P537 [6004]-459
[Total No. of Pages :4
B.E. (Civil)
OPERATIONS RESEARCH
(2019 Pattern) (Semester-VII) (Elective-III) (401003-F)
Time : 2½ Hours] [Max. Marks : 70
Instructions to the candidates:
1) Solve Q1 or Q2, Q3 or Q4, Q5 or Q6, Q7 or Q8.
2) Figures to the righte side indicate full marks.
3) Use of Calculator is allowed.
4) Assume suitable data if necessary.
OR
Q2) a) Six different jobs J1,J2, J3, J4 J5 and J6 are to be worked on a machine
tool with setting times as given in the following matrix. It is necessary that
a job once undertaken will not be handled again till all other jobs are
finished. Decide the sequence of jobs which gives minimum elapsed time.
[12]
P.T.O.
Next jobs
J1 J2 J3 J4 J5 J6
J1 - 17 20 22 6 8
J2 21 - 18 23 17 16
J3 23 22 - 19 22 19
Jobs J4 27 19 21 - 20 21
Before J5 16 18 17 23 - 17
J6 18 16 20 24 19 -
b) What are the applications of transportation problem in Construction
industry? [6]
Q3) a) In Simplex problem, explain the two phase method and its applications
[8]
x1 4 x2 2 x3 8 x4 2
x1 2 x2 3 x3 4 x4 1
x1 , x2 , x3 , x4 0
[6004]-459 2
Q5) a) Optimize Z x12 x22 4 x1 9 x2 [10]
Subject to
4 x1 3x2 15
3x1 5 x2 14
x1 , x2 0
[6004]-459 3
b) In an investment project, Seven salesmen are to be appointed for three
areas to maximize the sales. the sale in each zone w.r.t the number of
salesman is as given under. Find the optimum allocation. [9]
N. of salesmen 0 1 2 3 4 5 6 7
Zone 1 2 4 7 12 16 19 21 22
Zone 2 3 6 10 17 22 25 27 27
Zone 3 2 3 6 10 15 19 22 23
OR
Q8) a) Why is replacement of items required? what is the strategy used for
replacement of any machine? What are the types of costs to be
considered for calculating the replacement year? [9]
b) Write the applications of following OR techniqus in the filed of Civil
Engineering. [8]
i) Non linear Programming
ii) Dynamic programming
[6004]-459 4