The document is a request for access to facilitate the installation of high-speed internet by Safaricom at a specified estate or apartment. It outlines the technical scope of work, safety protocols, and power consumption details, along with a request for approval from estate management or landlords. The installation is free, and the document requires signatures for acceptance and authorization.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
6 views1 page
P2MP
The document is a request for access to facilitate the installation of high-speed internet by Safaricom at a specified estate or apartment. It outlines the technical scope of work, safety protocols, and power consumption details, along with a request for approval from estate management or landlords. The installation is free, and the document requires signatures for acceptance and authorization.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
Safaricom Internet
Our ref: SAF INTERNET
To: Management Estate/Apartment: ……………, Date: …………………….
Dear Sir/Madam,
REF: SAFARICOM INTERNET – INSTALLATION ACCESS REQUEST AT
Kindly assists facilitate access to our approved partner and contractor …………………………. to proceed with technical works with regards to installation of high-speed internet for esteemed customers. Technical Scope The technical scope of work will be as below but not limited to: • Survey and design. • Rooftop Pole mounting and radio. • Piloting of the existing routes (ducts) to establish continuity of the same to allow our cables to pass through. • Ethernet Cable Pulling. • Mounting of Cabinet with switch (Customer Distribution Points). • Submeter installation to monitor and account for Network Devices Power consumption. • Removal of excess materials or waste once work is completed. • Restoration/Repair of any damages in the property as a direct result of the works outlined. • Installation is Free.
We will also be keen on the below during implementation:
Security and Safety July 2024 • Our team will adhere to your security protocol within and outside your premises. • Each Handy Men will be identified by original Identity card (ID). • The site will be barricaded with a caution tape and casuals will be in full Personal Protective Equipment (PPE). • A First Aid kit will also be on site. Commercialization Regarding power consumption, our network devices Consumes an average of 30KWh per month, and we will settle the electricity charges at the prevailing rates. Payments will be directed to KPLC for the meter number linked to the power supply. Our sales team will then move into pre-sale and sell to our prospective customers. Activities will include but not limited to: • Access for the sales team to engage with the customers. Access to undertake house connections upon approval by the occupants. Acceptance (Estate Management/Landlord) I hereby approve the request from Safaricom to rollout, sell, connect, and maintain internet within the estate/building as per the conditions laid out above. I confirm I have the authority to provide the approval as or on behalf of the owner(s), management, and residents. Name…………………………….…. ID/Passport No……………………...… Signature……………... Date………. Phone No………………………...