The document summarizes points raised during a daily morning meeting across various departments, including issues related to machinery, maintenance, and production plans. Key topics include equipment repairs, stock maintenance, and upcoming audits, with specific action items assigned to responsible individuals and target dates for completion. The document serves as a detailed record of tasks and responsibilities to ensure operational efficiency.

Uploaded by

deepakjagzap11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views6 pages

Untitled Spreadsheet

The document summarizes points raised during a daily morning meeting across various departments, including issues related to machinery, maintenance, and production plans. Key topics include equipment repairs, stock maintenance, and upcoming audits, with specific action items assigned to responsible individuals and target dates for completion. The document serves as a detailed record of tasks and responsibilities to ensure operational efficiency.

Uploaded by

deepakjagzap11
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Dept / Point raised by

QA
MAINT
MAINT
MAINT
PDC
HR
PH
MAINT
PH
PH
SAP
PH
PH
MAINT
MC SHOP
DISPATCH
DISPATCH
DISPATCH
DEVP
PH
DEVP
DMT
PH
PH
PH
PPC
PPC
PPC
1S 2S
DEVP
DEVP
DEVP
PPC
MC SHOP
PH
QA
STORE
PDC
PURCHASE
MAINT
PH
HR
HR
QA
QA
QA
PH
PH
PH
PH
PH
PH
PH
PH
PH
PH
PPC
PPC
PH
MAINT
DMT
DMT
DMT
PH
PH
PH
ADMIN
QA
QA
HR
QA
QA
PPC
PPC
PPC
PH
Daily morning meeting points summary
points
spider blow hole issue, to be compare pdc3 & pdc 9 process parameters & rej %
CMM INVERTER ISSUE, BATTERY TO BE INSTALL
SAP SERVER PC POWER BACKUP
LADDLE DOOR HINGES TO BE FITTED
HD FOR LADDLE DOOR HINGES TO BE OBSERVE
APPRON FOR PDC WORKERS
UTILITY CRITICAL SPARES LIST TO BE PREPARE & MAINTAIN MIN. STOCK IN STORE
SILCARB HF PREHETAING ETAIL PLAN
NEW SPM PLAN TO BE PRAPARE & SUBMIT
SPIDER TAPPING MACHINES STAND BY MOTOR SHOULD BE AVAILABLE IN READY CONDITION
PURCHASE REQUISIION SHOULD BE GIVEN IN SAP
250 TOYO MACHINE MOTOR BURN-TO BE RESTORED
NEW DRILL MACHINE STARTING DETAIL PLAN
DG SET OIL REQUIRED, MAINTAIN STOCK
AIR DRYERS NOT WORKING, ANALYSIS REPORT REQUIRED
507 & 110W REWORK PENDING
122 CATCHING ISSUE- ACTION PLAN REQUIRED
RAYCHEM DISPATCH-REQUIRED MATERIAL FROM ALL STAGES TIL 2PM
NRG8 FRONT BKT BOTH CAVITY TRIAL OF FIXTURE
PENDING LIST SUBMISSION CHECKSHEET TO BE PREPARE
STARTER NU2.0 TRIAL ON TOMORROW
UNLOADED DIES SHOULD BE FORWARD TO PLOT NO. 12
507 DIE LOADING LAST RUN ISSUES SHOULD BE CORRECT
110W AFTER REWORK SHOULD BE DISPATCH
500W HSG MACHINING OF 8' POWDER COATING SHOLD BE DONE
HEAT TRACE BODY 500 N OS PROD. PENDING
ALSI 12 METAL SHORTAGE
UMBRELLA HEAD PRODN AS PER PLAN- 1128 NOS PER DAY
PDC1,2 ZONE AUDIT PLANNED
NRG8 FRONT & REAR TRIAL
FG11T , STARTER NU MACHINING TRIAL
