The document provides detailed excavation and filling data for various grid locations, including average ground levels, excavation depths, and quantities of fill material required. Each entry lists specific grid coordinates, footing numbers, and corresponding measurements for soil types and excavation levels. Additionally, it includes dimensions and quantities for filling materials across different grid sections.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views18 pages

Level Sheet

The document provides detailed excavation and filling data for various grid locations, including average ground levels, excavation depths, and quantities of fill material required. Each entry lists specific grid coordinates, footing numbers, and corresponding measurements for soil types and excavation levels. Additionally, it includes dimensions and quantities for filling materials across different grid sections.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

LEVEL SHEET

S.NO GRID FOOTING AVG OGL EXCAVATION LEVEL DEPTH OF EXCAVATION


BC SOIL ORDINARY BC SOIL ORDINARY

1 V1,U1,T1,S1,R1,Q1,P1 F6
92.20117 91.35 89.46 0.851167 1.89

2 C,D1-C,D 3 F7
92.20117 91.35 89.46 0.851167 1.89

3 Y3,X3,W3,V3,K3 F3
91.7026 90.8 88.95 0.9026 1.85

4 T3,R3,P3 F4
92.51243 91.61 89.8 0.902429 1.81

O3,N3,M3,K3,G3,C29,B
5 F2
29
92.51243 91.69 89.88 0.822429 1.81

Y4-5,V4-5,U4-5,T4-5,S4-
6 5,R4-5,Q4-5,P4-5,O4- F7
5,N4-5,M4-5,K4-5,G4-5

92.37554 91.5 89.7 0.875538 1.8


7 X4,W4 F3 92.37554 91.5 89.7 0.875538 1.8
8 Z4,Z5 F6 91.66733 90.99 89.12 0.677333 1.87
9 B4,B6,C6 F2 92.9555 92.23 90.31 0.7255 1.92
10 B2,D5 F1 92.9555 92.23 90.31 0.7255 1.92
11 D-C4 F8 92.9555 92.23 90.31 0.7255 1.92
12 V5-H14 F9 92.37554 91.5 89.3 0.875538 2.2
13 S8,P8,M8 F5 92.66445 91.84 90.12 0.824455 1.72
14 D-C8 F8 92.66445 91.84 90.12 0.824455 1.72
15 G8,B8 F2 92.66445 91.8 90.08 0.864455 1.72
16 Z30,Z9 F6 92.66445 91.8 90.08 0.864455 1.72
Y30,X9,W9,R10,Q10,P1
17 F3
0,O10,N10 92.66445 91.78 90.06 0.884455 1.72
18 Y9,V9,C11,B11 F2 92.66445 91.78 90.06 0.884455 1.72
19 X11,W11,S11,U9,M11 F1 93.42071 92.54 90.82 0.880714 1.72
H-D11,H-D13,H-D14,H-
20 F10
D15 93.42071 92.52 90.78 0.900714 1.74
21 B13,C13,C14,C15 F2 93.42071 92.52 90.78 0.900714 1.74
22 G16,D16 F1 93.42071 92.52 90.78 0.900714 1.74
23 B14 F4 93.42071 92.52 90.78 0.900714 1.74
K25,K26,D19-28,G19-
24 F6
28,C28 95.8416 95 93.12 0.8416 1.88
25 C19-27 F1 95.8416 95 93.12 0.8416 1.88
26 G-D 25-26 F9 95.8416 95 93.12 0.8416 1.88
27 K-B 16-18 F11 95.8416 95 93.12 0.8416 1.88
HEIGHT OF FILLING

