The document outlines a project titled 'Attendance Management System' prepared by Gaurav for Dr. Anurudh Kumar at Govt. Sarvodaya Bal Vidyalaya. It details the project's objectives, which include automating attendance recording to improve accuracy and efficiency, and describes the System Development Life Cycle (SDLC) phases involved in its development. The system aims to replace traditional methods with a digital solution that enhances productivity and ensures secure data management.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0 ratings0% found this document useful (0 votes)
25 views24 pages
Cs Project File Attendance Management System
The document outlines a project titled 'Attendance Management System' prepared by Gaurav for Dr. Anurudh Kumar at Govt. Sarvodaya Bal Vidyalaya. It details the project's objectives, which include automating attendance recording to improve accuracy and efficiency, and describes the System Development Life Cycle (SDLC) phases involved in its development. The system aims to replace traditional methods with a digital solution that enhances productivity and ensures secure data management.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 24
GOVT. SARVODAYA BAL
VIDYALAYA(ID:1617254)
PG VILLAGE , DELHI 110087
C.S. PROJECT
FILE:ATTENDANCE
MANAGEMENT SYSTEM
Prepared By:
Name: Gaurav
Class&sec:12 A
Roll no°:02
Board roll no°:
Prepared For:
DR. ANURUDH KUMAR
Lecturer computer scienceCERTIFICATE
Certified that the work contained in the
PROJECT TITLED ATTENDANCE MANAGEMENT
SYSTEM
by GAURAV has
successfully completed this project the project work
entitled Attendance Management System
in the subject of Computer
science
class 12 project lead down in the regulations
CBSE for the process of Project Report.
Dr. Anurudh Kumar
LECTURE COMPUTER SCIENCE‘ACKNOWLEDGEMENT
2.
INTRODUCTION
OBJECTIVE
4. PROPOSED SYSTEM. 4
5. ‘SYSTEM DEVELOPMENT LIFE CYCLE (SDLC) 5
6. PHASES OF SYSTEM DEVELOPMENT LIFE CYCLE 6
z FLOWCHART 8
SOURCE CODE
B
HARDWARE AND SOFTWARE REQUIREMENTS
BIBLIOGRAPHY
W7
20
2ACKNOWLEDGEMENT-
Apart from the efforts of me, the success of any project depends
largely on the
encouragement and guidelines of many others.
| take this opportunity to express my gratitude to the people who have
been instrumental in the successful completion of this
project.
| express deep sense of gratitude to almighty God for giving me
strength for the successful completion of the project.
l express my heartfelt gratitude to my parents for
constantencouragement while carrying
out this project.
| gratefully acknowledge the contribution of the individuals who
contributed in bringing this project up to this level, who continues to
look after me despite my flaws.
| express my deep sense of gratitude to DR. ANURUDH KUMAR who has
been
continuously motivating and extending their helping hand to us.
My sincere thanks to DR. ANURUDH KUMAR, Master in-charge. A guide,
Mentor all the above a
friend, who critically reviewed my project and helped in solving each
and every problem,
occurred during implementation of the project.
The guidance and support received from all the members who
contributed and who are
contributing to this project, was vital for the success of the project. | am
grateful for their constant support and helpINTRODUCTION
Attendance Management System is a crucial aspect of educational
institutions and organizations, ensuring proper tracking of presence
and productivity. Traditional methods like manual registers are time-
consuming, error-prone, and inefficient in handling large datasets. To
address these challenges, the Attendance Management System offers
a digital and automated solution designed for accuracy, efficiency,
and ease of use.
This system replaces manual attendance recording with advanced
technologies, allowing users to mark attendance via biometric
devices, RFID cards, or a web-based interface. It automates data
collection, minimizes errors, and provides real-time insights into
attendance patterns. Administrators can monitor attendance
records, generate reports, and ensure transparency and
accountability.
The key objectives of the system are to save time, reduce
administrative workload, and eliminate inaccuracies. It enhances
security by preventing fraudulent entries and ensures scalability to
accommodate a growing number of users. Additionally, the system's
automated reporting feature facilitates data-driven decisions for
policy implementation.
