1 Goals
1
will range from the hardware to conceptual design, touching on operating
systems, transactional subcomponents, index selection, query reformulation,
normalization decisions, and the comparative advantage of redundant data.
This portion of the course will be heavily sprinkled with case studies from
database tuning in biotech, telecommunications, and finance.
Because of my recent research interests, this year will include frequent
discussions of “array databases,” the extension of relational systems to sup-
port ordered data such as time series in finance, network management etc.
You will even get to program in our system aquery:
https://github.com/josepablocam/aquery2q
2 Mechanics
The first text will be used for the first half of the course and the second text
in the second half. The notes will be used throughout the course.
There are also optional books which are very nicely written:
2
Vossen The Morgan Kaufmann Series in Data Management Systems,
Jim Gray, Series Editor May 2001, 944 pages $79.95, ISBN 1-55860-
508-8 If you want to be a world authority on these topics.
2.2 Prerequisites
3
Tuning principles.
Hardware, operating system, and transaction subsystem
Transaction Chopping
Index tuning
Tuning relational systems
Tuning data warehouses
Troubleshooting
Case Studies from Wall Street and Elsewhere
4 Project
Your project is due on December 2, 2022. It will be graded by the last class
at which point you will have nothing more to do. You have three possible
projects:
4
+ (index number mod 10) ). For example, x3 and x13 are both at site 4.
Even indexed variables are at all sites. Each variable xi is initialized to the
value 10i (10 times i). Each site has an independent lock table. If that site
fails, the lock table is erased.
Algorithms to use
Please implement the available copies approach to replication using strict
two phase locking (using read and write locks) at each site and validation at
commit time. A transaction may read a variable and later write that same
variable (though then its lock will have to be promoted) as well as others.
Please use the version of the algorithm specified in my notes rather than in
the textbook, just for consistency. Note that available copies allows writes
and commits to go to just the available sites, so if site A is down, its last
committed value of x may be different from site B which is up.
At each variable locks are acquired in a first-come first-serve fashion, e.g.
if requests arrive in the order R(T1,x), R(T2,x), W(T3,x,73), R(T4,x) then,
assuming no transaction aborts, first T1 and T2 will share read locks on x,
then T3 will obtain a write lock on x and then T4 a read lock on x. Note
that T4 doesn’t skip in front of T3, as that might result in starvation for
writes. Note also that the blocking (waits-for) graph will have edges from
T3 to T2 from T3 to T1 and from T4 to T3.
In the case of requests arriving in the order R(T1,x), R(T2,x), W(T1,x,73),
there will be a waits-for edge from T1 to T2 because T1 is attempting to
promote its lock from read to write, but cannot do so until T2 releases its
lock.
By contrast, in the case W(T1,x,15), R(T2,x), R(T1,x), there will be a
waits-for edge from T2 to T1 but the R(T1,x) will not need to wait for a
lock because T1 already has a write-lock which is sufficient for the read. The
same would hold in this case: W(T1,x,15), R(T2,x), R(T1,x), W(T1,x,41).
To prevent needless deadlocks, a write of a replicated variable should
not acquire a lock on any site s unless it can acquire a lock on all the sites
containing that variable.
Detect deadlocks using cycle detection and abort the youngest transac-
tion in the cycle. This implies that your system must keep track of the
transaction time of any transaction holding a lock. (We will ensure that no
two transactions will have the same age.) There is never a need to restart
an aborted transaction. That is the job of the application (and is often done
5
incorrectly). Deadlock detection need not happen at every tick. When it
does, it should happen at the beginning of the tick. When deadlock detection
happens, it should be complete (i.e. find all the deadlocks).
Read-only transactions should use multiversion read consistency. Here
are some implementation notes that may be helpful. In which situations can
a read-only transaction read RO an item xi?
1. If xi is not replicated and the site holding xi is up, then the read-only
transaction RO can read the value of xi as of the time that RO begins.
Because that is the only site that knows about xi.
Implementation: for every version of xi, on each site s, record when that
version was committed. Also, the TM will record the failure history of every
site.