4.74000000000001

4.74000000000001

5.25

4.40000000000001

4.32000000000001

4.5
4.5
5.08
3.89
3.89
3.89
4.90000000000001
4.08
4.08
4.12
4.12

4.14
4.14
3.38000000000001
3.42
3.42
3.42
3.42

1.08
1.08
1.08
1.08
HEIGHT
DESCRE GRID FOOTIN LENGT QUANTI
S. NO. WIDTH FILLIN UNIT
PTION LINE G NO. H TY
G
F6
V1,U1,T
(2000*20
1 1,S1,R1, 7 CUM
00) 7
Q1,P1
NOS 3.5 3.5 4.74 406.455
F7(3200
C,D1-
2 *6100) 1 1 CUM
C,D 3
NOS 4.7 7.6 4.74 169.3128
F3(3200 Y3,X3,
3 *3200) 5 W3,V3, 5 CUM
NOS K3 4.7 4.7 5.25 579.8625
F4
(3500*35 T3,R3,P
4 3 CUM
00) 3 3
NOS 5 5 4.4 330
O3,N3,
F2(2900
M3,K3,
5 *2900) 7 7 CUM
G3,C29,
NOS
B29 4.4 4.4 4.32 585.4464
Y4-
5,V4-
5,U4-
5,T4-
5,S4-
F7(3200 5,R4-
6 *6100) 5,Q4- 13 CUM
13 NOS 5,P4-
5,O4-
5,N4-
5,M4-
5,K4-
5,G4-5 4.5 2089.62
4.7 7.6
F3(3200
7 *3200) 2 X4,W4 2 CUM
NOS 4.7 4.7 4.5 198.81
F6
(2000*20
8 Z4,Z5 2 CUM
00) 2
NOS 3.5 3.5 5.08 124.46
F2(2900
B4,B6,C
9 *2900) 3 3 CUM
6
NOS 4.4 4.4 3.89 225.9312
F1(2500
10 *2500) 2 B2,D5 2 CUM
NOS 4 4 3.89 124.48
F8(3000
11 *6100) D-C4 1 CUM
1NOS 4.5 7.6 3.89 133.038
F9(5200
12 *6300) V5-H14 1 CUM
1NOS 6.7 7.8 4.9 256.074
F5(3800
*3800) 3 S8,P8,M
13 3 CUM
NOS 8
5.3 5.3 4.08 343.8216
F8(3000
14 *6100) D-C8 1 CUM
1NOS 4.5 7.6 4.08 139.536
F2(2900
15 *2900) 2 G8,B8 2 CUM
NOS 4.4 4.4 4.12 159.5264
F6
(2000*20
16 Z30,Z9 2 CUM
00) 2
NOS 3.5 3.5 4.12 100.94
Y30,X9,
F3(3200 W9,R10,
17 *3200) Q10,P10 8 CUM
8NOS ,O10,N1
0 4.7 4.7 4.14 731.6208
F2(2900
Y9,V9,C
18 *2900) 4 4 CUM
11,B11
NOS 4.4 4.4 4.14 320.6016
F1(2500 X11,W1
19 *2500) 5 1,S11,U9 5 CUM
NOS ,M11 4 4 3.38 270.4
H-
F10(250 D11,H-
20 0*7300) D13,H- 4 CUM
4 NOS D14,H-
D15 4 8.8 3.42 481.536
F2(2900 B13,C13
21 *2900) 4 ,C14,C1 4 CUM
NOS 5 4.4 4.4 3.42 264.8448
F1(2500
22 *2500) 2 G16,D16 2 CUM
NOS 4 4 3.42 109.44
F4
(3500*35
23 B14 1 CUM
00) 1
NOS 5 5 3.42 85.5
F6 K25,K26
(2000*20 ,D19-
24 20 CUM
00) 20 28,G19-
NOS 28,C28 3.5 3.5 3.42 837.9
F1(2500
25 *2500) 9 C19-27 9 CUM
NOS 4 4 3.42 492.48
F9(5250
G-D 25-
26 *6300) 1 CUM
26
1NOS 6.75 7.8 3.42 180.063
F11 K-B 16-
27 1 CUM
(1NOS) 18 4.5 25.8 3.42 397.062