In summary, the Attendance Management System transforms
traditional attendance tracking into a modern, error-free, and
efficient process. By adopting this solution, institutions and
organizations can improve productivity, streamline operations, and
maintain accurate attendance records seam
lessly.OBJECTIVE OF PROJECT
The primary objective of this project, the Attendance Management
System, is to automate the process of recording and managing
attendance in an efficient, accurate, and user-friendly manner. The
system is designed to address the shortcomings of traditional
methods, such as manual attendance registers, which are time-
consuming, prone to errors, and difficult to maintain over time.
The project aims to simplify the attendance process by using a
computerized system that allows for real-time attendance marking
and secure data storage. By automating this process, the system
reduces administrative workload and ensures that attendance
records are consistently accurate.
Key objectives of this project include:
1. Streamlining Attendance Recording: Allow teachers or
administrators to quickly mark and update attendance records
digitally.
2. Improving Data Accuracy: Minimize errors associated with
manual entry.
3. Automated Report Generation: Provide detailed attendance
summaries and analytics, making it easy to monitor student or
employee attendance.
4, Ensuring Data Security: Store attendance data securely in a
database for quick retrieval and analysis.
5. User-Friendly Interface: Design an easy-to-use system that
requires minimal training for effective operation.—V
PROPOSED SYSTEM
The Attendance Management System aims to replace traditional
attendance tracking methods with a modern, automated, and efficient
digital solution. The proposed system is designed to simplify the
process of recording and managing attendance, ensuring accuracy,
security, and ease of use.
This system will allow teachers or administrators to record attendance
digitally through a user-friendly interface. All data will be securely
stored in a database, ensuring easy access, retrieval, and management
of attendance records. Additionally, the system will automate tasks like
report generation, reducing administrative workload. The system will
also include login authentication for secure access, preventing
unauthorized usage.
Core Functionalities of the System
1. Digital Attendance Recording: Enables users to mark attendance
quickly and efficiently using a computerized interface.
2. Automated Report Generation: Provides detailed attendance
summaries and analytics for monitoring and evaluation.
3. Secure Data Storage: Protects attendance data from unauthorized
access and ensures safe storage in a database.
4. Intuitive Interface: Offers a simple and user-friendly design for easy
operation by all stakeholders.SYSTEM DEVELOPMENT
LIFE CYCLE (SDLC)
System Development Life Cycle (SDLC) is a systematic
process used to design, develop, test, and deploy
software or information systems. It begins with the
planning phase, where the objectives, scope, and
feasibility of the project are defined. This is followed by
the analysis phase, during which detailed requirements
are gathered and evaluated to understand the system's
needs and workflows. Next is the design phase, where
the system's architecture, user interface, and database
structure are planned to serve as a blueprint for
development. The development phase involves writing
the code and building the system’s components based on
the design. After development, the testing phase is
conducted to identify and fix errors, ensuring the system
functions as intended. Once testing is complete, the
system moves to the deployment phase, where it is
installed and made operational for end-users. Finally, the
maintenance phase ensures the system remains
functional, secure, and updated with necessary
enhancements. SDLC ensures that the project is
completed efficiently and meets user requirements.PHASES OF SYSTEM
DEVELOPEMENT LIFE CYCLE
The System Development Life Cycle (SDLC) consists of structured
phases to ensure the successful development and deployment of
the Attendance Management System. Here are the phases:
1. Planning
The planning phase identifies the project's objectives and scope.
For the Attendance Management System, this phase addressed
the inefficiencies of manual attendance tracking. Key stakeholders,
including teachers and administrators, were consulted to outline
their requirements.
2. System Analysis
During this phase, system requirements were gathered, and data
flow diagrams were created to map the process. The
functionalities like student addition, attendance marking, and
report generation were analyzed in detail. Hardware and software
requirements were also identified.
3. System Design
The system's blueprint was created, including the user interface
(Ul) design and database schema. The UI was designed to ensure
simplicity, while the database was normalized to store student and
attendance data efficiently.