Examples:
• Sites 2-10 are down at 12 noon Site 1 commits a transaction that writes
x2 at 1 PM Site 1 fails here At 2 pm a read-only transaction begins.
It can abort because no site has been up since a transaction commits
its update to x2 and the beginning of the read-only transaction.
6
Test Specification
When we test your software, input instructions come from a file or the
standard input, output goes to standard out. (That means your algorithms
may not look ahead in the input.) Each line will have at most a single
instruction from one transaction or a fail, recover, dump, end, etc. Some
of these operations may be blocked due to conflicting locks. We will ensure
that when a transaction is waiting, it will not receive another operation.
If an operation for T1 is waiting for a lock held by T2, then when T2
commits, the operation for T1 proceeds if there is no other lock request ahead
of it. Lock acquisition is first come first served but several transactions may
hold read locks on the same item. As illustrated above, if x is currently
read-locked by T1 and there is no waiting list and T2 requests a read lock
on x, then T2 can get it. However, if x is currently read-locked by T1 and
T3 is waiting for a write lock on x and T2 subsequently requests a read
lock on x, then T2 must wait for T3 either to be aborted or to complete its
possesion of x; that is, T2 cannot skip T3.
The execution file has the following format:
begin(T1) says that T1 begins
beginRO(T3) says that T3 begins and is read-only
R(T1, x4) says transaction 1 wishes to read x4 (provided it can get the
locks or provided it doesn’t need the locks (if T1 is a read-only transaction)).
It should read any up (i.e. alive) copy and return the current value (or the
value when T1 started for read-only transaction). It should print that value
in the format
x4: 5
on one line by itself.
W(T1, x6,v) says transaction 1 wishes to write all available copies of x6
(provided it can get the locks on available copies) with the value v. So, T1
can write to x6 only when T1 has locks on all sites that are up and that
contain x6. If a write from T1 can get some locks but not all, then it is an
implementation option whether T1 should release the locks it has or not.
However, for purposes of clarity we will say that T1 should release those
locks.
dump() prints out the committed values of all copies of all variables at
all sites, sorted per site with all values per site in ascending order by variable
name, e.g.
7
site 1 – x2: 6, x3: 2, ... x20: 3
...
site 10 – x2: 14, .... x8: 12, x9: 7, ... x20: 3
This includes sites that are down (which of course should not reflect writes
when they are down).
in one line.
one line per site.
end(T1) causes your system to report whether T1 can commit in the
format
T1 commits
or
T1 aborts
fail(6) says site 6 fails. (This is not issued by a transaction, but is just
an event that the tester will execute.)
recover(7) says site 7 recovers. (Again, a tester-caused event) We discuss
this further below.
A newline in the input means time advances by one. There will be one
instruction per line.
Other events to be printed out:
(i) when a transaction commits, the name of the transaction;
(ii) when a transaction aborts, the name of the transaction;
(iii) which sites are affected by a write (based on which sites are up);
(iv) every time a transaction waits because of a lock conflict
(v) every time a transaction waits because a site is down (e.g., waiting for
an unreplicated item on a failed site).
Example (partial script with six steps in which transactions T1 commits,
and one of T3 and T4 may commit)
begin(T1)
begin(T2)
begin(T3)
W(T1, x1,5)
W(T3, x2,32)
W(T2, x1,17) // will cause T2 to wait, but the write will go ahead after T1
commits
end(T1)
8
begin(T4)
W(T4, x4,35)
W(T3, x5,21)
W(T4,x2,21)
W(T3,x4,23) // T4 will abort because it’s younger
Design
Your program should consist of two parts: a single transaction manager
that translates read and write requests on variables to read and write re-
quests on copies using the available copy algorithm described in the notes.
The transaction manager never fails. (Having a single global transaction
manager that never fails is a simplification of reality, but it is not too hard
to get rid of that assumption by using a shared disk configuration. For this
project, the transaction manager is also fulfilling the role of a broker which
routes requests and knows the up/down status of each site.)