10138.76 CUM
SR NO DESCRIPTION NO L B H QTY UNIT
1 GRID V1 TO P1 (TB2) 1 25.8 0.5 0.1 1.29
2 GRID Y3 TO X3(TB1) 1 9 0.5 0.1 0.45
3 GRID X3 TO V3 (TB2) 1 8.6 0.5 0.1 0.43
4 GRID V3 TO P3 (PB1) 1 25.8 0.5 0.1 1.29
5 GRID P3 TO C3 (TB2) 1 32.05 0.5 0.1 1.6025
6 GRID C2 TO B2 (TB1) 1 6.7 0.5 0.1 0.335
7 GRID C29 TO B29(PB1) 1 6.7 0.5 0.1 0.335
8 GRID Z4 TOX4(TB1) 1 15.625 0.5 0.1 0.78125
9 GRID X4 TO D4 (PB2) 1 60.65 0.5 0.1 3.0325
10 GRID D4 TO B4 (PB1) 1 9.6 0.5 0.1 0.48
11 GRID Z5 TO Y5 (PB1) 1 6.625 0.5 0.1 0.33125
12 GRID Y5 TO X5 (TB1) 1 9 0.5 0.1 0.45
13 GRID X5 TO U5 (PB2) 1 12.9 0.5 0.1 0.645
14 GRID U5 TO S5 (TB2) 1 8.6 0.5 0.1 0.43
15 GRID S5 TO M5 (PB2) 1 25.8 0.5 0.1 1.29
16 GRID M5 TO H5 (TB2) 1 8.55 0.5 0.1 0.4275
17 GRID H5 TO D5 (PB2) 1 5.25 0.5 0.1 0.2625
18 GRID D6 TO B6 (PB1) 1 9.6 0.5 0.1 0.48
19 GRID Z30 TO Y30 (PB1) 1 6.625 0.5 0.1 0.33125
20 GRID Y30 TO W30(TB1) 1 13.2 0.5 0.1 0.66
21 GRID W30 TO U30 (PB1) 1 8.7 0.5 0.1 0.435
22 GRID S7 TO M7(PB1) 1 25.8 0.5 0.1 1.29
23 GRID H8 TO D8 (TB2) 1 5.25 0.5 0.1 0.2625
24 GRID D8 TO C8(PB2) 1 2.9 0.5 0.1 0.145
25 GRID C8 TO B8 (PB1) 1 6.7 0.5 0.1 0.335
26 GRID Z9 TO X9 (TB1) 1 15.625 0.5 0.1 0.78125
27 GRID W9 TO U9 (TB2) 1 8.7 0.5 0.1 0.435
28 GRID S10 TO M10 (TB2) 1 25.8 0.5 0.1 1.29
29 GRID H11 TO C11 (PB2) 1 8.15 0.5 0.1 0.4075
30 GRID C11 TO B11 (PB1) 1 6.7 0.5 0.1 0.335
31 GRID X12 TO W12 (TB2) 1 4.2 0.5 0.1 0.21
32 GRID H13 TO C13 (PB2) 1 8.15 0.5 0.1 0.4075
33 GRID C13 TO B13 (PB1) 1 6.7 0.5 0.1 0.335
34 GRID H14 TO C14 (PB2) 1 8.15 0.5 0.1 0.4075
35 GRID C14 TO B14 (TB1) 1 6.7 0.5 0.1 0.335
36 GRID H15 TO C15 (PB2) 1 8.15 0.5 0.1 0.4075
37 GRID C15 TO B15( TB2) 1 6.7 0.5 0.1 0.335
38 GRID H16 TO D16(TB2) 1 5.25 0.5 0.1 0.2625
39 GRID D17 TO B17 (TB2) 1 9.6 0.5 0.1 0.48
40 GRID I18 TO C18 (TB2) 1 9.35 0.5 0.1 0.4675
41 GRID Z4 TO Z9 (TB2) 1 9.6 0.5 0.1 0.48
42 GRID Y9 TO Y30(TB2) 1 3.45 0.5 0.1 0.1725
43 GRID Y30 TO Y3 (TB1) 1 12.85 0.5 0.1 0.6425
44 GRID X-Y9 TO X-Y4(TB2) 1 9.6 0.5 0.1 0.48
45 GRID X-Y4 TO X-Y3(TB1) 1 7.2 0.5 0.1 0.36
46 GRID X12 TO X4 (TB2) 1 13.15 0.5 0.1 0.6575
47 GRID X4 TO X3 (TB1) 1 7.2 0.5 0.1 0.36
