ 154,367.30 ₱ 143,596.94 ₱ 109,253.82 ₱ 228,187.02 ₱ 388,702.15 ₱ 359,450.74 ₱ 309,408.36 ₱ 309,408.36 ₱ 289,132.75 ₱ 278,017.90 ₱ 269,764.26 ₱ 257,775.91 ₱ 205,948.04 ₱ 195,582.47 ₱ 195,582.47
₱ 516,609.81 ₱ 661,628.64 ₱ 806,647.47 ₱ 968,792.26 ₱ 1,110,357.16 ₱ 1,264,724.46 ₱ 1,408,321.40 ₱ 1,517,575.22 ₱ 1,745,762.24 ₱ 2,134,464.39 ₱ 2,493,915.13 ₱ 2,803,323.50 ₱ 3,112,731.86 ₱ 3,401,864.61 ₱ 3,679,882.51 ₱ 3,949,646.77 ₱ 4,207,422.68 ₱ 4,413,370.72 ₱ 4,608,953.19 ₱ 4,804,535.66
MANPOWER LEVELING
Labor Rates
DESCRIPTION HOURLY RATE DAY RATE
Construction Foreman 109.18 869.9
Leadman 100.15 797.95
Skilled Laborer 78.99 629.3
Unskilled Laborer 60.93 485.41
Traffic Controller (Flag Man) 60.93 485.41
Part Time Practitioner 109.18 869.9
Safety Practitioner/Officer (Part Time) 109.18 869.9
First Aider 78.99 629.3
Health Personnel (Full Time) 78.99 629.3
Mason 78.99 629.3
Steelman 78.99 629.3
Painter 78.99 629.3
Carpenter 78.99 629.3
Installer 78.99 629.3
Electrician 78.99 629.3
Tile Settler 78.99 629.3
Helper 78.99 485.41
Welder 78.99 629.3
Plumber 78.99 629.3
Laborer 60.93 629.3
Column Footing
8
4 Slab on Fill
7
7 Suspended Slab
17
10 SF Beam
4
Plumbing Fixtures
18
Masonry Painting
28
Sewerline Waterline
Wall Footings
5
3 Works
3
5 Works
6 Septic Vault
9
Roofing
10
18
Tileworks
56
MANPOWER LEVELING
GANTT CHART WITH S CURVE 1st Month 2nd Month 3rd Month 4th Month 5th Month
Items Activity MP Work Days Amount % of Total % of Work Days 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week
14.575 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 17 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
% Periodic Schedule 13.58% 3.81% 3.81% 4.26% 3.72% 4.06% 3.77% 2.87% 6.00% 10.22% 9.45% 8.13% 8.13% 7.60% 7.31% 7.09% 6.77% 5.41% 5.14% 5.14%
This week ₱ 516,609.81 ₱ 145,018.83 ₱ 145,018.83 ₱ 162,144.78 ₱ 141,564.90 ₱ 154,367.30 ₱ 143,596.94 ₱ 109,253.82 ₱ 228,187.02 ₱ 388,702.15 ₱ 359,450.74 ₱ 309,408.36 ₱ 309,408.36 ₱ 289,132.75 ₱ 278,017.90 ₱ 269,764.26 ₱ 257,775.91 ₱ 205,948.04 ₱ 195,582.47 ₱ 195,582.47
Column Footing Slab on Fill Suspended Slab SF Beam Plumbing Fixtures Masonry Painting
8 7 17 4 18 28
Tileworks
56
% Periodic Schedule 5.64% 4.11% 3.42% 4.19% 4.88% 4.13% 6.71% 5.72% 5.86% 7.18% 7.08% 6.98% 7.21% 6.92% 5.56% 5.79% 5.90% 5.90% 5.90% 4.25%
This week ₱ 214,723.23 ₱ 156,413.93 ₱ 130,201.79 ₱ 159,276.33 ₱ 185,569.62 ₱ 157,041.34 ₱ 255,348.54 ₱ 217,599.41 ₱ 222,779.31 ₱ 273,314.86 ₱ 269,302.91 ₱ 265,627.60 ₱ 274,404.60 ₱ 263,193.60 ₱ 211,606.97 ₱ 220,270.08 ₱ 224,601.64 ₱ 224,601.64 ₱ 224,601.64 ₱ 161,516.58
MANPOWER LEVELING
Chart
Title
ARILLO CONSTRUCTION
Marong Lambunao, Iloilo
Email: [email protected]
Contact No. 09615283170
Column Footing Slab on Fill Suspended Slab SF Beam Plumbing Fixtures Masonry Painting
8 7 17 4 18 28
Tileworks
56
MANPOWER LEVELING
GANTT CHART WITH S CURVE MAY JUNE JULY AUGUST SEPTEMBER
Work
Items Activity Days Amount % Wt 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week 1st Week 2nd Week 3rd Week 4th Week
% Periodic Schedule 5.64% 4.11% 3.42% 4.19% 4.88% 4.13% 6.71% 5.72% 5.86% 7.18% 7.08% 6.98% 7.21% 6.92% 5.56% 5.79% 5.90% 5.90% 5.90% 4.25%
Physical Progress Accomplishments
% Commulative Schedule 5.64% 9.75% 13.18% 17.36% 22.24% 26.37% 33.08% 38.80% 44.65% 51.84% 58.91% 65.90% 73.11% 80.02% 85.59% 91.38% 97.28% 103.18% 109.08% 113.33%
This week ₱ 214,723.23 ₱ 156,413.93 ₱ 130,201.79 ₱ 159,276.33 ₱ 185,569.62 ₱ 157,041.34 ₱ 255,348.54 ₱ 217,599.41 ₱ 222,779.31 ₱ 273,314.86 ₱ 269,302.91 ₱ 265,627.60 ₱ 274,404.60 ₱ 263,193.60 ₱ 211,606.97 ₱ 220,270.08 ₱ 224,601.64 ₱ 224,601.64 ₱ 224,601.64 ₱ 161,516.58
Financial Progress Accomplishments
To Date ₱ 214,723.23 ₱ 371,137.17 ₱ 501,338.96 ₱ 660,615.29 ₱ 846,184.91 ₱ 1,003,226.25 ₱ 1,258,574.79 ₱ 1,476,174.20 ₱ 1,698,953.51 ₱ 1,972,268.38 ₱ 2,241,571.29 ₱ 2,507,198.89 ₱ 2,781,603.49 ₱ 3,044,797.10 ₱ 3,256,404.07 ₱ 3,476,674.15 ₱ 3,701,275.79 ₱ 3,925,877.44 ₱ 4,150,479.08 ₱ 4,311,995.66