If the TM requests a read on a replicated data item x for read-write
transaction T and cannot get it due to failure, the TM should try another
site (all in the same step). If no relevant site is available, then T must wait.
This applies to read-only transactions as well which, for each replicated data
item x, must have access to the version of x that was the last to commit
before T began. (As mentioned above, if every site failed after a commit
to x but before T began, then the read-only transaction should abort.) T
may also have to wait for conflicting locks. Thus the TM may accumulate
an input command for T and will try it on the next tick (time moment).
As mentioned above, while T is blocked (whether waiting for a lock to be
released or a failure to be cleared), our test files will emit no new operations
for T.
If a site (also known as a data manager or DM) fails and recovers, the
DM would normally decide which in-flight transactions to commit (perhaps
by asking the TM about transactions that the DM holds pre-committed but
not yet committed), but this is unnecessary in this project, since, in the sim-
ulation model, commits are atomic with respect to failures (i.e., all writes of
a committing transaction apply or none do). Upon recovery of a site s, all
non-replicated variables are available for reads and writes. Regarding repli-
cated variables, the site makes them available for writing, but not reading.
In fact, a read for a replicated variable x will not be allowed at a recovered
site until a committed write to x takes place on that site (see lecture notes
on recovery when using the available copies algorithm).
9
During execution, your program should say which transactions commit
and which abort and why. For debugging purposes you should implement
(for your own sake) a command like querystate() which will give the state
of each DM and the TM as well as the data distribution and data values.
Finally, each read that occurs should show the value read.
If a transaction T accesses an item (really accesses it, not just request
a lock) at a site and the site then fails, then T should continue to execute
and then abort only at its commit time (unless T is aborted earlier due to
deadlock).
Output of your program:
Your program output will execute each test case starting with the initial
state of the database. Your output should contain: (i) the committed state
of the data items at each dump.
(ii) which value each read returns. (iii) which transactions commit and
which abort.
If our very able graders have system style problems with your project, they
may contact you to work with them to resolve them. You will not be per-
mitted to hand in a new version of the project, but you can ask the graders
to change a few things to get the project to run. If you do have such a
meeting, you will have 15-30 minutes to present. The test should take a
few minutes. The only times tests take longer are when the software is in-
sufficiently portable. The version you send in should run on departmental
servers or on your laptop. Reprozip will help.
The grader will ask you for a design document that explains the structure
of the code (see more below). The grader will also take a copy of your source
code for evaluation of its structure (and, alas, to check for plagiarism).
10
Answer: The value before Tj started. Before-image of xi.
11
portable Java or python or whatever is not the same. Documentation and
packaging using reprozip and doing so correctly constitutes roughly 20% of
the project grade.
Use everything you learn in class or from the tuning book and try to improve
a real system that is available to you. Use substantial relations, e.g. 100
million rows and up. Specify the database management system, operating
system, hardware platform including disks, memory size, and processor.
For each attempted improvement, specify what happened to the system
(whether it became faster or slower) and try to form a hypothesis as to why
that occurred.
You should be prepared to discuss your project with me or potentially
in front of the class.
If you want to write a paper though, it’s a one person job and we need
to discuss beforehand. Your model for a survey paper should be ACM
Computing Surveys. Also, you should create four non-trivial problems based
on the material you read and give the solutions.
12
5 Project Schedule — depends on project you choose
Last class in September: Letter of intent that you are going to do pro-
gramming project. Partner chosen if any. Please send this to me only if you
want to do something other than the replicated concurrency control project.
Otherwise, please send to [email protected]
Last class in October: design document. Please submit this document
through brightspace as for the final submission.
Project is due on December 2, 2022 at 4:30 pm. Please submit your
project to NYU Classes. Between December 2 and December 8, your project
will be graded. You will make an appointment that week with the graders.
We will figure out a randomized way to do this.
Last class in September: project outline (should fit on one page). Tuning
problem you intend to address. System you plan to use and experimental
question you plan to ask. This must be approved by me (Shasha) before
you go on.
Last Class in October: status report. How are you doing? Any show-
stoppers.
December 2, 2022: final report/demo to me.
13