48 GRID X-W30 TO X-W5(PB2) 1 3.25 0.5 0.1 0.1625
49 GRID W12 TOW5 (TB2) 1 10.25 0.5 0.1 0.5125
50 GRID W5 TO W3(PB1) 1 9.6 0.5 0.1 0.48
51 GRID W-V4 TO W-V3 (PB2) 1 3.45 0.5 0.1 0.1725
52 GRID V9 TO V5 (PB1) 1 6.7 0.5 0.1 0.335
53 GRID V5 TO V4(PB2) 1 2.9 0.5 0.1 0.145
54 GRID V4 TO V3 (PB1) 1 6.7 0.5 0.1 0.335
55 GRID V3TO V1 (TB2) 1 3.15 0.5 0.1 0.1575
56 GRID U9 TO U5 (TB1) 1 6.7 0.5 0.1 0.335
GRID U5 TO U4(PB2) 1 2.9 0.5 0.1 0.145
GRID U4 TO U3 (PB1) 1 6.7 0.5 0.1 0.335
GRID U3TO U1 (PB2) 1 3.15 0.5 0.1 0.1575
GRID T5 TO T4(PB2) 1 2.9 0.5 0.1 0.145
GRID T4 TO T3 (PB1) 1 6.7 0.5 0.1 0.335
GRID T3TO T1 (PB2) 1 3.15 0.5 0.1 0.1575
GRID S10 TO S5(TB2) 1 9.4 0.5 0.1 0.47
GRID S5 TO S4(PB2) 1 2.9 0.5 0.1 0.145
GRID S4 TO S3 (PB1) 1 6.7 0.5 0.1 0.335
GRID S3TO S1 (PB2) 1 3.15 0.5 0.1 0.1575
GRID R10 TO R5(PB1) 1 9.4 0.5 0.1 0.47
GRID R5 TO R4(PB2) 1 2.9 0.5 0.1 0.145
GRID R4 TO R3 (PB1) 1 6.7 0.5 0.1 0.335
GRID R3TO R1 (PB2) 1 3.15 0.5 0.1 0.1575
GRID Q10 TO Q5(PB1) 1 9.4 0.5 0.1 0.47
GRID Q5 TO Q4(PB2) 1 2.9 0.5 0.1 0.145
GRID Q4 TO Q3 (PB1) 1 6.7 0.5 0.1 0.335
GRID Q3TO Q1 (PB2) 1 3.15 0.5 0.1 0.1575
GRID P10 TO P5(PB1) 1 9.4 0.5 0.1 0.47
GRID P5 TO P4(PB2) 1 2.9 0.5 0.1 0.145
GRID P4 TO P3 (PB1) 1 6.7 0.5 0.1 0.335
GRID P3TO P1 (PB2) 1 3.15 0.5 0.1 0.1575
GRID O10 TO O5(TB2) 1 9.4 0.5 0.1 0.47
GRID O5 TO O4(PB2) 1 2.9 0.5 0.1 0.145
GRID O4 TO O3 (PB1) 1 6.7 0.5 0.1 0.335
GRID N10 TO N5(PB1) 1 9.4 0.5 0.1 0.47
GRID N5 TO N4(PB2) 1 2.9 0.5 0.1 0.145
GRID N4 TO N3 (PB1) 1 6.7 0.5 0.1 0.335
GRID M10 TO M5(TB2) 1 9.4 0.5 0.1 0.47
GRID M5 TO M4(PB2) 1 2.9 0.5 0.1 0.145
GRID M4 TO M3 (PB1) 1 6.7 0.5 0.1 0.335
GRID K&K'5 TO K&K'4(PB2) 2 2.9 0.5 0.1 0.29
GRID K&K'4 TO K&K'3 (PB1) 2 6.7 0.5 0.1 0.67
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SL NO DESCRIPTION GRID NO SIDE LENGTH HEIGHT QTY UNIT
1 PEDASTIAL SHUTTERING A-Z,1-30 92 4 0.8 0.8 235.52
2 COLUMN SHUTTERING A-Z,1-30 92 4 0.4 2.4 353.28
A-Z,1-30 37 4 0.4 2.4 142.08
A-Z,1-30 18 4 0.4 2.4 69.12
A-Z,1-30 14 4 0.4 2.4 53.76
A-Z,1-30 6 4 0.4 2.4 23.04
A-Z,1-30 5 2 0.5 2.4 12
A-Z,1-30 5 2 0.25 2.4 6
A-Z,1-30 2 4 0.5 2.4 9.6