TOP COVER & HEAT SINK- DISCUSSION WITH CUSTOMER FOR DISPATH
507 2 CAVITY TOOL LIFE DATA TO BE SEND TO MR SHINDE
SPIDER SPM TO BE SEND TO VADOBA ENGG.
SAFETY COMMITTE MEETING SHOULD BE DONE
CUSTOMER COMPLAINT NRG8 HEAT SINK HOLE BLOCK- MATERIAL WILL BE CHECK AT CUSTOMER END
SHAFT TO REWORK
Q502 & TD FRONT DIES TO BE SUIT ON 160T
INHOUSE COIL MAKING PLAN
DG RADIATOR WORK & COMPRESSOR AMC
PM PLAN DETAILS TO BE SUBMIT
TRAINNING TO ARRANGE FOR FIRE FIGHTING
DISPLAY BOARDS DATA TO BE UPDATE
TD FRONT BH ISSUE GATESB TO BE OPEN
BH550 DUP 4 FLASH ON EJE. P[INS TO BE CLEAR IN FETTLING
REQUIRED NEW INSERTS OF BH550
CYL BLOCK ALL DATA TO BE GIVEN
STAND BY BELT TO AVAILABLE FOR COMPRESSOR
HF RESTORATION PLAN TO BE FREEZED
VALEO SPM STATUS & START DATE PLAN TO BE SUBMIT
4 NOS FOURTH AXIS AVAILABLE INSTALLATION PLAN TO BE SUBMIT
UMBRELLA HEAD OLD DIE FYT RESULT
Q502 EJE. PIN APPROVEL FROM CUSTOMER
PDC10 HF REPARING PLAN
STARTER NU2.0 MACHINONG STATUS PLAN
DIWALI VACATION WORKING PLAN
Q502 LESS PRODUCTION
SHOT BLASTIMG MACHINE CYCLE TIME GETTING VARY DUE TO CURRENT TO BE CHECK
SILCARB HF REPORT TO BE SUBMIT TO PURCHASE
SPIDER DRIIL TAP MOTOR TO BE VAIALABLE AS GIVEN SPECS.
LUX LEVEL LOW AT DMT AREA
D CLAMP REQUISITION GIVEN- PURCHASE PENDING
CHECK ALL STAGES FAN & PROVIDE
DIWALI VACATION WORKING PLAN TO BE SUBMIT
NEXT MONTH PLAN SHOULD BE PREPARE WITH PPC ON 25TH DAY OF MONTH
NEXT DAY PLAN TO BE PREPARE ON PREVIOUS DAY
SCRAP MATERIAL SHOULD BE CLEAR TILL 3 NOV.
STARTER NU2.0 CASTING SURFACE TREATMENT TO BE DONE
INWARD MATERIAL GRN SHOULD BE DONE ON SAME DAY
TUBELIGHTS TO BE FITTED AT PLOT NO. 9 WC & AREA
TOP COVER MACHINING 100 NOS
FG11T- DESIGN REAVIEW - MAIL TO CUSTOMER
507 TRIMMING TO BE DONE- 600 SHOT TILL 3 PM
PROJECTOR & REFLECTOR TRIMMING TO BE DONE
DC DC COVER TO BE GIVE DISPATCH
SILCARB HF PURCHASING DETAILS TO BE SUBMIT
Resp. Target Date
SPQ 14/10/21
NY 14/10/21
SS 14/10/21
NY 14/10/21
DJ 14/10/21
SS 14/10/21
NY, SS 14/10/21
NY 14/10/21
KD 14/10/21
NY 14/10/21
ALL 14/10/21
NY 14/10/21
KD 14/10/21
SS 14/10/21
NY 14/10/21
SPQ 14/10/21
DJ, MG 14/10/21
ALL 14/10/21
SPD 14/10/21
TZ 14/10/21
DJ 15/10/21
DJ 14/10/21
DJ, VM 16/10/21
VM 16/10/21
KD 16/10/21
DJ 16/10/21
SS 22/10/21
DJ 16/10/21
DHANE 16/10/21
SPQ, SPD 16/10/21
SPQ, SPD 16/10/21
SPQ 16/10/21
SC 16/10/21
AG 16/10/21
MEMBERS 18/10/21
SPQ 22/10/21
SPQ 22/10/21
SC 22/10/21
SA 22/10/21
SS 30/10/21
SA 22/10/21
SS 22/10/21
ALL 24/10/21
SC 24/10/21
MN 24/10/21
PH 24/10/21
KD 24/10/21
SS 24/10/21
NY, PH 24/10/21
SPD 24/10/21
KD 24/10/21
SPQ 24/10/21
SPQ 24/10/21
NY 24/10/21
SPD 24/10/21
ALL 24/10/21
DJ 24/10/21
NY 24/10//21
DJ,NY 24/10/21
SS 24/10/21
TZ,SA,SS 26/10/21
SS 26/10/21
TZ 26/10/21
ALL 27/10/21
ALL 27/10/21
ALL 27/10/21
ALL 3/11/21
SPD, SS 29/10/21
SS 27/10/21
SA 28/10/21
SPD 27/10/21
SPD 27/10/21
DJ 27/10/21
DJ 27/10/21
SPQ 27/10/21
DJ 27/10/21