904.4 smt
LEVEL SHEET
S.NO GRID FOOTING AVG OGL EXCAVATION LEVELDEPTH OF EXCAVATION
BC SOIL ORDINARYBC SOIL ORDINARY
V1,U1,T1,S1,R1,Q1,
1 F6
P1 92.20117 91.35 89.46 0.851167 1.89
2 C,D1-C,D 3 F7 92.20117 91.35 89.46 0.851167 1.89
3 Y3,X3,W3,V3,K3 F3 91.7026 90.8 88.95 0.9026 1.85
4 T3,R3,P3 F4 92.51243 91.61 89.8 0.902429 1.81
O3,N3,M3,K3,G3,C2
5 F2
9,B29 92.51243 91.69 89.88 0.822429 1.81
Y4-5,V4-5,U4-5,T4-
5,S4-5,R4-5,Q4-5,P4-
6 F7
5,O4-5,N4-5,M4-
5,K4-5,G4-5 92.37554 91.5 89.7 0.875538 1.8
7 X4,W4 F3 92.37554 91.5 89.7 0.875538 1.8
8 Z4,Z5 F6 91.66733 90.99 89.12 0.677333 1.87
9 B4,B6,C6 F2 92.9555 92.23 90.31 0.7255 1.92
10 B2,D5 F1 92.9555 92.23 90.31 0.7255 1.92
11 D-C4 F8 92.9555 92.23 90.31 0.7255 1.92
12 V5-H14 F9 92.37554 91.5 89.3 0.875538 2.2
13 S8,P8,M8 F5 92.66445 91.84 90.12 0.824455 1.72
14 D-C8 F8 92.66445 91.84 90.12 0.824455 1.72
15 G8,B8 F2 92.66445 91.8 90.08 0.864455 1.72
16 Z30,Z9 F6 92.66445 91.8 90.08 0.864455 1.72
Y30,X9,W9,R10,Q10
17 F3
,P10,O10,N10 92.66445 91.78 90.06 0.884455 1.72
18 Y9,V9,C11,B11 F2 92.66445 91.78 90.06 0.884455 1.72
X11,W11,S11,U9,M1
19 F1
1 93.42071 92.54 90.82 0.880714 1.72
H-D11,H-D13,H-
20 F10
D14,H-D15 93.42071 92.52 90.78 0.900714 1.74
21 B13,C13,C14,C15 F2 93.42071 92.52 90.78 0.900714 1.74
22 G16,D16 F1 93.42071 92.52 90.78 0.900714 1.74
23 B14 F4 93.42071 92.52 90.78 0.900714 1.74
K25,K26,D19-
24 F6
28,G19-28,C28 95.8416 95 93.12 0.8416 1.88
25 C19-27 F1 95.8416 95 93.12 0.8416 1.88
26 G-D 25-26 F9 95.8416 95 93.12 0.8416 1.88
27 K-B 16-18 F11 95.8416 95 93.12 0.8416 1.88

SL NO DESCRIPTION GRID FOOTING NO LENGTH WIDTH HEIGHT


V1,U1,T
F6 (2000*2000) 7
1 1,S1,R1, F6
NOS
Q1,P1 7 0.4 0.4 3.04
F7(3200*6100) 1 C,D1-
2 F7
NOS C,D 3 2 0.4 0.4 3.04
Y3,X3,
F3(3200*3200) 5
3 W3,V3, F3
NOS
K3 5 0.4 0.4 3.55
F4 (3500*3500) 3 T3,R3,P
4 F4
NOS 3 3 0.4 0.4 2.7
O3,N3,
F2(2900*2900) 7 M3,K3,
5 F2
NOS G3,C29,
B29 7 0.4 0.4 2.62
Y4-
5,V4-
5,U4-
5,T4-
5,S4-
5,R4-
F7(3200*6100) 13
6 5,Q4- F7
NOS
5,P4-
5,O4-
5,N4-
5,M4-
5,K4-
5,G4-5 28 0.4 0.4 2.8
F3(3200*3200) 2
7 X4,W4 F3
NOS 2 0.4 0.4 2.8
F6 (2000*2000) 2
8 Z4,Z5 F6
NOS 2 0.4 0.4 3.38
F2(2900*2900) 3 B4,B6,C
9 F2
NOS 6 3 0.4 0.4 2.19
F1(2500*2500) 2
10 B2,D5 F1
NOS 2 0.4 0.4 2.19
F8(3000*6100)
11 D-C4 F8
1NOS 2 0.4 0.4 2.19
F9(5200*6300)
12 V5-H14 F9
1NOS 4 0.4 0.4 3.2
F5(3800*3800) 3 S8,P8,M
13 F5
NOS 8 3 0.4 0.4 2.38
F8(3000*6100)
14 D-C8 F8
1NOS 2 0.4 0.4 2.38
F2(2900*2900) 2
15 G8,B8 F2
NOS 2 0.4 0.4 2.42
F6 (2000*2000) 2
16 Z30,Z9 F6
NOS 2 0.4 0.4 2.42
Y30,X9,
W9,R10,
F3(3200*3200)
17 Q10,P10 F3
8NOS
,O10,N1
0 8 0.4 0.4 2.44
F2(2900*2900) 4 Y9,V9,C
18 F2
NOS 11,B11 4 0.4 0.4 2.44
X11,W1
F1(2500*2500) 5
19 1,S11,U9 F1
NOS
,M11 5 0.4 0.4 1.68
H-
D11,H-
F10(2500*7300) 4
20 D13,H- F10
NOS
D14,H-
D15 12 0.4 0.4 1.72
B13,C13
F2(2900*2900) 4
21 ,C14,C1 F2
NOS
5 4 0.4 0.4 1.72
F1(2500*2500) 2
22 G16,D16 F1
NOS 2 0.4 0.4 1.72
F4 (3500*3500) 1
23 B14 F4
NOS 1 0.4 0.4 1.72
K25,K26
F6 (2000*2000) 20 ,D19-
24 F6
NOS 28,G19-
28,C28 20 0.4 0.4 1.72
F1(2500*2500) 9
25 C19-27 F1
NOS 9 0.4 0.4 1.72
F9(5250*6300) G-D 25-
26 F9
1NOS 26 4 0.4 0.4 1.72
K-B 16-
27 F11 (1NOS) F11
18 6 0.4 0.4 1.72
HEIGHT OF FILLING HEIGHT OF COLOUMN

4.74000000000001 3.04000000000001
4.74000000000001 3.04000000000001
5.25 3.55
4.40000000000001 2.70000000000001

4.32000000000001 2.62000000000001

4.5 2.8
4.5 2.8
5.08 3.38
3.89 2.19
3.89 2.19
3.89 2.19
4.90000000000001 3.20000000000001
4.08 2.38
4.08 2.38
4.12 2.42000000000001
4.12 2.42000000000001

4.14 2.44
4.14 2.44

3.38000000000001 1.68000000000001

3.42 1.72
3.42 1.72
3.42 1.72
3.42 1.72

3.42 1.72
3.42 1.72
3.42 1.72
3.42 1.72

QTY UNIT
CMT
3.4048
CMT
0.9728

CMT
2.84
CMT
1.296

CMT

2.9344

CMT

12.544
CMT
0.896
CMT
1.0816
CMT
1.0512
CMT
0.7008
CMT
0.7008
CMT
2.048
CMT
1.1424
CMT
0.7616
CMT
0.7744
CMT
0.7744

CMT

3.1232
CMT
1.5616

CMT
1.344

CMT

3.3024

CMT
1.1008
CMT
0.5504
CMT
0.2752

CMT

5.504
CMT
2.4768
CMT
1.1008
CMT
1.6512